SUMMARY OF QUANTITIES
ITEM No. DESCRIPTION UNIT QUANTITIES
PART A FACILITIES FOR THE ENGINEER
A.1.1 (6) Provision of Combined Field Office, Laboratory and Living Quarters Building for the Engineer (Rental Basis)
month
A.1.1 (11) Provision of Furnitures/Fixtures, Equipment and Appliances for the Field Office for the Engineers
lumpsum
A.1.1 (15) Operation and Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the Engineer
month
A.1.2 (2) Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare Rental Basis
month
A.1.2 (5) Operation and Maintenance of 4x4 Pick Up Type Service Vehicle for the Engineer
month
TOTAL
PART B OTHER GENERAL REQUIREMENTS
B.4 (10) Miscellaneous Survey and Staking lumpsum
TOTAL
PART C EARTHWORK
1.29
100(1) CLEARING AND GRUBBING (with Stripping)
ha.
5.00
100(3)a2 INDIVIDUAL REMOVAL OF TREES (Small a, 301mm-500mmØ)
ea.
1.00
101((1) REMOVAL OF STRUCTURE AND OBSTRUCTION (Stone Masonry Lined Drainage Structures)
l.s.
64.00
101(4)a2 REMOVAL OF RCPC (30" dia.)-760 mm dia.
ea.
96,874.73
102(2) ROADWAY EXCAVATION (Common Soil)
cu.m.
738.47
103(1)a STRUCTURE EXCAVATION (Common Soil)
cu.m.
227.09
103 (3) FOUNDATION FILL
cu.m.
3,580.79
103 (6)a PIPE CULVERTS AND DRAIN EXCAVATION (Common Soil)
cu.m.
9,339.97
104 (7) EMBANKMENT FROM ROADWAY EXCAVATION (Common Soil)
cu.m.
24,655.80
105 (1)a SUBGRADE PREPARATION (Common Material)
sq.m.
TOTAL
PART D SUBBASE AND BASE COURSE
5,239.63
200(1) AGGREGATE SUBBASE COURSE cu.m.
TOTAL
PART E SURFACE COURSES
6,666.00
311(1)c1 PORTLAND CEMENT CONCRETE PAVEMENT (Unreinforced) - 230mm thick, 14 Days,
sq.m.
14,887.40
311(1)e1 PORTLAND CEMENT CONCRETE PAVEMENT (Unreinforced) - 280mm thick, 14 Days,
sq.m.
TOTAL
PART F REINFORCING STEEL & STRUCTURAL CONCRETE
114,324.23
404 (1)a REINFORCEING STEEL BAR (Grade 40)
kg.
25,573.49
404(1)b REINFORCEING STEEL BAR (Grade 60)
kg.
1,724.34
405 (1)a3 STRUCTURAL CONCRETE (Class A, 20.68 Mpa, 28 days)
cu.m.
54.78
407 (8) LEAN CONCRETE ( Class B (16.5 Mpa) )
cu.m.
TOTAL
PART G DRAINAGE STRUCTURES AND SLOPE PROTECTION STRUCTURE
221.00
500 (1)a3 PIPE CULVERTS (910 mmØ, RCPC) ln.m.
337.40
517 (1)b DRAIN PIPE PVC (3" dia. For Ret. Wall Weepholes & Revetment Weepholes)
ln.m.
TOTAL
2,222.00
600 (1) CURB AND GUTTER (Cast in place)
ln.m.
250.00
611(1) TREES FURNISHING
ea.
555.50
612(1) Reflectorized Thermoplastic Pavement Markings (White)
sq.m.
180.75
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow)
sq.m.
148.00
605(6) e2 HAZARD MARKERS (600x800mm, Chevron Signs)
ea.
TOTAL
SUMMARY OF QUANTITIES
ITEM No. DESCRIPTION UNIT QUANTITY
PART C - EARTHWORK
100(1) Clearing and Grubbing hectares 1.29
100(2)a Individual Removal of Trees (Small, 150mm-300mmØ) each 5.00
101 (3) a4 Removal of Actual Structures/Obstruction 0.25 m thick PCCP (Reinforced) square meter 0.00
101 (3) b6 Removal of Actual Structures/Obstruction 0.30 m thick PCCP (Unreinforced) square meter 0.00
101 (4) b Removal of Actual Structures/Obstruction Curb linear meter 0.00
101 (4) a1 Removal of Actual Structures/Obstruction 610 mm dia. RCPC linear meter 0.00
101 (4) a2 Removal of Actual Structures/Obstruction 760 mm dia. RCPC linear meter 64.00
101 (4) a3 Removal of Actual Structures/Obstruction 910 mm dia. RCPC linear meter 0.00
102(2) Surplus Common Excavation cubic meter 96,874.73
102(3) a Surplus Rock Excavation (Soft Rock)
102(3) b Surplus Rock Excavation (Hard Rock)
PART C EARTHWORKS
EARTHWORKS
END AREA (sq.m.) VOLUME (cu.m.)
CUT FILL CUT FILL
STATION LENGTH
SOFT
COMMON ROCK HARD ROCK COMMON SOFT ROCK HARD ROCK
000+000.00 7.35 -
000+020.00 20.00 11.81 - 191.60
000+040.00 20.00 5.08 1.68 168.90 16.80
000+060.00 20.00 - 12.98 50.80 146.60
000+080.00 20.00 18.66 0.04 186.60 130.20
000+100.00 20.00 53.96 - 726.20 0.40
000+120.00 20.00 41.19 0.62 951.50 6.20
000+140.00 20.00 22.38 1.14 635.70 17.60
000+160.00 20.00 24.83 29.93 472.10 310.70
000+180.00 20.00 6.10 8.25 309.30 381.80
000+200.00 20.00 7.65 10.77 137.50 190.20
000+220.00 20.00 18.90 6.64 265.50 174.10
000+240.00 20.00 11.12 5.69 300.20 123.30
000+260.00 20.00 14.82 7.35 259.40 130.40
000+280.00 20.00 26.06 5.92 408.80 132.70
000+300.00 20.00 32.22 5.48 582.80 114.00
000+320.00 20.00 9.93 5.11 421.50 105.90
000+340.00 20.00 19.40 5.23 293.30 103.40
000+360.00 20.00 49.20 - 686.00 52.30
000+380.00 20.00 7.35 0.88 565.50 8.80
000+400.00 20.00 9.20 0.51 165.50 13.90
000+420.00 20.00 43.61 0.18 528.10 6.90
000+440.00 20.00 31.66 - 752.70 1.80
000+460.00 20.00 16.70 0.12 483.60 1.20
000+480.00 20.00 13.62 2.80 303.20 29.20
000+500.00 20.00 18.09 0.03 317.10 28.30
000+520.00 20.00 3.98 0.36 220.70 3.90
000+540.00 20.00 23.57 0.77 275.50 11.30
000+560.00 20.00 7.94 0.82 315.10 15.90
000+580.00 20.00 6.14 1.36 140.80 21.80
000+600.00 20.00 18.35 0.03 244.90 13.90
000+620.00 20.00 10.13 0.84 284.80 8.70
000+640.00 20.00 7.46 1.09 175.90 19.30
000+660.00 20.00 22.58 - 300.40 10.90
000+680.00 20.00 45.85 - 684.30
000+700.00 20.00 45.20 - 910.50
000+720.00 20.00 23.82 0.69 690.20 6.90
000+740.00 20.00 18.56 0.03 423.80 7.20
000+760.00 20.00 20.56 - 391.20 0.30
000+780.00 20.00 61.47 - 820.30
000+800.00 20.00 36.06 0.43 975.30 4.30
000+820.00 20.00 17.19 7.11 532.50 75.40
000+840.00 20.00 42.49 0.34 596.80 74.50
000+860.00 20.00 42.07 1.56 845.60 19.00
000+880.00 20.00 32.42 10.59 744.90 121.50
000+900.00 20.00 44.05 16.17 764.70 267.60
000+920.00 20.00 0.45 20.79 445.00 369.60
000+940.00 20.00 39.21 0.19 396.60 209.80
000+960.00 20.00 71.39 - 1,106.00 1.90
000+980.00 20.00 45.46 - 1,168.50
001+000.00 20.00 45.51 - 909.70
001+020.00 20.00 129.24 - 1,747.50
001+040.00 20.00 45.28 - 1,745.20
001+060.00 20.00 35.47 - 807.50
001+080.00 20.00 84.51 16.03 1,199.80 160.30
001+100.00 20.00 76.27 0.02 1,607.80 160.50
001+120.00 20.00 54.62 0.27 1,308.90 2.90
001+140.00 20.00 0.90 3.11 555.20 33.80
001+160.00 20.00 12.69 0.17 135.90 32.80
001+180.00 20.00 20.62 - 333.10 1.70
001+200.00 20.00 31.78 0.02 524.00 0.20
001+220.00 20.00 57.89 - 896.70 0.20
001+240.00 20.00 60.47 - 1,183.60
001+260.00 20.00 38.59 4.58 990.60 45.80
001+280.00 20.00 55.87 - 944.60 45.80
001+300.00 20.00 68.80 - 1,246.70
001+320.00 20.00 95.00 - 1,638.00
001+340.00 20.00 30.69 0.01 1,256.90 0.10
001+360.00 20.00 186.69 - 2,173.80 0.10
001+380.00 20.00 102.69 - 2,893.80
001+400.00 20.00 67.70 - 1,703.90
001+420.00 20.00 75.49 - 1,431.90
001+440.00 20.00 23.80 - 992.90
001+460.00 20.00 94.31 5.06 1,181.10 50.60
001+480.00 20.00 48.42 9.76 1,427.30 148.20
001+500.00 20.00 20.65 5.02 690.70 147.80
001+520.00 20.00 21.63 5.16 422.80 101.80
001+540.00 20.00 16.06 5.27 376.90 104.30
001+560.00 20.00 46.43 5.76 624.90 110.30
001+580.00 20.00 37.80 8.62 842.30 143.80
001+600.00 20.00 174.00 - 2,118.00 86.20
001+620.00 20.00 145.33 - 3,193.30
001+640.00 20.00 106.38 - 2,517.10
001+660.00 20.00 56.96 1.06 1,633.40 10.60
001+680.00 20.00 31.28 0.02 882.40 10.80
001+700.00 20.00 37.26 - 685.40 0.20
001+720.00 20.00 44.89 - 821.50
001+740.00 20.00 33.29 0.14 781.80 1.40
001+760.00 20.00 104.60 0.18 1,378.90 3.20
001+780.00 20.00 92.18 - 1,967.80 1.80
001+800.00 20.00 38.05 0.02 1,302.30 0.20
001+820.00 20.00 61.61 - 996.60 0.20
001+840.00 20.00 44.22 0.01 1,058.30 0.10
001+860.00 20.00 67.84 0.08 1,120.60 0.90
001+880.00 20.00 20.16 3.91 880.00 39.90
001+900.00 20.00 96.12 1.70 1,162.80 56.10
001+920.00 20.00 169.72 1.55 2,658.40 32.50
001+940.00 20.00 121.52 4.37 2,912.40 59.20
001+960.00 20.00 131.53 2.00 2,530.50 63.70
001+980.00 20.00 82.95 8.47 2,144.80 104.70
002+000.00 20.00 59.32 16.48 1,422.70 249.50
002+020.00 20.00 76.83 10.01 1,361.50 264.90
002+040.00 20.00 68.10 9.81 1,449.30 198.20
002+060.00 20.00 25.82 22.68 939.20 324.90
002+080.00 20.00 20.37 25.04 461.90 477.20
002+100.00 20.00 4.44 12.89 248.10 379.30
002+120.00 20.00 0.90 7.77 53.40 206.60
002+140.00 20.00 15.25 0.01 161.50 77.80
002+160.00 20.00 16.88 - 321.30 0.10
002+180.00 20.00 6.39 1.74 232.70 17.40
002+200.00 20.00 - 24.03 63.90 257.70
002+220.00 20.00 - 34.22 582.50
002+222.00 2.00 1.23 0.12 1.23 34.34
WIDTH (m)
ROAD+ LENGTH
STATION AREA (m²) REMARKS
(m)
SHOULDER
00+000.00
02+262.00 10.90 2262.00 24655.80 Both Sides
TOTAL 24655.80
Note: Extended up to 40 m.
Quantity 24,655.80 square meter
PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course
ITEM 200
STATION WIDTH (m) LENGTH (m) AREA (m²) VOLUME (m3) REMARKS
THICKNESS
00+000.00 6.70 0.20
PCCP
02+222.00 6.70 2222.00 0.20 14887.4000 2977.48 Total of Bothside
GRAVEL 00+000.00 3.00 0.20
SHOULDER 02+222.00 3.00 2222.00 0.20 6666.0000 1333.20 Total of Bothside
Curb & Gutter 0.67 2222.00 0.20 1488.7400 297.75 Right Side
Extended
SUBBASE @ 0.50 2222.00 0.48 1111.00 533.28
Right Side Right Side
EXTENDED
SUBBASE @ 10.20 20 0.48 204.00 97.92
End of PCCP
TOTAL 148.00
PART C - EARTHWORKS
Stone
Inlet of RCPC @ Station 0+380 & 0+390
Masonry 1.5 0.5 3.5 19 66.5
Stone
Outlet of RCPC @ Station 0+380 & 0+390
Masonry 3 0.5 6 23 241.5
Stone
Inlet of RCPC @ Station 0+910
Masonry 1 0.5 1.5 9 10.125
Stone
Outlet of RCPC @ Station 0+910
Masonry 1.5 0.5 3.5 15 52.5
Total= 370.625
101((1) REMOVAL OF STRUCTURE AND OBSTRUCTION (Stone Masonry Lined Drainage Structures)
Type 4 Cantilever Retaining Wall Single and Double Barrel Used as Inlet or Outlet w/ or w/o Downstream Improvement
PART C EARTHWORKS
760mm
0+065.00 8.00
910 13 Single RCPC 2.86 65.78 Type 3 2.53 6.0467 Type 4 0 0
0+164.00 8.00
910 13 Single None 2.86 65.78 Type 3 3.56 8.5084 Type 4 0 0
0+328.00 760mm 8.00
910 13 Single RCPC 2.86 65.78 Type 3 4.12 9.8468 Type 4 0 0
0+380.00 760mm 8.00
Single RCPC
0+711.00
910 13 Single None 2.86 65.78 Type 3 3.16 7.5524 Type 4 0 0
0+910.00 760mm 8.00
910 26 Double RCPC 4.8321 111.1383 Type 3 3.15 11.39355 Type 4 0 0
1+047.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+118.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+146.00 760mm 8.00
Single RCPC
1+160.00
910 26 Double None 4.8321 111.1383 Type 3 4.36 15.77012 Type 4 0 0
1+337.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+458.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+567.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+888.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
1+947.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
2+076.00
910 13 Single None 2.86 65.78 Type 3 3.15 7.5285 Type 4 0 0
500 (1) a1 Reinforced Concrete Pipe Culvert (610mmØ, Class II, RCPC)
Quantity
610mm dia 0.00 linear meter
500 (1) a2 Reinforced Concrete Pipe Culvert (760mmØ, Class II, RCPC)
Quantity
760mm dia 0.00 linear meter
500 (1) a3 Reinforced Concrete Pipe Culvert (910mmØ, Class II, RCPC)
Quantity
910mm dia 221.00 linear meter
0+065.00 Type 4
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
0+164.00 Type 4
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
0+328.00 Type 4
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
0+380.00
0+390.00
0+453.00 Type 4
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
0+656.00
0 0
Type 4
0+711.00
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
0+910.00 910 26 Type 3 Double 279.79 4.85
Type 4
1+047.00
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
Type 4
1+118.00
910 13 Type 3 Single 204 3.43 Single 0 0 14 4.342
1+146.00
Type 4
1+160.00
910 26 Type 3 Double 279.79 4.85 Double 54 8.684
Type 4
1+337.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
Type 4
1+458.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
Type 4
1+567.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
Type 4
1+888.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
Type 4
1+947.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
Type 4
2+076.00
910 13 Type 3 Single 204 3.43 Single 14 4.342
HEIGHT = 5.00 m.
RCPC ALONG RW = YES
SIZE OF RCPC = 910 Note: Retaining Wall use for RCPC Outlet
NO. OF RCPC = Single = 13
REINFORCEMENT = Double = 1
TO BE DEDUCTED = 187.65 kg
CONCRETE TO BE
DEDUCTED = 2.85 cu.m
PART C EARTHWORKS
Parapet P1 12 0.888 200 200 550 100 550 200 1.60 751 1,201.60 1,067.02
b1a 0.20 22.500 P2 10 0.616 300 149,900 - - 149.90 6 26 0.24 936.84 577.09
=
b1 = 0.30 S1 20 2.47 150 450 4,850 200 5.50 1,000 5,500.00 13,585.00
STEM 286.88 S3 16 1.579 150 700 4,850 200 5.75 1,000 5,750.00 9,079.25
500 VER
b2 = 0.55 S5 16 1.579 100 325 50 100 - 0.58 1,510 868.25 1,370.97
1000HOR
FOOTING F1 20 2.47 300 360 2,360 360 3.08 501 1,543.08 3,811.41
B = 2.50 F3 20 2.47 300 360 2,360 360 3.08 501 1,543.08 3,811.41
500 VER
c = 1.15 F6 16 1.579 100 660 50 100 - 0.91 906 824.46 1,301.82
1000HOR
HEIGHT = 5.00 m.
RCPC ALONG RW = YES
SIZE OF RCPC = 910
NO. OF RCPC = Single = 0
REINFORCEMENT = Double = 0
TO BE DEDUCTED = 0 kg
CONCRETE TO BE
DEDUCTED = 0 cu.m
PART C EARTHWORKS
Parapet P1 12 0.888 200 200 550 100 550 200 1.60 155 248.00 220.22
b1a 0.20 4.620 P2 10 0.616 300 30,700 - - 30.70 6 5 0.24 191.40 117.90
=
b1 = 0.30 S1 20 2.47 150 450 4,850 200 5.50 206 1,133.00 2,798.51
STEM 58.91 S3 16 1.579 150 700 4,850 200 5.75 206 1,184.50 1,870.33
500 VER
b2 = 0.55 S5 16 1.579 100 325 50 100 - 0.58 320 184.00 290.54
1000HOR
FOOTING F1 20 2.47 300 360 2,360 360 3.08 103 317.24 783.58
B = 2.50 F3 20 2.47 300 360 2,360 360 3.08 103 317.24 783.58
500 VER
c = 1.15 F6 16 1.579 100 660 50 100 - 0.91 192 174.72 275.88
1000HOR
HEIGHT = 3.50 m.
RCPC ALONG RW = YES
SIZE OF RCPC = 910
NO. OF RCPC = Single = 0
REINFORCEMENT = Double = 0
TO BE DEDUCTED = 0 kg
CONCRETE TO BE
DEDUCTED = 0 cu.m
PART C EARTHWORKS
Parapet P1 12 0.888 200 100 550 100 550 100 1.40 101 141.40 125.56
b1a 0.20 2.400 P2 10 0.616 300 19,900 - - 19.90 6 3 0.24 123.72 76.21
=
STEM 16.78 S3 12 0.888 300 400 3,350 100 3.85 67 257.95 229.06
500 VER
b2 = 0.35 S5 12 0.888 100 175 50 100 - 0.43 147 62.48 55.48
1000HOR
500 VER
c = 0.65 F6 12 0.888 100 360 50 100 - 0.61 84 51.24 45.50
1000HOR
PART C EARTHWORKS
Type 2
0+000.00 0+063.50 63.50 (W=600mm) Concrete 1.25 79.375 5.715
Type 2
0+066.50 0+162.50 96.00 (W=600mm) Concrete 1.25 120 8.64
Type 2
0+165.50 0+326.50 161.00 (W=600mm) Concrete 1.25 201.25 14.49
Type 2
0+396.80 0+451.50 54.70 (W=600mm) Concrete 1.25 68.375 4.923
Type 2
0+454.50 0+644.00 189.5 (W=600mm) Concrete 1.25 236.875 17.055
Type 2
0+656.00 0+709.50 53.50 (W=600mm) Concrete 1.25 66.875 4.815
Type 2
0+712.50 0+900.00 187.50 (W=600mm) Concrete 1.25 234.375 16.875
Type 2
0+920.00 1+045.50 125.50 (W=600mm) Concrete 1.25 156.875 11.295
Type 2
1+048.50 1+116.50 68.00 (W=600mm) Concrete 1.25 85 6.12
Type 2
1+119.50 1+140.00 20.50 (W=600mm) Concrete 1.25 25.625 1.845
Type 2
1+160.00 1+335.50 175.50 (W=600mm) Concrete 1.25 219.375 15.795
Type 2
1+338.50 1+456.50 118.00 (W=600mm) Concrete 1.25 147.5 10.62
Type 2
1+459.50 1+565.50 106.00 (W=600mm) Concrete 1.25 132.5 9.54
Type 2
1+568.50 1+886.50 318.00 (W=600mm) Concrete 1.25 397.5 28.62
Type 2
1+889.50 1+945.50 56.00 (W=600mm) Concrete 1.25 70 5.04
Type 2
1+948.50 2+074.50 126.00 (W=600mm) Concrete 1.25 157.5 11.34
Type 2
2+076.50 2+160.00 83.50 (W=600mm) Concrete 1.25 104.375 7.515
W+trench x D x L
Type of Lined
Start Station End Station Length Shoulder Type Reinforcement Concrete Remarks
Canal
Type 2
0+000.00 0+063.50 63.50 (W=600mm) Concrete 2205.355 27.6225
Type 2
0+066.50 0+162.50 96.00 (W=600mm) Concrete 3334.08 41.76
Type 2
0+165.50 0+326.50 161.00 (W=600mm) Concrete 5591.53 70.035
Type 2
0+396.80 0+451.50 54.70 (W=600mm) Concrete 1899.731 23.7945
Type 2
0+454.50 0+644.00 189.50 (W=600mm) Concrete 6581.335 82.4325
Type 2
0+656.00 0+709.50 53.50 (W=600mm) Concrete 1858.055 23.2725
Type 2
0+712.50 0+900.00 187.50 (W=600mm) Concrete 6511.875 81.5625
Type 2
0+920.00 1+045.50 125.50 (W=600mm) Concrete 4358.615 54.5925
Type 2
1+048.50 1+116.50 68.00 (W=600mm) Concrete 2361.64 29.58
Type 2
1+119.50 1+140.00 20.50 (W=600mm) Concrete 711.965 8.9175
Type 2
1+160.00 1+335.50 175.50 (W=600mm) Concrete 6095.115 76.3425
Type 2
1+338.50 1+456.50 118.00 (W=600mm) Concrete 4098.14 51.33
Type 2
1+459.50 1+565.50 106.00 (W=600mm) Concrete 3681.38 46.11
Type 2
1+568.50 1+886.50 318.00 (W=600mm) Concrete 11044.14 138.33
Type 2
1+889.50 1+945.50 56.00 (W=600mm) Concrete 1944.88 24.36
Type 2
1+948.50 2+074.50 126.00 (W=600mm) Concrete 4375.98 54.81
Type 2
2+076.50 2+160.00 83.50 (W=600mm) Concrete 2899.955 36.3225
PART C EARTHWORKS
0+385.00 2.40 2.40 12.00 Single 0.22 0.30 For Box Culvert Barrel
2.31per ln.m 312.25per ln.m 27.72 3747 3.29
For Wingwall and Slab
11.42 per side 536.89 per side 22.84 1073.78
For Railing/Headwall
0.26 per side 25.89 per side 0.52 51.78
0+650.00 2.40 2.40 12.00 Single 0.22 0.30 For Box Culvert Barrel
2.31per ln.m 312.25per ln.m 27.72 3747 3.29
For Wingwall and Slab
11.42 per side 536.89 per side 22.84 1073.78
For Railing/Headwall
0.26 per side 25.89 per side 0.52 51.78
Total= 24.00 102.16 9,745.12 6.58
PART C EARTHWORKS
Total
No. of Length Reinforcemen
Start Station End Station Length Height Length of Concrete
Weepholes per PVC t
PVC
2667.6 44.72
0+020.00 0+124.00 104.00 1.00 55.00 0.43 23.38
1344.06 29.26
0+250.00 0+288.00 38.00 1.50 23.00 0.50 11.50
2547.9 86.4
0+320.00 0+365.00 45.00 2.50 27.00 0.75 20.25
2046.44 56.76
0+450.00 0+494.00 44.00 2.00 26.00 0.63 16.25
1992 76.8
0+520.00 0+550.00 30.00 3.00 20.00 0.83 16.50
PART C EARTHWORKS
Total
No. of Length Reinforcemen
Start Station End Station Length Height Length of Concrete
Weepholes per PVC t
PVC
778.96 27.04
0+020.00 0+124.00 104.00 0.80 55.00 0.15 8.25
497.04 11.78
0+250.00 0+288.00 38.00 1.00 22.00 0.15 3.30
867.6 18.45
0+320.00 0+365.00 45.00 1.50 26.00 0.15 3.90
976.36 21.12
0+450.00 0+494.00 44.00 1.80 26.00 0.15 3.90
733.8 15.6
0+520.00 0+550.00 30.00 2.00 19.00 0.15 2.85
S1 S2 S3 S4 S5 F1 F2 F3 F4 F5 F6 P1 P2
HEIGHT b1 b2 D B a c DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC DIA SPAC
1 0.2 0.25 0.2 0.8 0.3 0.25 12 300 10 200 12 300 10 200 12 500 VER 12 300 10 150 12 300 10 150 0 0 12 500 VER 12 200 10 300
1000HOR 1000HOR
1.5 0.2 0.2 0.3 0.8 0.3 0.3 16 300 12 250 12 300 12 500 12 500 VER 16 300 12 150 16 300 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
1.8 0.2 0.3 0.3 0.8 0.3 0.2 16 300 12 250 12 300 12 500 12 500 VER 16 300 12 150 16 300 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
2 0.2 0.3 0.3 0.8 0.3 0.2 16 300 12 250 12 300 12 500 12 500 VER 16 300 12 150 16 300 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
2.5 0.2 0.3 0.4 1 0.3 0.4 16 300 12 250 12 300 12 500 12 500 VER 16 300 12 150 16 300 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
2.8 0.2 0.3 0.4 1.2 0.4 0.5 20 300 12 250 12 300 12 500 12 500 VER 16 300 12 150 16 300 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
3 0.2 0.35 0.45 1.5 0.5 0.65 20 300 12 250 12 300 12 500 12 500 VER 20 400 12 150 20 400 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
3.5 0.2 0.35 0.45 1.5 0.5 0.65 20 300 12 250 12 300 12 500 12 500 VER 20 400 12 150 20 400 12 150 12 1 12 500 VER 12 200 10 300
1000HOR 1000HOR
4 0.3 0.4 0.45 2 0.7 0.9 20 200 16 300 16 200 16 600 16 500 VER 20 400 16 300 20 400 16 300 12 1 16 500 VER 12 200 10 300
1000HOR 1000HOR
5 0.3 0.55 0.5 2.5 0.8 1.15 20 150 16 300 16 150 16 600 16 500 VER 20 300 16 300 20 300 16 300 16 1 16 500 VER 12 200 10 300
1000HOR 1000HOR
6 0.3 0.6 0.5 3 1 1.4 25 200 16 250 16 200 16 500 16 500 VER 25 300 16 300 25 300 16 300 16 1 16 500 VER 12 200 10 300
1000HOR 1000HOR
7 0.3 0.8 0.6 3.5 1.2 1.5 25 150 16 200 16 150 16 400 16 500 VER 25 300 16 300 25 300 16 300 20 1 20 500 VER 12 200 10 300
1000HOR 1000HOR
8 0.3 1 0.6 4 1.3 1.7 28 150 16 150 16 200 16 300 16 500 VER 28 300 16 300 28 300 16 300 20 1 20 500 VER 12 200 10 300
1000HOR 1000HOR
PCCP (THK=0.23m)
STATION WIDTH (m) LENGTH (m) AREA (m²)
3+747
3+804 6.1 57.26 349.29
TOTAL 349.29
*3.01m WIDTH BOTH SIDES
A) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR 0+000.00 TO 000+000 (RIGHT SIDE)
HEIGHT = 6 m. LENGTH = m.
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 1 1.8 2.00
b1a = 0.20 ,b1 = 0.30 - P2 10 0.616 A.S. D (100) - - -0.10 6 0 0.24 -0.6 -
hp= 0.60 S1 20 2.466 200 D 500 5,850 200 6.55 1 1 0.72 7.27 16.00
STEM S2 12 0.888 190 A (10) -0.01 29 0 0.29 -0.29 -
b1 = 0.30 ,b2 = 0.84 - S3 16 1.579 200 C 500 5,850 200 6.55 1 1 0.38 6.93 10.00
S4 12 0.888 380 A (100) - -0.10 15 0 0.29 -1.5 (1.00)
500 Vert.
S5 16 1.579 E 100 470 50 100 - 0.72 12 8.64 14.00
1000 Hor.
FOOTING F1 16 1.579 160 B 360 3460 360 4.18 0 1 0.38 0 -
BASE - F2 16 1.579 260 A -100 -0.10 14 0 0.38 -1.4 (2.00)
B= 3.60 ,D = 0.50 F3 16 1.579 160 B 360 3460 360 4.18 0 1 0.38 0 -
F4 16 1.579 260 A -100 -0.10 14 0 0.38 -1.4 (2.00)
F5 16 1.579 AS A -100 -0.10 2 0 0.38 -0.2 -
F6 16 1.579 1000 B.W. E 100 360 50 100 - 0.61 0 0 -
TOTAL = - cu.m. TOTAL = 37.00
VOL. OF LEAN CONC. = -
GRADE 40 = 21.000 kgs.
Needed Weepholes (3" Φ) = 0 pcs. 0.90 m length GRADE 60 = 16.000 kgs.
No. of pcs. At 3m length = 0 pcs Qty. = 0 ln.m.
A) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+160 TO CH : 18+192
HEIGHT = 4 m. LENGTH = 32.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 161 289.8 257.00
b1a = 0.20 ,b1 = 0.3 4.80 P2 10 0.616 A.S. D 31,900 - - 31.90 6 6 0.24 200.04 118.00
hp= 0.60 S1 20 2.466 320 D 500 3,850 200 4.55 101 1 0.72 532.27 1,133.00
STEM S2 12 0.888 270 A 31,990 31.99 14 6 0.29 472.22 398.00
b1 = 0.3 ,b2 = 0.52 48.28 S3 16 1.579 320 C 500 3,850 200 4.55 101 1 0.38 497.93 726.00
S4 12 0.888 540 A 31,900 - 31.90 8 6 0.29 269.12 227.00
500 Vert.
S5 10 0.616 E 100 310 50 100 - 0.56 264 147.84 91.00
1000 Hor.
FOOTING F1 16 1.579 280 B 180 2360 180 2.72 115 0 0.38 312.8 494.00
BASE 25.60 F2 12 0.888 230 A 31900 31.90 11 6 0.29 370.04 312.00
B= 2.5 ,D = 0.32 F3 16 1.579 280 B 180 2360 180 2.72 115 0 0.38 312.8 494.00
F4 12 0.888 230 A 31900 31.90 11 6 0.29 370.04 312.00
F5 12 0.888 AS A 31900 31.90 2 6 0.29 67.28 57.00
F6 12 0.888 500 B.W. E 100 180 50 100 - 0.43 80 34.4 31.00
TOTAL = 78.00 cu.m. TOTAL = 4,650.00
VOL. OF LEAN CONC. = 6.00
GRADE 40 = 3517.000 kgs.
Needed Weepholes (3" Φ) = 32 pcs. 0.70 m length GRADE 60 = 1133.000 kgs.
No. of pcs. At 3m length = 7 pcs Qty. = 22.4 ln.m.
B) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+330 TO CH : 18+341
HEIGHT = 3.5 m. LENGTH = 11.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 56 100.8 90.00
b1a = 0.20 ,b1 = 0.3 1.65 P2 10 0.616 A.S. D 10,900 - - 10.90 6 2 0.24 68.28 40.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 74 1 0.38 327.82 473.00
STEM S2 12 0.888 330 A 10,990 10.99 10 2 0.29 115.7 98.00
b1 = 0.3 ,b2 = 0.38 11.97 S3 12 0.888 150 C 500 3,350 200 4.05 74 1 0.29 321.16 266.00
S4 12 0.888 660 A 10,900 - 10.90 6 2 0.29 68.88 58.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 84 41.16 25.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 44 0 0.38 109.12 172.00
BASE 7.59 F2 12 0.888 250 A 10900 10.90 10 2 0.29 114.8 97.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 44 0 0.38 109.12 172.00
F4 12 0.888 250 A 10900 10.90 10 2 0.29 114.8 97.00
F5 12 0.888 AS A 10900 10.90 2 2 0.29 22.96 19.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 25 10.25 9.00
TOTAL = 21.00 cu.m. TOTAL = 1,616.00
VOL. OF LEAN CONC. = 1.90
GRADE 40 = 1616.000 kgs.
Needed Weepholes (3" Φ) = 10 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 6 ln.m.
C) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+469 TO CH : 18+478
HEIGHT = 3.5 m. LENGTH = 9.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 46 82.8 74.00
b1a = 0.20 ,b1 = 0.3 1.35 P2 10 0.616 A.S. D 8,900 - - 8.90 6 2 0.24 56.28 33.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 60 1 0.38 265.8 384.00
STEM S2 12 0.888 330 A 8,990 8.99 10 2 0.29 95.7 80.00
b1 = 0.3 ,b2 = 0.38 9.79 S3 12 0.888 150 C 500 3,350 200 4.05 60 1 0.29 260.4 216.00
S4 12 0.888 660 A 8,900 - 8.90 6 2 0.29 56.88 47.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 70 34.3 21.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 36 0 0.38 89.28 141.00
BASE 6.21 F2 12 0.888 250 A 8900 8.90 10 2 0.29 94.8 79.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 36 0 0.38 89.28 141.00
F4 12 0.888 250 A 8900 8.90 10 2 0.29 94.8 79.00
F5 12 0.888 AS A 8900 8.90 2 2 0.29 18.96 16.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 21 8.61 8.00
TOTAL = 17.00 cu.m. TOTAL = 1,319.00
VOL. OF LEAN CONC. = 1.55
GRADE 40 = 1319.000 kgs.
Needed Weepholes (3" Φ) = 8 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 4.8 ln.m.
D) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+657 TO CH : 18+663
HEIGHT = 3 m. LENGTH = 6.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 31 55.8 50.00
b1a = 0.20 ,b1 = 0.3 0.90 P2 10 0.616 A.S. D 5,900 - - 5.90 6 1 0.24 36.84 22.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 32 1 0.38 125.76 179.00
STEM S2 12 0.888 340 A 5,990 5.99 9 1 0.29 56.52 48.00
b1 = 0.3 ,b2 = 0.35 5.36 S3 12 0.888 190 C 500 2,850 200 3.55 32 1 0.29 122.88 101.00
S4 12 0.888 680 A 5,900 - 5.90 5 1 0.29 30.95 26.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 42 19.95 12.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 18 0 0.38 36.54 58.00
BASE 2.93 F2 12 0.888 300 A 5900 5.90 7 1 0.29 43.33 37.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 18 0 0.38 36.54 58.00
F4 12 0.888 300 A 5900 5.90 7 1 0.29 43.33 37.00
F5 12 0.888 AS A 5900 5.90 2 1 0.29 12.38 10.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 12 4.32 4.00
TOTAL = 9.00 cu.m. TOTAL = 642.00
VOL. OF LEAN CONC. = 0.88
GRADE 40 = 642.000 kgs.
Needed Weepholes (3" Φ) = 5 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 1 pcs Qty. = 3 ln.m.
E) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+829 TO CH : 18+836
HEIGHT = 3 m. LENGTH = 7.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 36 64.8 58.00
b1a = 0.20 ,b1 = 0.3 1.05 P2 10 0.616 A.S. D 6,900 - - 6.90 6 1 0.24 42.84 26.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 37 1 0.38 145.41 207.00
STEM S2 12 0.888 340 A 6,990 6.99 9 1 0.29 65.52 56.00
b1 = 0.3 ,b2 = 0.35 6.26 S3 12 0.888 190 C 500 2,850 200 3.55 37 1 0.29 142.08 117.00
S4 12 0.888 680 A 6,900 - 6.90 5 1 0.29 35.95 31.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 48 22.8 14.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 21 0 0.38 42.63 67.00
BASE 3.41 F2 12 0.888 300 A 6900 6.90 7 1 0.29 50.33 43.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 21 0 0.38 42.63 67.00
F4 12 0.888 300 A 6900 6.90 7 1 0.29 50.33 43.00
F5 12 0.888 AS A 6900 6.90 2 1 0.29 14.38 12.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 14 5.04 4.00
TOTAL = 10.00 cu.m. TOTAL = 745.00
VOL. OF LEAN CONC. = 1.02
GRADE 40 = 745.000 kgs.
Needed Weepholes (3" Φ) = 5 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 1 pcs Qty. = 3 ln.m.
F) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 18+960 TO CH : 18+967
HEIGHT = 3.5 m. LENGTH = 7.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 36 64.8 58.00
b1a = 0.20 ,b1 = 0.3 1.05 P2 10 0.616 A.S. D 6,900 - - 6.90 6 1 0.24 42.84 26.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 47 1 0.38 208.21 301.00
STEM S2 12 0.888 330 A 6,990 6.99 10 1 0.29 72.8 62.00
b1 = 0.3 ,b2 = 0.38 7.62 S3 12 0.888 150 C 500 3,350 200 4.05 47 1 0.29 203.98 169.00
S4 12 0.888 660 A 6,900 - 6.90 6 1 0.29 43.14 37.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 56 27.44 17.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 28 0 0.38 69.44 110.00
BASE 4.83 F2 12 0.888 250 A 6900 6.90 10 1 0.29 71.9 61.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 28 0 0.38 69.44 110.00
F4 12 0.888 250 A 6900 6.90 10 1 0.29 71.9 61.00
F5 12 0.888 AS A 6900 6.90 2 1 0.29 14.38 12.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 16 6.56 6.00
TOTAL = 13.00 cu.m. TOTAL = 1,030.00
VOL. OF LEAN CONC. = 1.21
GRADE 40 = 1030.000 kgs.
Needed Weepholes (3" Φ) = 6 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 1 pcs Qty. = 3.6 ln.m.
G) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+110 TO CH : 19+125
HEIGHT = 3.5 m. LENGTH = 15.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 76 136.8 121.00
b1a = 0.20 ,b1 = 0.3 2.25 P2 10 0.616 A.S. D 14,900 - - 14.90 6 3 0.24 93.72 55.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 100 1 0.38 443 639.00
STEM S2 12 0.888 330 A 14,990 14.99 10 3 0.29 158.6 133.00
b1 = 0.3 ,b2 = 0.38 16.32 S3 12 0.888 150 C 500 3,350 200 4.05 100 1 0.29 434 360.00
S4 12 0.888 660 A 14,900 - 14.90 6 3 0.29 94.62 79.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 112 54.88 34.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 60 0 0.38 148.8 235.00
BASE 10.35 F2 12 0.888 250 A 14900 14.90 10 3 0.29 157.7 132.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 60 0 0.38 148.8 235.00
F4 12 0.888 250 A 14900 14.90 10 3 0.29 157.7 132.00
F5 12 0.888 AS A 14900 14.90 2 3 0.29 31.54 26.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 35 14.35 13.00
TOTAL = 28.00 cu.m. TOTAL = 2,194.00
VOL. OF LEAN CONC. = 2.59
GRADE 40 = 2194.000 kgs.
Needed Weepholes (3" Φ) = 13 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 3 pcs Qty. = 7.8 ln.m.
H) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+150 TO CH : 19+194
HEIGHT = 3.5 m. LENGTH = 44.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 221 397.8 353.00
b1a = 0.20 ,b1 = 0.3 6.60 P2 10 0.616 A.S. D 43,900 - - 43.90 6 8 0.24 274.92 162.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 294 1 0.38 1302.42 1,880.00
STEM S2 12 0.888 330 A 43,990 43.99 10 8 0.29 463.1 391.00
b1 = 0.3 ,b2 = 0.38 47.87 S3 12 0.888 150 C 500 3,350 200 4.05 294 1 0.29 1275.96 1,057.00
S4 12 0.888 660 A 43,900 - 43.90 6 8 0.29 277.32 234.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 315 154.35 95.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 176 0 0.38 436.48 689.00
BASE 30.36 F2 12 0.888 250 A 43900 43.90 10 8 0.29 462.2 390.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 176 0 0.38 436.48 689.00
F4 12 0.888 250 A 43900 43.90 10 8 0.29 462.2 390.00
F5 12 0.888 AS A 43900 43.90 2 8 0.29 92.44 78.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 101 41.41 37.00
TOTAL = 84.00 cu.m. TOTAL = 6,445.00
VOL. OF LEAN CONC. = 7.59
GRADE 40 = 6445.000 kgs.
Needed Weepholes (3" Φ) = 39 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 8 pcs Qty. = 23.4 ln.m.
I) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+255 TO CH : 19+265
HEIGHT = 3.5 m. LENGTH = 10.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 51 91.8 82.00
b1a = 0.20 ,b1 = 0.3 1.50 P2 10 0.616 A.S. D 9,900 - - 9.90 6 2 0.24 62.28 37.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 67 1 0.38 296.81 428.00
STEM S2 12 0.888 330 A 9,990 9.99 10 2 0.29 105.7 89.00
b1 = 0.3 ,b2 = 0.38 10.88 S3 12 0.888 150 C 500 3,350 200 4.05 67 1 0.29 290.78 241.00
S4 12 0.888 660 A 9,900 - 9.90 6 2 0.29 62.88 53.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 77 37.73 23.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 40 0 0.38 99.2 157.00
BASE 6.90 F2 12 0.888 250 A 9900 9.90 10 2 0.29 104.8 88.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 40 0 0.38 99.2 157.00
F4 12 0.888 250 A 9900 9.90 10 2 0.29 104.8 88.00
F5 12 0.888 AS A 9900 9.90 2 2 0.29 20.96 18.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 23 9.43 8.00
TOTAL = 19.00 cu.m. TOTAL = 1,469.00
VOL. OF LEAN CONC. = 1.73
GRADE 40 = 1469.000 kgs.
Needed Weepholes (3" Φ) = 9 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 5.4 ln.m.
J) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+265 TO CH : 19+313
HEIGHT = 4 m. LENGTH = 48.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 241 433.8 385.00
b1a = 0.20 ,b1 = 0.3 7.20 P2 10 0.616 A.S. D 47,900 - - 47.90 6 8 0.24 298.92 177.00
hp= 0.60 S1 20 2.466 320 D 500 3,850 200 4.55 151 1 0.72 795.77 1,694.00
STEM S2 12 0.888 270 A 47,990 47.99 14 8 0.29 704.34 597.00
b1 = 0.3 ,b2 = 0.52 72.42 S3 16 1.579 320 C 500 3,850 200 4.55 151 1 0.38 744.43 1,085.00
S4 12 0.888 540 A 47,900 - 47.90 8 8 0.29 401.76 340.00
500 Vert.
S5 10 0.616 E 100 310 50 100 - 0.56 392 219.52 135.00
1000 Hor.
FOOTING F1 16 1.579 280 B 180 2360 180 2.72 172 0 0.38 467.84 739.00
BASE 38.40 F2 12 0.888 230 A 47900 47.90 11 8 0.29 552.42 468.00
B= 2.5 ,D = 0.32 F3 16 1.579 280 B 180 2360 180 2.72 172 0 0.38 467.84 739.00
F4 12 0.888 230 A 47900 47.90 11 8 0.29 552.42 468.00
F5 12 0.888 AS A 47900 47.90 2 8 0.29 100.44 85.00
F6 12 0.888 500 B.W. E 100 180 50 100 - 0.43 120 51.6 46.00
TOTAL = 118.00 cu.m. TOTAL = 6,958.00
VOL. OF LEAN CONC. = 9.00
GRADE 40 = 5264.000 kgs.
Needed Weepholes (3" Φ) = 48 pcs. 0.70 m length GRADE 60 = 1694.000 kgs.
No. of pcs. At 3m length = 11 pcs Qty. = 33.6 ln.m.
K) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+395 TO CH : 19+409
HEIGHT = 3.5 m. LENGTH = 14.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 71 127.8 113.00
b1a = 0.20 ,b1 = 0.3 2.10 P2 10 0.616 A.S. D 13,900 - - 13.90 6 2 0.24 86.28 51.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 94 1 0.38 416.42 601.00
STEM S2 12 0.888 330 A 13,990 13.99 10 2 0.29 145.7 124.00
b1 = 0.3 ,b2 = 0.38 15.23 S3 12 0.888 150 C 500 3,350 200 4.05 94 1 0.29 407.96 338.00
S4 12 0.888 660 A 13,900 - 13.90 6 2 0.29 86.88 74.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 105 51.45 32.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 56 0 0.38 138.88 219.00
BASE 9.66 F2 12 0.888 250 A 13900 13.90 10 2 0.29 144.8 123.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 56 0 0.38 138.88 219.00
F4 12 0.888 250 A 13900 13.90 10 2 0.29 144.8 123.00
F5 12 0.888 AS A 13900 13.90 2 2 0.29 28.96 25.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 32 13.12 12.00
TOTAL = 26.00 cu.m. TOTAL = 2,054.00
VOL. OF LEAN CONC. = 2.42
GRADE 40 = 2054.000 kgs.
Needed Weepholes (3" Φ) = 12 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 7.2 ln.m.
L) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+535 TO CH : 19+580
HEIGHT = 3.5 m. LENGTH = 45.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 226 406.8 361.00
b1a = 0.20 ,b1 = 0.3 6.75 P2 10 0.616 A.S. D 44,900 - - 44.90 6 8 0.24 280.92 166.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 300 1 0.38 1329 1,918.00
STEM S2 12 0.888 330 A 44,990 44.99 10 8 0.29 473.1 400.00
b1 = 0.3 ,b2 = 0.38 48.96 S3 12 0.888 150 C 500 3,350 200 4.05 300 1 0.29 1302 1,079.00
S4 12 0.888 660 A 44,900 - 44.90 6 8 0.29 283.32 239.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 322 157.78 97.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 180 0 0.38 446.4 705.00
BASE 31.05 F2 12 0.888 250 A 44900 44.90 10 8 0.29 472.2 399.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 180 0 0.38 446.4 705.00
F4 12 0.888 250 A 44900 44.90 10 8 0.29 472.2 399.00
F5 12 0.888 AS A 44900 44.90 2 8 0.29 94.44 80.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 104 42.64 38.00
TOTAL = 86.00 cu.m. TOTAL = 6,586.00
VOL. OF LEAN CONC. = 7.76
GRADE 40 = 6586.000 kgs.
Needed Weepholes (3" Φ) = 39 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 8 pcs Qty. = 23.4 ln.m.
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 31 55.8 50.00
b1a = 0.20 ,b1 = 0.3 0.90 P2 10 0.616 A.S. D 5,900 - - 5.90 6 1 0.24 36.84 22.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 40 1 0.38 177.2 256.00
STEM S2 12 0.888 330 A 5,990 5.99 10 1 0.29 62.8 53.00
b1 = 0.3 ,b2 = 0.38 6.53 S3 12 0.888 150 C 500 3,350 200 4.05 40 1 0.29 173.6 144.00
S4 12 0.888 660 A 5,900 - 5.90 6 1 0.29 37.14 31.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 49 24.01 15.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 24 0 0.38 59.52 94.00
BASE 4.14 F2 12 0.888 250 A 5900 5.90 10 1 0.29 61.9 52.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 24 0 0.38 59.52 94.00
F4 12 0.888 250 A 5900 5.90 10 1 0.29 61.9 52.00
F5 12 0.888 AS A 5900 5.90 2 1 0.29 12.38 10.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 14 5.74 5.00
TOTAL = 11.00 cu.m. TOTAL = 878.00
VOL. OF LEAN CONC. = 1.04
GRADE 40 = 878.000 kgs.
Needed Weepholes (3" Φ) = 5 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 1 pcs Qty. = 3 ln.m.
N) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+772 TO CH : 19+801
HEIGHT = 3 m. LENGTH = 29.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 146 262.8 233.00
b1a = 0.20 ,b1 = 0.3 4.35 P2 10 0.616 A.S. D 28,900 - - 28.90 6 5 0.24 180.6 107.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 153 1 0.38 601.29 858.00
STEM S2 12 0.888 340 A 28,990 28.99 9 5 0.29 273.96 232.00
b1 = 0.3 ,b2 = 0.35 25.92 S3 12 0.888 190 C 500 2,850 200 3.55 153 1 0.29 587.52 482.00
S4 12 0.888 680 A 28,900 - 28.90 5 5 0.29 151.75 128.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 180 85.5 53.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 86 0 0.38 174.58 276.00
BASE 14.14 F2 12 0.888 300 A 28900 28.90 7 5 0.29 212.45 180.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 86 0 0.38 174.58 276.00
F4 12 0.888 300 A 28900 28.90 7 5 0.29 212.45 180.00
F5 12 0.888 AS A 28900 28.90 2 5 0.29 60.7 51.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 57 20.52 18.00
TOTAL = 44.00 cu.m. TOTAL = 3,074.00
VOL. OF LEAN CONC. = 4.24
GRADE 40 = 3074.000 kgs.
Needed Weepholes (3" Φ) = 22 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 13.2 ln.m.
O) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 19+910 TO CH : 19+940
HEIGHT = 3.5 m. LENGTH = 30.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 151 271.8 241.00
b1a = 0.20 ,b1 = 0.3 4.50 P2 10 0.616 A.S. D 29,900 - - 29.90 6 5 0.24 186.6 111.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 200 1 0.38 886 1,279.00
STEM S2 12 0.888 330 A 29,990 29.99 10 5 0.29 314.4 266.00
b1 = 0.3 ,b2 = 0.38 32.64 S3 12 0.888 150 C 500 3,350 200 4.05 200 1 0.29 868 719.00
S4 12 0.888 660 A 29,900 - 29.90 6 5 0.29 188.1 159.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 217 106.33 65.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 120 0 0.38 297.6 470.00
BASE 20.70 F2 12 0.888 250 A 29900 29.90 10 5 0.29 313.5 266.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 120 0 0.38 297.6 470.00
F4 12 0.888 250 A 29900 29.90 10 5 0.29 313.5 266.00
F5 12 0.888 AS A 29900 29.90 2 5 0.29 62.7 53.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 69 28.29 25.00
TOTAL = 57.00 cu.m. TOTAL = 4,390.00
VOL. OF LEAN CONC. = 5.18
GRADE 40 = 4390.000 kgs.
Needed Weepholes (3" Φ) = 26 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 15.6 ln.m.
P) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+050 TO CH : 20+070
HEIGHT = 3.5 m. LENGTH = 20.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 101 181.8 161.00
b1a = 0.20 ,b1 = 0.3 3.00 P2 10 0.616 A.S. D 19,900 - - 19.90 6 3 0.24 123.72 74.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 134 1 0.38 593.62 857.00
STEM S2 12 0.888 330 A 19,990 19.99 10 4 0.29 211.5 178.00
b1 = 0.3 ,b2 = 0.38 21.76 S3 12 0.888 150 C 500 3,350 200 4.05 134 1 0.29 581.56 482.00
S4 12 0.888 660 A 19,900 - 19.90 6 3 0.29 124.62 106.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 147 72.03 44.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 80 0 0.38 198.4 313.00
BASE 13.80 F2 12 0.888 250 A 19900 19.90 10 3 0.29 207.7 177.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 80 0 0.38 198.4 313.00
F4 12 0.888 250 A 19900 19.90 10 3 0.29 207.7 177.00
F5 12 0.888 AS A 19900 19.90 2 3 0.29 41.54 35.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 46 18.86 17.00
TOTAL = 38.00 cu.m. TOTAL = 2,934.00
VOL. OF LEAN CONC. = 3.45
GRADE 40 = 2934.000 kgs.
Needed Weepholes (3" Φ) = 18 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 10.8 ln.m.
Q) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+215 TO CH : 20+225
HEIGHT = 3 m. LENGTH = 10.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 51 91.8 82.00
b1a = 0.20 ,b1 = 0.3 1.50 P2 10 0.616 A.S. D 9,900 - - 9.90 6 2 0.24 62.28 37.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 53 1 0.38 208.29 297.00
STEM S2 12 0.888 340 A 9,990 9.99 9 2 0.29 95.13 80.00
b1 = 0.3 ,b2 = 0.35 8.94 S3 12 0.888 190 C 500 2,850 200 3.55 53 1 0.29 203.52 167.00
S4 12 0.888 680 A 9,900 - 9.90 5 2 0.29 52.4 44.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 66 31.35 19.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 30 0 0.38 60.9 96.00
BASE 4.88 F2 12 0.888 300 A 9900 9.90 7 2 0.29 73.36 62.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 30 0 0.38 60.9 96.00
F4 12 0.888 300 A 9900 9.90 7 2 0.29 73.36 62.00
F5 12 0.888 AS A 9900 9.90 2 2 0.29 20.96 18.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 20 7.2 6.00
TOTAL = 15.00 cu.m. TOTAL = 1,066.00
VOL. OF LEAN CONC. = 1.46
GRADE 40 = 1066.000 kgs.
Needed Weepholes (3" Φ) = 8 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 4.8 ln.m.
R) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+375 TO CH : 20+385
HEIGHT = 3.5 m. LENGTH = 10.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 51 91.8 82.00
b1a = 0.20 ,b1 = 0.3 1.50 P2 10 0.616 A.S. D 9,900 - - 9.90 6 2 0.24 62.28 37.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 67 1 0.38 296.81 428.00
STEM S2 12 0.888 330 A 9,990 9.99 10 2 0.29 105.7 89.00
b1 = 0.3 ,b2 = 0.38 10.88 S3 12 0.888 150 C 500 3,350 200 4.05 67 1 0.29 290.78 241.00
S4 12 0.888 660 A 9,900 - 9.90 6 2 0.29 62.88 53.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 77 37.73 23.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 40 0 0.38 99.2 157.00
BASE 6.90 F2 12 0.888 250 A 9900 9.90 10 2 0.29 104.8 88.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 40 0 0.38 99.2 157.00
F4 12 0.888 250 A 9900 9.90 10 2 0.29 104.8 88.00
F5 12 0.888 AS A 9900 9.90 2 2 0.29 20.96 18.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 23 9.43 8.00
TOTAL = 19.00 cu.m. TOTAL = 1,469.00
VOL. OF LEAN CONC. = 1.73
GRADE 40 = 1469.000 kgs.
Needed Weepholes (3" Φ) = 9 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 5.4 ln.m.
S) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+433 TO CH : 20+530
HEIGHT = 3 m. LENGTH = 97.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 486 874.8 777.00
b1a = 0.20 ,b1 = 0.3 14.55 P2 10 0.616 A.S. D 96,900 - - 96.90 6 17 0.24 605.88 358.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 511 1 0.38 2008.23 2,864.00
STEM S2 12 0.888 340 A 96,990 96.99 9 17 0.29 917.28 775.00
b1 = 0.3 ,b2 = 0.35 86.69 S3 12 0.888 190 C 500 2,850 200 3.55 511 1 0.29 1962.24 1,611.00
S4 12 0.888 680 A 96,900 - 96.90 5 17 0.29 509.15 430.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 588 279.3 172.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 286 0 0.38 580.58 917.00
BASE 47.29 F2 12 0.888 300 A 96900 96.90 7 17 0.29 712.81 602.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 286 0 0.38 580.58 917.00
F4 12 0.888 300 A 96900 96.90 7 17 0.29 712.81 602.00
F5 12 0.888 AS A 96900 96.90 2 17 0.29 203.66 172.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 189 68.04 60.00
TOTAL = 148.00 cu.m. TOTAL = 10,257.00
VOL. OF LEAN CONC. = 14.19
GRADE 40 = 10257.000 kgs.
Needed Weepholes (3" Φ) = 73 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 15 pcs Qty. = 43.8 ln.m.
T) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+634 TO CH : 20+667
HEIGHT = 3 m. LENGTH = 33.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 166 298.8 265.00
b1a = 0.20 ,b1 = 0.3 4.95 P2 10 0.616 A.S. D 32,900 - - 32.90 6 6 0.24 206.04 122.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 174 1 0.38 683.82 975.00
STEM S2 12 0.888 340 A 32,990 32.99 9 6 0.29 312.57 264.00
b1 = 0.3 ,b2 = 0.35 29.49 S3 12 0.888 190 C 500 2,850 200 3.55 174 1 0.29 668.16 549.00
S4 12 0.888 680 A 32,900 - 32.90 5 6 0.29 173.2 146.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 204 96.9 60.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 98 0 0.38 198.94 314.00
BASE 16.09 F2 12 0.888 300 A 32900 32.90 7 6 0.29 242.48 205.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 98 0 0.38 198.94 314.00
F4 12 0.888 300 A 32900 32.90 7 6 0.29 242.48 205.00
F5 12 0.888 AS A 32900 32.90 2 6 0.29 69.28 58.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 64 23.04 20.00
TOTAL = 50.00 cu.m. TOTAL = 3,497.00
VOL. OF LEAN CONC. = 4.83
GRADE 40 = 3497.000 kgs.
Needed Weepholes (3" Φ) = 25 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 15 ln.m.
U) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+634 TO CH : 20+667
HEIGHT = 3 m. LENGTH = 33.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 166 298.8 265.00
b1a = 0.20 ,b1 = 0.3 4.95 P2 10 0.616 A.S. D 32,900 - - 32.90 6 6 0.24 206.04 122.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 174 1 0.38 683.82 975.00
STEM S2 12 0.888 340 A 32,990 32.99 9 6 0.29 312.57 264.00
b1 = 0.3 ,b2 = 0.35 29.49 S3 12 0.888 190 C 500 2,850 200 3.55 174 1 0.29 668.16 549.00
S4 12 0.888 680 A 32,900 - 32.90 5 6 0.29 173.2 146.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 204 96.9 60.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 98 0 0.38 198.94 314.00
BASE 16.09 F2 12 0.888 300 A 32900 32.90 7 6 0.29 242.48 205.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 98 0 0.38 198.94 314.00
F4 12 0.888 300 A 32900 32.90 7 6 0.29 242.48 205.00
F5 12 0.888 AS A 32900 32.90 2 6 0.29 69.28 58.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 64 23.04 20.00
TOTAL = 50.00 cu.m. TOTAL = 3,497.00
VOL. OF LEAN CONC. = 4.83
GRADE 40 = 3497.000 kgs.
Needed Weepholes (3" Φ) = 25 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 15 ln.m.
V) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+672.50 TO CH : 20+718.00
HEIGHT = 3.5 m. LENGTH = 45.50 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 228 410.4 364.00
b1a = 0.20 ,b1 = 0.3 6.83 P2 10 0.616 A.S. D 45,400 - - 45.40 6 8 0.24 283.92 168.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 304 1 0.38 1346.72 1,944.00
STEM S2 12 0.888 330 A 45,490 45.49 10 8 0.29 478.1 404.00
b1 = 0.3 ,b2 = 0.38 49.50 S3 12 0.888 150 C 500 3,350 200 4.05 304 1 0.29 1319.36 1,093.00
S4 12 0.888 660 A 45,400 - 45.40 6 8 0.29 286.32 242.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 322 157.78 97.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 182 0 0.38 451.36 713.00
BASE 31.40 F2 12 0.888 250 A 45400 45.40 10 8 0.29 477.2 403.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 182 0 0.38 451.36 713.00
F4 12 0.888 250 A 45400 45.40 10 8 0.29 477.2 403.00
F5 12 0.888 AS A 45400 45.40 2 8 0.29 95.44 81.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 105 43.05 38.00
TOTAL = 87.00 cu.m. TOTAL = 6,663.00
VOL. OF LEAN CONC. = 7.85
GRADE 40 = 6663.000 kgs.
Needed Weepholes (3" Φ) = 40 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 8 pcs Qty. = 24 ln.m.
W) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+672.50 TO CH : 20+718.00
HEIGHT = 3.5 m. LENGTH = 45.50 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 228 410.4 364.00
b1a = 0.20 ,b1 = 0.3 6.83 P2 10 0.616 A.S. D 45,400 - - 45.40 6 8 0.24 283.92 168.00
hp= 0.60 S1 16 1.579 150 D 500 3,350 200 4.05 304 1 0.38 1346.72 1,944.00
STEM S2 12 0.888 330 A 45,490 45.49 10 8 0.29 478.1 404.00
b1 = 0.3 ,b2 = 0.38 49.50 S3 12 0.888 150 C 500 3,350 200 4.05 304 1 0.29 1319.36 1,093.00
S4 12 0.888 660 A 45,400 - 45.40 6 8 0.29 286.32 242.00
500 Vert.
S5 10 0.616 E 100 240 50 100 - 0.49 322 157.78 97.00
1000 Hor.
FOOTING F1 16 1.579 250 B 160 2160 160 2.48 182 0 0.38 451.36 713.00
BASE 31.40 F2 12 0.888 250 A 45400 45.40 10 8 0.29 477.2 403.00
B= 2.3 ,D = 0.3 F3 16 1.579 250 B 160 2160 160 2.48 182 0 0.38 451.36 713.00
F4 12 0.888 250 A 45400 45.40 10 8 0.29 477.2 403.00
F5 12 0.888 AS A 45400 45.40 2 8 0.29 95.44 81.00
F6 12 0.888 500 B.W. E 100 160 50 100 - 0.41 105 43.05 38.00
TOTAL = 87.00 cu.m. TOTAL = 6,663.00
VOL. OF LEAN CONC. = 7.85
GRADE 40 = 6663.000 kgs.
Needed Weepholes (3" Φ) = 40 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 8 pcs Qty. = 24 ln.m.
X) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+718 TO CH : 20+743
HEIGHT = 3 m. LENGTH = 25.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 126 226.8 201.00
b1a = 0.20 ,b1 = 0.3 3.75 P2 10 0.616 A.S. D 24,900 - - 24.90 6 4 0.24 155.16 92.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 132 1 0.38 518.76 740.00
STEM S2 12 0.888 340 A 24,990 24.99 9 4 0.29 235.35 200.00
b1 = 0.3 ,b2 = 0.35 22.34 S3 12 0.888 190 C 500 2,850 200 3.55 132 1 0.29 506.88 416.00
S4 12 0.888 680 A 24,900 - 24.90 5 4 0.29 130.3 111.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 156 74.1 46.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 74 0 0.38 150.22 237.00
BASE 12.19 F2 12 0.888 300 A 24900 24.90 7 4 0.29 182.42 155.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 74 0 0.38 150.22 237.00
F4 12 0.888 300 A 24900 24.90 7 4 0.29 182.42 155.00
F5 12 0.888 AS A 24900 24.90 2 4 0.29 52.12 44.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 49 17.64 16.00
TOTAL = 38.00 cu.m. TOTAL = 2,650.00
VOL. OF LEAN CONC. = 3.66
GRADE 40 = 2650.000 kgs.
Needed Weepholes (3" Φ) = 19 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 11.4 ln.m.
Y) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 20+718 TO CH : 20+743
HEIGHT = 3 m. LENGTH = 25.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 126 226.8 201.00
b1a = 0.20 ,b1 = 0.3 3.75 P2 10 0.616 A.S. D 24,900 - - 24.90 6 4 0.24 155.16 92.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 132 1 0.38 518.76 740.00
STEM S2 12 0.888 340 A 24,990 24.99 9 4 0.29 235.35 200.00
b1 = 0.3 ,b2 = 0.35 22.34 S3 12 0.888 190 C 500 2,850 200 3.55 132 1 0.29 506.88 416.00
S4 12 0.888 680 A 24,900 - 24.90 5 4 0.29 130.3 111.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 156 74.1 46.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 74 0 0.38 150.22 237.00
BASE 12.19 F2 12 0.888 300 A 24900 24.90 7 4 0.29 182.42 155.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 74 0 0.38 150.22 237.00
F4 12 0.888 300 A 24900 24.90 7 4 0.29 182.42 155.00
F5 12 0.888 AS A 24900 24.90 2 4 0.29 52.12 44.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 49 17.64 16.00
TOTAL = 38.00 cu.m. TOTAL = 2,650.00
VOL. OF LEAN CONC. = 3.66
GRADE 40 = 2650.000 kgs.
Needed Weepholes (3" Φ) = 19 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 11.4 ln.m.
Z) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+130 TO CH : 21+139
HEIGHT = 3 m. LENGTH = 9.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 46 82.8 74.00
b1a = 0.20 ,b1 = 0.3 1.35 P2 10 0.616 A.S. D 8,900 - - 8.90 6 2 0.24 56.28 33.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 48 1 0.38 188.64 269.00
STEM S2 12 0.888 340 A 8,990 8.99 9 2 0.29 86.13 72.00
b1 = 0.3 ,b2 = 0.35 8.04 S3 12 0.888 190 C 500 2,850 200 3.55 48 1 0.29 184.32 151.00
S4 12 0.888 680 A 8,900 - 8.90 5 2 0.29 47.4 40.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 60 28.5 18.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 27 0 0.38 54.81 87.00
BASE 4.39 F2 12 0.888 300 A 8900 8.90 7 2 0.29 66.36 55.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 27 0 0.38 54.81 87.00
F4 12 0.888 300 A 8900 8.90 7 2 0.29 66.36 55.00
F5 12 0.888 AS A 8900 8.90 2 2 0.29 18.96 16.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 18 6.48 6.00
TOTAL = 13.00 cu.m. TOTAL = 963.00
VOL. OF LEAN CONC. = 1.32
GRADE 40 = 963.000 kgs.
Needed Weepholes (3" Φ) = 7 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 1 pcs Qty. = 4.2 ln.m.
AA) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+191 TO CH : 21+221
HEIGHT = 3 m. LENGTH = 30.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 151 271.8 241.00
b1a = 0.20 ,b1 = 0.3 4.50 P2 10 0.616 A.S. D 29,900 - - 29.90 6 5 0.24 186.6 111.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 158 1 0.38 620.94 886.00
STEM S2 12 0.888 340 A 29,990 29.99 9 5 0.29 282.96 240.00
b1 = 0.3 ,b2 = 0.35 26.81 S3 12 0.888 190 C 500 2,850 200 3.55 158 1 0.29 606.72 498.00
S4 12 0.888 680 A 29,900 - 29.90 5 5 0.29 156.75 133.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 186 88.35 54.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 89 0 0.38 180.67 285.00
BASE 14.63 F2 12 0.888 300 A 29900 29.90 7 5 0.29 219.45 186.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 89 0 0.38 180.67 285.00
F4 12 0.888 300 A 29900 29.90 7 5 0.29 219.45 186.00
F5 12 0.888 AS A 29900 29.90 2 5 0.29 62.7 53.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 59 21.24 19.00
TOTAL = 45.00 cu.m. TOTAL = 3,177.00
VOL. OF LEAN CONC. = 4.39
GRADE 40 = 3177.000 kgs.
Needed Weepholes (3" Φ) = 23 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 13.8 ln.m.
BB) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+361 TO CH : 21+373
HEIGHT = 3 m. LENGTH = 12.00 m. (LEFTT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 61 109.8 98.00
b1a = 0.20 ,b1 = 0.3 1.80 P2 10 0.616 A.S. D 11,900 - - 11.90 6 2 0.24 74.28 44.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 64 1 0.38 251.52 359.00
STEM S2 12 0.888 340 A 11,990 11.99 9 2 0.29 113.13 96.00
b1 = 0.3 ,b2 = 0.35 10.73 S3 12 0.888 190 C 500 2,850 200 3.55 64 1 0.29 245.76 202.00
S4 12 0.888 680 A 11,900 - 11.90 5 2 0.29 62.4 53.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 78 37.05 23.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 36 0 0.38 73.08 115.00
BASE 5.85 F2 12 0.888 300 A 11900 11.90 7 2 0.29 87.36 74.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 36 0 0.38 73.08 115.00
F4 12 0.888 300 A 11900 11.90 7 2 0.29 87.36 74.00
F5 12 0.888 AS A 11900 11.90 2 2 0.29 24.96 21.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 23 8.28 7.00
TOTAL = 18.00 cu.m. TOTAL = 1,281.00
VOL. OF LEAN CONC. = 1.76
GRADE 40 = 1281.000 kgs.
Needed Weepholes (3" Φ) = 9 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 5.4 ln.m.
CC) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+652 TO CH : 21+709
HEIGHT = 2 m. LENGTH = 57.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 286 514.8 457.00
b1a = 0.20 ,b1 = 0.2 6.84 P2 10 0.616 A.S. D 56,900 - - 56.90 6 10 0.24 355.8 210.00
hp= 0.60 S1 12 0.888 180 D 500 1,850 100 2.45 317 0 0.29 776.65 690.00
STEM S2 10 0.616 340 A 56,990 56.99 6 10 0.24 356.34 211.00
b1 = 0.2 ,b2 = 0.25 23.09 S3 10 0.616 180 C 500 1,850 100 2.45 317 0 0.24 776.65 478.00
S4 10 0.616 680 A 56,900 - 56.90 4 10 0.24 237.2 140.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 232 87 54.00
1000 Hor.
FOOTING F1 12 0.888 300 B 60 1310 60 1.43 191 0 0.29 273.13 243.00
BASE 16.53 F2 10 0.616 250 A 56900 56.90 6 10 0.24 355.8 210.00
B= 1.45 ,D = 0.2 F3 12 0.888 300 B 60 1310 60 1.43 191 0 0.29 273.13 243.00
F4 10 0.616 250 A 56900 56.90 6 10 0.24 355.8 210.00
F5 10 0.616 AS A 56900 56.90 2 10 0.24 118.6 70.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 83 25.73 16.00
TOTAL = 46.00 cu.m. TOTAL = 3,232.00
VOL. OF LEAN CONC. = 6.20
GRADE 40 = 3232.000 kgs.
Needed Weepholes (3" Φ) = 29 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 14.5 ln.m.
BB) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+740 TO CH : 21+767
HEIGHT = 2 m. LENGTH = 27.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 136 244.8 217.00
b1a = 0.20 ,b1 = 0.2 3.24 P2 10 0.616 A.S. D 26,900 - - 26.90 6 5 0.24 168.6 99.00
hp= 0.60 S1 12 0.888 180 D 500 1,850 100 2.45 150 0 0.29 367.5 326.00
STEM S2 10 0.616 340 A 26,990 26.99 6 5 0.24 169.14 100.00
b1 = 0.2 ,b2 = 0.25 10.94 S3 10 0.616 180 C 500 1,850 100 2.45 150 0 0.24 367.5 226.00
S4 10 0.616 680 A 26,900 - 26.90 4 5 0.24 112.4 66.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 112 42 26.00
1000 Hor.
FOOTING F1 12 0.888 300 B 60 1310 60 1.43 91 0 0.29 130.13 116.00
BASE 7.83 F2 10 0.616 250 A 26900 26.90 6 5 0.24 168.6 99.00
B= 1.45 ,D = 0.2 F3 12 0.888 300 B 60 1310 60 1.43 91 0 0.29 130.13 116.00
F4 10 0.616 250 A 26900 26.90 6 5 0.24 168.6 99.00
F5 10 0.616 AS A 26900 26.90 2 5 0.24 56.2 33.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 39 12.09 7.00
TOTAL = 22.00 cu.m. TOTAL = 1,530.00
VOL. OF LEAN CONC. = 2.94
GRADE 40 = 1530.000 kgs.
Needed Weepholes (3" Φ) = 14 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 2 pcs Qty. = 7 ln.m.
EE) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+768 TO CH : 21+848
HEIGHT = 2 m. LENGTH = 80.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 401 721.8 641.00
b1a = 0.20 ,b1 = 0.2 9.60 P2 10 0.616 A.S. D 79,900 - - 79.90 6 14 0.24 499.56 295.00
hp= 0.60 S1 12 0.888 180 D 500 1,850 100 2.45 445 0 0.29 1090.25 968.00
STEM S2 10 0.616 340 A 79,990 79.99 6 14 0.24 500.1 296.00
b1 = 0.2 ,b2 = 0.25 32.40 S3 10 0.616 180 C 500 1,850 100 2.45 445 0 0.24 1090.25 672.00
S4 10 0.616 680 A 79,900 - 79.90 4 14 0.24 333.04 197.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 324 121.5 75.00
1000 Hor.
FOOTING F1 12 0.888 300 B 60 1310 60 1.43 267 0 0.29 381.81 339.00
BASE 23.20 F2 10 0.616 250 A 79900 79.90 6 14 0.24 499.56 295.00
B= 1.45 ,D = 0.2 F3 12 0.888 300 B 60 1310 60 1.43 267 0 0.29 381.81 339.00
F4 10 0.616 250 A 79900 79.90 6 14 0.24 499.56 295.00
F5 10 0.616 AS A 79900 79.90 2 14 0.24 166.52 98.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 116 35.96 22.00
TOTAL = 65.00 cu.m. TOTAL = 4,532.00
VOL. OF LEAN CONC. = 8.70
GRADE 40 = 4532.000 kgs.
Needed Weepholes (3" Φ) = 40 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 7 pcs Qty. = 20 ln.m.
FF) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 21+868 TO CH : 21+916
HEIGHT = 3 m. LENGTH = 48.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 241 433.8 385.00
b1a = 0.20 ,b1 = 0.3 7.20 P2 10 0.616 A.S. D 47,900 - - 47.90 6 8 0.24 298.92 177.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 253 1 0.38 994.29 1,418.00
STEM S2 12 0.888 340 A 47,990 47.99 9 8 0.29 452.79 384.00
b1 = 0.3 ,b2 = 0.35 42.90 S3 12 0.888 190 C 500 2,850 200 3.55 253 1 0.29 971.52 798.00
S4 12 0.888 680 A 47,900 - 47.90 5 8 0.29 251.1 213.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 294 139.65 86.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 142 0 0.38 288.26 455.00
BASE 23.40 F2 12 0.888 300 A 47900 47.90 7 8 0.29 351.54 298.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 142 0 0.38 288.26 455.00
F4 12 0.888 300 A 47900 47.90 7 8 0.29 351.54 298.00
F5 12 0.888 AS A 47900 47.90 2 8 0.29 100.44 85.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 94 33.84 30.00
TOTAL = 73.00 cu.m. TOTAL = 5,082.00
VOL. OF LEAN CONC. = 7.02
GRADE 40 = 5082.000 kgs.
Needed Weepholes (3" Φ) = 36 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 7 pcs Qty. = 21.6 ln.m.
GG) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 22+021 TO CH : 22+086
HEIGHT = 3 m. LENGTH = 65.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 326 586.8 521.00
b1a = 0.20 ,b1 = 0.3 9.75 P2 10 0.616 A.S. D 64,900 - - 64.90 6 11 0.24 405.24 240.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 343 1 0.38 1347.99 1,923.00
STEM S2 12 0.888 340 A 64,990 64.99 9 11 0.29 613.62 519.00
b1 = 0.3 ,b2 = 0.35 58.09 S3 12 0.888 190 C 500 2,850 200 3.55 343 1 0.29 1317.12 1,081.00
S4 12 0.888 680 A 64,900 - 64.90 5 11 0.29 340.45 288.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 396 188.1 116.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 192 0 0.38 389.76 615.00
BASE 31.69 F2 12 0.888 300 A 64900 64.90 7 11 0.29 476.63 403.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 192 0 0.38 389.76 615.00
F4 12 0.888 300 A 64900 64.90 7 11 0.29 476.63 403.00
F5 12 0.888 AS A 64900 64.90 2 11 0.29 136.18 115.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 127 45.72 41.00
TOTAL = 99.00 cu.m. TOTAL = 6,880.00
VOL. OF LEAN CONC. = 9.51
GRADE 40 = 6880.000 kgs.
Needed Weepholes (3" Φ) = 49 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 10 pcs Qty. = 29.4 ln.m.
HH) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 22+120 TO CH : 22+155
HEIGHT = 3 m. LENGTH = 35.00 m. (LEFT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 176 316.8 281.00
b1a = 0.20 ,b1 = 0.3 5.25 P2 10 0.616 A.S. D 34,900 - - 34.90 6 6 0.24 218.04 129.00
hp= 0.60 S1 16 1.579 190 D 500 2,850 200 3.55 185 1 0.38 727.05 1,037.00
STEM S2 12 0.888 340 A 34,990 34.99 9 6 0.29 330.57 280.00
b1 = 0.3 ,b2 = 0.35 31.28 S3 12 0.888 190 C 500 2,850 200 3.55 185 1 0.29 710.4 583.00
S4 12 0.888 680 A 34,900 - 34.90 5 6 0.29 183.2 155.00
500 Vert.
S5 10 0.616 E 100 225 50 100 - 0.48 216 102.6 63.00
1000 Hor.
FOOTING F1 16 1.579 340 B 110 1810 110 2.03 104 0 0.38 211.12 333.00
BASE 17.06 F2 12 0.888 300 A 34900 34.90 7 6 0.29 256.48 217.00
B= 1.95 ,D = 0.25 F3 16 1.579 340 B 110 1810 110 2.03 104 0 0.38 211.12 333.00
F4 12 0.888 300 A 34900 34.90 7 6 0.29 256.48 217.00
F5 12 0.888 AS A 34900 34.90 2 6 0.29 73.28 62.00
F6 12 0.888 500 B.W. E 100 110 50 100 - 0.36 68 24.48 22.00
TOTAL = 53.00 cu.m. TOTAL = 3,712.00
VOL. OF LEAN CONC. = 5.12
GRADE 40 = 3712.000 kgs.
Needed Weepholes (3" Φ) = 26 pcs. 0.60 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 5 pcs Qty. = 15.6 ln.m.
II) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 22+169.50 TO CH : 22+208.50
HEIGHT = 2.5 m. LENGTH = 39.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 196 352.8 313.00
b1a = 0.20 ,b1 = 0.2 4.68 P2 10 0.616 A.S. D 38,900 - - 38.90 6 7 0.24 243.48 144.00
hp= 0.60 S1 12 0.888 130 D 500 2,350 100 2.95 300 1 0.29 972 786.00
STEM S2 10 0.616 300 A 38,990 38.99 8 7 0.24 325.36 192.00
b1 = 0.2 ,b2 = 0.25 20.18 S3 10 0.616 130 C 500 2,350 100 2.95 300 1 0.24 957 545.00
S4 10 0.616 600 A 38,900 - 38.90 5 7 0.24 202.9 120.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 200 75 46.00
1000 Hor.
FOOTING F1 12 0.888 240 B 60 1510 60 1.63 163 0 0.29 265.69 236.00
BASE 12.87 F2 10 0.616 260 A 38900 38.90 7 7 0.24 284.06 168.00
B= 1.65 ,D = 0.2 F3 12 0.888 240 B 60 1510 60 1.63 163 0 0.29 265.69 236.00
F4 10 0.616 260 A 38900 38.90 7 7 0.24 284.06 168.00
F5 10 0.616 AS A 38900 38.90 2 7 0.24 81.16 48.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 64 19.84 12.00
TOTAL = 37.00 cu.m. TOTAL = 3,014.00
VOL. OF LEAN CONC. = 4.83
GRADE 40 = 3014.000 kgs.
Needed Weepholes (3" Φ) = 24 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 12 ln.m.
JJ) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 22+400 TO CH : 22+460
HEIGHT = 2.5 m. LENGTH = 60.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 301 541.8 481.00
b1a = 0.20 ,b1 = 0.2 7.20 P2 10 0.616 A.S. D 59,900 - - 59.90 6 10 0.24 373.8 221.00
hp= 0.60 S1 12 0.888 130 D 500 2,350 100 2.95 462 1 0.29 1496.88 1,210.00
STEM S2 10 0.616 300 A 59,990 59.99 8 10 0.24 499.12 296.00
b1 = 0.2 ,b2 = 0.25 31.05 S3 10 0.616 130 C 500 2,350 100 2.95 462 1 0.24 1473.78 840.00
S4 10 0.616 600 A 59,900 - 59.90 5 10 0.24 311.5 184.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 305 114.38 70.00
1000 Hor.
FOOTING F1 12 0.888 240 B 60 1510 60 1.63 250 0 0.29 407.5 362.00
BASE 19.80 F2 10 0.616 260 A 59900 59.90 7 10 0.24 436.1 258.00
B= 1.65 ,D = 0.2 F3 12 0.888 240 B 60 1510 60 1.63 250 0 0.29 407.5 362.00
F4 10 0.616 260 A 59900 59.90 7 10 0.24 436.1 258.00
F5 10 0.616 AS A 59900 59.90 2 10 0.24 124.6 74.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 99 30.69 19.00
TOTAL = 58.00 cu.m. TOTAL = 4,635.00
VOL. OF LEAN CONC. = 7.43
GRADE 40 = 4635.000 kgs.
Needed Weepholes (3" Φ) = 38 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 6 pcs Qty. = 19 ln.m.
KK) REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES OF RETAINING WALL FOR CH : 22+537.50 TO CH : 22+582.50
HEIGHT = 2 m. LENGTH = 45.00 m. (RIGHT SIDE)
Parapet P1 12 0.888 200 F 300 550 100 550 300 1.80 226 406.8 361.00
b1a = 0.20 ,b1 = 0.2 5.40 P2 10 0.616 A.S. D 44,900 - - 44.90 6 8 0.24 280.92 166.00
hp= 0.60 S1 12 0.888 180 D 500 1,850 100 2.45 250 0 0.29 612.5 544.00
STEM S2 10 0.616 340 A 44,990 44.99 6 8 0.24 281.46 166.00
b1 = 0.2 ,b2 = 0.25 18.23 S3 10 0.616 180 C 500 1,850 100 2.45 250 0 0.24 612.5 377.00
S4 10 0.616 680 A 44,900 - 44.90 4 8 0.24 187.28 111.00
500 Vert.
S5 10 0.616 E 100 125 50 100 - 0.38 184 69 43.00
1000 Hor.
FOOTING F1 12 0.888 300 B 60 1310 60 1.43 151 0 0.29 215.93 192.00
BASE 13.05 F2 10 0.616 250 A 44900 44.90 6 8 0.24 280.92 166.00
B= 1.45 ,D = 0.2 F3 12 0.888 300 B 60 1310 60 1.43 151 0 0.29 215.93 192.00
F4 10 0.616 250 A 44900 44.90 6 8 0.24 280.92 166.00
F5 10 0.616 AS A 44900 44.90 2 8 0.24 93.64 55.00
F6 10 0.616 500 B.W. E 100 60 50 100 - 0.31 65 20.15 12.00
TOTAL = 36.00 cu.m. TOTAL = 2,551.00
VOL. OF LEAN CONC. = 4.89
GRADE 40 = 2551.000 kgs.
Needed Weepholes (3" Φ) = 23 pcs. 0.50 m length GRADE 60 = 0.000 kgs.
No. of pcs. At 3m length = 4 pcs Qty. = 11.5 ln.m.
ITEM NO. DESCRIPTION QUANTITY UNIT
404(1)a REINFORCING STEEL (Grade 40) 2551.000 kgs.
404(1)b REINFORCING STEEL (Grade 60) 0.000 kgs.
405(1)a3 STRUCTURAL CONCRETE (Class"A" - 20.68mPa) 36.00 cu.m.
407(8) LEAN CONCRETE (Class"B" - 16.50mPa.) 4.89 cu.m.
517(1)b DRAIN PIPE (PVC FOR RETAINING WALL) 11.5 ln.m.
TOTAL SUMMARY
ITEM NO. DESCRIPTION QUANTITY UNIT
404(1)a REINFORCING STEEL (Grade 40) 123,158.00 kgs.
404(1)b REINFORCING STEEL (Grade 60) 2827.000 kgs.
405(1)a3 STRUCTURAL CONCRETE (Class"A" - 20.68mPa) 1,756.00 cu.m.
407(8) LEAN CONCRETE (Class"B" - 16.50mPa.) 171.73 cu.m.
517(1)b DRAIN PIPE (PVC FOR RETAINING WALL) 515 ln.m.
PART A - FACILITIES FOR THE ENGINEER
Pay Item Suffix Description Valid Values
(Number) (Subscrip Thickness/Sizes
t)
B.10 Dayworks
B.11 Provisional Sum
B.12 Removal and Relocation of Utilities
101 (3) a2 a2 Removal of Actual Structures/Obstruction 0.20 m thick PCCP 0.20 m thick
(Reinforced)
101 (3) a3 a3 Removal of Actual Structures/Obstruction 0.23 m thick PCCP 0.23 m thick
(Reinforced)
101 (3) a4 a4 Removal of Actual Structures/Obstruction 0.25 m thick PCCP 0.25 m thick
(Reinforced)
101 (3) a5 a5 Removal of Actual Structures/Obstruction 0.28 m thick PCCP 0.28 m thick
(Reinforced)
101 (3) a6 a6 Removal of Actual Structures/Obstruction 0.30 m thick PCCP 0.30 m thick
(Reinforced)
101 (3) a7 a7 Removal of Actual Structures/Obstruction 0.33 m thick PCCP 0.33 m thick
(Reinforced)
101 (3) a8 a8 Removal of Actual Structures/Obstruction 0.35 m thick PCCP 0.35 m thick
(Reinforced)
101 (3) a9 a9 Removal of Actual Structures/Obstruction 0.38 m thick PCCP 0.38 m thick
(Reinforced)
101 (3) b1 b1 Removal of Actual Structures/Obstruction 0.15 m thick PCCP 0.15 m thick
(Unreinforced)
101 (3) b2 b2 Removal of Actual Structures/Obstruction 0.20 m thick PCCP 0.20 m thick
(Unreinforced)
101 (3) b3 b3 Removal of Actual Structures/Obstruction 0.23 m thick PCCP 0.23 m thick
(Unreinforced)
101 (3) b4 b4 Removal of Actual Structures/Obstruction 0.25 m thick PCCP 0.25 m thick
(Unreinforced)
101 (3) b5 b5 Removal of Actual Structures/Obstruction 0.28 m thick PCCP 0.28 m thick
(Unreinforced)
101 (3) b6 b6 Removal of Actual Structures/Obstruction 0.30 m thick PCCP 0.30 m thick
(Unreinforced)
101 (3) b7 b7 Removal of Actual Structures/Obstruction 0.33 m thick PCCP 0.33 m thick
(Unreinforced)
101 (3) b8 b8 Removal of Actual Structures/Obstruction 0.35 m thick PCCP 0.35 m thick
(Unreinforced)
Removal
c of Pipes other than Pipe Culverts 50mm dia. High
101 (5) c1 50 mm dia.
Density
1 Polyethylene HDPE
Removal
c of Pipes other than Pipe Culverts 75mm dia. High
101 (5) c2 75 mm dia.
Density
2 Polyethylene HDPE
Removal
c of Pipes other than Pipe Culverts 100mm dia. High
101 (5) c3 100 mm dia.
Density
3 Polyethylene HDPE
Removal
c of Pipes other than Pipe Culverts 150mm dia. High
101 (5) c4 150 mm dia.
Density
4 Polyethylene HDPE
Removal
c of Pipes other than Pipe Culverts 200mm dia. High
101 (5) c5 200 mm dia.
Density
5 Polyethylene HDPE
QUIREMENTS
Each B.5
Lump sum B.6
PS B.10
PS B.11
Lump sum B.12
Month B.14
Lump sum B.15 (1)
Each B.16
Lump Sum B.17
620
620
620
400
350
950
380
950
380
450
350
950
950
365
350
350
285
950
950
950
950
380
380
380
380
950
950
950
950
950
950
950
950
950
5350
5450
5550
5650
5700
5800
5850
6000
5850
5950
6050
6250
75
60
47
56
62
66
72
76
1100
1350
1700
1900
2500
3200
54
56
1450
1650
1800
1950
2050
2200
2993
3741
50
52
80
60
7500
8750
10000
11250
12500
13750
15000
16250
17500
18750
20000
21250
22500
23750
25000
26250
27500
52
40
220
450
35
40
20
60
80
150
100
100
40
40
35
45
42
120
4500
75
5000
60
60
60
60
60
150
150
650
150
100
90
775
150
90
1260
1100
700
875
950
950
950
870
450
500
35
60
20
903
1060
375
750 3/4''
1100
333
600
950
1000
12000
15000
18000
23000
23500
24000
29000
33000
1750
55
250
33
45
650
6000
10100
16125
2045
1000
950
1300
1700
1850
2500
2700
3500
4000
5100
650
900
1600
2000
2800
3500
3700
5800
6500
410
490
550
25
28
14
19
70
783
535
525
510
783
510
510
510
575
450
1700
2150
2300
2800
3200
1950
2250
2550
2900
3300
3700
4100
160
280
350
550
550
620
1060
800
1000
1500
1750
3500
4250
5100
12000
1450
530
620
1060
950
1600
490
490
95
225
345
1300
1650
1700
1950
1100
1950
2400
3350
21
28
28
15
20
120
145
180
200
75
7150
7360
10450
13100
20900
4500
5230
20900
943
210
215
78
110
495
495
565
565
565
565
565
565
565
565
565
565
565
565
565
565
565
250
110
70
40
70
70
250
850
60
230
230
8
110
120
410
430
75
70
45
245
250
210
47000
47000
60000
45000
45000
44000
43000
43000
45000
44000
43000
42000
36000
45000
57000
58000
45000
7600
7400
80
95
105
120
210
320
550
850
50
150
50
150
58
174
73
219
58
148
53
160
78
173
48
250
506
640
650
650
420
280
250
668
545
100
75
50
95
330
125
40
35
90
55
90
55
90
90
105
51
48
50
60
62
80
190
180
230
265
235
190
330
340
6850
4500
6500
8475
165
315
460
655
1050
1425
1985
2400
3100
3800
12
16
22
25
50
70
75
95
120
20
25
30
50
62
75
80
180
30
35
45
58
60
70
125
225
20
22
26
26
27
36
55
64
32
40
75
90
112
150
222
350
20
22
25
33
55
68
70
85
55
70
95
145
210
312
340
583
420
32
37
14
17
32
37
55
56
74
7
9
14
32
37
6
18
9
47
37
57
21
38
60
26
50
81
81
81
89
101
120
126
37
94
100
110
128
135
74
173
270
107
194
277
22
36
59
32
47
52
6
7
11
28
51
85
88
1935
1340
16500
165
5000
280
260
500
387
33
1600
193
8
282
35
100
30
16
24
160
185
230
60
65
1600
1550
2800
450
120
85
890
1700
5200
4500
6500
1900
2100
3000
1800
1850
650
550
550
4800
5500
410
421
421
180
180
190
180
195
180
1300
850
740
1500
800
300
575
780
231
494
752
7
10
12
198
72
95
126
21
9
14
18
15
23
35
5
9
33
32
32
39
366
778
1700
1957
69
103
64
100
198
46
29
24
37
29
95
130
175
230
167
360
463
1390
1287
670
32
1287
1597
443
536
800
700
1000
968
1236
1000
1236
556
1648
1442
7416
14306
2000
3700
204
22
35
50
55
800000
18000
19500
25000
Gutter
Masonry
Box Culvert
RETAINING WALL : CANTILEVER TYPE
HEIGHT = 5.00 m.
RCPC ALONG RW = YES
SIZE OF RCPC = 910
NO. OF RCPC = Single = 1
REINFORCEMENT = Double = 1
TO BE DEDUCTED = 37.53 kg
CONCRETE TO BE
DEDUCTED = 0.57 cu.m
PART C EARTHWORKS
Parapet P1 12 0.888 200 200 550 100 550 200 1.60 2,171 3,473.60 3,084.56
b1a 0.20 0.150 P2 10 0.616 300 433,900 - - 433.90 6 75 0.24 2,711.40 1,670.22
=
b1 = 0.30 S1 20 2.47 150 450 4,850 200 5.50 2,894 15,917.00 39,314.99
STEM 774.69 S3 16 1.579 150 700 4,850 200 5.75 2,894 16,640.50 26,275.35
500 VER
b2 = 0.55 S5 16 1.579 100 325 50 100 - 0.58 4,350 2,501.25 3,949.47
1000HOR
FOOTING F1 20 2.47 300 360 2,360 360 3.08 1,447 4,456.76 11,008.20
B = 2.50 F3 20 2.47 300 360 2,360 360 3.08 1,447 4,456.76 11,008.20
500 VER
c = 1.15 F6 16 1.579 100 660 50 100 - 0.91 2,610 2,375.10 3,750.28
1000HOR
HEIGHT = 5.00 m.
RCPC ALONG RW = YES
SIZE OF RCPC = 910
NO. OF RCPC = Single = 1
REINFORCEMENT = Double = 1
TO BE DEDUCTED = 37.53 kg
CONCRETE TO BE
DEDUCTED = 0.57 cu.m
PART C EARTHWORKS
Parapet P1 12 0.888 200 200 550 100 550 200 1.60 2,171 3,473.60 3,084.56
b1a 0.20 0.150 P2 10 0.616 300 433,900 - - 433.90 6 75 0.24 2,711.40 1,670.22
=
b1 = 0.30 S1 20 2.47 150 450 4,850 200 5.50 2,894 15,917.00 39,314.99
STEM 774.69 S3 16 1.579 150 700 4,850 200 5.75 2,894 16,640.50 26,275.35
500 VER
b2 = 0.55 S5 16 1.579 100 325 50 100 - 0.58 4,350 2,501.25 3,949.47
1000HOR
FOOTING F1 20 2.47 300 360 2,360 360 3.08 1,447 4,456.76 11,008.20
B = 2.50 F3 20 2.47 300 360 2,360 360 3.08 1,447 4,456.76 11,008.20
500 VER
c = 1.15 F6 16 1.579 100 660 50 100 - 0.91 2,610 2,375.10 3,750.28
1000HOR