PEKERJAAN : PEMASANGAN FLOWLINE Ø 3" SCH 40 DAN GASLINE Ø 2" SCH 80 DARI SUMUR OGAN A 4
KE SP OGAN FIELD PRABUMULIH REGION SUMATERA
REKAPITULASI
BIAYA PELAKSANAAN
JUMLAH
NO URAIAN PEKERJAAN BIAYA
RP
I MATERIAL 60,917,305
II PENGADAAN MATERIAL UTAMA -
A JASA -
B PERSIAPAN DAN MOBILISASI. -
C PEKERJAAN KONSTRUKSI 1,170,000
1 FLOWLINE SUMUR OGAN A4 265,217,156
2 GASLINE SUMUR OGAN A4 240,000
D PENGUJIAN & TIE IN 1,500,000
E PEMBERSIHAN DAN DEMOBILISASI. 3,245,125
Terbilang :
1
NO. LELANG : ………………………………………..
PEKERJAAN : PEMASANGAN FLOWLINE 3"SCH 40 dan Gasline 2" SCH 80" DARI SUMUR OGAN .A 4
KE SP OGAN FIELD PRABUMULIHPT PERTAMINA EP REGION SUMATERA
HARGA JUMLAH
NO URAIAN VOL & SAT SATUAN HARGA
RP RP
TOTAL A 50,292,685
10,624,620
2
NO. LELANG : ………………………………………..
PEKERJAAN : PEMASANGAN FLOWLINE Ø 3" SCH 40 DAN GASLINE Ø 2" SCH 80 DARI SUMUR OGAN A 4
KE SP OGAN FIELD PRABUMULIH REGION SUMATERA
RINCIAN BIAYA
HARGA SATUAN JUMLAH JUMLAH BIAYA (RP)
TOTAL
No. URAIAN PEKERJAAN VOL & SAT SATUAN HARGA
UPAH MATERIAL ALAT TRANSPORTASI
I. PENGADAAN MATERIAL
1 Pengadaan Material Utama 1.00 Paket 60,917,305 60,917,305 60,917,305
Sub. Total I 60,917,305
II JASA ###
A PERSIAPAN DAN MOBILISASI.
1 Mobilisasi peralatan kerja/bahan. 1.00 Hari 345,000 825,000 1,170,000 1,170,000
2 Membuat tenda 1.00 Unit 167,625 167,500 335,125 335,125
3 Dokumentasi 1.00 Lot - 240,000 - - 240,000 240,000
4 Penjagaan peralatan dan material 30.00 Hari 50,000 - - - 50,000 1,500,000
Sub. Total II.A 3,245,125
B TRANSPORTASI PEKERJAAN
1 Pick up selama pekerjaan ( 1 Unit ) 30.00 Hari 350,000 350,000 10,500,000
Sub. Total II.B 13,745,125
C PEKERJAAN MEKANIKAL
1. PEMASANGAN FLOWLINE OGN A4
a Mengecer pipa Ø 3" sch 40 254.00 joint 3,533 1,442 - 4,975 1,263,650
b Memotong & bevel pipa Ø 3"sch 40 16.00 Ttk 3,363 44,740 941 - 49,044 784,704
c Memotong & bevel pipa Ø 2"sch 40 2.00 Ttk 1,876 29,250 525 - 31,651 63,302
d Menyetel,mengelas pipa Ø 3" sch 40 248.00 joint 23,462 23,962 20,769 - 68,193 16,911,864
e Memasang valve Ø 3" - 300 # 3.00 pcs 31,000 3,000 - 34,000 102,000
f Memasang valve Ø 2" - 300 # 1.00 pcs 25,833 2,500 - 28,333 28,333
g Menyetel, mengelas Flange Ø 3" - 300 # 9.00 Psc 14,808 23,962 20,769 - 59,539 535,851
h Menyetel, mengelas flange Ø 2" - 300 # 5.00 pcs 10,694 17,306 15,000 - 43,000 215,000
i Menyetel, mengelas elbow Ø3" - 45°/90° sch 40 15.00 pcs 22,212 35,942 31,154 - 89,308 1,339,620
3
NO. LELANG : ………………………………………..
PEKERJAAN : PEMASANGAN FLOWLINE Ø 3" SCH 40 DAN GASLINE Ø 2" SCH 80 DARI SUMUR OGAN A 4
KE SP OGAN FIELD PRABUMULIH REGION SUMATERA
RINCIAN BIAYA
HARGA SATUAN JUMLAH JUMLAH BIAYA (RP)
TOTAL
No. URAIAN PEKERJAAN VOL & SAT SATUAN HARGA
UPAH MATERIAL ALAT TRANSPORTASI
j Menyetel, mengelas elbow Ø 2" - 90 ° sch 40 1.00 pcs 16,042 25,958 22,500 - 64,500 64,500
k Menyetel, mengelas tee Ø 3" x 3" x2" sch 40 1.00 pcs 26,873 43,456 37,602 - 107,931 107,931
l Menyetel, mengelas reduser Ø 3" x 2 " sch 40 1.00 pcs 17,001 27,511 23,846 - 68,358 68,358
m Menanam & mengangkat pipa Ø 6 " ( road crossing ) 32.00 M 14,300 1,250 - 15,550 497,600
n Menaman & mengangat pipa Ø 3 " sch 40 3,015.00 M 14,300 - 2,500 16,800 50,652,000
o Membalut/wraping Ø 3 " sch 40 ( inner & outer,holiday test ) 3,015.00 M 914 28,452 580 29,946 90,287,190
p Memasang centralizer pipa Ø 3 " sch 40 20.00 Pcs 15,417 50,000 - 65,417 1,308,340
q Memasang end seal pipa Ø 3 " sch 40 8.00 Psc 15,417 50,000 580 65,997 527,976
r Mengecat pipa Ø 3 " sch 40 dengan cat menie 1 x dan cat kilap 2 x 75.00 M 533 5,129 10 5,672 425,400
s Mengecat pipa Ø 2 " sch 40 dengan cat menie 1 x dan cat kilap 2 x 6.00 M 533 5,129 10 5,672 34,032
Sub. Total II.C.1 165,217,651
4
NO. LELANG : ………………………………………..
PEKERJAAN : PEMASANGAN FLOWLINE Ø 3" SCH 40 DAN GASLINE Ø 2" SCH 80 DARI SUMUR OGAN A 4
KE SP OGAN FIELD PRABUMULIH REGION SUMATERA
RINCIAN BIAYA
HARGA SATUAN JUMLAH JUMLAH BIAYA (RP)
TOTAL
No. URAIAN PEKERJAAN VOL & SAT SATUAN HARGA
UPAH MATERIAL ALAT TRANSPORTASI
sistim flange Ø 3 " - 30 #
### 1.00 Ttk 37,000 37,000 37,000
sistim flange Ø 2 " - 30 # 1.00 Ttk 35,000 35,000 35,000
d Tie in dengan sistim flange
sistim
Tie screw Øsistim
in dengan 2" flange 1.00 Ttk
Sub. Total II.D 2,357,000