You are on page 1of 17

A.II.2.

PRELIMINARY TREATED WATER RATE


This Breakdown Price is submitted as baseline of cost calculation only. The Company does not
pay the Contractor this Breakdown Price. All Contract price in this are Schedule of Rate (Schedule A Part I)
exclude VAT.

Unit Price
No Description Unit Volume
A MATERIAL & CONSUMABLE
a.1. Fuel Ls 1 800.00
a.3. Vehycle Ls 1 1,486.83
Subtotal A

B MANPOWER (Salary & Wages)


b.1. Mechanic Person 1 382.36
b.2. Elektrikal Person 1 382.36
b.3. Plumber Person 1 382.36
Subtotal B

C MAINTENANCE COST
c.1. Preventive Maintenance Ls 1 619.44
c.2. Maintenance Ls 1 9,660.37

Subtotal C

D OTHER
d.1. Safety Ls 1 210.83
d.2. Cleaning Services Ls 1 75.00
d.3. Communication Ls 1 83.33
d.4. Risk [ 0.5% x (Sub Tot A+B+C)] Ls 1 68.57

Subtotal D

E PROFIT [ 15%(Sub Tot A+B+C+D)]

TOTAL COST (USD/Mn)


PRODUCTION OF RAW WATER (M3)/Mn
RATE PER M3 (USD)
te (Schedule A Part I)

PERUBAHAN
Price Unit Price Price

800.00 266.67 266.67


1,486.83 743.42 743.42
2,286.83 1,010.08

382.36 382.36 382.36


382.36 382.36 382.36
382.36 382.36 382.36
1,147.09 1,147.09

619.44 59.44 59.44


9,660.37 4,380.19 4,380.19

10,279.81 4,439.63

210.83 210.83 210.83


75.00 - -
83.33 27.78 27.78
68.57 32.98 24.80

437.74 263.41

2,122.72 1,029.03

16,274.19 7,889.25
196,666.67 196,666.67
0.0828 0.0401
Analisa Harga Satuan
PRELIMANARY TREATED WATER
Refer to : Schedule A.II.2.

Code No. : A.2.1


Subjek : Material & Consumable
Sub Objek : Kendaraan Operasional
Lokasi : Preliminary Treated Water (Sangatta Baru dan Tj. Bara)
Kendaraan Operasional per Bulan $1,486.83
Bahan Bakar (Fuel) per Bulan $800.00

No. Uraian Satuan


A.2.1.1 A. Perawatan Pipa Transmisi & Preventive Maintenace M&E Unit
- Jenis Kendaraan : Daihatsu Rocky
- Tahun Pembuatan : 1996
- Jumlah : 1 unit
- Harga Saat ini : Rp 60,000,000.00
- Harga 3 thn mendtg : Rp -
- Depresiasi : Rp 2,190,740.74
- Prosen Depresiasi : 3.65%

Perawatan
- Ganti Olie Ls
- Preventive Maintenance
- Ganti Ban
- Overhaul
Sub Total A.2.1.1.

A.2.1.2. B. Konsumsi Bahan Bakar


> Perawatan Pipa Transmisi, Inspeksi & PM Ltr

Sub Total A.2.1.2.

Code No. : A.2.2


Subjek : Man Power
Sub Objek : Salary & Wages
Lokasi : Preliminary Treated Water (Sangatta Baru dan Tj. Bara)
Kebutuhan Gaji per Bulan $1,147.09

No. Uraian Satuan


A.2.2. a. Salary Mekanical
- Basic Staf Mekanik Bln
- Tunjangan Jabatan : Rp.
- Tunjangan Hari Raya : Rp. Bln
- Uang Makan : Rp. 12.500/hari Org
- Uang Transport : Rp. - Org
- Jamsostek : Rp. 50.000,-/bln Bln
- PPh : 3% dari Basic Bln
- Over Time (Jam/bln) : 70 Bln
Jumlah Personal : 1 Orang

b. Salary Electrical
- Basic Staf Electric Bln
- Tunjangan Jabatan : Rp.
- Tunjangan Hari Raya : Rp. Bln
- Uang Makan : Rp. 12.500/hari Org
- Uang Transport : Rp. - Org
- Jamsostek : Rp. 50.000,-/bln Bln
- PPh : 3% dari Basic Bln
- Over Time (Jam/bln) : 70 Bln
Jumlah Personal : 1 Orang

c. Salary Plumbing
Basic Staf Plumber Bln
- Tunjangan Jabatan : Rp.
- Tunjangan Hari Raya : Rp. Bln
- Uang Makan : Rp. 12.500/hari Org
- Uang Transport : Rp. - Org
- Jamsostek : Rp. 50.000,-/bln Bln
- PPh : 3% dari Basic Bln
- Over Time (Jam/bln) : 70 Bln
Jumlah Personal : 1 Orang

Tugas Dan Kewajiban

1. Staf Electric
> Melakukan preventive maintenance terhadap pompa di Settling Pond (SP) dan di Storage Dam (SD
> Melakukan pengukuran tegangan dan arus beban terhadap masing-masing pompa serta memastik
> Melakukan check terhadap semua komponen panel terhadap fungsional dan fisik (validitas kompo
diperlukan.
> Membuat laporan secara periodik (Mingguan dan bulanan)

2. Staf Mechanic
* Melakukan preventive maintenance terhadap semua pompa dengan melakukan regreasing atau p
secara rutin.
* Melakukan resetting terhadap aligment pompa di SP dan SD
* Melakukan perawatan terhadap pipa discharge dan suction berikut semua accessoriesnya.
* Melakukan Check terhadap akurasi Water Level Control yang terdapat di tangki CPP, dll serta mem
* Melaporkan ke Supervisor bilamana terjadi kerusakan atau melakukan penggantian komponen bila
* Membuat laporan secara rutin (mingguan dan bulanan) terhadap hasil kerja.

3. Staf Plumbing
- Melakukan preventive maintenance terhadap pipa dan valve atau accessories lain secara berkala
A. Sangatta Baru
> Dari SP ke tangki CPP
> Dari SP ke WTP
> Jalur pipa fire untuk air baku.
B. Tanjung Bara
> Dari SD ke tangki Road 1
> Dari tangki Road-1 ke WTP dan ke CTM
> Jalur pipa fire untuk air baku.
- Melaporkan ke Supervisor bilamana terjadi kerusakan atau melakukan perbaikkan/penggantian ko
- Membuat laporan secara rutin (mingguan dan bulanan) terhadap hasil kerja.

Code No. : A.2.3.


Subjek : Maintenance Repairing
Sub Objek : Mchanical & Electrical
Lokasi : Preliminary Treated Water (Sangatta Baru dan Tj. Bara)
Preventive Maintenance : $619.44
Maintenance/Repair : $9,660.37

Estimate
No. U R A I A N
Vol / Qtt

Preliminary Treated Water (Sangatta Baru dan Tj. Bara)


A.2.3.1. a. Preventive
- Lubrication (Grease) 1
- Peminyakan 1
- Check setting 1
- Pengukuran Tegangan, Arus beban dan Tahanan Isolasi. 4
- Pembersihan Lokasi 1
- Perawatan Pond & Dam 0.08
- Communication 1

A.2.3.2. b. Perbaikan / Penggantian Komponen


- Rewinding electromotor 0.60
- Penggantian komponen panel kontrol pompa 1
- Perbaikkan Water Meter 1
- Perbaikan pipa Trans Pre Treated dari Pond ke WTP 0.6
- Perbaikan pipa Trans Pre Treated dari Dam ke WTP 0.6
- Perbaikkan pipa transmisi dari Pond ke CPP 2
- Perbaikkan pipa transmisi dari Dam ke Tangki Road 1 2
- Perbaikkan pipa transmisi dari Tangki Road 1 ke CTM 2
- Perbaikkan Fire Hydrant Raw Water 3
- Pengecatan tangki 0.08
- Penggantian Bearing pompa centrifugal 1
- Penggantian Mechanical seal pompa centrifugal 0.6
- Perbaikkan cubicle box 0.6
- Perawatan jalan inspeksi pipa 0.6
- Spare pompa Centrifugal 0.25
- Pengerukkan lumpur Dam 0.08
- Pengerukkan lumpur Pond 0.08

Code No. : A.2.4


Subjek : Safety Equipment
Sub Objek : Personal Safety Equipment
Lokasi : Prelimanary Treated Water
Gaji setiap Operator per bulan $52.71

No. Uraian Satuan


A.2.4. Staf Org
- Seragam Kerja : 2 x/thn @ Rp.400.000,-
- Sepatu Safety : 2x/thn @ Rp. 325.000,-
- Helmet safety : 1x / 1 tahun @ 15.000
- Sarung Tangan : 1x / 3 bulan @ Rp. 160.000,-
- Jas Hujan : 2 x /thn @ Rp. 75.000
- Kaca Mata : 1x / 6 bulan @Rp. 30.000,-
- Rompi : 2x/thn @ Rp. 250.000,-
- Life Jacket : 2x / thn @ Rp. 225.000,-
- Sepatu Boot : 1x / 6 bulan @ Rp. 2.400.000,-
Jumlah : 632,500.00
Sub Total A.2.4
atta Baru dan Tj. Bara)

PERUBAHAN
Harga Satuan Jumlah Harga
Jumlah Jumlah
( Rp. ) ( Rp. ) ( USD )
2 2,190,740.74 4,381,481.48 486.83 1.00

2 4,500,000.00 9,000,000.00 1,000.00 1.00

1,486.83

1200 6,000.00 7,200,000.00 800.00 400

800.00

atta Baru dan Tj. Bara)


PERUBAHAN
Harga Satuan Jumlah Harga
Jumlah Jumlah
( Rp. ) ( Rp. ) ( USD )

1 2,200,000.00 2,200,000.00 244.44 1


- -
1 183,333.33 183,333.33 20.37 1
1 325,000.00 325,000.00 36.11 1
- -
1 60,000.00 60,000.00 6.67 1
1 66,000.00 66,000.00 7.33 1
1 606,936.42 606,936.42 67.44 1

382.36

1 2,200,000.00 2,200,000.00 244.44 1


- -
1 183,333.33 183,333.33 20.37 1
1 325,000.00 325,000.00 36.11 1
- -
1 60,000.00 60,000.00 6.67 1
1 66,000.00 66,000.00 7.33 1
1 606,936.42 606,936.42 67.44 1

382.36

1 2,200,000.00 2,200,000.00 244.44 1


- -
1 183,333.33 183,333.33 20.37 1
1 325,000.00 325,000.00 36.11 1
- -
1 60,000.00 60,000.00 6.67 1
1 66,000.00 66,000.00 7.33 1
1 606,936.42 606,936.42 67.44 1

382.36

ond (SP) dan di Storage Dam (SD), termasuk panel kontrol pompa.
ng-masing pompa serta memastikan bahwa WLC masih berfungsi dengan baik.
gsional dan fisik (validitas komponen) serta melakukan penggantian bilamana

gan melakukan regreasing atau peminyakan terhadap komponen yang diperlukan

ut semua accessoriesnya.
dapat di tangki CPP, dll serta memastikan masih dalam kondisi yang baik.
ukan penggantian komponen bilamana diperlukan.

accessories lain secara berkala pada jalur pipa


ukan perbaikkan/penggantian komponen bilamana diperlukan.

atta Baru dan Tj. Bara)

PERUBAHAN

Estimate Biaya
Satuan Harga Satuan Harga Satuan
Jumlah
IDR USD

x/Bln 250,000.00 250,000.00 125,000.00


x/Bln 250,000.00 250,000.00
x/Bln 350,000.00 350,000.00
x/Bln 225,000.00 900,000.00
x/Bln 675,000.00 675,000.00
x/Bln 30,000,000.00 2,400,000.00 2,000,000.00
x/Bln 750,000.00 750,000.00 250,000.00
5,575,000.00 619.44

x/Bln 5,500,000.00 3,300,000.00 2,750,000.00


x/Bln 1,250,000.00 1,250,000.00 625,000.00
x/Bln 1,250,000.00 1,250,000.00 625,000.00
x/Bln 5,500,000.00 3,300,000.00 2,750,000.00
x/Bln 5,000,000.00 3,000,000.00 2,500,000.00
x/Bln 3,500,000.00 7,000,000.00 1,750,000.00
x/Bln 3,500,000.00 7,000,000.00 1,750,000.00
x/Bln 3,500,000.00 7,000,000.00 1,750,000.00
x/Bln 2,500,000.00 7,500,000.00 1,250,000.00
x/Bln 97,000,000.00 8,083,333.33 50,000,000.00
x/Bln 2,750,000.00 2,750,000.00 1,375,000.00
x/Bln 2,350,000.00 1,410,000.00 1,175,000.00
x/Bln 1,250,000.00 750,000.00 625,000.00
x/Bln 3,500,000.00 2,100,000.00 1,750,000.00
x/Bln 45,000,000.00 11,250,000.00 10,000,000.00
x/Bln 120,000,000.00 10,000,000.00 60,000,000.00
x/Bln 120,000,000.00 10,000,000.00 60,000,000.00
86,943,333.33 9,660.37
PERUBAHAN
Harga Satuan Jumlah Harga Harga Satuan
Jumlah
( Rp. ) ( Rp. ) ( USD ) ( Rp. )
3 632,500.00 1,897,500.00 210.83 632,500.00

210.83
PERUBAHAN
Harga Satuan Jumlah Harga
( Rp. ) ( Rp. ) ( USD )
2,190,740.74 2,190,740.74 243.42

4,500,000.00 4,500,000.00 500.00

743.42

6,000.00 2,400,000.00 266.67

266.67 1,010.08

PERUBAHAN
Harga Satuan Jumlah Harga
( Rp. ) ( Rp. ) ( USD )

2,200,000.00 2,200,000.00 244.44


- -
183,333.33 183,333.33 20.37
325,000.00 325,000.00 36.11
- -
60,000.00 60,000.00 6.67
66,000.00 66,000.00 7.33
606,936.42 606,936.42 67.44

382.36

2,200,000.00 2,200,000.00 244.44


- -
183,333.33 183,333.33 20.37
325,000.00 325,000.00 36.11
- -
60,000.00 60,000.00 6.67
66,000.00 66,000.00 7.33
606,936.42 606,936.42 67.44

382.36

2,200,000.00 2,200,000.00 244.44


- -
183,333.33 183,333.33 20.37
325,000.00 325,000.00 36.11
- -
60,000.00 60,000.00 6.67
66,000.00 66,000.00 7.33
606,936.42 606,936.42 67.44

382.36
PERUBAHAN

Estimate Biaya
Jumlah
IDR USD

125,000.00
-
-
-
-
160,000.00
250,000.00
535,000.00 59.44

1,650,000.00
625,000.00
625,000.00
1,650,000.00
1,500,000.00
3,500,000.00
3,500,000.00
3,500,000.00
3,750,000.00
4,166,666.67
1,375,000.00
705,000.00
375,000.00

2,500,000.00
5,000,000.00
5,000,000.00
39,421,666.67 4,380.19
PERUBAHAN
Jumlah Harga
( Rp. ) ( USD )
1,897,500.00 210.83

210.83
Tabel
NILAI DEPRESIASI BARANG / PERALATAN

No. Tahun ESTIMASI HARGA


Jenis Barang / Peralatan
Lambung Pembuatan Saat Ini 3 Thn Mendatang
KENDARAAN OPERASIONAL (VEHYCLE)
Daihatsu Rocky 1996 65,000,000.00 -
Daihatsu Rocky 1996 65,000,000.00 -
NILAI DEPRESIASI Jumlah Harga Depr %
Tahun 1 Tahun 2 Tahun 3 Terdepresiasi per Bulan Depresiasi

21,666,666.67 26,000,000.00 31,200,000.00 78,866,666.67 2,190,740.74 3.37%


21,666,666.67 26,000,000.00 31,200,000.00 78,866,666.67 2,190,740.74 3.37%
Depresiasi