You are on page 1of 1

SL-270 SR-273 S-211 / 221 FE-311 / 321 / 331 FCV-411 / 421 / 431 PCV-411 / 421 / 431

VENT TO SAFE AREA


VENT TO SAFE AREA VENT TO SAFE AREA
VENT TO SAFE AREA

TOV
STATION

SL-270 1 2 SR-273
AG
UG

BV-271 BV-272
STATION STATION

TP
02

BY PASS
PROVISION

TP
01 5C 6C 7A 8A 9A
FCV-411 PCV-411
USM
FE-311 (NOTE 5, 6)
3A (NOTE 3, 4)

S-211 4A
(NOTE 2)

GC
NPS 36 PGU II-SECTOR 2

NPS 36 PGU II LOOP 2

BY PGB BY OTHER
5A 6A 7B 8B 9B
FCV-421 PCV-421
USM
FE-321 (NOTE 5, 6)
3B 10
(NOTE 3)
TP
S-221 4B 03 REVISION CONTRACTOR OWNER
(NOTE 2)

BY PASS
PROVISION

5B 6B 7C 8C 9C
USM FCV-431 PCV-431
FE-331 (NOTE 5, 6)
(NOTE 3)
0 22/07/21 APPROVED FOR CONSTRUCTION IJS NZJ MAA MSMS AFAM JJS

DRF EM PM DE EM PM
REV. DATE DESCRIPTIONS
DRAWN CHK'D APP'D REV'D ENDORS'D APP'D

OWNER
PETRONAS GAS BERHAD (101671-H)
SEGAMAT OPERATION CENTRE
GAS TRANSMISSION & REGASIFICATION
KM 10, LEBUHRAYA SEGAMAT - KUANTAN
85000 SEGAMAT
JOHOR DARUL TAKZIM
MALAYSIA

CONTRACTOR
AXIANERGY (M) SDN. BHD.
NO.18 & 18-1, PERSIARAN METRO SENDAYAN 1,
SENDAYAN METRO PARK,
71950 BANDAR SERI SENDAYAN SEREMBAN,
NEGERI SEMBILAN
TEL : 06-792-2154 FAX : 06-792-2451

SUB CONTRACTOR

PROJECT
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING
(EPCC) OF NPS 36 PULAU INDAH LATERAL PIPELINE PROJECT (TULIP)

CONTRACT NO JOB NO

RFP-000000000263/1004 -

DRAWING TITLE
PROCESS FLOW DIAGRAM

DRAWING NO. SHEET SCALE REV.

TULIP-EPCC-EXE-AXN-SARO-PRO-PFD-001 1 OF 1 N.T.S 0

You might also like