You are on page 1of 6

CURRICULAM VITAE

SHAIK BAJI
bajishaikh92@gmail.com
M0b.no: 0091 – 6281936843
POST APPLIED FOR : MECHA. MAINTENANCE SUPERVISOR
Professional Summary:
A competent well experienced as Mechanical Engineer in Rotating & Static and
Piping department of Maintenance, Commissioning, Turnaround & Quality
projects and worked internationally in various world class facilities of
MIDDLE EAST: MELLITHA OIL & GAS services, SABIC, ADNOC, KUWAIT OIL COMPANY,
RAS GAS, SPETCO INTERNATIONAL PETROLEUM COMPANY, SALALAH METHONAL COMPANY,
KCPC
INDIA: RELIANCE (Jam Nagar, Dahej, Nago Thane, Hazeera),
HPCL & MITTEL ENERGY LTD (PUNJAB -3 times),
HPCL REFAINERY- MUMBAI, APGENCO, ANDHRA PAPER LIMITED,
NABHA POWER LIMTED, AND JAYA LAXMI OIL AND CHEMICALS LIMITED
having over 18 years of extensive experience in the production facilities maintenance of upstream
and downstream industries like Oil and Gas, Petrochemical refainaries.

Technical and Academic Qualification


 Diploma in Mechanical institute of Engineering Management, from Karnataka State
Open University, Karnataka, India.
 ITI/NTC passed in first class in July 1997 from department of technical education &
training, Andhra Pradesh, India.
 National Council for Vocational Training passed in department of employment and
training, Andhra Pradesh, India, (Provisional National Apprenticeship – 2003)
 Diploma in Computer Applications: Passed in A+ grade, Andhra Pradesh, India-2012
Professional Safety Training Attended:
 MELLITHA OIL & GAS (MELLITHA LIBYA)
 SABIC – SAUDI ARABIA * (IBN RUSHED)
 ADNOC – ABUDHABI * (BAROUGE-3 & HABSHAN)
 RAS GAS – QATAR
 KUWAIT OIL COMPANY – KUWAIT * (BURGAN & MINAGUISH)
 SALALAH MITHONAL COMPANY – OMAN
 RELIANCE – INDIA (JAMNAGAR, DAHEJ, HAZEERA & NAGOTHANE,)
 HPCL & MITTEL ENERGY LTD – PUNJAB * (BHATINDA)
 HPCL REFAINERY * (MUMBAI)

1) Interactive Safety induction, 2) Basic and Signatory training on HSE


3) Hydrogen sulfide Use of Breathing Apparatus Set,
4) Permit to work, 5) Job Safety Analysis, 6) Confined Space Entry,
7) Acid Gas Injection, 8) Fire and Safety watch
AS A PERMIT HOLDER & RECIEVER:
 Good knowledge in work permit system and Coordinate daily toolbox talk
 To attend the toolbox meetings to establish scope of work activities such as safety
requirements permit to work, Logout / Tag out procedure, special tools and materials.
 To comply with all company Health Safety and Environment as well as work permit,
policies and procedure
EXECELLELENT SKILLS IN THE PROJECT S OF:
MAINTENANCE, ERACTION, COMMISSINING & TURNAROND

S.NO DETAILS OF EXPERIENCE

0 ROTATING EQUIPMENT ENINEER For Shutdown & Start up


Reliance Industries Limited – Jaam Nagar ( SEZ - FCC)
Through: Man Turbo Energy Solutions (Vendor)
From 4th September 2022 to 6th October2022
1 ROTATING EQUIPMENT ENINEER For Shutdown & Start up
MELLITHA OIL & GAS services - LIBYA
Through: BONNATI
From June 2022 to July 2022

2 MECHANICAL COMMISSIONING ENGINEER


Commissioning & Startup (HDPE & PPU)
(HMEL)Hpcl & Mittel Energy Limited Batinda, Punjab, India.
THROGH: Promantec Consultants Pvt Ltd.(Third party rolI
Contract). From February2022 – June2022

3 ROTATING EQUIPMENT ENINEER For Maintenance Shutdown & Start up In


Reliance Industries Limited, Dahej (PET 5&6)
Through: TUV Nord (Third party roll Contract)
From November 2021 to December 2021

4 FIELD ENGINEER MECHANICAL ROTARY


Erection & Commissioning, Startup
(CCR<ISOM< DHT & PRIME- G)
Hindustan Petroleum Corporation Limited - Mumbai India.
THROUGH: Aarvi Encon Pvt limited. (Third party roll Contract).
From March 2021 to November 14/11/2021

5 SENIOR. MECHANICAL EXECUTIVE ROTARY


Turnaround < Commissioning & Startup (FCCU)
(HMEL) Hpcl & Mittel Energy Limited Batinda, Punjab, India.
THROUGH: Bonace Engineering Pvt Ltd. (Secondment/Third party roll
Contract). From February2020 - February2021

6 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In Andhra Paper Ltd, Kadium, India. Through Turbo Tech Engineering.
From October 2020 – November 2020

7 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In ApGenko, Nellore, India. Through Surya Sai Engineering Ltd
From September 2020 – October 2020.

8 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In Nabha Power Ltd, Punjab, India. Through Green Solo ( JS TURBO)
From January 2020 – March 2020

9 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In SABIC (Ibn Rushd),Yanbu . Through SMH (Royal Enter Prises Ltd)
From March 2019 – MAY 2019.
10 ROTATING EQUIPMENT FOREMAN For Turnaround Project
In ADNOC (Borouge-3) Ruwais, Through Mitsubishi Hitachi Power system
(ERAM) ,From December 2018 – February 2019.

11 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In RELIANCE Industries Ltd, HAZEERA & NAGOTHANE (SBR & LDPE)
Through Roto Start Services. From September 2018 – October 2018

12 ROTATING EQUIPMENT SUPERVISOR For Turnaround Project


In SALALAH METHONAL COMPANY – OMAN. Through TOCO (Adyrd
Interservice LLC – LLC – Abudhabi). From March 2018 – July 2018

13 ROTATING EQUIPMENT TECHNICIAN F or Turnaround Project (Bab Gas)


In Adnoc (Habshan) Through Mitsubishi Hitachi Power Systems (Eram)
From January 2018 – February 2018.

14 ROTATING EQUIPMENT TECHNICIAN For Maintenance Project (MSRT)


Kuwait Oil Company, (Minaguish). Through Hot Engineering & Constructions Co –
Kscc, Kuwait. From October 2013 – September 2017

15 ROTATING EQUIPMENT TECHNICIAN For Commissioning & Startup Project


In Kuwait Oil Company, (Minaguish). Through Safwan Petroleum Technologies
Company W.L.L (SPETCO)-Kuwait. From August 2014 - Feb 2015.

16 MECHANICAL EXECUTIVE (ROTARY) For Commissioning & Startup(FCCU)


(HMEL)Hpcl – Mittel Energy Ltd Bhatinda, India.
Through Aarvi Encon limited. (Secondment / Third party roll Contract)
From February 2012 -- September 2013.

17 ROTATING EQUIPMENT TECHNICIAN For Commissioning & Maintenance


(AKG # 1&2) Ras Gas - Qatar (Ras Lafan). Through TransField Services.(Twt)
From May 2010 – October 2011

18 ROTATING EQUIPMENT TECHNICIAN For Maintenance Project In


Kuwait Oil Company (Burgan), Kuwait. Through M/S Al-Meer Technical
Services Co WLL. From June 2009 – May 2010.

19 ROTATING EQUIPMENT TECHNICIAN For Maintenance Project In


Kuwait Company for Process Plant Construction, Kuwait.
(BENNING GHOVEN-GERMAN technology plant). From Aug 2006 – July 2008

20 MECHANICAL MAINTENANCE FOREMAN For Maintenance Project In


Jaya laxmi Oil & Chemical industries Limited, India.
From Aug 2001 – June 2006.

Professional Expertise & Core Competencies in


Multiple projects of Maintenance, & Commissioning , Turnarounds, Carrying out of
projects as per Standard Quality Procedures and Safety rules and regulations. And
good experience in Planning, Organization & Controlling. Under third roll project
handle the contractors(PMC&EPC)+200 man power,
Coordination and support for the multiple assignments of projects completes
Construction, commissioning, Maintenance & Turnaround project.
various types of Plant Piping, Static & Rotating equipments such as roto dynamic & Positive
displacement pumps, compressors, turbines, blowers, agitators, gearboxes, finned air
coolers, heat exchangers, heating oil burners, granulators, feeding screw & chain belt
conveyors, processing line valves, rotary valves and pneumatic cylinders and equipment
related pipe and Fabricate works, and special tool designing for dismantling critical.
► OPERATION & MAINTENANCE PROJECTS:
 Overhauled various types of process equipment during, routine, planned, unplanned and
condition based maintenance i.e.
shutdowns, turnarounds without loss time injuries. Onsite trouble shooting and fault
diagnosis of running rotating equipment and turbo machinery.
 Exhibiliting proficiency in planning and organizing daily maintenance, emergency and
project works including Inspections of rotating equipments
 Analyzing facilities, conducting root cause failure analysis. Initiating/defining scope of
inspections & repairing, preparing procedures, creating programs for predictive
maintenance monitoring of complex rotating equipments and system, directing predictive
maintenance monitoring and documenting equipment history in order to improve plant
equipments efficiency.
 Identify issues, seeking assistance and implementing improved reliability programs to
reduce unplanned down time and maintenance cost.
 Service as advisor to operation and maintenance, assisting with the operation performance
monitoring and repair of plant equipments
 Initiating requisitions for required materials, tools and contractor services as required
 Actively participate in the safety process assuring work plans, company standard policies
and procedures as per HSEMS
Reviewing works prior to start and ensuring materials, resources, information and tools
are on hand to active high level of craft productivity

MAJOR ACTIVITIES:
GAS TURBINES: MAN DIESEL & TURBO SE and RUSTON TA 1500(GT).
Daily monitoring and collecting data measures under routine planned maintenance, and take
the correct action in breakdown condition, inspection, servicing and reinstallation of parts in
major planned shutdowns. All these analyzing records maintain for equipment life & improve
the plant efficiency
Inspection and replacing the various major components of Air filter elements, combustion hot
path elements, Bov & Igv and turbine internal & externals and supporting,
10&13 stages Gas generator (THM 1304) crank washings and alignments
Sub system of Lubricating, Cooling media, Vapor extraction unit equipments pumps, filter
elements, strainers replacing, servicing, installations and startups.
STEAM TURBINES: MITSUBISHI HITACHI POWER SYSTEM, ELLIOT EBARA, SIEMENS, MAN TURBO,
ABB
Major& Minor activities inspection & replacing of Bearings, Control unit valves, gland seals
and internal & externals, rotor inspections of steam turbine

CENTRIFUGAL COMPRESSORS: MCL & BCL (INLINE & BACK – BACK)


MITSUBHISHI HITACHI POWER SYSTEM SIEMENS, ELIOT, MAN TURBO & DIESEL SE, THERMODYN,
Major activities of Bearing inspections, Dry gas seals replacements, rotor inspections, Axial
floats, alignments, centering, startups.
RECIPROCATING COMPRESSOR: Cooper Bessemer, Ariel & Dresser Rand
Inspection and replacing of Valves, packing’s, rings, bearings, settings and adjustments
Flushing’s, functional tests, alignments, data measures.
PUMPS: HORIZONTAL AND VERTICAL MOUNTED SINGLE & MULTI STAGE
THERMOMECANNICA – MWIP KOC ,(Oil Well Feed water injection)
INGERSALRAND AND KIRLOSKAR BROTHERS (Condensate Extraction Pump)
Gear boxes, Agitators, Heat exchangers, heating oil burners, scrapers, conveyors ,
valves, Fin fans Ect…related special tools designing’s, pipe and fabricate works.
► MAJOR ACTIVITIES IN TURNAROUND PROJECT
DISMANTLING, INSPECTION, INSTALLING AND STARTUP
 Ensure all preparations completed before Dismantling of turbines, and procedures to be
sequences under safe standard procedures for Turbine rotor removal.
 Turbine accessories should inspected as per recommended specific codes and standard
 Visual, dimensional and body condition of rotors, bearings, casing condition, internals,
externals and supporting
 Replaceable parts should be ensure of specific code and standard, material, design, its
package under Preservation,
 Maintain the all clearances under the tolerances as per manufacture protocols
 Witnessing preparation and inspection of specific testing’s as per recommended
 Ensure final box up inspection clearance like short bolting, torque, standard rating gasket &
face inspections as per specific code and standards
 TA-MECHANICAL: Rotor replacement, position and leveling checks, float and alignments,
installations & calibrations as per recommended procedures
 Clearness of Sub system of lube oil and cooling media flushing, filter element replacement
and calibrations, auto cuts, dor and box up checks for Start up of main systems
 STARTUP PROCEDURES: Sub system of lube oil and cooling media flushing, filter element
replacement and calibrations, auto cuts and solo runs of drivers final alignment. Mechanical
Run & Performing tests, under capacity testing check all parameters are in as per
manufactures recommended data sheet, and finally check the equipment tripping system for
protection and working under normal operational conditions.
 To carry out of alignments works, Rim and Face, Rivers, Graphical methods, Straight edge
method and Chain & Sprocket drives Alignments

► ERACTION, PRE-COMMISSIONING & COMMISSIONING REFINERY PROJECT:


AKG 1&2, PPU, GAS RE-INJECTION PLANT, GAS COMPRESSION PACKAGE, ISOM, CCR,
PRIME-G & FCC,
 Coordination with safety department. Supervise, Manage and support subcontractors to
proceed with construction effectively in accordance with project specifications under safe
conditions. Ensure effective implementation of preservation activities on equipments & system
with the project.
 Ensure necessary construction drawings and materials in advance of construction
implementation. Manage construction progress by checking daily, weekly and monthly work
done quantities and prepare construction reports. Supervise and ensure construction
quality in accordance with project specification and ITP,
 Inspection and audits of site Installing procedures and installations as per recommended
drawings P&ID and ISO & GAD.
 Supervision the timely completion of projects to daily monitoring of progress, preparing of
assignment plans, schedules, based on priorities for Pre-commissioning & Commissioning
activities. Such as Erection audit, Alignment checks, Mechanical clearance, Hydro testing,
Cleaning, Flushing, Box-ups, Punching list, Pre-commissioning, Commissioning, Machine
Test runs, Plant start-ups, ect for all Rotary & Static Equipments.
 Ensure all checks completed and health condition of Sub system.
 Commissioning execution, calibration & testing of instruments prior to installation, visual
inspections for mechanical completions and correct installation
 Preparation & develop of designed test procedures for field performing test phase
their functioning smooth in pre-functional and functional tests by Load variations & flow.
 Coordinate with other disciplines or departments to resolve interface issues. Monitor and
check daily activities, Coordinate the activity between external & internal stakeholders,
especially clients.
 Monitoring of work progress and progress weekly reports of status of each assignment,
ensuring all procedures and calculations are submitted to the client for review and approval.
Execute and submit inspection documentation works for static and rotating equipments to
assure that the required that the required forms used in testing submitted are approved by
client representative as per ITP such as
 Installation checklist for static/rotating equipments
 Inspection, Pressure testing, Flushing and mechanical checkouts
 Axial/radial, soft foot parallelism forms for Rotating equipments.

PERSONAL DETAILS:
Name : Shaikh Baji
Fathers Name : Mastan
National : Indian
Date of Birth : 16th May 1979
Marital Status : Married
Language Known: English, Hindi, Urdu, Tamil and Telugu
Present Address : Arundalpet, Narasaraopet (post)
Guntur (District), AndhraPradesh (State), India-522601

CONTACT DETAILS:
Mobile No : 0091 - 6281936843
Email Id : bajishaikh92@gmail.com
Skype Id : Shaikh Baji (live: bajishaikh92)
Rotating Equipment Supervisor,
Andhra Pradesh, India.

PASSP0RT DETAILS :
Passport Number: V5413037
Place of Issue : VIJAYAWADA
Date of Issue : 21/12/2021
Date of Expiry : 20/12/2031

Declaration
I hereby declare that the information mentioned above is correct to the best of my
knowledge.

SHAIK.BAJI
+916281936843
bajishaikh92@gmail.com

*** cowed 2 vaccination done

You might also like