Package One
Purchaser review and comments do not indicate either responsibility or liability for accuracy and
completeness of this document or alter any contractual terms and conditions:
VOID
DATE:28.03.2022
DOCUMENT TITLE:
CRITICALITY RATING:
SIGNATURE :
DOCUMENT TITLE: JSA for Removal of Broken Eye Bolt Stud REVISION
Contractar Name: TECNICAS REUNIDAS LLC Sub-Contractor Name: Towell Engineering Services Co. LLC
Type of JSA: REMOVAL OF BROKEN EYE BOLT STUD JSA No: DRP001-TES-JSA-C-00029 New: : Revise:
Job Description: -
1. Replacement of installed eyebolts with new supplied bolts.
2- Extraction / drilling of broken bolt.
3- Reinstallation of dismantled covers.
Prepared by Subcontractor:
Name: BA.MOHAMED IBRAHIM Position: HSE MANAGER Signature: Date:
Page1 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Fatality or
Permanent damage
total
> 2 weeks beyond project Total facility loss 5 L M H H H
permanent
boundary
disability
Permanent damage
Damage to an
within project Permanent
1 week to entire facility or loss
boundary or partial 4 L M H H H
2 weeks of multiple systems
reportable release disability
in a facility
beyond boundary
Page2 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
EMERGENCY: call TRD HOT LINE: 97864422 and follow the Emergency Response Plan; First aid facilities shall be available
COVID 19: respect the protocol Wearing facemask, Maintain social distance, Use of sanitizers and soap liquids, Avoid
touching eyes, mouth or nose before washing hands. Follow with MOH instructions. In case of COVID19 symptoms, report
Additional
7.0 Instructions
to your supervisor immediately
HEAT STRESS: Drink water and take rest breaks; Don`t work in open area for too long
CONFINED SPACES: if confined space entry is applicable a separated PTW with JSA is required
ENVIRONMENT: respect the Environment HSE Plan in all aspects
Page3 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
RISK RESIDUAL
S.No JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE
RATING RISK
Page4 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page5 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page6 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page7 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page8 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Keep away from heat, sparks, pilot lights, hot surfaces and
open flames
Fitter
Fire H Unplug electrical tools, motors and appliances before L
Supervisor
spraying or bringing the can near any source of electricity
Ensure to place dry powder fire extinguisher.
Page9 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page10 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Weld-on eyebolt Welding & grinding Refer JSA No- DRP001-PUC-TRL-O94-000-4008 Rev.2 Supervisor
10 with cover plate H L
Operation Hot work activity & Control measures. HSE Supervisor
Lifting supervisor is responsible for the pre-lift meeting
specific to the activity.
Lack of knowledge / Poor Lifting Supervisor
understanding Use Risk assessment / JSA as a reference before the
Rigger
activity
Site Supervisor
Communication to the workforce shall be properly
HSE Supervisor
H understood in a convenient language in pre lift
L
meeting.
H Lifting zone shall be controlled by barricade and
Lifting of cover signage all over the lifting radius.
plate & connect Dedicated stand by man shall be deployed to control
11 to manway in the unauthorized person and equipment entering Lifting Supervisor
Unauthorized Entry L
steam drum inside the lifting area Site Supervisor
Display the Signage and provide barricade
Notify the nearby other subcontractor about the lifting
operation.
Cranes shall have third party certificated and approved
Lifting Supervisor
by TRD (initial and monthly inspection stickers).
Rigger
Visual inspection must be carried prior lifting (using the L
Crane topple/ overturn Site Supervisor
daily checklist)
Operator
De-rate all cranes involved in the lift by 25% of the load
chart as per TRD procedure
Page11 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page12 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page13 / 14
Duqm Refinery Project EPC Package One
JSA – REMOVAL OF BROKEN EYE BOLT STUD (Rev-00)
Page14 / 14