You are on page 1of 1

Report No.

WOOD-CPDP24-PI-FA01-005-003
:

Date: 07 February 2024


DAILY PAINTING INSPECTION REPORT :

Page: 01

Project Name : OFFSHORE FACILITIES REJUVINATION PROJECT WOOD Document No: 1000-373-0000-PLN-044 Rev 1

Client : BSP Contract No: 14021029


CLIMATIC CONDITION TO WORK AREA CONDITION OF STEEL PRIOR TO BLASTING SURFACE PREPARATION

Time ( to write reading at the beginning of work and every 3 hours ) SURFACE PROFILE (PRESS "O" FILM ) Required Actual

06 Feb 2024 06 Feb 2024 07 Feb 2024


ISO St 3 ISO St 3
Time 10:43:40 hrs 15:47:48 hrs 08:19:51 hrs
1st Coat 2nd Coat Final Coat
SURFACE PROFILE
Dry Bulb 28 32.1 29.4 N/A Required Actual
Wet Bulb 25.2 26.7 25.7 N/A
Rel.Humidity 79.8 65.5 75 SALT CONTAMINATION TEST
Steel temp 27.2 31.3 29 Required Actual
Dew Point 24.2 24.8 24.43 Type of Abrasive : Power tool/Sanding/Sand Paper Batch NO : N/A N/A

Weather Clear Clear Clear Grade of Steel : Carbon Steel Size : Fine Grit 180 Dust Level: ISO 8502-3 Rating 1
PAINTING
Batch No WFT DFT ( Micron)
No. Of Coat Brand Name Type Paint Color Thinning Application Method
Part A Part B ( Micron) Min Max Avg
1st Coat Jotun Barrier 2796718-1 2774815-1 Grey No.17 Brush / Roller 137 81 92 86.5
2nd Coat Jotun Jotacote Universal 3090171-1 2904385-1 Buff No.17 Brush / Roller 177 226 263 244.5
Final Coat Jotun Hardtop CA 3090166-1 3090167-1 White No.17 Brush / Roller 127 307 322 314.5
ITEM of PAINTED MATERIAL

ITEM No. Work Pack No. Drawing No. Item Line No/Equiment No

1 1029-180-FA01-WPK-005_C1 CP.24.D.39.020/002NM REV-0 Painting on Field Weld and Touch-up paint on areas affected by installation of Riser 50-WI-X52-93-93-2008 (PID 2008)

1. Touch-up painting of affected areas has been done after cleaning & abrade by Sanding/Sand Paper (Fine Grit-180)
2. Painter's ID: AFW-BP046
REMARKS:

Prepared By: Reviewed By:

Name: Name:

Date: Date:

You might also like