1 CRICKET GROUND
PART-1 96.63 95.90 -0.73 1467.0 -1063.6
PART-2 96.65 95.90 -0.75 1360.5 -1020.4
PART-3 96.73 96.72 -0.01 955.5 -4.8
PART-4 96.77 97.60 0.83 1533.5 1265.1
PART-5 96.75 97.35 0.60 1520.7 912.4
PART-6 96.68 96.70 0.02 1012.8 25.3
4 BUILDING
CUTTING(EXCAVATION) 98.40 1.91 270.0 515.7
FILLING -2.81 60.0 -168.6
-2.51 169.0 -424.2
stairs -2.01 41.00 -82.4
TOTAL 3886
CUTTING 2212
FILLING 1674
-4.98
20880 152.21
2088
43.69
103.95
2.4
s hope s hope s hope s hope
j inglish j inglish j inglish j inglish
s smith s smith s smith s smith
m labuscha m labuscha m forde m forde
r chase r chase r chase r chase
c green c green c green c green
r shepherd K CARTY r shepherd r shepherd
s abbott s abbott s abbott X BARTLETT
a zampa a zampa a zampa a zampa
g motie X BARTLETT j hazelwood j hazelwood
a joseph a joseph a joseph a joseph
GRADE OF CONCRETE
CEMENT PER CUM SAND (KG) AGGREGRATE WATER
M-5 (1:5:10) 2.82 785 1440 71
M-7.5 (1:4:8) 3.48 773 1420 87
M-10 (1:3:6) 4.52 739 1386 102
M-15 (1:2:4) 6.47 704 1320 146
M-20 (1:1.5:2) 8 693 1344 180
M-25 (1:1:2) 11.3 616 1154 254
M-30 AND AS PER DSESIGN
ABOVE
GRADE OF CONCRETE
CEMENT PER CUM SAND (KG) AGGREGRATE WATER
M-5 (1:5:10) 2.82 785 1440 71
M-7.5 (1:4:8) 3.48 773 1420 87
M-10 (1:3:6) 4.52 739 1386 102
M-15 (1:2:4) 6.47 704 1320 146
M-20 (1:1.5:2) 8 693 1344 180
M-25 (1:1:2) 11.3 616 1154 254
M-30 AND AS PER DSESIGN
ABOVE
CUTTING AND FILLING CALCULATION FOR THE PROJECT OF LANJIGARH 3563
TOTAL
S.NO. DESCREPTION UOM LENGTH BREADTH HEIGHT AREA(CUM) 1492
1 CHANGE ROOM
CUM 180.00 1.20 216.0
2 SPORT COMPLEX
SHOPS AREA 28.77 23.91 1.05 722.3 2.1
ACTIVITY AREA 1750.00 1.50 2625.0 1.05
3
99.5
TOTAL #REF!
CUTTING #REF!
FILLING 0
CUTTING AND FILLING CALCULATION FOR THE PROJECT OF LANJIGARH 3810
TOTAL 15796
CUTTING 9803
FILLING 5993
1490 5300
271.10437
650
554
2625
99.5