Rev01 - Risk Assessment
Rev01 - Risk Assessment
CLIENT DETAILS
Company / Organisation: Fuzzy Operations
Client contact: Daniel McMillan Mobile #: 0402 091 345 Email Address: danielm@fuzzy.com.au
Job / Purchase Order #:
Risk Assessment Location: Desktop On Site Date of Assessment: 08/11/2022
Person Conducting Assessment: Signature: Assessors Qualification:
Benjamin Luxford TMD Open# 468
Site distance or visibility compromised on TMD to be consulted if signs need to be adjusted outside of
PCBU
approach for road users due to signage tolerances due to visibility
MEDIUM LOW TMD
placement – inappropriate driver reactions or Regular sign/device checks
TMI
non-compliance.
Ensure signage does not conflict with permanent posted
Conflict in signage compromising legibility of PCBU
signage
worksite - inappropriate driver reactions or non- MEDIUM Conflicting signs to be covered or removed
LOW TMD
compliance. TMI
Regular sign/device checks
Designer to assess appropriate speed options (implement
reduction if required)
Ensure traffic control sign & devices are clearly visible to all PCBU
Road users traveling at inappropriate speeds for road users TMI
works undertaken – risk of accident-causing MEDIUM Vehicles, Workers & TC’s located clear of travel path LOW TMD
injury, property damage or death. TC
All TC’s
TRAFFIC GUIDANCE SCHEME RISK ASSESSEMENT
Potential Safety Risks; Risk Rating Responsible Party
Control Measures; to be Implemented to mitigate the Residual Risk
Identify all risks associated with the work that (Using above (Who will manage
identified risk (Using above Matrix)
pose a threat to the safety of the site Matrix) controls)
Works incorrectly scheduled (traffic volumes not PCBU & TMD to assess work method options
PCBU
considered) – negative impact to network MEDIUM Confirm suitable times with asset owner LOW
TMD
operations / network blockages. Work scheduled to reduce impact on network
Incorrectly trained/non-accredited staff – work Evidence of competency to be verified PCBU
site non-compliance resulting in injury, property MEDIUM Work inductions to be completed LOW Op’s Team
damage or death. Work pre-start meeting to be conducted TMI
Fit for Duty check conducted at pre-start PCBU
Staff fatigue - work site non-compliance resulting
MEDIUM Welfare checks during shift LOW Op’s Team
in injury, property damage or death
Adequate staff allocated for daily tasks TMI
Incorrect P.P.E. for shift (inc. adequate food & PCBU
water) – dehydration/starvation/sun protection LOW PPE checks prior to & throughout shift LOW Op’s Team
leading to fatigue. TMI
PCBU
Designer to generate manifest for Op’s & Assets Teams
Incorrect signage & devices – non-compliant TMD
MEDIUM Vehicle stock confirmed & loaded LOW
worksite establishment and management. Op’s Team
TMI to check available resources prior to implementation
TMI
Application of incorrect or expired
Correct specifications to be confirmed prior to design PCBU
specifications, standards, rules and LOW LOW
Suitability reviews prior to submission TMD
policies
Older works contractually governed by
Specifications to be confirmed with PCBU by TMD prior to PCBU
older standards, roles, LOW LOW
design TMD
specifications and/or policies
TRAFFIC GUIDANCE SCHEME RISK ASSESSEMENT
OTHER. (Residual Risks to be assessed on site by PCBU representative & TMI at pre-start)
Potential Safety Risks; Risk Rating Responsible Party
Control Measures; to be Implemented to mitigate the Residual Risk
Identify all risks associated with the work that (Using above (Who will manage
identified risk (Using above Matrix)
pose a threat to the safety of the site Matrix) controls)
TRAFFIC GUIDANCE SCHEME RISK ASSESSEMENT
Shoulder, Verge & Lane Closures to isolate Full road closure will be apply to
work areas whilst permitting flow in both closed Gregory terrace only
Traffic past the Worksite NOT APPLICABLE
directions under traffic control using a single production truck will be allowed to
trafficable lane enter the site.
TRAFFIC GUIDANCE SCHEME RISK ASSESSEMENT