Professional Documents
Culture Documents
Purchaser review and comments do not indicate either responsibility or liability for accuracy
and completeness of this document or alter any contractual terms and conditions:
VOID
DATE:
DOCUMENT TITLE:
JSA FOR LOADING & UNLOADING JOB & LIFTING ACTIVITY BY USING CRANE, HIAB, TELEHANDLER,
MAN LIFT OPERATIONS (TESCO)
DRP001-PUC-TRL-O94-000-4043
1 PAGE
DUQM REFINERY PROJECT - EPC1
CRITICALITY RATING :
JSA FOR LOADING & UNLOADING JOB & LIFTING ACTIVITY BY USING
CRANE, HIAB, TELEHANDLER, MAN LIFT OPERATIONS
SIGNATURE :
DESIGNATION :
Contractor Name: TECNICAS REUNIDAS LLC Sub-Contractor Name: Towell Engineering Services Co.LLC
Job Description: Transportation of Materials, Loading / Unloading Job & Lifting Activity by using Crane / Hiab / Telehandler / Man Lift Operations
Prepared By Subcontractor:
Signature:
Name: SHAILESH C SUVARNA Position: TESCO- HSE Manager Date: 11-10-2020
Page 1 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Operation not permitted; must implement Operation permitted with a time Operation permitted with
Risk Mitigation High controls to reduce risk to an acceptable or Medium Low
limited waiver endorsed by implementation of core HSE program
Controls manageable level. (M) (L)
(H) management. elements.
Page 2 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Potential
◼Noise ◼ Air Pollution (dust) ◼ Air Pollution (smoke) Air Pollution (vapor)
4.0 Environmental
Soil erosion ◼ Spills (to ground) Spills (Water) Hazards to Flora & Fauna
Hazards
Hazardous
5.0 Materials (attach Carcinogen Irritant Highly Flammable Toxic Explosive
MSDS)
Other Potential ◼ Electrical Pressure (air, water, gas) ◼ Mechanical (crush points) ◼ Ergonomics ◼ Temperature (±)
6.0 Hazards Light / Dark Ignition Sources Dust / Vapor Suffocation Other Trades
Additional
7.0 Instructions
Drink water and take rest breaks in hot weather conditions/Wear warm/suitable clothes in cold weather conditions
Page 3 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Site
1 • Workers and drivers shall be familiar with
Preparation the Site Traffic Management Plan for the
Project.
• Flagman shall be available with the
moving equipment during operation.
• Vehicle movement and pedestrian Y
Struck by
movement shall be separated. • Project Manager
moving • Adequate parking shall be provided for all • Construction
equipment / H vehicles and heavy equipment. L Manager
vehicle • HSE Supervisor
• Site Engineer
Page 4 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
PTW
2
Preparation
Page 5 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 6 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Manual
04.
Handling
• Maintain proper back posture and body position
Back pain or
during manual lifting of materials. Position body where
muscle
less effort is exerted and less strain
catch/cramps • Supervisors
due to wrong H • Do not twist the body same time while lifting L
• Do not exceed load for manual handling more than 20 • Site Engineer Y
posture of
lifting kg.
Page 7 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 8 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 9 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 10 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 11 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 12 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 13 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 14 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
• Site
• Ground shall be even and compacted where
Supervisor
Uneven MEWP is used. Y
L
Ground • Flagman shall be available always. • Operator
Page 15 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Y
• Proper PPE according to the weather conditions
shall be used • Site Engineer
a) Dusty / wet • Dust insulated Rest shed should be provided • Site supervisor
10 Environment H L • Foreman
areas • Work shall be stopped when Supervisor assesses
the situation to be dangerous for the life or health
of workers.
Page 16 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 17 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 18 / 19
Duqm Refinery Project EPC Package One
JSA for Loading & Unloading Rev.01
Page 19 / 19