Professional Documents
Culture Documents
who is taking charge and have responsibility in the analysis of feasibility study in a infrastructure
project in a company? and what kind of outputs it will become, will it be specific data like chart or
qualitative explanation output, or such as audit report?
Question:
What is the relationship between engineering economic analysis and engineering design. How does
economic analysis assist decision making in the design process?
Excuse me sir, my name is Maleakhi. i have a question, what if a project is classified as "not worth the
investment" after feasibility analysis but the owner of that project still want to continue the project,
what is the best solution for that case ?
Name : Antonio Christopher Paramaarta (191317696) Question: A feasibility study it does not
guarantee the success of a project. What factors make a project fail even though a feasibility study
has been carried out?
181317527- Jose Gerard Hananto If in a construction project a schedule has been made for a certain
time for the estimated time of the project, but when it starts there are several obstacles that must be
faced such as weather or delays in the delivery of the materials running out or lack of funds due to
inflation during the project, how do you handleIf in a construction project a schedule has been made
for a certain time for the estimated time of the project, but when it starts there are several obstacles
that must be faced such as weather or delays in the delivery of the materials running out or lack of
funds due to inflation during the project, how do you handle this, thank you this, Thank you
if in this feasibility study there are assessments that become benchmarks for the work to be carried
out, then if the assessment deviates from what it should be, for example if there is an act of
corruption, then what response should be done? will the work be continued?
The preparation of the feasibility study is carried out through two main approaches, namely risk
analysis and feasibility analysis based on projected cash outflows for investment and operations as
well as cash inflows from sales of proceeds. The question is how to do a feasibility analysis?
[5:27 PM] Bernardinus Sandiko Pinayungan
During the middle of the construction execution, one of the feasibility types shows to have problems
from the initiation phase (e.g there is problem regarding the legal law because a new legal law is
created). What the best thing to do to solve the problem?
In execution phase of construction project, why project manager is the one who spends most of the
time in this step? Is it possible if someone other than project manager take over project manager's
task?
As we know earlier, in the standard construction project, it has following five major life cycle phases
in general. The question is what stage of the Life Cycle Phases in Construction Project is the cost
lowest?
What is sensitivity analysis that mentioned in the feasibility study workflow and how can it changed?