DAILY ACTIVITY REPORT

Project: Rep. No: DAR-155 Date: 07/08/2020

Contractor:

A. Manpower B. Plant / Equipment


Indirect No. Direct No. Plant / Equipment No.
Engineer/ Office Staff 1 Fabricator / Fitter Generator
Surveyor Grinder Compressor 1
Safety Officer / Inspector Operator JCB
Draftsman Rigger Lifting Cranes
Ganger 2 Carpenter 4 Welding M/C
Storekeeper Mason 2 Cutting M/C 2
Driver Steel Fixer Compactor
Mechanic Grit Blaster Loader / Truck
Watchman Painter 3 Excavator / Rock breaker
Utility man Helper Front End Loader
Foreman Labour Rolling M/C
Welder Plumber Water Tanker 1
Duct man Electrician Ele. Jack Hummer
Level M/C / Total station
Total Manpower 14
Total Cumulative Man hours 140
C. Concerns:

D. Activities in Progress:
1.Library room parquet floor fixing.
2 library room and wooden staircase painting work.

E. Inspections scheduled:

F. Material delivery details:

Project Engineer