You are on page 1of 5

Doc No:

DERMAGA GMS2-EXE-DER-MLNG-CVS-JHA-
MALAYSIA
OIL & GAS 0003
LNG DUA
SDN BHD MLNG Document No:
SDN. BHD

Revision: A
PROVISION OF EPCC FOR GMS1 & GMS 2 SUPERVISORY
COMPUTER AND FLOW COMPUTER UPGRADE FOR MALAYSIA Page 1 of 5
LNG SDN. BHD.

PROJECT : PROVISION OF EPCC FOR GMS1 &


GMS 2 SUPERVISORY COMPUTER
AND FLOW COMPUTER UPGRADE
FOR MALAYSIA LNG SDN. BHD.

CLIENT : MALAYSIA LNG DUA SDN. BHD.

CONTRACT NO. : DTC0BTU/MLNG/2018/38

DOCUMENT TITLE : JOB HAZARD ANALYSIS FOR


CABLE GLANDING AND
TERMINATION

A 26-08-19 ISSUE FOR REVIEW MSMS MAR SAAR


Prepared By Reviewed By Approved By
Discipline Technical Project
Revision Date Description Engineer Manager Manager
DERMAGA OIL & GAS SDN BHD
DOCUMENT REVIEW STATUS
PETRONAS LNG COMPLEX
JOB HAZARD ANALYSIS

Serial Number: TBA Owner: TBA


Revision number A Date Created: 26/08/2019 10:00

Job Title Cable Pulling and Dressing

Status TBA

Area MLNG

Author Mohamad Safuan B Mohammad Somari

Job Hazard Analysis Members

No Name Department Status Date Time

Contractors

Dermaga Oil & Gas Sdn. Bhd.

Worksheet

Job Safety Analysis Worksheet

No. Description of Job Step Potential Who or what might Control Measure Action Party
hazard/Risk be harmed

Mobilization

1 Mobilize / Demobilize of Traffic Accident People & Asset To provide banks-man for Work Leader &
equipment and personnel vehicle reverse, negotiate Driver
using; corner / congested road.
i) Pickup Truck Strictly comply with plant
ii) Van speed limit

Materials fall from People & Asset Materials must be secured Work Leader &
pickup and latched properly. Driver
Protruding of materials
must not be > 1m from
vehicle.
No overhanging &
overloading materials and
tools on truck.

Source of ignition People & Asset Vehicle ignition key to be Work Leader &
while entering the switch off upon hearing the Driver
process area emergency alarm
Vehicle side window to be
open - alarm sound more
clear
Vehicle must strictly
comply with the General
Traffic Rules stipulated in
MLNG Traffic & Vehicle
Regulations
Comply with PTW
requirement upon entry
into process area.
Gas test by AGT.
Road barrier is to be
opened by OPS AST only.

Install and dismantle scaffolding

2 Worksite preparation Slippery, falling & People & Asset - Ensure access Work leader
tripping area clear and
clean from any
obstruction
- Ensure safety
shoe in a good
condition
- Plan safe access

Not familiar with People - Assist by Work leader


location scaffolding
supervisor
- Assist by scaffolder
work leader

3 Handling equipment / cable Pinch Point People & Asset - Wear hand glove Work leader
- Competent
Personnel only
- Always alert &
aware with pinch
point area

Hand Injuries People - To used Work leader


correct/proper
hand gloves
- To used correct
/proper tools

Slippery, falling & People & Asset - Ensure access Work leader
tripping area clear and
clean from any
obstruction
- Ensure safety
shoe in a good
condition
- Plan safe access

4 Cable Glanding Pinch Point People & Asset - Wear hand glove Work leader /
Always alert & Construction
aware the pinch Supervisor
point area

Falling object People & Asset - Wear Safety Work leader


Helmet
- Barricade the area
- Close
communication

6 Cable termination Slippery, falling & People & Asset - Ensure access Work leader /
tripping area clear and Construction
clean from any Supervisor
obstruction
- Ensure safety
shoe in a good
condition
- Re-inspection by
supervisor before
leave the work
place
- Place all
equipment to
designated
storage area

Pinch Point People & Asset - Wear hand glove Work leader /
Always alert & Construction
aware the pinch Supervisor
point area

7 House Keeping Slippery, falling & People & Asset - Ensure access Work leader /
tripping area clear and Construction
clean from any Supervisor
obstruction
- Ensure safety
shoe in a good
condition
- Re-inspection by
foreman before
leave the work
place
- Place all
equipment to
designated
storage area

General Notes

Approval Status

Prepared By Contractor