20
1500
32ØCWL
50ØVS @HIGH LEVEL 50ØVS
200ØDP 25ØGV
CO 100ØSP
25ØWM 100ØSP CO
CO CO INLET
OUTLET CO
10.20
11.40
HB
PLAN
32ØCWL 25ØGV 32ØCWL
AD
SEPTIC TANK
@HIGH LEVEL 25ØWM @HIGH LEVEL 100ØSP
600 X 600 MM
MANHOLE COVER
W/ RETRACTABLE
VARIES
AD
25ØCV 1000 1000 1500
25ØWM LIFTING HANDLE
2.00
25ØGV (TYPICAL) CO CO CO CO CO CO CO
AD AD 100ØBD 100ØBD 100ØBD
50
50
50
200ØDP 200ØDP 100ØDS 100ØDS 100ØDP OFFSET 100ØDS
300
300
300
TAP TO NEAREST SEWER/DRAINAGE LINE SECOND FLOOR INLET
(VERIFY@SITE) 100Ø SP
1800
DRAINAGE LINE
(VERIFY@SITE) TAP FROM NEAREST
2 PLUMBING LAYOUT OUTLET
WATERLINE LINE P2 2 SCALE 1:100m
(VERIFY@SITE)
GROUND FLOOR
1 PLUMBING LAYOUT S=0.5% S=0.5% S=0.5% S=0.5% S=0.5% S=0.5%
P2 2 SCALE 1:100m
SECTION
18.70
75ØGD 75ØGD 75ØGD 75ØGD 75ØGD 75ØGD
75ØDS 75ØDS 75ØDS 75ØDS 75ØDS 75ØDS
50Ø VENT 480 STAINLESS STEEL
GREASE TRAP
50Ø WS CAP.= 4 GPM (MIN.)
FR. SINK "METMA", "UNILEX"
BRAND
25Ø CWL 50Ø WP
400
20Ø CWL PLAN
10.20
WC C.O.
100Ø SP
280
FD C.O.
50Ø WP
CO
BAFFLES
REMOVABLE
BASKET
STAINLESS STEEL
GREASE TRAP
CAP.= 4 GPM (MIN.) SECTION 50Ø DRAIN
ROOF ISOMETRIC "METMA",
BRAND
PIPE
3 PLUMBING LAYOUT
P2 2 SCALE 1:100m 4 DETAIL OF GREASE TRAP
ROUGHING-IN OF TOILET AND BATH P4 7 SCALE NTS
CONSULTANT: PROJECT TITLE: DESIGNED/DRAWN BY: SHEET CONTENTS: MARK COMMENT/S DATE
R.A. 9266 (REPUBLIC ACT OF 2004)
-
- GROUND FLOOR PLUMBING LAYOUT
SECOND FLOOR PLUMBING LAYOUT
2
P
ALL DESIGNS, DRAWINGS, SPECIFICATIONS AND COPIES THEREOF, PREPARED DATE FINISHED: 10-2019
MASTER PLUMBER AND FURNISHED BY THE ARCHITECT IN THE CONNECTION WITH THIS PROJECT, ROOF PLUMBING LAYOUT
ARE INSTRUMENTS OF PROFESSIONAL SERVICE, AS INSTRUMENTS OF
CHECKED BY: ROUGHING-IN OF TOILET AND BATH
PROFESSIONAL SERVICE THEY ARE THE PROPERTY OF THE ARCHITECT DETAIL OF GREASE TRAP
ADDRESS: - WHETHER THE WORK FOR WHICH THEY ARE MADE MAY BE EXECUTED OR NOT, - DETAIL OF SEPTIC TANK
OWNER:
-
AND ARE NOT TO BE REPRODUCED OR USED ON OTHER WORK EXCEPT BY
WRITTEN AGREEMENT WITH THE ARCHITECT
DATE CHECKED: 2
10-2019