BARANGAY ANNUAL INVESTMENT PLAN/PROGRAM 2025

FY2025 ANNUAL INVESTMENT PROGRAM (AIP)


By Program/Project/Activity by Sector

Barangay: POBLACION IV
City/Municipality: SAN JOSE
Province: OCCIDENTAL MINDORO

Schedule of Implementation Amount


Implementing
AIP Reference Code Program/Project/Activity Expected Outputs Funding Source Personal Maintenance and
Office/department Completion
Start Date Services Other Operating Capital Outlay Total
Date
(PS) Expenses

Installed, It can
Procurement/Installation 100 units of CCTV in San Sebastian
reassure the NGAs/PGO/LGU/20%/
St, P. Pastor St., Lapu-Lapu St., Capt. Cooper St., Rajah
public about
Soliman St., Sikatuna St. Ext., Bonifacio St. Ext., Diego Silang LGU/Barangay January December 6,000,000.00 6,000,000.00
community safety DF/DBM/OTHER
St., Liboro St., Dagohoy St., Sikatuna St. & Purok Riverside
& Prevent and SOURCING
Barangay Poblacion IV, San Jose, Occidental Mindoro
Detect crimes.

Procurement/Installation 50 units of solar street lights in San Installed,


Sebastian St, P. Pastor St., Lapu-Lapu St., Capt. Cooper St., NGAs/PGO/LGU/20%/
Enhanced Safety
Rajah Soliman St., Sikatuna St. Ext., Bonifacio St. Ext., Diego
LGU/Barangay January December and Security & 3,000,000.00 3,000,000.00
Silang St., Liboro St., Dagohoy St., Sikatuna St. & Purok DF/DBM/OTHER
Helps people to
Riverside Barangay Poblacion IV, San Jose, Occidental SOURCING
feel safe and can
Mindoro help to reduce
crime

Installed,
Procurement/Installation of Fire Hydrant in San Sebastian St,
maintenance of NGAs/PGO/LGU/20%/
P. Pastor St., Lapu-Lapu St., Capt. Cooper St., Rajah Soliman
the water system
St., Sikatuna St. Ext., Bonifacio St. Ext., Diego Silang St., LGU/Barangay January December 5,000,000.00 5,000,000.00
and adequate fire DF/DBM/OTHER
Liboro St., Dagohoy St., Sikatuna St. & Purok Riverside
protection for our SOURCING
Barangay Poblacion IV, San Jose, Occidental Mindoro
community

1
BARANGAY ANNUAL INVESTMENT PLAN/PROGRAM 2025

Schedule of Implementation Amount

Construction of Drainage System in San Sebastian St, P. Completed,


Pastor St., Lapu-Lapu St., Capt. Cooper St., Rajah Soliman St., reducing
Sikatuna St. Ext., Bonifacio St. Ext., Diego Silang St., Liboro Implementing flooding, NGAs/PGO/LGU/20%/
AIP Reference Code Program/Project/Activity Expected Outputs Funding Source
St., Dagohoy St., Sikatuna St. & Purok Riverside Barangay Office/department improving water
LGU/Barangay January December 1,000,000.00 1,000,000.00
Poblacion IV, San Jose, Occidental Mindoro flow, and DF/DBM/OTHER
preventing SOURCING
damage to
infrastructures

Breakwater along the coastal of Barangay Poblacion IV Purok Completed, NGAs/PGO/LGU/20%/


Riverside Reduces
LGU/Barangay January December 6,000,000.00 6,000,000.00
incoming wave DF/DBM/OTHER
enr SOURCING

Improvement and Rehabilitation of Day Care Center including Completed,


beautification such as playground, roofing and garden. enhances early
childhood
education,
providing a
foundation for NGAs/PGO/LGU/20%/
lifelong learning
LGU/Barangay January December 2,000,000.00 2,000,000.00
and Upgrading DF/DBM/OTHER
facilities ensures SOURCING
a safe and
conducive
environment for
children’s
development.

Additional Medicines and medical Instrument for the LGU/Barangay January December Received, NGAs/PGO/LGU/20%/ 100,000.00 100,000.00
operational Health Care Center of Barangay Poblacion IV accessible
medical tools DF/DBM/OTHER
support prompt SOURCING
responses to
emergencies,
ensuring the well-
being of residents
and contributing
to a healthier and
more resilient

2
BARANGAY ANNUAL INVESTMENT PLAN/PROGRAM 2025

Schedule of Implementation Amount


Implementing
AIP Reference Code Program/Project/Activity Expected Outputs Funding Source
Office/department
barangay.

Procurement/Installation of Solar lights intended for our Installed, provide


Barangay IV hall and Multi- Purpose Covered Court sustainable and
cost-effective
lighting, reducing
NGAs/PGO/LGU/20%/
reliance on
LGU/Barangay January December conventional 100,000.00 100,000.00
DF/DBM/OTHER
energy sources SOURCING
and lower utility
cost.

Barangay Patrol Car Received, enable


quick response to
incidents, deter
criminal activities, NGAs/PGO/LGU/20%/
and facilitate
LGU/Barangay January December 300,000.00 300,000.00
rapid assistance DF/DBM/OTHER
during SOURCING
emergencies
within the
community.

Rehabilitation and improvement of our Multi-Purpose Completed,


Covered Court enhance the
barangay’s
NGAs/PGO/LGU/20%/
capacity to
LGU/Barangay January December conduct training 3,000,000.00 3,000,000.00
DF/DBM/OTHER
sessions, SOURCING
workshops and
educational
programs

-Nothing follows- 26,500,000.00 26,500,000.00

3
BARANGAY ANNUAL INVESTMENT PLAN/PROGRAM 2025

Prepared by: Attested by:

CHRISTIAN BRAYAN M. TERCERO MYLENE S. LIBERATO SUSAN A. NECESITO


Barangay Secretary Barangay Treasurer Punong Barangay