08/25/2020 Renny & Jonnathan construction services

PICARD BUILDING CASA ROPA


PORTSMOUTH
FROM FUNDATION TO FINISH

fhone (767) 295 78 82

# 002 area sternal new laundry and bathroom

workforce cost : 28.800 Dollar EC

CONSTRUCTION MATERIALS

________________________________________________________________

Description Quantity

-------------------------------------------------------------------------------------------------------------------

Description : ceramic floor installation 62 sq . m .

type of materials quantity

tiles ceramic 62 sq. m

tiles cement 48 bag

grout 6 bag

concrete disc 2

spaces for 20" by 20", 4mm or 5mm tiles 12" by 20" 2 mm

________________________________________________________________

Description to cover 70 square meters with texturing

type of materials Quantity

troweltex 9 bucket
________________________________________________________________

Description demolition and installation

type of materials Quantity

doors 5

windows 3

wood 2x 6 x 20 6

wood nails 3 1/2" 3 lb

_________________________________________________________________

_Description for contruction wall

type of materials Quantity

pimice sand 4 yard

layou sand 4 yard

bloq 6" 1100

ordinary portland cement 98 bag

white lime 3 bag 50 l b

steel rods 3/8 10 mm 80

binding wire black 15 lb

concrete nails 3 lb

____________________________________________________________ 2

Description paint application

type of materials Quantity

prime 2 bucket

pint 2 bucket
_______________________________________________________
2

Description Plumbing

type of materials Quantity

pipe pvc 3" 1

pipe pvc 2" 2

elbow 3" 4

end cap 3" 1

tee 2" 1

elbow 2" 4

siphon 2" 2

teflon 1

glue for pipe cement 1/4 1

working duration time : 30 dias

time varies depending on the number of workers

signature stamp