Lab, Report No: oamp-oon.a02s
Tesued Date
‘TEST REPORT ON CONCRETE CYLINDER SAMPLE
Name ofthe Laboratory + Departmen of Public Works nd Highvays-Regional Office XI
‘dares ofthe Laboratory DPWH Region XI, Go. Chaver Stet, R. Magsaysay Ave, Davao City
Proce Name/ibrConract No, 23200034 Bana Bdge Project
Iinplomentng Office Mc-UPMO DPWHL
Kind of Matra’ + Conerete Cylinder Sample
‘Semple Idenjtenion + Sample 1 (12 bas) TH2
Type/Grade/Class 2 NIA
Guanty Represented =: ‘T5cum
Original Source £ Safeon Industries, In. Pant
Sampled avAdirss Secon Indust, Ine, Mars, Devan Cy
Manufactured by :NA
Brant 2 NA
SuppterContracor Safecon Industries, Ine China Road and Bridge Comp
Proposed Use Tem a00(1?}Concret Pls in Dred Holes (Sm ia)
Governing Spec's { DPWH Standard Speitcatonon Kem 400 (34.47 Mpa/SO00psi @ 28 days)
Sampled by + John Cristian T. Gaden, EV BMC-UPMO DPWH, Davao Ciy 09053611761 Janay 18,2028
Litingin, Projet Engineer Chin Ron and Bridge Cop. BF
Cndomium Bde. Soao Ave, Cat
Salon St nvm Mania
1: (PWN Material n-Chere) (Office AtressContt Ne) (one Samples
Submived by 5 Jon Cristian, Caden, ELV BMC-UPMO DPWH, Davee Ciy
Republic ofthe Philippines
Department of Public Works and Highways
QUALITY ASSURANCE AND HYDROLOGY DIVISION
Regional fice XI, Davao City
Li Jingtao, Project Engineer
(China Road and Bridge Cop, BF
January 25, 2024
CCondominum Bldg, A Soriano Ave, Cor
Solana St, Inramuros, Manila
(DPWI Material n-Charge) (Office AddressContact No) (Date Recaved
Nov? ONMDOOET-7024 (Paid under OR HOSSISIS)
TEST (a Temp, °c/%sRH| pate TesTED | METHOD USED | REQUIREMENTS | RESULTS
‘Compressive Strength Test @ 28 days NA January 25,2028 | DPWH-QMST-62 | 34.47 MPa 4L18
(AASHTO T22) 3529
4167
REMARKS:
1. The ea relate only othe Hem etd a eed
2. Th Te Reports shall ot be ripradus exp fal, iho
Tea Report
vriten approval ofthe aboratory and mat Be erifie By he abraory a tree copy of thoi
“Test Report or OPWH Project
n
Festa ys yeu
exdun faffeapparo Cas py Rowena
abora(fey ‘fei fant jer I Chief, Quay Assdbnce and Hyekology i
LEvataaed TESTED: ~ T
YON T-ALAS OSPNTO B. CABALLERO
Engineer I ‘Assis Regional Director
Dewi qust-76 R00Republic ofthe Philippines
Department of Public Works and Highways
QUALITY ASSURANCE AND HYDROLOGY DIVISION,
Regional Office XI, Davao City
Lab, Report No.: QAnD.0022-2024
Tanuary 25, 2024
Tssued Date
TEST REPORT ON CONCRETE CYLINDER SAMPLE
Name ofthe Laboratory Department of Public Works and Highways-Regional Office X1
‘Address ofthe Laboratory: DPWH Region XI, Gov. Chavez Sireet, R, Magsaysay Ave., Davao City
Project Name/tD/Contract No. : 23200034 Bucana Bridge Project
Implementing Ofice + BMC-UPMO DPWH
Kind of Materials Concrete Cylinder Sample
‘Sample Idenificaion + Sample 2 (13 bags) TMI
Type/Grade/Class 2 NIA
Quanity Represented 2 7Scum.
Original Source Safecon Industries, Ine. Plant
sampled au/Address + Safecon Industries, Ine, Ma-a, Davao City
Manufactured by 2 NIA
Brand NA
Supplier/Conractor + Safecon Industries, Ine /China Road and Bridge Corp.
Proposed Use + Item 400 (17)Coneret Piles in Dried Holes (1.5m dia)
Governing Spec's + DPWH Standard Specification on Item 400 (34.47 Mpa/S0OOpsi @ 28 days)
Sampled by John Christian T. Gaden, EI BMC-UPMO DPW, Daveo City (09053611761 January 18,2024
Li ingtao, Project Engineer Chine Road and Bridge Corp, BF
Condominum Bd. A Soriano Ave, Cor
Solna St, Inamutos, Mania
(DPWH Material In-Charge) (OteeAdiretContct Na) (Date Sampled)
Submited by + John Christian T. Gaden, EV BMC-UPMO DPWH, Daves City
[Ldingtao, Project Engincer China Road and Bridge Cop, BF
soot Confomiun Big, A Soria Ave, Cox Sanuary 25,2004
Solana St, Inramuros, Mania
(DPW Moterite-In-Charge) (Office AddressContact No) Date Receved,
“Tab No.7 QAND-W023-2074 (Paid under OR #0651514)
TEST (@ Temp.,°c/RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS
‘Compressive Strength Test @ 28 days Nia January 25,2024 | DPWH-QMST-62 | 3447MPa 47.08
(AASHTO T22) 48.10
46.98
REMARKS:
1. The rest relate ony othe tem tested as ced
2 Mere Reports shal no Be nprduced cept null ito writen pra ofthe laboratory and mast he cen by he laboratory a re cap ofthe orignal
Test Report
Tested by: [Checked by:
pawn POYCARIXFO
Laborafiey Téphnicifn
[Evaluated by: TTESTED =
RAMON L. ALAS 10 B. CABALLERO
Enbineee I ‘AssiNant Regional Director
DDPWH-QMSF-76 RevOO
‘Test Report for DPWH ProjectRepublic ofthe Philippines
Department of Public Works and Highways
QUALITY ASSURANCE AND HYDROLOGY DIVISION
Regional Office X1, Davao City
Lab. Report No.: QAHD-0023-2024
January 25,2024
Tssued Date
TEST REPORT ON CONCRETE CYLINDER SAMPLE
Name ofthe Laboratory + Department of Public Works and Highways-Regional Office XI
‘Address of he Laboratory + DPWH Region XI, Gov. Chavez Steet, R. Magsaysay Ave, Davao City
Project Name/ID/Contract No. : 23200034 Bucana Bridge Project
Implementing Office BMC-UPMO DPWH
Kind of Materials + Conerete Cylinder Sample
Sample Identification + Sample 3 (12 bags) TM
Type/Grade/Class NIA
Quantity Represented Scum,
Original Source + Safecon Industries, In. Plant
Sampled av/Address Safeoon Industries, Ine, Masa, Davao City
‘Manufactured by NIA
Brand NIA
‘Supplier/Contractor Safecon Industries, Inc/China Road and Bridge Corp.
Proposed Use tem 400 (17)Coneret Piles in Drilled Holes (1.5m di.)
Governing Spec's DPWH Standard Specification on Item 400 (34.47 Mpa/S000psi @ 28 days)
Sampled by + John Christian T, Gaden, EV. BMC-UPMO DPWH, Davo City (9053611761 January 18,2028
Lidingta, Project Engineer China Road and ridge Corp, BF
CCondominur Bldg, A. Serio Ave. Cor
Solana St names, Manila
£ (DPWH Materile-In-Charge) (Office AdiressContct No) (ate Sample
Submited by + John Christian T. Gaden, IV BMC-UPMO DPWH, Davao City
LiJingtao, Project Engineer Chin Road and Bridge Cop, BF
CCondominum Bldg, A. Soriano Ave, Cor Sewary 25, 2004
Solana St, namures, Manila
(DPIWH Satria tn-Oh Adres No (ate Receive
Tab No.7 OATID-0023-2024 (Paid under OR # 06515!
rest [@ Temp.,°C/%6RH| DATE TesTED | METHOD USED | REQUIREMENTS | RESULTS
Compressive Strength Test @ 28 days NA. January 25,2024 | DPWH-QMST-62 | 3447MPa 3483
(AASHTO 122) 3637
3735
REMARKS:
1 The rvs relate bt the tem’ ested os revived
1b Phuc Tea Report lint Be reproduc hep fl witowwriten approval ofthe labora and must Be cei bythe laboratory a aru copy of horn
erected
nowhy
Cie, cut Ase nd Hy ogy Dn
[Evaluated by: TESTED = v
de sso 5, cABALLERO
Entec sith Regional Dito
DPWH-QHSF-76 Revo
“Test Report for DPWH ProjectRepublic ofthe Philippines
Department of Public Works and Highways
QUALITY ASSURANCE AND HYDROLOGY DIVISION,
Regional Office XI, Davao City
Lab. Report No.: QAHD-0024-2024
Yanuary 25, 2024
Trsued Date
REPORT ON CONCRETE CYLINDER SAMPLI
Name ofthe Laboratory Department of Public Works and Highvays-Regional Office XI
‘Address ofthe Laboratory DPWH Region XI, Gov. Chaver Street, R. Magsaysay Ave., Davao Ci
‘Project Name/ID/Contract No. : 23200034 Bucana Bridge Project
Implementing Office BMC-UPMO DPWIT
Kind of Material’s + Conerete Cylinder Sample
Sample identification + Sample 4 (13 bags) TM3
Type/Grade/Class NIA
Quantity Represented + 7Seum
Original Source Sefecon Industries, ne. Plant
Sampled aUAddress Safecon Industries, Ine, Ma-a, Davao City
‘Manufactured by NA
Brand NA
‘Supplicr/Contractor Sefecon Industries, Inc/China Road and Bridge Corp.
Proposed Use Item 400 (17)Conerte Piles in Drilled Holes (1.Sm dia.)
Governing Spec's DPWH Standard Specification on lem 400 (34.47 MpaS000psi @ 28 days)
Sampled by John Christian T. Gaden, IV BMC-UPMO DPWH, Davao City (09053611761 January 18,2024
iSingiao, Project Engineer China Roed and Bridge Corp, BF
CCondominam Bldg, A Soriano Ave, Cor.
Solana St, names, Manila
(DPWH Materia-n-Charg) (office AdaressComact Na) (Date Sampled)
Submitted by John Christian T. Gaden, E-IV BMC-UPMO DPWH, Davao City
LiJingtao, Project Engincer China Road and Bridge Corp, BF
neers Canfominan Bp, A Soto Ave Ca anuary 25,2024
Solana St, Inramuros, Manila
$f (DPWH Matriat-tn-Charge) (Office AdavessCantct Na) Date Received)
Tat Now? QNHD-0074-2024 (Paid under OR # 0651514)
TEST @ Temp.,°C/%RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS
‘Compressive Strength Test @ 28 days NA January 25,2024 | DPWH-QMST-62 | 3447 MPa 4343
(AASHTO 722) 4361
4345
"REMARKS:
1. The retreat only othe em ested as recive.
2. Th Tet Rapors shal a be rproced ee ul, iho writen apron ofthe abraary and mat be eid by the ara atau copy ofthe onal
Tat Reo
Tested by [Checked by: :
exbay VP ARpAFO H Row
Laborato nce Chit, Quality Assure and Hy oh Division
(Bete ; FTESTED =
as sos fro B. CABALLERO
Exkiner sitht Regional Director
Dew. QS Reed
Test Repo for DPWH ProjectRepublic ofthe Philippines
Department of Public Works and Highwa
QUALITY ASSURANCE AND HYDROLOGY DIVISION
Regional Office XI, Davao City
Lab, Report No: onrtp.002s.2024
Tamar 25,2004
Tiswed Date
TEST REPORT ON CONCRETE CYLINDER SAMPLE
[Name ofthe Laboratory + Deparment of Public Works and Highways Regional Office XI
‘Adare ofthe Laboratory: DPWH Region XI, Gov, Chaver Set, R Magsaysay Ave, Davao City
Project Name/b/Contrat No. + 23200034 Bucana Bridge Project
Implementing Office BMC-UPMO DPWH
Kind of Materials Conree Cylinder Sample
Sample Hdentcaton Sample 5 (12 bags) TMS
Type GraderCase 2 NA
Quanity Represented Scum
Original Source ¢ Secon Industries, ne, Plant
Sompled a Address + Safeco Infuse, Ine, Maa, Davo Cy
Manufactured by NA
Brand :NA
‘Sunlir/Contracor + Safcon Industries, In/Chins Road and Bridge Comp.
Proposed Use + tem 40S Structural Conerete (Pile Cap)
Governing Spec's + DPWH Standard Speitcation on lm 405 (4.82 Mpa/60psi @ 28 ays)
Sampled by John Christan T. Gaden, FIV BMC-UPMO DPWH, Davao Ciy 09053611761 January 18,2024
Livigtan, Projet Engineer Chow Road and Bridge Crp, BF
Condominum Big. Soran Ave Cor
Salon St nraman Mala
2 (DPN Mater Chore) (optee ArestConct 0) (Oat Sonpteo
Submited by + Jon Cristian. Gaden, EV. BMC-UPMO DPN, Davo iy
Lidingtao, Project Engineer China Road and Bridge Cop, BF
Condominam Bide, A. Soriano Ave, Cor
Solana St, Invamuros, Mania
January 25, 2024
(DPWH Material In-Charg) (Offie AdtressContact No) (Date Recelved
‘Dari -WO7S 707 Paid under OR FOGSISIA)
Test (@ Temp.,°c/%RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS
Compressive Stength Test @ 28 days Nia. January 25,2024 | DPWH-QMST-62 | 44.82 MPa 38.95
(AASHTO 722) 38.10
3805
REMARKS:
4 Terns relat onto the tem’ as recived
2. Thue npn she na be produ excep nll how writen approval fh laboratory and maz be ceed bythe araory aie copy the onal
Tet Report
f Aa
rested by: [Checked
aN ROWKNA EDNTTO
Engineer I Chief, Quality Assulbnce and Hy’ on
|Evaluated by: (TESTED * V
" ALAS B. CABALLERO
Enginoer I Assist Regional Director
DPWH-QMSE.76 Revoo
“Test Repo for DPWH Project,Republic ofthe Philippines
Department of Public Works and Highways
QUALITY ASSURANCE AND HYDROLOGY DIVISION,
Regional Office XI, Davao City
Lab, Report No. : ‘QAHD-0026-2024
Saray 35,2034
‘Tssued Date
‘TE CYLINDER SAMPLI
TEST REPORT ON CONC
Name ofthe Laboratory Department of Public Works and Highways-Regional Office XI
‘Address ofthe Laboratory: DPWH Region XI, Gov. Chavez Street, R. Magsaysay Ave, Davao City
Project Name/1D/Contract No. + 23200034 Bucana Bridge Project
Implementing Office BMC-UPMO DPWH
Kind of Materia’ + Conerete Cylinder Sample
Sample Identification + Sample 6 (13 bags) TM
Type/Grade/Class Nia.
Quanity Represented 2 7Scum,
Original Source + Safecon Industries, In. Plant
Sampled avAdaress 1 Safeoon Industries, Ine, Ma-a, Davao City
‘Manufactured by 2 NIA
Brand 2 NIA
‘Supplier/Contractor Safecon Industries, Inc/China Road and Bridge Corp.
Proposed Use Mem 40S Structural Concrete (Pile Cap)
Governing Spec's DPWH Standard Specification on Item 405 (44.82 Mpa/6S00psi @ 28 days)
Sampled by John Christian T. Gaden, E-IV BMC-UPMO DPWH, Davzo City (09083611761 January 18, 2024
[LiJingtao, Projet Engineer Chisa Road and Bridge Corp, BF
Condominum Bi, A Soriano Ave, Cor
Solana St, Inramuros, Manila
£ (@DPWH Materlate-In-Charge) (Office AdéressComtct No) (ate Sampled
‘Submited by + John Christian T. Gaden, IV BMC-UPMO DPWH, Daveo City
Litingtao, Project Engineer China Road and Bridge Comp, BF. laa
CCondominum Bldg, A. Soriano Ave, Cot
Solana St nramoros, Maila
(DPW Materials n-Charge) (ofice dres'Contact No) (ate Received)
Tab No.7 QATID-0076-3024 (Paid under OR # 0651514)
Test (@ Temp, °c/%RH | DATE TESTED | METHOD USED | REQUIREMENTS | RESULTS
Compressive Strength Test @ 28 days NIA January 25,2024 | DPWH-QMST-62 | 44.82 MPa 29.2
(AASHTO 122) 234
43.02
REMARKS:
1 ‘heres relat onto the em’ etd a eee.
2. Ph Tet Reports shal not be reproduced excep al. hoe
Tes Report
wren approval ofthe aor and mast be cried by the abaratony as ar copy ofthe origina
1
4
[Checked by: Li
‘AN’ 7 ROWANA'TS
sincer I Chief, Quality Assulunce and Jierogy Division
t
seffo B, CABALLERO
Assistale Regional Director
TTESTED =
fs ‘ALAS:
Enkineer I
[DPWIH-QUSF-76 RevOO
“Test Repor for DPW Projet