[5:10 PM] I Dewa Gede Ananda Kusuma

who is taking charge and have responsibility in the analysis of feasibility study in a infrastructure
project in a company? and what kind of outputs it will become, will it be specific data like chart or
qualitative explanation output, or such as audit report?

[5:12 PM] Muhammad Reza Syahdaputra Ramadhani

Name: Muhammad Reza Syahdaputra Ramadhani

Student Number: 191317762

Question:

What is the relationship between engineering economic analysis and engineering design. How does
economic analysis assist decision making in the design process?

[5:14 PM] Rainer Karolan


If the construction management fall off the schedule, do economy of the project fall off or stay the
same ?

[5:15 PM] Maleakhi Haholongan Atnel Hutabarat

Excuse me sir, my name is Maleakhi. i have a question, what if a project is classified as "not worth the
investment" after feasibility analysis but the owner of that project still want to continue the project,
what is the best solution for that case ?

[5:16 PM] Antonio Christopher Paramaarta

Name : Antonio Christopher Paramaarta (191317696) Question: A feasibility study it does not
guarantee the success of a project. What factors make a project fail even though a feasibility study
has been carried out?

[5:18 PM] Christian Aldo Chandra


181317150 Christian Aldo Chandra
As we are know from the recent problematic in Wadas (Bener Dam purworejo),where the local
people demanding to stop the quarry activity in that project… which type of this case go in the
feasibility study (The 5 types)?

[5:20 PM] Chavien Ari Darmawan


Name: Chavien Ari Darmawan
Std.ld: 181317249
What is the "sensitivity analysis"
stated on the workflow of
feasibility study? and is there
any example of the analysis?

[5:20 PM] Jose Gerard Hananto

181317527- Jose Gerard Hananto If in a construction project a schedule has been made for a certain
time for the estimated time of the project, but when it starts there are several obstacles that must be
faced such as weather or delays in the delivery of the materials running out or lack of funds due to
inflation during the project, how do you handleIf in a construction project a schedule has been made
for a certain time for the estimated time of the project, but when it starts there are several obstacles
that must be faced such as weather or delays in the delivery of the materials running out or lack of
funds due to inflation during the project, how do you handle this, thank you this, Thank you

[5:23 PM] Zeno Roland Ridho

Zeno Roland R (181317511)

if in this feasibility study there are assessments that become benchmarks for the work to be carried
out, then if the assessment deviates from what it should be, for example if there is an act of
corruption, then what response should be done? will the work be continued?

[5:24 PM] ALBY REIJI FRANANDA


Alby Reiji Frananda (191317872)

The preparation of the feasibility study is carried out through two main approaches, namely risk
analysis and feasibility analysis based on projected cash outflows for investment and operations as
well as cash inflows from sales of proceeds. The question is how to do a feasibility analysis?
[5:27 PM] Bernardinus Sandiko Pinayungan

191317915 - Bernardinus Sandiko P

During the middle of the construction execution, one of the feasibility types shows to have problems
from the initiation phase (e.g there is problem regarding the legal law because a new legal law is
created). What the best thing to do to solve the problem?

[5:27 PM] Angelina Amara Nugroho


Name: Angelina Amara N
Student number: 191317739

In execution phase of construction project, why project manager is the one who spends most of the
time in this step? Is it possible if someone other than project manager take over project manager's
task?

[5:30 PM] Yohanes Celvin Arysandi Seran

Yohanes Celvin Arysandi Seran (191317928)

As we know earlier, in the standard construction project, it has following five major life cycle phases
in general. The question is what stage of the Life Cycle Phases in Construction Project is the cost
lowest?

[5:32 PM] Adithya Aladar

Adithya Aladar 191317568

What is sensitivity analysis that mentioned in the feasibility study workflow and how can it changed?

[5:35 PM] Alfredo Ago Sangke


Name : Alfredo Ago S. NPM : 191317697 Question : When we want to start a project, we need to
evaluate from every factor, such as economy side, when the the calculation already made and in the
middle of the project execution the interest rate of money suddenly increased, and made the project
seems imposible, what should we do?

[5:42 PM] I Putu Bimo Artadiningrat


Name : I Putu Bimo ArtadiningratNPM : 191317582 if a construction once have everything under
calculated and during the project execution there are unexpected thing happened which hinders the
project or overbudget, is that considered as a feasibility failure ? and should the project continue
with this circumstances ?