You are on page 1of 5

Doc No:

DERMAGA GMS2-EXE-DER-MLNG-CVS-JHA-
MALAYSIA
OIL & GAS 0001
LNG DUA
SDN BHD MLNG Document No:
SDN. BHD

Revision: A
PROVISION OF EPCC FOR GMS1 & GMS 2 SUPERVISORY
COMPUTER AND FLOW COMPUTER UPGRADE FOR MALAYSIA Page 1 of 5
LNG SDN. BHD.

PROJECT : PROVISION OF EPCC FOR GMS1 &


GMS 2 SUPERVISORY COMPUTER
AND FLOW COMPUTER UPGRADE
FOR MALAYSIA LNG SDN. BHD.

CLIENT : MALAYSIA LNG DUA SDN. BHD.

CONTRACT NO. : DTC0BTU/MLNG/2018/38

DOCUMENT TITLE : JOB HAZARD ANALYSIS FOR


SCALFOLDING INSTALLATION
AND DISMANTLE

A 26-08-19 ISSUE FOR REVIEW MSMS MAR SAAR


Prepared By Reviewed By Approved By
Discipline Technical Project
Revision Date Description Engineer Manager Manager
DERMAGA OIL & GAS SDN BHD
DOCUMENT REVIEW STATUS
PETRONAS LNG COMPLEX
JOB HAZARD ANALYSIS

Serial Number: TBA Owner: TBA


Revision number A Date Created: 26/08/2019 10:00

Job Title Scaffolding Installation and Dismantle

Status TBA

Area MLNG

Author Mohamad Safuan B Mohammad Somari

Job Hazard Analysis Members

No Name Department Status Date Time

Contractors

Dermaga Oil & Gas Sdn. Bhd.

Worksheet

Job Safety Analysis Worksheet

No. Description of Job Step Potential Who or what might Control Measure Action Party
hazard/Risk be harmed

Mobilization

1 Mobilize / Demobilize of Traffic Accident People & Asset To provide banks-man for Work Leader &
equipment and personnel vehicle reverse, negotiate Driver
using; corner / congested road.
i) Pickup Truck Strictly comply with plant
ii) Van speed limit

Materials fall from People & Asset Materials must be secured Work Leader &
pickup and latched properly. Driver
Protruding of materials
must not be > 1m from
vehicle.
No overhanging &
overloading materials and
tools on truck.

Source of ignition People & Asset Vehicle ignition key to be Work Leader &
while entering the switch off upon hearing the Driver
process area emergency alarm
Vehicle side window to be
open - alarm sound more
clear
Vehicle must strictly
comply with the General
Traffic Rules stipulated in
MLNG Traffic & Vehicle
Regulations
Comply with PTW
requirement upon entry
into process area.
Gas test by AGT.
Road barrier is to be
opened by OPS AST only.
Install and dismantle scaffolding

2 Worksite preparation Slippery, falling & People & Asset - Ensure access Work leader
tripping area clear and
clean from any
obstruction
- Ensure safety
shoe in a good
condition
- Plan safe access

Not familiar with People - Assist by Work leader


location scaffolding
supervisor
- Assist by scaffolder
work leader

3 Choose the scaffold material / Pinch Point People & Asset - Wear hand glove Work leader
manual Handling - Competent
Personnel only
- Always alert &
aware with pinch
point area

Hand Injuries People - To used Work leader


correct/proper
hand gloves
- To used correct
/proper tools

Slippery, falling & People & Asset - Ensure access Work leader
tripping area clear and
clean from any
obstruction
- Ensure safety
shoe in a good
condition
- Plan safe access

4 Start to erect / Dismantle the Personnel People & Asset - Competent Work leader
scaffolding, working at personnel
Installation lift & bay, hand heights/ - Regularly
rails, mid rails, ladder & toe overboard monitoring by
board. Loss of balance, Supervisor
- Time to time
monitoring by
Safety Officer &
Const. Supt.
- Install hand rail &
guard rail.

Falling object People & Asset - Wear Safety Work leader


Helmet
- Install toe boards
& guardrails
- Barricade the area
- Close
communication
- Proper tagline

Improper manual People - Change the object Work leader /


handling – for example, Scaffolding
technique/ repack a heavy Supervisor
Incorrect body load into smaller,
posture more manageable
parcels
- Use mechanical
aids
- Change the
nature of work-
offer frequent
breaks or multi
task.
- work shift/ work
rotation
- Buddy system

5 Inspect the completed Personnel People - Competent Construction


scaffoldings (tagging) working at personnel Supervisor /
heights/ - Time to time Scaffolding
overboard monitoring by Inspector
Loss of balance Safety Officer &
Const. Supt.

6 Housekeeping Slippery, falling & People & Asset - Ensure access Work leader /
tripping area clear and Construction
clean from any Supervisor
obstruction
- Ensure safety
shoe in a good
condition
- Re-inspection by
supervisor before
leave the work
place
- Place all
equipment to
designated
storage area

Pinch Point People & Asset - Wear hand glove Work leader /
Always alert & Construction
aware the pinch Supervisor
point area

Improper manual People & Asset - Change the object Work leader /
handling – for example, Construction
technique/ repack a heavy Supervisor
Incorrect body load into smaller,
posture more manageable
parcels
- Use mechanical
aids
- Change the
nature of work-
offer frequent
breaks or multi
task.
- work shift/ work
rotation
- Buddy system

General Notes

Approval Status

Prepared By Contractor

You might also like