CUTTING AND FILLING CALCULATION FOR THE PROJECT OF LANJIGARH 538

AVERAGE AVERAGE TOTAL


S.NO. DESCREPTION UOM LEVEL LEVEL HEIGHT LENGTH BREADTH AREA(CUM)

1 CRICKET GROUND
PART-1 96.63 95.90 -0.73 1467.0 -1063.6
PART-2 96.65 95.90 -0.75 1360.5 -1020.4
PART-3 96.73 96.72 -0.01 955.5 -4.8
PART-4 96.77 97.60 0.83 1533.5 1265.1
PART-5 96.75 97.35 0.60 1520.7 912.4
PART-6 96.68 96.70 0.02 1012.8 25.3

2 2.5M FLAT CIRCLE


PART-1 96.44 95.70 -0.74 152.5 -112.4
PART-2 96.48 95.85 -0.63 141.7 -88.6
PART-3 96.59 96.90 0.31 100.6 31.4
PART-4 96.66 98.25 1.59 155.4 246.7
PART-5 96.63 97.84 1.22 151.6 184.2
PART-6 96.51 96.45 -0.06 108.1 -6.8

3 2.5M 150MM INCLIND


PART-1 96.44 95.78 -0.66 159.0 -105.3
PART-2 96.48 95.93 -0.55 150.1 -82.6
PART-3 96.59 96.98 0.39 104.2 40.4
PART-4 96.66 98.32 1.66 161.4 268.4
PART-5 96.63 97.92 1.29 160.3 206.8
PART-6 96.51 96.53 0.01 108.1 1.4

4 BUILDING
CUTTING(EXCAVATION) 98.40 1.91 270.0 515.7
FILLING -2.81 60.0 -168.6
-2.51 169.0 -424.2
stairs -2.01 41.00 -82.4
TOTAL 3886
CUTTING 2212
FILLING 1674
-4.98

20880 152.21
2088

43.69

103.95
2.4
s hope s hope s hope s hope
j inglish j inglish j inglish j inglish
s smith s smith s smith s smith
m labuscha m labuscha m forde m forde
r chase r chase r chase r chase
c green c green c green c green
r shepherd K CARTY r shepherd r shepherd
s abbott s abbott s abbott X BARTLETT
a zampa a zampa a zampa a zampa
g motie X BARTLETT j hazelwood j hazelwood
a joseph a joseph a joseph a joseph

N POORAN N POORAN N POORAN N POORAN


D WARNER D WARNER D WARNER D WARNER
M MARSH M MARSH M MARSH M MARSH
T HEAD s abbott s abbott T HEAD
G MAXWELL G MAXWELL G MAXWELL G MAXWELL
A RUSSELL A RUSSELL A RUSSELL A RUSSELL
J HOLDER j inglish J HOLDER j inglish
M STONIS r shepherd M STONIS r shepherd
J HAZLEWOOD r chase J HAZLEWOOD r chase
J BEHRENDOR a zampa J BEHRENDOR a zampa
A JOSEPH A JOSEPH A JOSEPH A JOSEPH

j inglish j inglish r powell


s smith N POORAN N POORAN
M MARSH M MARSH M MARSH
b king b king b king
j charles D WARNER D WARNER
G MAXWELL G MAXWELL G MAXWELL
A RUSSELL A RUSSELL A RUSSELL
J HOLDER J HOLDER J HOLDER
M STONIS M STONIS s abbott
J HAZLEWOOD a joseph a joseph
a zampa a zampa a zampa
GRADE OF CONCRETE
CEMENT PER CUM SAND (KG) AGGREGRATE WATER
M-5 (1:5:10) 2.82 785 1440 71
M-7.5 (1:4:8) 3.48 773 1420 87
M-10 (1:3:6) 4.52 739 1386 102
M-15 (1:2:4) 6.47 704 1320 146
M-20 (1:1.5:2) 8 693 1344 180
M-25 (1:1:2) 11.3 616 1154 254
M-30 AND AS PER DSESIGN
ABOVE

GRADE OF CONCRETE
CEMENT PER CUM SAND (KG) AGGREGRATE WATER
M-5 (1:5:10) 2.82 785 1440 71
M-7.5 (1:4:8) 3.48 773 1420 87
M-10 (1:3:6) 4.52 739 1386 102
M-15 (1:2:4) 6.47 704 1320 146
M-20 (1:1.5:2) 8 693 1344 180
M-25 (1:1:2) 11.3 616 1154 254
M-30 AND AS PER DSESIGN
ABOVE

GRADE OF CONCRETE
CEMENT PER CUM SAND (KG) AGGREGRATE WATER
M-5 (1:5:10) 2.82 785 1440 71
M-7.5 (1:4:8) 3.48 773 1420 87
M-10 (1:3:6) 4.52 739 1386 102
M-15 (1:2:4) 6.47 704 1320 146
M-20 (1:1.5:2) 8 693 1344 180
M-25 (1:1:2) 11.3 616 1154 254
M-30 AND AS PER DSESIGN
ABOVE
CUTTING AND FILLING CALCULATION FOR THE PROJECT OF LANJIGARH 3563
TOTAL
S.NO. DESCREPTION UOM LENGTH BREADTH HEIGHT AREA(CUM) 1492
1 CHANGE ROOM
CUM 180.00 1.20 216.0
2 SPORT COMPLEX
SHOPS AREA 28.77 23.91 1.05 722.3 2.1
ACTIVITY AREA 1750.00 1.50 2625.0 1.05

3
99.5
TOTAL #REF!
CUTTING #REF!
FILLING 0
CUTTING AND FILLING CALCULATION FOR THE PROJECT OF LANJIGARH 3810

AVERAGE AVERAGE TOTAL


S.NO. DESCREPTION UOM LEVEL LEVEL HEIGHT LENGTH BREADTH AREA(CUM)
1.1 SWIMMING POOL CUM 98.20 100.83 3.13 17.2 26.2 1412.0
1.2 DECK 100.20 100.35 0.15 21.0 2.2 6.9
100.20 100.10 -0.10 26.5 2.2 -5.8
100.20 101.23 1.03 22.0 5.6 127.3
100.20 101.40 1.20 26.5 2.2 70.0
1.3 GREEN AREA 100.05 100.72 0.67 564.0 380.3
99.50 101.76 2.26 37.2 84.1
100.65 101.59 0.94 64.3 60.4
99.50 100.40 0.90 41.2 37.1
100.05 100.35 0.30 59.0 17.7
1.4 SETTING 100.20 99.95 -0.25 5.2 20.5 -26.7
1.5 CHANGE ROOM 100.50 101.21 0.71 70.0 49.5
2 PARKING 98.70 99.51 0.81 666.0 537.2
3 PARKING 98.00 98.50 0.50 420.0 210.0
4 PARKING 97.65 97.47 -0.18 223.0 -40.1
5 PARKING 97.30 97.28 -0.02 227.0 -3.8
6 PARKING 97.10 97.73 0.63 232.0 146.9
7 BASKETBALL COURT 99.15 98.40 -0.75 20.3 37.3 -567.9
8 TENNIS COURT 99.15 100.42 1.27 1747.0 2219.7
RAMP IN FRONT OF BASKET
9 BALL COURT 98.10 98.05 -0.05 90.0 -4.9
10 MAIN ENTRY OF COURT 99.00 99.44 0.44 30.0 4.8 62.9

RAMP IN FRONT OF VOLLEY


11 BALL COURT 99.85 100.48 0.63 90.0 56.3
RAMP BETWEEN PARKING
12 AND VOLLEY BALL COURT 100.85 101.60 0.75 100.0 75.0
13 PAVED AREA 99.00 100.32 1.32 71.0 93.9
14 FRONT PARKING 101.95 101.83 -0.12 71.0 -8.3
15 FRONT PATHWAY 102.30 102.25 -0.05 76.0 -3.8
16 RAMP 101.43 101.85 0.42 76.0 32.3
17 DG-SET 96.50 95.95 -0.55 359.0 -197.4
18 AUDITORIUM 96.95 96.55 -0.40 1116.0 -446.4
AUDITORIUM
19 SURROUNDING 96.50 96.74 0.24 1054.00 253.92
20.1 SPORT COMPLEX (SHOPS) 96.80 97.68 0.88 28.17 23.31 577.85
20.2 SPORT COMPLEX 101.00 99.70 -1.30 1593 -2070.9
21 GREEN AREA 100.10 99.08 -1.02 200 -205
22 GREEN AREA 100.10 100.30 0.20 133.00 26.60
23 GREEN AREA 100.70 99.80 -0.90 240.00 -216.00
24 GREEN AREA 100.15 101.88 1.72 365.00 629.62
BACK SIDE OF SPORT
25.1 COMPLEX 99.65 98.33 -1.32 920.00 -1212.56
BACK SIDE OF SPORT
25.2 COMPLEX 99.65 100.43 0.77 301.00 233.27
26 PARKING 100.675 101.57462 0.90 817.00 734.99
27 PATHWAY 99.65 99.075 -0.58 99.00 -56.93
28 GREEN AREA 99.5 99 -0.50 606.00 -303.00
29 GREEN AREA 96.78 97.06 0.28 404.00 111.77
30 PATHWAY 95.65 97.03 1.38 116.00 160.47
31 PATHWAY 96 95.85 -0.15 181 -27.15
32 PARKING 95.85 95.85 0.00 461.00 0.00
33 ROAD
1 101.15 101.73 0.58 286.00 165.88
2 98.85 99.48 0.63 414.00 260.82
2.1 FOOTHPATH 99 99.48 0.48 98.00 47.04
3 96.83 97.45 0.62 573.00 353.35
4 96.28 95.87 -0.42 348.00 -145.00
5 95.85 96.17 0.32 710 228.21
6 97.55 97.51 -0.04 368 -13.80
7 99.73 99.11 -0.62 713 -445.62
8 101.0 101.85 0.82 426 347.90

TOTAL 15796
CUTTING 9803
FILLING 5993
1490 5300

271.10437

650

554
2625

99.5