You are on page 1of 6
Lab, Report No: oamp-oon.a02s Tesued Date ‘TEST REPORT ON CONCRETE CYLINDER SAMPLE Name ofthe Laboratory + Departmen of Public Works nd Highvays-Regional Office XI ‘dares ofthe Laboratory DPWH Region XI, Go. Chaver Stet, R. Magsaysay Ave, Davao City Proce Name/ibrConract No, 23200034 Bana Bdge Project Iinplomentng Office Mc-UPMO DPWHL Kind of Matra’ + Conerete Cylinder Sample ‘Semple Idenjtenion + Sample 1 (12 bas) TH2 Type/Grade/Class 2 NIA Guanty Represented =: ‘T5cum Original Source £ Safeon Industries, In. Pant Sampled avAdirss Secon Indust, Ine, Mars, Devan Cy Manufactured by :NA Brant 2 NA SuppterContracor Safecon Industries, Ine China Road and Bridge Comp Proposed Use Tem a00(1?}Concret Pls in Dred Holes (Sm ia) Governing Spec's { DPWH Standard Speitcatonon Kem 400 (34.47 Mpa/SO00psi @ 28 days) Sampled by + John Cristian T. Gaden, EV BMC-UPMO DPWH, Davao Ciy 09053611761 Janay 18,2028 Litingin, Projet Engineer Chin Ron and Bridge Cop. BF Cndomium Bde. Soao Ave, Cat Salon St nvm Mania 1: (PWN Material n-Chere) (Office AtressContt Ne) (one Samples Submived by 5 Jon Cristian, Caden, ELV BMC-UPMO DPWH, Davee Ciy Republic ofthe Philippines Department of Public Works and Highways QUALITY ASSURANCE AND HYDROLOGY DIVISION Regional fice XI, Davao City Li Jingtao, Project Engineer (China Road and Bridge Cop, BF January 25, 2024 CCondominum Bldg, A Soriano Ave, Cor Solana St, Inramuros, Manila (DPWI Material n-Charge) (Office AddressContact No) (Date Recaved Nov? ONMDOOET-7024 (Paid under OR HOSSISIS) TEST (a Temp, °c/%sRH| pate TesTED | METHOD USED | REQUIREMENTS | RESULTS ‘Compressive Strength Test @ 28 days NA January 25,2028 | DPWH-QMST-62 | 34.47 MPa 4L18 (AASHTO T22) 3529 4167 REMARKS: 1. The ea relate only othe Hem etd a eed 2. Th Te Reports shall ot be ripradus exp fal, iho Tea Report vriten approval ofthe aboratory and mat Be erifie By he abraory a tree copy of thoi “Test Report or OPWH Project n Festa ys yeu exdun faffeapparo Cas py Rowena abora(fey ‘fei fant jer I Chief, Quay Assdbnce and Hyekology i LEvataaed TESTED: ~ T YON T-ALAS OSPNTO B. CABALLERO Engineer I ‘Assis Regional Director Dewi qust-76 R00 Republic ofthe Philippines Department of Public Works and Highways QUALITY ASSURANCE AND HYDROLOGY DIVISION, Regional Office XI, Davao City Lab, Report No.: QAnD.0022-2024 Tanuary 25, 2024 Tssued Date TEST REPORT ON CONCRETE CYLINDER SAMPLE Name ofthe Laboratory Department of Public Works and Highways-Regional Office X1 ‘Address ofthe Laboratory: DPWH Region XI, Gov. Chavez Sireet, R, Magsaysay Ave., Davao City Project Name/tD/Contract No. : 23200034 Bucana Bridge Project Implementing Ofice + BMC-UPMO DPWH Kind of Materials Concrete Cylinder Sample ‘Sample Idenificaion + Sample 2 (13 bags) TMI Type/Grade/Class 2 NIA Quanity Represented 2 7Scum. Original Source Safecon Industries, Ine. Plant sampled au/Address + Safecon Industries, Ine, Ma-a, Davao City Manufactured by 2 NIA Brand NA Supplier/Conractor + Safecon Industries, Ine /China Road and Bridge Corp. Proposed Use + Item 400 (17)Coneret Piles in Dried Holes (1.5m dia) Governing Spec's + DPWH Standard Specification on Item 400 (34.47 Mpa/S0OOpsi @ 28 days) Sampled by John Christian T. Gaden, EI BMC-UPMO DPW, Daveo City (09053611761 January 18,2024 Li ingtao, Project Engineer Chine Road and Bridge Corp, BF Condominum Bd. A Soriano Ave, Cor Solna St, Inamutos, Mania (DPWH Material In-Charge) (OteeAdiretContct Na) (Date Sampled) Submited by + John Christian T. Gaden, EV BMC-UPMO DPWH, Daves City [Ldingtao, Project Engincer China Road and Bridge Cop, BF soot Confomiun Big, A Soria Ave, Cox Sanuary 25,2004 Solana St, Inramuros, Mania (DPW Moterite-In-Charge) (Office AddressContact No) Date Receved, “Tab No.7 QAND-W023-2074 (Paid under OR #0651514) TEST (@ Temp.,°c/RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS ‘Compressive Strength Test @ 28 days Nia January 25,2024 | DPWH-QMST-62 | 3447MPa 47.08 (AASHTO T22) 48.10 46.98 REMARKS: 1. The rest relate ony othe tem tested as ced 2 Mere Reports shal no Be nprduced cept null ito writen pra ofthe laboratory and mast he cen by he laboratory a re cap ofthe orignal Test Report Tested by: [Checked by: pawn POYCARIXFO Laborafiey Téphnicifn [Evaluated by: TTESTED = RAMON L. ALAS 10 B. CABALLERO Enbineee I ‘AssiNant Regional Director DDPWH-QMSF-76 RevOO ‘Test Report for DPWH Project Republic ofthe Philippines Department of Public Works and Highways QUALITY ASSURANCE AND HYDROLOGY DIVISION Regional Office X1, Davao City Lab. Report No.: QAHD-0023-2024 January 25,2024 Tssued Date TEST REPORT ON CONCRETE CYLINDER SAMPLE Name ofthe Laboratory + Department of Public Works and Highways-Regional Office XI ‘Address of he Laboratory + DPWH Region XI, Gov. Chavez Steet, R. Magsaysay Ave, Davao City Project Name/ID/Contract No. : 23200034 Bucana Bridge Project Implementing Office BMC-UPMO DPWH Kind of Materials + Conerete Cylinder Sample Sample Identification + Sample 3 (12 bags) TM Type/Grade/Class NIA Quantity Represented Scum, Original Source + Safecon Industries, In. Plant Sampled av/Address Safeoon Industries, Ine, Masa, Davao City ‘Manufactured by NIA Brand NIA ‘Supplier/Contractor Safecon Industries, Inc/China Road and Bridge Corp. Proposed Use tem 400 (17)Coneret Piles in Drilled Holes (1.5m di.) Governing Spec's DPWH Standard Specification on Item 400 (34.47 Mpa/S000psi @ 28 days) Sampled by + John Christian T, Gaden, EV. BMC-UPMO DPWH, Davo City (9053611761 January 18,2028 Lidingta, Project Engineer China Road and ridge Corp, BF CCondominur Bldg, A. Serio Ave. Cor Solana St names, Manila £ (DPWH Materile-In-Charge) (Office AdiressContct No) (ate Sample Submited by + John Christian T. Gaden, IV BMC-UPMO DPWH, Davao City LiJingtao, Project Engineer Chin Road and Bridge Cop, BF CCondominum Bldg, A. Soriano Ave, Cor Sewary 25, 2004 Solana St, namures, Manila (DPIWH Satria tn-Oh Adres No (ate Receive Tab No.7 OATID-0023-2024 (Paid under OR # 06515! rest [@ Temp.,°C/%6RH| DATE TesTED | METHOD USED | REQUIREMENTS | RESULTS Compressive Strength Test @ 28 days NA. January 25,2024 | DPWH-QMST-62 | 3447MPa 3483 (AASHTO 122) 3637 3735 REMARKS: 1 The rvs relate bt the tem’ ested os revived 1b Phuc Tea Report lint Be reproduc hep fl witowwriten approval ofthe labora and must Be cei bythe laboratory a aru copy of horn erected nowhy Cie, cut Ase nd Hy ogy Dn [Evaluated by: TESTED = v de sso 5, cABALLERO Entec sith Regional Dito DPWH-QHSF-76 Revo “Test Report for DPWH Project Republic ofthe Philippines Department of Public Works and Highways QUALITY ASSURANCE AND HYDROLOGY DIVISION, Regional Office XI, Davao City Lab. Report No.: QAHD-0024-2024 Yanuary 25, 2024 Trsued Date REPORT ON CONCRETE CYLINDER SAMPLI Name ofthe Laboratory Department of Public Works and Highvays-Regional Office XI ‘Address ofthe Laboratory DPWH Region XI, Gov. Chaver Street, R. Magsaysay Ave., Davao Ci ‘Project Name/ID/Contract No. : 23200034 Bucana Bridge Project Implementing Office BMC-UPMO DPWIT Kind of Material’s + Conerete Cylinder Sample Sample identification + Sample 4 (13 bags) TM3 Type/Grade/Class NIA Quantity Represented + 7Seum Original Source Sefecon Industries, ne. Plant Sampled aUAddress Safecon Industries, Ine, Ma-a, Davao City ‘Manufactured by NA Brand NA ‘Supplicr/Contractor Sefecon Industries, Inc/China Road and Bridge Corp. Proposed Use Item 400 (17)Conerte Piles in Drilled Holes (1.Sm dia.) Governing Spec's DPWH Standard Specification on lem 400 (34.47 MpaS000psi @ 28 days) Sampled by John Christian T. Gaden, IV BMC-UPMO DPWH, Davao City (09053611761 January 18,2024 iSingiao, Project Engineer China Roed and Bridge Corp, BF CCondominam Bldg, A Soriano Ave, Cor. Solana St, names, Manila (DPWH Materia-n-Charg) (office AdaressComact Na) (Date Sampled) Submitted by John Christian T. Gaden, E-IV BMC-UPMO DPWH, Davao City LiJingtao, Project Engincer China Road and Bridge Corp, BF neers Canfominan Bp, A Soto Ave Ca anuary 25,2024 Solana St, Inramuros, Manila $f (DPWH Matriat-tn-Charge) (Office AdavessCantct Na) Date Received) Tat Now? QNHD-0074-2024 (Paid under OR # 0651514) TEST @ Temp.,°C/%RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS ‘Compressive Strength Test @ 28 days NA January 25,2024 | DPWH-QMST-62 | 3447 MPa 4343 (AASHTO 722) 4361 4345 "REMARKS: 1. The retreat only othe em ested as recive. 2. Th Tet Rapors shal a be rproced ee ul, iho writen apron ofthe abraary and mat be eid by the ara atau copy ofthe onal Tat Reo Tested by [Checked by: : exbay VP ARpAFO H Row Laborato nce Chit, Quality Assure and Hy oh Division (Bete ; FTESTED = as sos fro B. CABALLERO Exkiner sitht Regional Director Dew. QS Reed Test Repo for DPWH Project Republic ofthe Philippines Department of Public Works and Highwa QUALITY ASSURANCE AND HYDROLOGY DIVISION Regional Office XI, Davao City Lab, Report No: onrtp.002s.2024 Tamar 25,2004 Tiswed Date TEST REPORT ON CONCRETE CYLINDER SAMPLE [Name ofthe Laboratory + Deparment of Public Works and Highways Regional Office XI ‘Adare ofthe Laboratory: DPWH Region XI, Gov, Chaver Set, R Magsaysay Ave, Davao City Project Name/b/Contrat No. + 23200034 Bucana Bridge Project Implementing Office BMC-UPMO DPWH Kind of Materials Conree Cylinder Sample Sample Hdentcaton Sample 5 (12 bags) TMS Type GraderCase 2 NA Quanity Represented Scum Original Source ¢ Secon Industries, ne, Plant Sompled a Address + Safeco Infuse, Ine, Maa, Davo Cy Manufactured by NA Brand :NA ‘Sunlir/Contracor + Safcon Industries, In/Chins Road and Bridge Comp. Proposed Use + tem 40S Structural Conerete (Pile Cap) Governing Spec's + DPWH Standard Speitcation on lm 405 (4.82 Mpa/60psi @ 28 ays) Sampled by John Christan T. Gaden, FIV BMC-UPMO DPWH, Davao Ciy 09053611761 January 18,2024 Livigtan, Projet Engineer Chow Road and Bridge Crp, BF Condominum Big. Soran Ave Cor Salon St nraman Mala 2 (DPN Mater Chore) (optee ArestConct 0) (Oat Sonpteo Submited by + Jon Cristian. Gaden, EV. BMC-UPMO DPN, Davo iy Lidingtao, Project Engineer China Road and Bridge Cop, BF Condominam Bide, A. Soriano Ave, Cor Solana St, Invamuros, Mania January 25, 2024 (DPWH Material In-Charg) (Offie AdtressContact No) (Date Recelved ‘Dari -WO7S 707 Paid under OR FOGSISIA) Test (@ Temp.,°c/%RH| DATE TESTED | METHOD USED | REQUIREMENTS | _ RESULTS Compressive Stength Test @ 28 days Nia. January 25,2024 | DPWH-QMST-62 | 44.82 MPa 38.95 (AASHTO 722) 38.10 3805 REMARKS: 4 Terns relat onto the tem’ as recived 2. Thue npn she na be produ excep nll how writen approval fh laboratory and maz be ceed bythe araory aie copy the onal Tet Report f Aa rested by: [Checked aN ROWKNA EDNTTO Engineer I Chief, Quality Assulbnce and Hy’ on |Evaluated by: (TESTED * V " ALAS B. CABALLERO Enginoer I Assist Regional Director DPWH-QMSE.76 Revoo “Test Repo for DPWH Project, Republic ofthe Philippines Department of Public Works and Highways QUALITY ASSURANCE AND HYDROLOGY DIVISION, Regional Office XI, Davao City Lab, Report No. : ‘QAHD-0026-2024 Saray 35,2034 ‘Tssued Date ‘TE CYLINDER SAMPLI TEST REPORT ON CONC Name ofthe Laboratory Department of Public Works and Highways-Regional Office XI ‘Address ofthe Laboratory: DPWH Region XI, Gov. Chavez Street, R. Magsaysay Ave, Davao City Project Name/1D/Contract No. + 23200034 Bucana Bridge Project Implementing Office BMC-UPMO DPWH Kind of Materia’ + Conerete Cylinder Sample Sample Identification + Sample 6 (13 bags) TM Type/Grade/Class Nia. Quanity Represented 2 7Scum, Original Source + Safecon Industries, In. Plant Sampled avAdaress 1 Safeoon Industries, Ine, Ma-a, Davao City ‘Manufactured by 2 NIA Brand 2 NIA ‘Supplier/Contractor Safecon Industries, Inc/China Road and Bridge Corp. Proposed Use Mem 40S Structural Concrete (Pile Cap) Governing Spec's DPWH Standard Specification on Item 405 (44.82 Mpa/6S00psi @ 28 days) Sampled by John Christian T. Gaden, E-IV BMC-UPMO DPWH, Davzo City (09083611761 January 18, 2024 [LiJingtao, Projet Engineer Chisa Road and Bridge Corp, BF Condominum Bi, A Soriano Ave, Cor Solana St, Inramuros, Manila £ (@DPWH Materlate-In-Charge) (Office AdéressComtct No) (ate Sampled ‘Submited by + John Christian T. Gaden, IV BMC-UPMO DPWH, Daveo City Litingtao, Project Engineer China Road and Bridge Comp, BF. laa CCondominum Bldg, A. Soriano Ave, Cot Solana St nramoros, Maila (DPW Materials n-Charge) (ofice dres'Contact No) (ate Received) Tab No.7 QATID-0076-3024 (Paid under OR # 0651514) Test (@ Temp, °c/%RH | DATE TESTED | METHOD USED | REQUIREMENTS | RESULTS Compressive Strength Test @ 28 days NIA January 25,2024 | DPWH-QMST-62 | 44.82 MPa 29.2 (AASHTO 122) 234 43.02 REMARKS: 1 ‘heres relat onto the em’ etd a eee. 2. Ph Tet Reports shal not be reproduced excep al. hoe Tes Report wren approval ofthe aor and mast be cried by the abaratony as ar copy ofthe origina 1 4 [Checked by: Li ‘AN’ 7 ROWANA'TS sincer I Chief, Quality Assulunce and Jierogy Division t seffo B, CABALLERO Assistale Regional Director TTESTED = fs ‘ALAS: Enkineer I [DPWIH-QUSF-76 RevOO “Test Repor for DPW Projet

You might also like