You are on page 1of 1

A p c0x I A*rr

Project r INSULATION PlptNG DAN EeUIPMENT SDO


Contractor : PT. ANIS JAYA RAYA
P.o : 4500293873
Location : MARUNDA, JAKARTA UTARA

RFr ( )
Number OO I I RFI/SDO-A.I R INS/V/23 Date 24t05t2023
Revision
Subject : Change Material Rockwool Blanket with NBR for Line Chilled Water at SN-2
Work ltems
lnsulation D HDPE Others

Herewith we ng quantiy of Material NBR

1. Material for Chilled Water Line at SN-2 1 Pipe l-.5" 76,00 m


Eil 90 1.5" 30,00 ea
FIg 1.5" 8,00 ea
Valve 1.5" 2,04 ea
2 Pipe 2" 1.2,00 m
Ell 90 2" 1,00 ea
Flg Z" 4,00 ea
3 Pipe 3" 12,O0 m
Ell90 3" 1,00 ea
Flg 5 4,00 ea

Prepared by, Approved by,


PT. ANIS JAYA RAYA PT. Sari Dumai Oleo
.@L

Z-
4 \P a
5

lzalGhazali Nc