100 9/7/19
100 9/17/19
150 9/23/19
1000 9/26/19
100 9/16/19
500 9/26/19
DEF.BAR 16MMX6.0M 1,126 PCS
375 9/5/19
500 9/26/19
600 9/6/19
520 9/17/19
800 9/19/19
500 9/27/19
700 9/28/19
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 48 PCS 24 9/10/19
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 208 9/10/19
PLAIN ROUND BAR 12MMX6.0M 1,500.00 24 PCS 9/10/19
SPANDEK 5200MM
SPANDEK 3800MM
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM
CAPPING 1510MM
CAPPING 1690MM
CAPPING 3660MM
END WALL FLASHING 3660MM
END WALL FLASHING 2000MM
END WALL FLASHING 2440MM
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 120 PCS DR NO 1825823
200 DR.NO1822873
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
150.00
50201 50 .9/6/19 R LINA
KAMP 50300 100 9/7/19 Z CABALQUINTO
50206 6 9/9/19 VILLACRISIS
50208 6 9/10/19 DELA ROSA
50212 20 9/11/19 PASQUETE
50213 16 9/12/19 ESCANILLAN
50214 16 9/13/19 LINA
50215 16 9/13/19 ESCANILLAN
50217 30 9/16/19 BOLONGAITA
50223 20 9/17/19 JUBLAR
KAMP. 54276 100 9/17/19 Z CABALQUINTO
50225 25 9/18/19 BOLONGAITA
50226 10 9/18/19 N. BATERSAL
50227 25 9/19/19/ BOLONGAITA
50228 8 9/20/19 M. BOLA
50229 35 9/20/19 VELEGANIO
50231 20 9/21/19 P. QPQUERA
50232 5 9/21/19 DELA ROSA
KAMP. 54490 150 9/23/19 Z CABALQUINTO
50233 25 9/23/19 P. QPQUERA
50234 16 9/23/19 DELA ROSA
50238 11 9/24/19 VELIGANIO
50242 20 9/25/19 P. QPQUERA
50246 25 9/26/19 BOLONGAITA
50250 12 9/27/19 ORTIZ
54154 13 9/28/19 BATERSAL
54156 5 9/28/19 P. QPQUERA
54159 5 9/28/19 J. ABRIL
.
KAMP. 54490 150 9/23/19 Z CABALQUINTO
50240 2 9/25/19 PEPITO
54156 20 9/28/19 P. QPQUERA
54157 15 9/28/19 AGUS
KAMP
50202 50 9/6/19 ASCARDA
50203 50 9/6/19 SARABIA
50205 50 9/7/19 ASCARDA
50207 50 9/9/19 ASCARDA
50209 50 9/11/19 ASCARDA
50215 24 9/13/19 ESCANILLAN
50217 20 9/16/19 BOLONGAITA
50220 35 9/16/19 BOLONGAITA
50221 30 9/17/19 OPQUERA
50229 10 9/20/19 VELEGANIO
50233 20 9/23/19 P. QPQUERA
50234 10 9/23/19 DELA ROSA
50243 24 9/25/19 BATAIN
50236 50 9/23/19 G. ASCARDA
KAMP. 54545 1000 9/26/19 Z CABALQUINTO
54151 50 9/27/19 BOLONGAITA
54156 10 9/28/19 P. QPQUERA
54157 13 9/28/19 AGUS
100.00
50203 20 9/6/19 SARABIA
50209 50 9/11/19 ASCARDA
50215 12 9/13/19 ESCANILLAN
54274 100 9/16/19 Z CABALQUINTO
50228 3 9/20/19 M. BOLA
KAMP. 54545 500 9/26/19 Z CABALQUINTO
KAMP
50202 30 9/6/19 ASCARDA
50205 30 9/7/19 ASCARDA
50207 5 9/9/19 ASCARDA
50212 30 9/11/19 PASQUETE
50216 12 9/13/19 VILLAESTER
50218 20 9/16/19 M. BOLA
50219 30 9/16/19 G. ASCARDA
50222 30 9/17/19 G. ASCARDA
50224 20 9/17/19 C. NICOR
50228 12 9/20/19 M. BOLA
50230 20 9/20/19 BATAIN
50232 10 9/21/19 DELA ROSA
50236 50 9/23/19 G. ASCARDA
50242 12 9/25/19 P. QPQUERA
50243 24 9/25/19 BATAIN
50246 69 9/26/19 BOLONGAITA
50247 20 9/26/19 P. AVUS
KAMP. 54545 500 9/26/19 Z CABALQUINTO
54151 50 9/27/19 BOLONGAITA
54155 30 9/28/19 BOLONGAITA
54159 30 9/28/19 J. ABRIL
KAMP.
50208 5 9/10/19 DELA ROSA
50214 5 9/13/19 LINA
50214 18 9/13/19 LINA
50215 8 9/13/19 ESCANILLAN
50216 5 9/13/19 VILLLAESTER
50217 5 9/16/19 BOLONGAITA
50222 20 9/17/19 G. ASCARDA
50225 2 9/18/19 BOLONGAITA
50226 3 9/18/19 N. BATERSAL
50228 2 9/20/19 M. BOLA
50229 7 9/20/19 VELEGANIO
50230 5 9/20/19 BATAIN
50231 5 9/21/19 P. QPQUERA
50233 4 9/23/19 P. QPQUERA
50236 5 9/23/19 G. ASCARDA
50242 5 9/25/19 P. QPQUERA
50243 4 9/25/19 BATAIN
40244 5 9/25/19 TEANIO
40246 13 9/26/19 BOLONGAITA
50247 10 9/26/19 P. AVUS
54151 9 9/27/19 BOLONGAITA
54156 7 9/28/19 P. QPQUERA
54157 13 9/28/19 AGUS
40.00
50201 10 9/6/19 R LINA
50226 2 9/18/19 N. BATERSAL
50231 2 9/21/19 P. QPQUERA
50242 5 9/25/19 P. QPQUERA
50246 3 9/26/19 BOLONGAITA
50250 2 9/27/19 ORTIZ
54154 3 9/28/19 BATERSAL
54156 2 9/28/19 P. QPQUERA
54159 1 9/28/19 J. ABRIL
20
-
50201 10 9/6/19 ESCANILLAN
50213 2 9/12/19 ESCANILLAN
50223 5 9/17/19 JUBLAR
50225 4 9/18/19 BOGAITA
50226 3 9/18/19 N. BATERSAL
50227 4 9/19/19 BOGAITA
50228 2 9/20/19 M. BOLA
50229 5 9/20/19 VELEGANIO
50231 3 9/21/19 P. QPQUERA
50232 2 9/21/19 DELA ROSA
50233 3 9/23/19 P. QPQUERA
50234 2 9/23/19 DELA ROSA
50238 2 9/24/19 VELIGANIO
50239 5 9/24/19 EBARDOLA
50240 2 9/25/19 PEPITO
50242 10 9/25/19 P. QPQUERA
50246 4 9/26/19 BOLONGAITA
50250 2 9/27/19 ORTIZ
54154 3 9/28/19 BATERSAL
54156 2 9/28/19 P. QPQUERA
54157 4 9/28/19 AGUS
54159 2 9/28/19 J. ABRIL
H.O MANILA
H.O MANILA
H.O MANILA
H.O MANILA
H.O MANILA 30.00 54376 3 9/21/19 Z. CABALQUINTO
54158 1 9/28/19 D.ESCANILLAN
H.O MANILA
50238 4 9/24/19 VELIGANIO
54152 3 9/27/19 CARATAO
54158 4 9/28/19 D. ESCANILLAN
25.00
50214 1 9/13/19 LINA
50215 2 9/13/19 ESCANILLAN
50224 3 9/17/19 C. NICOR
50226 2 9/18/19 N. BATERSAL
50233 2 9/23/19 P. OPQUERA
50238 2 9/24/19 BOGAITA
H.O MANILA
50246 2 9/26/19 BOLONGAITA
50247 1 9/26/19 P. AVUS
50249 2 9/27/19 P. OPQUERA
54152 4 9/27/19 CARATAO
54158 6 9/28/19 D. ESCANILLAN
25.00
50206 2 9/6/19 VILLACRUSIS
50210 1 9/11/19 UNGOD
50226 2 9/18/19 N. BATERSAL
50238 2 9/24/19 VELIGANIO
50247 1 9/26/19 P. AVUS
50249 1 9/27/19 P. OPQUERA
54151 2 9/27/19 BOLONGAITA
54152 2 9/27/19 CARATAO
54156 1 9/28/19 P. QPQUERA
54158 1 9/28/19 D. ESCANILLAN
H.O MANILA
54158 2 9/28/19 D. ESCANILLAN
25.00
54156 1 9/28/19 P. OPQUERA
H.O MANILA -
50239 30 9/24/19 EBARDOLA
50245 30 9/25/19 DESAMPARADO
50246 20 9/26/19 BOLONGAITA
BANTAYAN HRDW
50249 20 9/27/19 P. OPQUERA
54152 30 9/27/19 CARATAO
BANTAYAN HRDW
54152 30 9/27/19 CARATAO
54156+ 10 9/28/19 P. OPQUERA
BANTAYAN HRDW
H.O MANILA
54158 12 9/28/19 D. ESCANILLAN
H.O MANILA
50206 4 9/9/19 VILLACRUSIS
50208 1 9/10/19 DELA ROSA
50222 1 9/17/19 G. ASCARDA
50233 10 9/23/19 P. OPQUERA
50249 5 9/27/19 P. OPQUERA
10.00
50204 10 9/7/19
H.O MANILA
50235 3 9/23/19 TEANIO
50248 4 9/26/19 TEANIO
54153 1 9/28/19 TEANIO
H.O MANILA
50241 2 9/25/19 ALOLOR
54155 30 9/28/19 BOLONGAITA
-
BARROWED FRM KODIA 200.00
WARE HOUSE ROOFING -
2,500.00
-
-
2.00
13.00
1.00
2.00
2.00
PICK UP TO KAMP. 3.00
LBK.8-9 LOT 1 TO 15 DEWATERING 2.00
75.00
BEAM BLK 8-9 LOT 8-9 71.00
BARRACKS 67.00
BARRACKS 63.00
25.00
BEAM COLUMN BLK 19 LOT 11 TO 26 24.00
CHB FILLING BLK 8-9 LOT 8 TO15 22.00
BEAM COLUMN BLK 19 LOT 11 TO 26 19.00
BEAM BLK 8-9 LOT 8-9 17.00
BEAM COLUMN BLK 19 LOT 11 TO 26 15.00
BEAM COLUMN BLK 19 LOT 11 TO 26 13.00
63.00
BEAM COLUMN BLK 19 LOT 11 TO 26 61.00
BEAM BLK 8-9 LOT 8-9 60.00
BLK 19 LOT 11 TO 26 BEAM 58.00
BARRACKS 54.00
BARRACKS 48.00
25.00
BEAM BLK 8-9 LOT 1 TO 7 8 TO 15 23.00
BEAM BLK 8-9 LOT 1 TO 7 8 TO 15 22.00
BEAM BLK 8-9 LOT 8-9 20.00
BEAM BLK 8-9 LOT 8-9 12.00
BEAM BLK 8-9 LOT 8-9 11.00
BLK 19 LOT 11 TO 26 BEAM 10.00
STYRUP BLK 19 LOT 11 TO 26 8.00
BARRACKS 6.00
CHB LAYING BLK 19 LOT 11 TO 26 5.00
BARRACKS 4.00
4.00
BARRACKS 2.00
25.00
BEAM BLK 19 LOT 11 TO 26 24.00
50.00
BEAM COLUMN BLK 19 LOT 11 TO 26 24.00
HAULING OF CHB
77.00
SCRAPHOLDING BLK 8-98 LOT 8-15 71.00
SCRAPHOLDING BLK 8-98 LOT 8-15 51.00
CHB LAYING BLK 19 LOT 11 TO26 26.00
SCRAPHOLDING BLK 8-98 LOT 8-15 11.00
-
WARE HOUSE 300.00
CHB LAYING BLK 19 LOT 11 TO26 270.00
SCRAPHOLDING BLK 8-98 LOT 8-15 240.00
BLK 19 LOT 11 TO 26 BEAM 220.00
-
-
PURCHASE 120.00
BLK 19 LOT 11 TO 26 BEAM 100.00
BARRACKS 70.00
PURCHASE 120.00
BARRACKS 90.00
BEAM BLK 19 LOT 11 TO 26 80.00
PURCHASE 290.00
60.00
BARRACKS 48.00
10.00
LAY OUT BLK 8 LOT 1 TO 16 8.00
BEAM CHB LAYING BLK 19 6.00
R. NECARTER C. SILFAVAN
ECT; DIRECTOR
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE SEP. 30 TO OCT 5 2019
ROOFING
ANGLE BAR 4.5MMX
ANGLE BAR 4MMX7 96 PCS
3,000.00
ANGLE BAR 6MMX7
ANGLE BAR 3MMX5
C-PURLINS1.2X2X6X4.0M 438
CAPPING 1510MM
CAPPING 1690MM
CAPPING 3660MM
END WALL FLASHING 3660MM
END WALL FLASHING 2000MM
END WALL FLASHING 2440MM
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CONSTRUCTION PAIL
CUT-OFF BLADE 14''
STEEL CUTTING DISC 4''
STEEL GRINDING DISC 4''
ELECTRUDE HOLDER 500A
JACKSON ELECTRUDE HOLDER 300A
WELDING CABLE # 2.0
TANSI #100
DIGGING BAR
MASONRY DRILL BIT 12MM
STEEL DRILL BIT 5/32
SCREW BIT
EXPANSION BOLT 7MM
DYNA BOLT 12MM
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 120 PCS
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
60.00
54160 20 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 40.00
54673 100 10/1/19 R. ORTIZ PICK UP TO KAMP. 140.00
54165 12 10/2/19 BATAIN BEAM BLK 9 LOT 8-15 128.00
54167 20 10/2/19 G, ASCARDA TUCALO BLK 7 LOT 1-8 108.00
54169 3 10/2/19 S. LAVAJO CHB FABRICATION 105.00
54172 15 10/3/19 R. ORTIZ TUCALO BLK 7 LOT 1-8 90.00
54173 10 10/3/19 P, OPQUERA TUCALO BLK 19 LOT 11 TO 26 80.00
54175 6 10/3/19 S. LAVAJO CHB FABRICATION 74.00
54176 7 10/4/19 L. ESTOSA TUCALO BLK 7 LOT 1-8 67.00
54179 32 10/5/19 CABRADILLA R C P FABRICATION 35.00
54180 20 10/5/19 R. EBARDOLASA BEAM BLK 19 LOT 11-26 15.00
54181 10 10/5/19 R. ORTIZ BEAM BLK 7 LOT 18 5.00
54184 4 10/5/19 S. LAVAJO CHB FABRICATION 1.00
54788 200 10/5/19 Z. CABALQUINTO PICK UP TO KAMP. 201.00
300
.
80.00
54160 20 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 60.00
54161 25 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 35
54687 100 10/2/19 Z. CABALQUINTO PICK UP TO KAMPINGANON 135.00
54165 32 10/2/19 P. OPQUERA CHB LAYING BLK19 LOT 11 TO 26 103.00
54170 15 10/3/19 G. ASCARDA CHB LAYING BLK7 LOT 1-8 88.00
54173 10 10/3/19 P, OPQUERA CHB LAYING BLK19 LOT 11 TO 26 78.00
54176 7 10/4/19 L. ESTOSA CHB LAYING BLK7 LOT 1-8 71.00
54181 11 10/5/19 R. ORTIZ BEAM BLK 7 LOT 18 60.00
54182 22 10/5/19 J. DUASO BEAM BLK 7 LOT 1-8 38.00
1,037.00
54160 5 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 1,032.00
54162 30 10/1/19 D. EACANILLAN BLK8 LOT 1-8 TUCALO 1,002.00
54164 50 10/1/149 SEVILLENO STYRUP BLK.7 LOT 1-8 952.00
54165 10 10/2/19 BATAIN BEAM BLK 9 LOT 8-15 942.00
54165 30 10/2/19 P. OPQUERA CHB LAYING BLK19 LOT 11 TO 26 912.00
54167 50 10/2/19 G, ASCARDA TUCALO BLK 7 LOT 1-8 862.00
54170 50 10/3/19 G. ASCARDA STYRUP BLK7 LOT 1-8 812.00
54170 6 10/3/19 VELIGANIO MATTING BLK 19 LOT 11-26 806.00
54179 80 10/5/19 CABRADILLA R C P FABRICATION 726.00
54182 50 10/5/19 J. DUASO BEAM BLK 7 LOT 1-8 676.00
615.00
54162 30 10/1/19 D. EACANILLAN BLK8 LOT 1-8 TUCALO 585.00
54164 10 10/1/149 SEVILLENO STYRUP BLK.7 LOT 1-8 575.00
54167 12 10/2/19 G, ASCARDA TUCALO BLK 7 LOT 1-8 563.00
54170 50 10/3/19 G. ASCARDA TUCALO BLK 7 LOT 1-8 513.00
54177 10 10/4/19 VELIGANIO TUCALO BLK 7 LOT 1-8 503.00
54182 6 10/5/19 J. DUASO BEAM BLK 7 LOT 1-8 497.00
441.00
54160 10 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 431.00
54161 20 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 411.00
54163 25 10/1/19 M. UGADO BEAM BLK 19 LOT 11-26 386.00
54177 20 10/4/19 VELIGANIO BEAM STYRUP BLK 7 LOT 1-8 366.00
54177 40 10/4/19 VELIGANIO BEAM STYRUP BLK 7 LOT 1-8 326.00
54180 30 10/5/19 R. EBARDOLASA BEAM BLK 19 LOT 11-26 296.00
135.00
54160 6 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 129.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 126.00
54162 4 10/1/19 D. EACANILLAN BLK 8 LOT 1-8 122.00
54163 5 10/1/19 M. UGADO BEAM BLK 19 LOT 11-26 117.00
54164 8 10/1/149 SEVILLENO STYRUP BLK.7 LOT 1-8 109.00
54165 11 10/2/19 P. OPQUERA CHB LAYING BLK19 LOT 11 TO 26 98.00
54167 6 10/2/19 G, ASCARDA TUCALO BLK 7 LOT 1-8 92.00
54170 8 10/3/19 G. ASCARDA TUCALO BLK. 7 LOT 1-8 84.00
54170 2 10/3/19 VELIGANIO MATTING BLK 19 LOT 11-26 82.00
54177 20 10/4/19 VELIGANIO BEAM STYRUP BLK 7 LOT 1-8 62.00
54178 12 10/4/19 TENORIO BEAM STYRUPBLK19 LOT 11TO 26 50.00
54179 7 10/5/19 CABRADILLA R C P FABRICATION 43.00
54180 18 10/5/19 R. EBARDOLASA BEAM BLK 19 LOT 11-26 25.00
54788 270 10/5/19 Z. CABALQUINTO PICK UP TO KAMP. 295.00
10.00
54160 3 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 7.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 4.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 1.00
54165 1 10/2/19 BATAIN BEAM BLK 9 LOT 8-15 -
54751 17.69 10/3/19 R. ARQUIO FRM KAMP. LOADED BY DT 88 17.69
54752 20.1 10/3/19 MORANO FRM KAMP. LOADED BY DT 112 37.70
54752 20.1 10/3/19 MORANO FRM KAMP. LOADED BY DT 112 57.01
54179 20 10/5/19 CABRADILLA R C P FABRICATION 37.01
54181 3 10/5/19 R. ORTIZ BEAM BLK 7 LOT 18 34.01
20.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 17.00
54170 3 10/3/19 G. ASCARDA TUCALO BLK. 7 LOT 1-8 14.00
54172 2 10/3/19 R. ORTIZ TUCALO BLK 7 LOT 1-8 12.00
54173 2 10/3/19 P, OPQUERA CHB LAYING BLK19 LOT 11 TO 26 10.00
- 69.00
54160 5 9/30/19 P. OPQUERA BLK 19 LOT 11 TO 26 BEAM 64.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 61.00
54161 3 9/30/19 MANSUETO TUCALO BLK.8 LOT 1 TO 8 58.00
54165 1 10/2/19 BATAIN BEAM BLK 9 LOT 8-15 57.00
54165 4 10/2/19 P. OPQUERA CHB LAYING BLK19 LOT 11 TO 26 53.00
54170 2 10/3/19 G. ASCARDA TUCALO BLK. 7 LOT 1-8 51.00
54172 2 10/3/19 R. ORTIZ TUCALO BLK 7 LOT 1-8 49.00
54173 2 10/3/19 P, OPQUERA CHB LAYING BLK19 LOT 11 TO 26 47.00
54175 2 10/3/19 S. LAVAJO CHB FABRICATION 45.00
54176 2 10/4/19 L. ESTOSA CHB LAYING BLK7 LOT 1-8 43.00
54760 17.69 10/4/19 R. ARQUIO LODED BY .DT-88 60.69
54761 20.01 10/4/19 MORANO LOADED BY DT 112 80.70
54762 13.48 10/4/19 T. CASTILLANO LOADED BY DT-39 94.18
54763 15.76 10/4/19 CARILLO LOADED BY DT-96 109.94
54768 15.76 10/4/19 CARILLO LOADED BY DT-96 125.70
54770 17.69 10/4/19 R. ARQUIO LODED BY .DT-88 143.39
54773 15.76 10/4/19 CARILLO LOADED BY DT-96 159.15
54179 20 10/5/19 CABRADILLA R C P FABRICATION 139.15
54181 3 10/5/19 R. ORTIZ BEAM BLK 7 LOT 18 136.15
54182 3 10/5/19 J. DUASO BEAM BLK 7 LOT 1-8 133.15
54184 1 10/5/19 S. LAVAJO CHB FABRICATION 132.15
2,500.00
15.00
-
2.00
13.00
1.00
2.00
2.00
2.00
54168 1 10/2/19 ALOLOR DEWATERING BLK 7-8-9 1.00
303.00
28.00
11.00
54788 1 10/5/19 Z. CABALQUINTO PICK UP TO KAMP. 100 MTRS
63.00
54172 3 10/3/19 R, ORTIZ BRASE BLK 19 LOT 11 TO 26 60.00
54176 2 10/4/19 L. ESTOSA BRASE BLK7 LOT 1 TO 8 58.00
54179 1 10/5/19 CABRADILLA R C P FABRICATION 57.00
48.00
54172 3 10/3/19 R, ORTIZ BRASE BLK 19 LOT 11 TO 26 45.00
54174 2 10/3/19 BATAIN CHB FABRICATION 43.00
54176 2 10/4/19 L. ESTOSA BRASE BLK7 LOT 1 TO 8 41.00
4.00
54174 1 10/3/19 BATAIN CHB FABRICATION 3.00
2.00
24.00
54172 3 10/3/19 R, ORTIZ BRASE BLK 19 LOT 11 TO 26 21.00
11.00
-
220.00
- -
-
70.00
LOADED TO SV - 08 490.00
690.00
48.00
54174 6 10/3/19 BATAIN CHB FABRICATION 42.00
54179 4 10/5/19 CABRADILLA R C P FABRICATION 38.00
229.00
76.00
10.00
6.00
54180 1 10/5/19 R. EBARDOLASA BEAM BLK 19 LOT 11-26 5.00
300 10/11/19
300 10/11/19
300 10/12/19
1300
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 96 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 438
CAPPING 1510MM
CAPPING 1690MM
CAPPING 3660MM
END WALL FLASHING 3660MM
END WALL FLASHING 2000MM
END WALL FLASHING 2440MM
FAUCET 1/2
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
300 D.R 5774483
280 DR 5189101
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
KAMP. 54846
54061 2 10/10/19 MANSUETO
54062 3 10/10/19 CIGJE
BNTYN HRWR.
BNTYN HRWR.
54191 1 10/8/19 EBARDOLASA
-
H,O MANILA
54187 2 10/7/19 EBARDOLASA
54191 2 10/8/19 EBARDOLASA
54057 2 10/9/19 EBARDOLASA
54070 2 10/11/19 EBARDOLASA
54078 2 10/12/19 EBARDOLASA
201.00
C,H.B FABRICATION 197.00
R.C.P. FABRICATION 165.00
R.C.P. FABRICATION 133.00
TUCALO BLK 7 LOT 1-8 121.00
C,H.B FABRICATION 105.00
TUCALO BLK 19 LOT 27 TO 31 95.00
R.C.P. FABRICATION 89.00
R.C.P. FABRICATION 57.00
TUCALO BLK 19 LOT 27 TO 31 42.00
BEAM BLK. 8 LOT 1-7 32.00
CHB. FABRICATION 22.00
ST-06 122.00
422.00
R.C.P. FABRICATION 390.00
COLUMN BLK 7 LOT 1-8 382.00
DAMBA FLSTERRING 372.00
ST-06 672.00
R.C.P. FABRICATION 640.00
CHB. FABRICATION 626.00
BEAM COLUMN BLK 7 611.00
BEAM BLK 19 LOT 11-26 591.00
ST-06 891.00
ST-06 1,191.00
R.C.P. FABRICATION 1,159.00
R.C.P. FABRICATION 1,127.00
1,127.00
1,127.00
1,127.00
1,127.00
1,127.00
1,127.00
38.00
C.H B. LAYING BLK 7 26.00
C.H B. LAYING BLK 7 12.00
C.H B. LAYING BLK 7 -
50.00
C.H B. LAYING BLK 7 30.00
C.H B. LAYING BLK 7 15.00
C.H.B LAYING BLK. 7 8.00
CHB LAYING BLK 7 LOT 1-8 6.00
6.00
6.00
6.00
6.00
497.00
C.H B. LAYING BLK 7 485.00
TUCALO BLK 19 LOT 27-31 455.00
C.H B. LAYING BLK 7 450.00
BEAM BLK. 8 LOT 1-7 457.00
C.H B. LAYING BLK 7 439.00
BEAM COLUMN BLK 7 427.00
BEAM BLK19 LOT 27-31 397.00
BEAM BLK19 LOT 27-31 375.00
TUCALO BLK7 LOT 1-8 365.00
365.00
365.00
365.00
296.00
TIE BEAM BLK7 LOT 1-8 274.00
STYRUP BLK 19 LOT 27-31 262
BLK 19 LOT 27-31 232.00
TUCALO PUTTING 202.00
BEAM BLK 7 LOT 1-8 172.00
BEAM BLK 7 LOT 1-8 152.00
COLUMN BLK 7 LOT 1-8 112.00
BEAM COLUMN BLK 7 72.00
C.H.B LAYING BLK. 7 42.00
BEAM BLK19 LOT 27-31 34.00
BEAM BLK 19 LOT 11-26 4.00
4.00
4.00
4.00
295.00
R.C.P. FABRICATION 289.00
R.C.P. FABRICATION 283.00
C.H B. LAYING BLK 7 277.00
TUCALO BLK 19 LOT 27-31 267.00
TUCALO BLK 19 LOT 27-31 257.00
TIE BEAM BLK7 LOT 1-8 243.00
TUCALO BLK 7 LOT 1-8 233.00
STYRUP BLK 19 LOT 27-31 220.00
BLK 19 LOT 27-31 214.00
R.C.P. FABRICATION 208.00
STYRUP BLK 7 LOT 1-8 206.00
TUCALO BLK 19 LOT 27 TO 31 200.00
C.H B. LAYING BLK 7 197.00
BEAM BLK. 8 LOT 1-7 193.00
STYRUP BLK7 LOT 1-8 183.00
BLK. 9 LOT 1-8 181.00
R.C.P. FABRICATION 177.00
BLK 19 LOT 11 TO 26 165.00
BEAM BLK 7 LOT 1-8 161.00
BEAM BLK 19 LOT 11-26 156.00
C.H.B LAYING BLK. 7 148.00
BEAM BLK19 LOT 27-31 136.00
R.C.P. FABRICATION 132.00
BEAM BLK 19 LOT 11-26 125.00
125.00
125.00
125.00
34.01
DT-88 53.70
R.C.P. FABRICATION 34.01
TUCALO BLK 19 LOT 27 TO 31 32.01
BEAM BLK 19 LOT 11-26 30.00
30.00
30.00
30.00
30.00
10.00
TUCALO BLK 7 LOT 1-8 8.00
TUCALO BLK 19 LOT 27 TO 31 7.00
7.00
7.00
7.00
7.00
7.00
132.15
C,H.B FABRICATION 131.15
C.H B. LAYING BLK 7 128.15
C.H B. LAYING BLK 7 126.15
TUCALO BLK 7 LOT 1-8 124.15
C,H.B FABRICATION 121.15
DT- 112 141.16
R.C.P. FABRICATION 121.15
TUCALO BLK 19 LOT 27 TO 31 119.15
C.H B. LAYING BLK 7 117.01
BEAM BLK. 8 LOT 1-7 115.01
CHB. FABRICATION 113.01
COLUMN BLK 7 LOT 1-8 112.01
C.H B. LAYING BLK 7 110.01
BLK 19 LOT 11 TO 26 109.01
DAMBA FLSTERRING 108.01
CHB. FABRICATION 106.01
C.H B. LAYING BLK 7 104.01
BEAM BLK 19 LOT 11-26 101.01
CHB BLK19 LOT 27-31 99.01
99.01
99.01
99.01
99.01
99.01
48.00
230.00
BLK 19 LOT 11 TO 26 22.00
22.00
22.00
22.00
22.00
45.00
SAG RODS 24.00
24.00
24.00
24.00
24.00
24.00
2,500.00
2,500.00
2,500.00
2,500.00
15.00
15.00
15.00
15.00
-
2.00
13.00
1.00
2.00
2.00
1.00
303.00
28.00
11.00
FABRICATE ON SITE 43.00
FABRICATE ON SITE 75.00
FABRICATE ON SITE 107.00
FABRICATE ON SITE 113.00
FABRICATE ON SITE 145.00
FABRICATE ON SITE 177.00
FABRICATE ON SITE 209.00
FABRICATE ON SITE 241.00
FABRICATE ON SITE 271.00
100.00
100.00
100.00
100.00
100.00
57.00
57.00
57.00
57.00
57.00
57.00
41.00
C.H B. LAYING BLK 7 39.00
DAMBA FLSTERRING 37.00
TUCALO BLK7 LOT 1-8 36.00
36.00
36.00
36.00
2.00
21.00
21.00
21.00
5.00
C.H B. LAYING BLK 7 3.00
BLK 19 LOT 11 TO 26 -
10.00
BLK 19 LOT 11 TO 26 7.00
4.00
2.00
C- PURLINS PAINTING 1.00
50.00
50.00
50.00
50.00
11.00
220.00
220.00
220.00
220.00
220.00
220.00
70.00
PICK UP TO BNTYN HRWR 370.00
PICK UP TO BNTYN HRWR 650.00
DAMBA FLSTERRING 630
630
630
630
490.00
LOADED TO SV - 08 690.00
DAMBA 680.00
680.00
680.00
680.00
680.00
38.00
CHB FABRICATION 32.00
R C P FABRICATION 28.00
28.00
28.00
28.00
229.00
TUCALO BLK7 LOT 1-8 227.00
227.00
227.00
227.00
227.00
292.00
PAINTING C- PURLINS 290.00
C- PURLINS PAINTING 288.00
C- PURLINS PAINTING 286.00
C- PURLINS PAINTING 284.00
C- PURLINS PAINTING 282.00
282.00
282.00
282.00
10.00
C- PURLINS PAINTING 9.00
9.00
9.00
9.00
9.00
9.00
5.00
C.H B. LAYING BLK 7 4.00
TUCALO PUTTING 2.00
GR. NECARTER C. SILFAVAN
OJECT MANAGER
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE OCT. 14 TO 19 2019
TOTAL TOTAL DELIVERY DELIVERIES
ITEM NO. DESCRIPTION REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 1,283 BAGS
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 144 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M PCS 48 10/19/19 KAMP.
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 624
PCS 186 10/19/19 KAMP.
CAPPING 1690MM
CAPPING 3660MM
END WALL FLASHING 3660MM
END WALL FLASHING 2000MM
END WALL FLASHING 2440MM
FAUCET 1/2
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
EMPTY CONTAINER 10
CONSTRUCTION PAIL
CUT-OFF BLADE 14''
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
57357 LOADED TO ST O8
54079 50 10/13/19 CABRADILLA RCP FABRICATION
51856 LOADED TO ST O8
51882 T. CASTILLANO DT- 39
54001 60 10/16/19 CARATAO STYRUP BLK 23 LOT 1-12
54012 50 10/17/19 A. NAVARRO STYRUP BLK 7 LOT 1-8
54013 50 10/17/19 D. ESCANILLAN TUCALO MATTING BLK7-8-
54020 70 10/18/19 MANSUETO VERTICAL/ HORIZONTAL BLK 23
54021 50 10/18/19 G. ASCARDA STYRUP BLK 7 LOT 1-8
54020 20 10/18/19 D. LABARDA VERTICAL BLK 19 LOT 27-31
54031 40 10/19/19 BATAIN SOG MATTING BLK8-9 LOT 1-16
57357 LOADED TO ST O8
FAB. ON SITE
54086 560 10/14/19 VELIGANIO BLK 19 LOT 27 31
FAB. ON SITE
54088 706 10/15/19 D. ESCANILLAN CHB BLK. 7 LOT 1-8
FAB. ON SITE
54098 759 10/16/19 CARABALE CHB LAYING BLK 9 C.R
FAB. ON SITE
54007 662 10/17/19 BATAIN CHB BLK. 7 LOT 1-8
FAB. ON SITE
54018 673 10/18/19 P. OPQUERA CHB LAYING BLK 19 LOT 11-26
FAB. ON SITE
54025 594 10/19/19 H. SARIO CHB BLK 8-9 LOT 1-16
FAB. ON SITE
54018 327 10/18/19 P. OPQUERA CHB LAYING BLK 19 LOT 11-26
-
BTYN HRDW
51081 15 10/14/19 BOLA BLK B LOT 1-7
54085 30 10/14/19 P. CUYOS CHB FABRICATION
54094 250 10/15/19 L. CANONIGO CHARGE TO KODIA
BTYN HRDW LOADED TO ST 08
54009 20 10/17/19 SARAN BEAM BLK7 LOT 1 TO 8
54019 15 10/18/19 P. CUYOS BARRACKS
51824 Z. CABALQUITO
54016 5 10/18/19 ALOJACIN TUCKING OF C- PURLINS
54084 1 10/14/19 BARDOLASA PAINTING C- PURLINS
54092 2 10/16/19 EBARDOLASA PAINTING C- PURLINS
54100 1 10/16/19 POGADO PAINTING C- PURLINS
54022 1 10/18/19 EBARDOLASA PAINTING C- PURLINS
1,127.00
1,095.00
1,063.00
1,053.00
1,021.00
975.00
945.00
923.00
891.00
876.00
856.00
840.00
830.00
810.00
785.00
753.00
738.00
708.00
678.00
646.00
626.00
616.00
596.00
581.00
576.00
544.00
512.00
512.00
512.00
512.00
6.00
-
100.00
50.00
1,050.00
1,000.00
950.00
900.00
868.00
818.00
818.00
818.00
818.00
28.00
128.00
70.00
270.00
1,270.00
1,210.00
1,160.00
1,110.00
1,040.00
990.00
970.00
930.00
930.00
930.00
930.00
930.00
365.00
305.00
295.00
795.00
785.00
745.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
4.00
104.00
100.00
300.00
250.00
750.00
700.00
680.00
650.00
634.00
622.00
592.00
586.00
586.00
586.00
125.00
120.00
119.00
117.00
111.00
107.00
103.00
59.00
49.00
45.00
40.00
34.00
30.00
28.00
24.00
22.00
20.00
16.00
151.00
149.00
145.00
139.00
137.00
133.00
131.00
131.00
131.00
131.00
131.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
7.00
7.00
7.00
7.00
7.00
7.00
99.01
119.02
139.01
99.01
97.00
95.00
93.00
91.00
86.00
83.00
81.00
79.00
39.00
36.00
34.00
32.00
31.00
51.01
71.02
71.02
71.02
71.02
200.00
560.00
-
706.00
759.00
-
662.00
-
673.00
-
594.00
-
327.00
-
48.00
96.00
22.00
208.00
24.00
45.00
45.00
-
2,500.00
2,500.00
2,500.00
2,500.00
15.00
13.00
13.00
13.00
13.00
160.00
145.00
145.00
145.00
7.00
6.00
32.00
27.00
27.00
27.00
32.00
27.00
27.00
27.00
27.00
27.00
200.00
166.00
163.00
100.00
91.00
91.00
91.00
32.00
27.00
27.00
27.00
32.00
22.00
22.00
10.00
9.00
2.00
13.00
1.00
2.00
2.00
1.00
303.00
28.00
166.00
198.00
228.00
260.00
292.00
324.00
356.00
388.00
420.00
452.00
100.00
100.00
95.00
95.00
95.00
57.00
57.00
57.00
57.00
57.00
57.00
36.00
34.00
33.00
2.00
1.00
2.00
21.00
21.00
21.00
3.00
-
4.00
49.00
11.00
220.00
220.00
220.00
220.00
220.00
220.00
620.00
920.00
905.00
875.00
625.00
865.00
845.00
830.00
830.00
830.00
830.00
830.00
38.00
30.00
27.00
27.00
27.00
227.00
225.00
223.00
223.00
223.00
223.00
223.00
200.00
195.00
195.00
195.00
195.00
195.00
195.00
282.00
281.00
279.00
278.00
277.00
277.00
9.00
8.00
2.00
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE OCT. 20 TO 26,2019
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENT
S QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 1,433 BAGS
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 144 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 624 PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM 54 10/26/19 KAMP.
FAUCET 1/2
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
EMPTY CONTAINER 10
CONSTRUCTION PAIL
CUT-OFF BLADE 14''
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
FABRICATE ON SITE
54035 202 10/21/19 P. OPQUERA CHB BLK 19 LOT 11 TO 26
FABRICATE ON SITE
57402 357 10/22/19 SISDUYRO CHB LAYING BLK19 LOT 27-31
FABRICATE ON SITE
57408 900 10/23/19 SEVILENO CHB BLK 7 LOT9-TO 16
FABRICATE ON SITE
57420 713 10/24/19 P. OPQUERA CHB BLK 19 LOT 27-31
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
57402 132 10/22/19 SISDUYRO BLK 19 LOT 27-31
FABRICATE ON SITE
57424 134 1024/19 SEVILENO CHB LAYING BLK 8 LOT 1-8
54038 208 10/21/19 D. ESCANILLAN TRUSSES BLK 7-8-9
512.00
480.00
460.00
435.00
430.00
415.00
405.00
373.00
353.00
351.00
451.00
446.00
396.00
381.00
349.00
344.00
319.00
287.00
225.00
375.00
365.00
355.00
325.00
293.00
278.00
258.00
226.00
206.00
202.00
197.00
197.00
197.00
100.00
86.00
66.00
216.00
196.00
190.00
175.00
169.00
163.00
143.00
123.00
103.00
103.00
103.00
818.00
768.00
718.00
686.00
636.00
586.00
566.00
516.00
466.00
466.00
466.00
466.00
466.00
930.00
920.00
870.00
825.00
775.00
773.00
723.00
693.00
653.00
603.00
593.00
558.00
553.00
553.00
553.00
553.00
553.00
553.00
553.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
705.00
586.00
566.00
516.00
511.00
491.00
461.00
461.00
461.00
461.00
461.00
461.00
461.00
131.00
127.00
125.00
123.00
121.00
119.00
115.00
113.00
109.00
105.00
104.00
103.00
99.00
97.00
95.00
93.00
90.00
88.00
84.00
84.00
84.00
84.00
84.00
84.00
84.00
84.00
84.00
30.00
47.69
30.00
30.00
30.00
30.00
30.00
30.00
30.00
7.00
6.00
5.00
4.00
3.00
3.00
71.02
68.02
65.02
64.02
62.02
61.02
59.02
58.02
54.02
52.02
51.02
48.02
45.02
43.02
42.02
55.52
69.02
67.02
66.02
64.02
63.02
61.02
58.02
56.02
54.02
53.02
51.02
51.02
51.02
202.00
-
357.00
-
900.00
-
713.00
-
713.00
209.00
132.00
-
134.00
-
96.00
208.00
-
45.00
21.00
-
-
64.00
61.00
61.00
61.00
256.00
216.00
181.00
161.00
151.00
131.00
121.00
121.00
121.00
121.00
121.00
54.00
54.00
16.00
16.00
31.00
31.00
93.00
93.00
31.00
31.00
2,500.00
2,500.00
2,000.00
1,600.00
1,200.00
1,000.00
880.00
880.00
880.00
880.00
13.00
145.00
140.00
135.00
130.00
125.00
120.00
115.00
95.00
80.00
80.00
80.00
6.00
5.00
4.00
27.00
25.00
24.00
23.00
19.00
16.00
16.00
BATAIN
BLK 8 LOT 1-8 SEWER LINE
27.00
25.00
21.00
18.00
200.00
198.00
197.00
196.00
196.00
163.00
162.00
158.00
153.00
153.00
100.00
97.00
94.00
91.00
88.00
85.00
73.00
64.00
64.00
64.00
64.00
27.00
26.00
25.00
21.00
18.00
18.00
18.00
22.00
21.00
17.00
14.00
14.00
14.00
9.00
8.00
2.00
13.00
1.00
2.00
2.00
1.00
303.00
28.00
452.00
484.00
516.00
548.00
580.00
612.00
644.00
676.00
95.00
57.00
57.00
57.00
57.00
57.00
57.00
33.00
32.00
32.00
32.00
32.00
1.00
2.00
21.00
20.00
19.00
19.00
19.00
4.00
49.00
11.00
220.00
220.00
220.00
220.00
220.00
220.00
620.00
830.00
115.00
27.00
223.00
221.00
221.00
221.00
221.00
221.00
221.00
221.00
221.00
195.00
190.00
185.00
185.00
185.00
185.00
185.00
185.00
185.00
227.00
225.00
223.00
222.00
220.00
220.00
220.00
220.00
8.00
8.00
8.00
8.00
8.00
8.00
2.00
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE OCT. 28-NOV 4,2019
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 1,633 BAGS
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 144 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 624 PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
TEFLON TAPE
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
FABRICATE ON SITE
51662 490 10/28/19 PEPITO CHB LAYING BLK 23 LOT 1-12
FABRICATE ON SITE
51671 1054 10/28/19 BATIANCILA CHB LAYING BLK 23 LOT 1-12
51677 9 10/29/19 P. OPQUERIA ROOFING BLK 23 LOT 11-26
BNTYN HRDWR
BNTYN HRDWR
BNTYN HRDWR
51661 4 10/28/19 P. CUYOS WATER LINE
51675 2 10/29/19 P. CUYOS WATER LINE
197.00
165.00
140.00
115.00
100.00
68.00
36.00
21.00
6.00
-
200.00
180.00
170.00
162.00
132.00
107.00
107.00
107.00
107.00
107.00
107.00
107.00
107.00
103.00
83.00
63.00
38.00
18.00
14.00
-
466.00
416.00
384.00
364.00
314.00
314.00
314.00
314.00
314.00
314.00
314.00
314.00
314.00
314.00
553.00
548.00
498.00
475.00
455.00
445.00
425.00
410.00
410.00
410.00
410.00
410.00
410.00
410.00
410.00
410.00
410.00
705.00
655.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
645.00
461.00
431.00
401.00
401.00
401.00
401.00
401.00
401.00
401.00
401.00
401.00
84.00
82.00
80.00
76.00
74.00
70.00
67.00
65.00
63.00
61.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
30.00
3.00
51.02
48.02
46.02
44.02
29.02
27.02
26.02
24.02
22.02
19.02
19.02
19.02
490.00
-
1,054.00
-
96.00
61.00
52.00
52.00
52.00
121.00
97.00
97.00
97.00
97.00
97.00
97.00
97.00
97.00
97.00
97.00
97.00
54.00
54.00
16.00
16.00
31.00
31.00
93.00
93.00
31.00
31.00
2,500.00
2,500.00
880.00
640.00
640.00
640.00
640.00
640.00
640.00
640.00
13.00
10.00
10.00
10.00
10.00
-
80.00
60.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
4.00
3.00
2.00
16.00
12.00
10.00
10.00
10.00
10.00
10.00
10.00
18.00
14.00
12.00
12.00
196.00
153.00
10.00
300.00
10.00
64.00
60.00
58.00
58.00
58.00
18.00
14.00
12.00
12.00
12.00
12.00
12.00
14.00
12.00
12.00
12.00
12.00
8.00
2.00
13.00
1.00
2.00
2.00
1.00
303.00
28.00
676.00
706.00
738.00
770.00
95.00
57.00
56.00
56.00
56.00
56.00
56.00
32.00
30.00
29.00
1.00
2.00
19.00
18.00
18.00
18.00
18.00
4.00
49.00
11.00
220.00
220.00
220.00
220.00
220.00
220.00
620.00
600.00
590.00
590.00
590.00
590.00
590.00
590.00
830.00
115.00
27.00
221.00
218.00
215.00
213.00
213.00
213.00
213.00
213.00
185.00
220.00
219.00
217.00
217.00
217.00
217.00
217.00
217.00
217.00
8.00
2.00
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE; NOV. 4 TO 9 2019
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 3,313 BAGS
BAGS 150 11/4/19 KAMP
43 11/12/19 S. LABAHO
48 11/13/19 S. LABAHO
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 144 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 832 PCS
208 11/9/19 KAMP
SPANDEK 5200MM 64
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
END WALL FLASHING 3660MM 31 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
DRAINAGE SYSTEM
RCP 900MM 303 PCS
6 11/11/19 BANAWA
10 11/12/19 BANAWA
10 11/13/19 BANAWA
10 11/15/19 BANAWA
4 11/16/19 BANAWA
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
HARDWARE CLOTH 4 MTRS
B-B ROLLER 4' 22 PCS
PCS 20 11/4/19 H.O MANILA
CONSTRUCTION PAIL
CUT- OFF BLADE 12' 20 PCS 20 11/4/19 H.O MANILA
SHOVEL 10 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
TIONGSON LOADED TO ST 06
51691 30 11/4/19 L. SEVILENO SOG BLK 9 LOT 9-15
51693 25 11/4/19 S. LABAHO C. H . B FABRICATION
51694 52 11/4/19 CABRADILLA R.C.P FABRICATION
51695 12 11/4/19 ALMOJALAS SOG BLK 9 LOT 9-15
52701 6 11/4/19 R. ORTIZ BEAM BLK 7 LOT 1-8
52705 20 11/5/19 IBARDOLASA BEAM BLK 23 LOT 1-12
52706 12 11/5/19 NAVARRO S O G MATTING BLK 8 LOT 1-8
52711 6 11/5/19 H. MANSUETO FIRE WALL BLK 9 LOT 1-8
52720 25 11/6/19 IBARDOLASA BEAM BLK 23 LOT 1-12
52723 18 11/6/19 NULOT S OG MATTING BLK 7 LOT 1-8
52725 10 11/6/19 D. MATA COLUMN BLK 7 LOT 1-8
52730 16 11/6/19 CABRADILLA R C P FABRICATION
57608 Z. CABALQUINTO LOADED TO D-T 88
52735 15 11/7/2019 VILLAESTER MATTING BLK 7 LOT 9-15
52739 2 11/7/2019 CABRADILLA R C P FABRICATION
52742 15 11/8/19 CIGJE MATTING BLK 19 LOT 11-26
52748 10 11/8/19 J. NAVARRO S O G BLK 9 LOT 1-8
51556 20 11/8/19 ROSALES BANAWA C H B FAB.
51560 25 11/9/19 PEPITO BEAM BLK 23 LOT 1-12
51563 30 11/9/19 CIGJE S O G BLK 19 LOT 11-26
.
TIONGSON LOADED TO ST 06
52703 4 11/5/19 CARABALLE CHB LAYING C.R BLK 8
52705 10 11/5/19 IBARDOLASA BEAM BLK 23 LOT 1-12
52708 15 11/5/19 PEPITO C H B BLK 23 LOT 1-12
52717 17 11/6/19 ROSATASE C H B BLK 23 LOT 1-12
52720 25 11/6/19 IBARDOLASA C H B BLK 23 LOT 1-12
52721 7 11/6/19 SEVILENO FIRE WALL BLK 9 LOT 9-15
52724 4 11/6/19 ROSATASE FIRE WALL BLK 9 LOT 9-15
52726 15 11/6/19 PEPITO BLK 23 VAERTICAL
57608 Z. CABALQUINTO LOADED TO D-T 88
52732 3 11/7/19 CARABALLE S O G BLK 7 LOT 1-8
52733 15 11/7/19 H. SARIO C H B BLK 23 LOT 1-12
52734 6 11/7/19 H. MANSUETO FIRE WALL BLK 8 LOT 1-8
52739 2 11/7/2019 CABRADILLA R C P FABRICATION
52744 20 11/8/19 PEPITO C. H. B. BLK 7 LOT 1-8
52746 7 11/8/19 BATIANCILA PIRE WALL BLK 9 LOT 1-8
51553 5 11/8/19 DUAZO COLAR R. C. P ROAD 06
51557 3 11/9/19 J. OPAGA MAN HOLE BLK 3 ROAD 6
51562 8 11/9/19 ROSATASE FIRE WALL BLK 8 LOT 9-15
FABRICATE ON SITE
51698 919 11/4/19 PEPITO CHB BLK 23 LOT 1-12
FABRICATE ON SITE
51699 125 11/4/19 P. OPQUERIA BLK 19 LOT 11-26
FABRICATE ON SITE
52704 251 11/5/19 J. OPAGA CHB BLK 23 LOT 1-12
FABRICATE ON SITE
52708 593 11/5/19 PEPITO CHB BLK 23 LOT 1-12
FABRICATE ON SITE
52729 364 11/6/19 GUEVARRA C H B BLK 19 LOT11-26
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
51698 310 11/4/19 PEPITO CHB BLK 23 LOT 1-12
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
52746 246 11/8/19 BATIANCILA FIRE WALL BLK 9 LOT 1-15
FABRICATE ON SITE
51566 95 11/11/19 J. OPAGA MAN HOLE ROAD 06
FABRICATE ON SITE
51588 195 11/12/19 P. OPQUERIA C H B LAYING BLK 19 LOT 11-26
51417 Z. CABALQUINTO LOADED TO D-T 88
51594 500 11/12/19 R. TEJADA MAN HOLE ROAD 6
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
52464 500 11/14/19 MARABE C H B LAYING BLK 7 LOT 9-16
52467 150 11/14/19 BATAIN C H B C.R BLK 7 LOT 9-16
51417 Z. CABALQUINTO LOADED TO D-T 88
52452 50 11/13/19 NARABE PCCP FORM ROAD 6
52486 158 11/15/19 S. ALOJACIN ROOFING BLK 7 LOT9-16
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
107.00
257.00
227.00
202.00
150.00
138.00
132.00
112.00
100.00
94.00
69.00
51.00
41.00
25.00
175.00
160.00
158.00
143.00
133.00
113.00
88.00
58.00
43.00
293.00
243.00
215.00
190.00
184.00
161.00
131.00
106.00
86.00
66.00
46.00
-
230.00
-
300.00
96.00
296.00
237.00
217.00
211.00
201.00
191.00
171.00
161.00
151.00
145.00
445.00
445.00
445.00
445.00
445.00
150.00
146.00
136.00
121.00
104.00
79.00
72.00
68.00
53.00
203
200.00
185.00
179.00
177.00
157.00
150.00
145.00
142.00
134.00
409.00
403.00
388.00
368.00
361.00
357.00
337.00
327.00
312.00
287.00
262.00
257.00
247.00
235.00
221.00
211.00
211.00
211.00
211.00
211.00
211.00
314.00
204.00
154.00
124.00
99.00
1,099.00
1,049.00
1,039.00
1,019.00
989.00
939.00
909.00
859.00
859.00
859.00
859.00
859.00
410.00
400.00
350.00
300.00
290.00
280.00
260.00
210.00
195.00
145.00
95.00
45.00
-
1,000.00
964.00
914.00
864.00
854.00
844.00
824.00
804.00
774.00
754.00
734.00
729.00
679.00
629.00
614.00
604.00
594.00
584.00
534.00
528.00
478.00
458.00
448.00
442.00
392.00
377.00
357.00
337.00
337.00
337.00
337.00
645.00
625.00
595.00
1,095.00
1,075.00
1,065.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
1,015.00
401.00
389.00
359.00
309.00
249.00
749.00
709.00
659.00
609.00
601.00
589.00
493.00
493.00
493.00
493.00
493.00
493.00
60.00
57.00
54.00
52.00
49.00
47.00
45.00
44.00
179.00
174.00
170.00
168.00
166.00
160.00
158.00
154.00
151.00
149.00
147.00
143.00
139.00
137.00
133.00
127.00
125.00
123.00
120.00
116.00
114.00
108.00
104.00
102.00
98.00
92.00
80.00
76.00
72.00
68.00
66.00
62.00
60.00
56.00
56.00
56.00
30.00
50.01
30.00
48.50
63.50
82.00
102.10
117.01
115.01
95.00
93.00
90.00
88.00
86.00
83.00
81.00
79.00
77.00
75.00
74.00
74.00
74.00
74.00
74.00
74.00
3.00
20.69
36.60
56.61
72.52
90.21
110.22
128.22
144.13
117.13
93.13
85.13
85.13
85.13
85.13
19.02
36.77
56.78
70.26
90.27
107.96
121.44
118.44
116.44
112.44
111.44
109.44
107.44
105.44
104.44
102.44
98.44
97.44
96.44
86.44
84.44
82.44
81.44
80.44
98.13
118.14
134.05
151.74
171.75
187.66
205.35
225.36
245.37
263.06
261.06
260.06
258.06
257.06
239.37
236.37
234.37
231.37
229.37
228.37
226.37
224.37
222.37
220.37
218.37
216.37
201.37
197.37
195.37
193.37
183.37
178.37
176.37
198.37
214.87
232.87
247.87
268.00
267.00
265.00
229.00
226.00
222.00
221.00
193.00
187.00
204.69
220.60
240.61
238.61
236.61
234.61
233.61
231.61
229.61
228.61
228.61
228.61
228.61
228.61
919.00
-
125.00
-
251.00
-
593.00
-
364.00
-
283.00
633.00
735.00
1,102.00
2,047.00
1,047.00
1,220.00
4,241.00
3,241.00
2,741.00
2,784.00
2,832.00
1,832.00
1,332.00
1,332.00
1,332.00
1,332.00
1,332.00
1,332.00
310.00
-
95.00
195.00
246.00
-
95.00
-
195.00
-
500.00
-
110.00
305.00
705.00
1,050.00
550.00
400.00
400.00
400.00
400.00
144.00
208.00
158.00
-
-
-
21.00
-
-
52.00
44.00
44.00
44.00
44.00
44.00
44.00
97.00
87.00
63.00
43.00
9.00
-
-
54.00
54.00
16.00
16.00
31.00
31.00
93.00
93.00
31.00
31.00
2,500.00
2,500.00
640.00
260.00
-
2,000.00
4,000.00
3,720.00
3,720.00
3,720.00
3,720.00
3,720.00
3.00
10.00
50.00
40.00
5.00
165.00
140.00
125.00
100.00
90.00
75.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
2.00
1.00
8.00
7.00
6.00
5.00
4.00
3.00
3.00
3.00
3.00
10.00
8.00
1.00
33.00
28.00
25.00
20.00
18.00
15.00
11.00
11.00
11.00
11.00
12.00
10.00
1.00
33.00
28.00
25.00
20.00
18.00
15.00
11.00
11.00
11.00
11.00
11.00
196.00
194.00
192.00
190.00
186.00
136.00
136.00
136.00
136.00
136.00
136.00
136.00
153.00
150.00
100.00
100.00
100.00
100.00
10.00
8.00
6.00
5.00
5.00
5.00
300.00
250.00
250.00
250.00
250.00
250.00
10.00
10.00
10.00
10.00
58.00
3.00
99.00
94.00
85.00
70.00
64.00
55.00
43.00
43.00
43.00
12.00
3.00
33.00
28.00
25.00
20.00
18.00
15.00
11.00
11.00
11.00
12.00
3.00
35.00
30.00
27.00
22.00
19.00
15.00
15.00
15.00
8.00
6.00
5.00
2.00
2.00
2.00
2.00
13.00
1.00
2.00
2.00
1.00
3.00
303.00
28.00
770.00
785.00
787.00
806.00
822.00
838.00
854.00
856.00
866.00
876.00
882.00
892.00
902.00
912.00
916.00
95.00
80.00
80.00
80.00
80.00
56.00
55.00
54.00
53.00
50.00
48.00
48.00
48.00
48.00
48.00
29.00
28.00
27.00
24.00
22.00
21.00
19.00
17.00
17.00
17.00
17.00
24.00
22.00
20.00
18.00
18.00
18.00
18.00
18.00
1.00
-
2.00
18.00
17.00
15.00
15.00
12.00
10.00
9.00
8.00
8.00
8.00
8.00
4.00
20.00
19.00
19.00
19.00
19.00
20
49.00
20.00
18.00
18.00
18.00
18.00
11.00
220.00
220.00
220.00
220.00
220.00
590.00
584.00
564.00
544.00
541.00
541.00
541.00
541.00
830.00
820.00
818.00
798.00
795.00
795.00
795.00
795.00
795.00
115.00
27.00
24.00
21.00
21.00
19.00
19.00
19.00
213.00
211.00
206.00
203.00
200.00
200.00
200.00
200.00
185.00
180.00
175.00
170.00
165.00
160.00
160.00
160.00
160.00
160.00
20.00
19.00
19.00
19.00
217.00
216.00
215.00
212.00
212.00
212.00
212.00
212.00
212.00
8.00
38.00
38.00
38.00
38.00
33.00
33.00
33.00
33.00
33.00
60.00
40.00
2.00
-
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE; NOV. 4 TO 9 2019
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES UNIT COST
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 3,713
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6
ANGLE BAR 4MMX75MMX75MMX6. 192 PCS 11/17/19 KAMP.
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.
ANGLE BAR 3MMX50MMX50MMX6.
C-PURLINS1.2X2X6X4.0M 1,040 PCS 208 11/17/19 KAMP.
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
COCO LUMBER 2X2X6
COCO LUMBER 2X3X8 1200 PCS
CORROGATED SHEET 26 X 8 33
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
FABRICATE ON SITE
52498 2 11/18/19 H. SARIO FORM WORKS BLK 7 LOT 1-8
57153 4 11/18/19 ARONALE B S P OFFICE/ SILLION
57172 2 11/19/19 ARONALE B S P OFFICE/ SILLION
57199 2 11/22/19 ARONALE B S P OFFICE/ SILLION
55841 2 11/26/19 VILLAESTER BLK 9 LOT M9-16 PLASTER
1 11/27/19 SEVILENO FORM WORKS BLK 9 LOT 1-16
56612 2 11/29/19 OPQUERIA BLK 19 LOT 11-26 SEPTIC TANK
Z. CABALQUINTO WAREHOUSE
57162 3 11/18/19 PORROSUELO CHARGE TO CODIA
57175 3 11/20/19 P.OPQUERA CURVA N' GUTTER
57178 2 11/20/19 BATERSAL C H B BLK 23 LOT 1-12
57179 2 11/20/19 M. ALOLOR C H B C.R BLK 7 LOT1-8
52497 1 11/18/19 CARATAO COLUMN BLK 31 LOT 9-16
Z. CABALQUINTO WAREHOUSE
445.00
433.00
423.00
399.00
379.00
359.00
339.00
319.00
299.00
274.00
249.00
219.00
209.00
189.00
169.00
139.00
114.00
99.00
69.00
59.00
49.00
19.00
16.00
166.00
151.00
131.00
331.00
329.00
299.00
283.00
243.00
227.00
212.00
176.00
161.00
136.00
121.00
111.00
101.00
131.00
111.00
311.00
291.00
261.00
211.00
211.00
211.00
211.00
211.00
211.00
211.00
201.00
197.00
167.00
137.00
133.00
122.00
120.00
115.00
65.00
45.00
40.00
20.00
18.00
16.00
-
300.00
275.00
267.00
252.00
247.00
227.00
207.00
195.00
191.00
184.00
178.00
328.00
303.00
300.00
297.00
291.00
261.00
211.00
136.00
86.00
56.00
30.00
-
300.00
280.00
276.00
271.00
266.00
236.00
216.00
196.00
186.00
166.00
158.00
258.00
248.00
228.00
213.00
193.00
193.00
193.00
193.00
193.00
859.00
849.00
809.00
739.00
689.00
639.00
579.00
529.00
529.00
529.00
529.00
529.00
529.00
529.00
529.00
529.00
337.00
287.00
277.00
227.00
187.00
162.00
152.00
82.00
52.00
-
1,000.00
900.00
890.00
870.00
820.00
800.00
750.00
730.00
700.00
680.00
670.00
650.00
565.00
535.00
475.00
465.00
445.00
425.00
405.00
395.00
375.00
345.00
245.00
225.00
225.00
225.00
225.00
225.00
225.00
1,015.00
965.00
925.00
890.00
840.00
828.00
808.00
808.00
808.00
808.00
808.00
808.00
808.00
493.00
443.00
397.00
347.00
327.00
277.00
245.00
191.00
131.00
131.00
131.00
131.00
56.00
54.00
52.00
48.00
46.00
40.00
37.00
34.00
32.00
30.00
22.00
20.00
16.00
5.00
1.00
-
135.00
131.00
124.00
120.00
116.00
112.00
110.00
106.00
101.00
85.00
81.00
79.00
77.00
75.00
63.00
59.00
54.00
52.00
46.00
45.00
43.00
41.00
37.00
31.00
25.00
21.00
17.00
13.00
9.00
7.00
5.00
3.00
-
135.00
133.00
131.00
125.00
119.00
115.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
113.00
74.00
72.00
70.00
68.00
66.00
64.00
62.00
61.00
59.00
56.00
54.00
51.00
49.00
49.00
49.00
85.13
83.13
103.14
120.83
134.31
154.32
172.01
192.08
205.56
225.57
239.05
237.05
235.05
255.06
253.06
251.06
268.75
284.51
297.99
318.00
316.00
314.00
312.00
312.00
312.00
312.00
312.00
312.00
312.00
228.61
227.61
225.61
223.61
221.61
219.61
217.61
202.61
201.61
200.61
199.61
197.61
196.61
176.61
174.61
171.61
169.61
164.61
161.61
159.61
157.61
156.61
154.61
151.61
169.30
161.30
159.30
144.30
142.30
122.30
120.30
118.30
115.30
103.30
101.30
100.30
90.30
87.30
84.30
83.30
82.30
81.30
79.30
76.30
75.30
74.30
72.30
92.31
112.32
110.32
95.32
79.32
39.32
35.32
32.32
26.32
43.66
61.00
78.31
75.31
73.31
70.31
69.31
68.31
67.31
66.31
83.65
80.65
77.65
75.65
73.65
71.65
63.65
60.65
77.99
95.33
112.67
110.67
107.67
104.67
89.67
69.67
69.67
69.67
69.67
69.67
69.67
69.67
69.67
1,332.00
5,723.00
5,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
400.00
-
250.00
-
1,000.00
500.00
-
-
-
192.00
208.00
-
21.00
-
44.00
108.00
98.00
89.00
79.00
79.00
79.00
79.00
79.00
79.00
128.00
108.00
78.00
58.00
48.00
18.00
8.00
-
-
-
54.00
54.00
16.00
16.00
31.00
31.00
93.00
-
93.00
-
31.00
31.00
-
2,500.00
2,500.00
3,720.00
3,600.00
3,240.00
2,920.00
2,760.00
2,600.00
2,360.00
2,160.00
2,160.00
2,160.00
3.00
10.00
-
55.00
35.00
5.00
165.00
150.00
140.00
140.00
140.00
140.00
140.00
140.00
140.00
3.00
2.00
0
7.00
6.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
38.00
11.00
7.00
1.00
33.00
30.00
28.00
28.00
28.00
28.00
28.00
28.00
28.00
11.00
7.00
1.00
33.00
30.00
28.00
28.00
28.00
28.00
28.00
28.00
28.00
136.00
36.00
536.00
486.00
436.00
386.00
386.00
386.00
386.00
386.00
386.00
386.00
100.00
50.00
50.00
50.00
50.00
5.00
3.00
250.00
100.00
100.00
100.00
100.00
100.00
100.00
10.00
10.00
10.00
10.00
5.00
4.00
43.00
31.00
13.00
109.00
100.00
94.00
94.00
94.00
94.00
94.00
11.00
7.00
-
32.00
29.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
11.00
7.00
-
32.00
27.00
24.00
22.00
22.00
22.00
22.00
22.00
22.00
2.00
26.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
2.00
13.00
1.00
2.00
2.00
1.00
3.00
5.00
303.00
28.00
916.00
924.00
934.00
944.00
954.00
964.00
974.00
984.00
994.00
1,000.00
1,008.00
1,016.00
1,026.00
1,034.00
1,044.00
80.00
48.00
46.00
42.00
40.00
38.00
36.00
35.00
33.00
33.00
33.00
33.00
33.00
17.00
15.00
13.00
9.00
5.00
3.00
1.00
-
18.00
2.00
-
8.00
6.00
4.00
1.00
1.00
1.00
4.00
19.00
10.00
7.00
4.00
2.00
-
-
20
49.00
48.00
48.00
48.00
18.00
16.00
14.00
14.00
14.00
11.00
220.00
220.00
220.00
220.00
220.00
541.00
501.00
451.00
421.00
371.00
351.00
336.00
321.00
316.00
310.00
300.00
300.00
300.00
300.00
300.00
300.00
795.00
755.00
705.00
701.00
671.00
651.00
646.00
631.00
626.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
620.00
115.00
19.00
-
200.00
190.00
186.00
185.00
183.00
183.00
183.00
183.00
183.00
160.00
155.00
150.00
145.00
145.00
145.00
145.00
145.00
145.00
145.00
19.00
212.00
210.00
207.00
205.00
204.00
202.00
201.00
191.00
186.00
186.00
186.00
186.00
186.00
186.00
38.00
37.00
36.00
35.00
34.00
30.00
30.00
30.00
30.00
30.00
33.00
21.00
14.00
10.00
10.00
40.00
5.00
PROJECT :VILLA MERCEDEZ 3 SILLON
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
DATE; DEC. 1 TO 15 2019
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 5,353
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
PCS
PCS
UPVC EL BOW 1/2 X 90 128 PCS
PCS
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
CORROGATED SHEET 26 X 8 33
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
S. LABAHO Z. CABALQUINTO
56647 2131 12/5/19 P. OPQUERIA
56561 1000 12/6/19 P. OPQUERIA
PCS 1000
KAMP. Z. CABALQUINTO
54109 3 12/5/19 P.OPQUERIA
54110 8 12/5/19 R. BATAIN
BY; ENGR. J. FORROSUELO APPROVED BY; ENGR. NECARTER C. SILFAVAN
PROJECT; MANAGER
REMARKS BALANCE
211.00
BEAM BLK 31 LOT 9-16 196.00
R C P FABRICATION 166.00
C H B FABRICATION/ LABAHO 141.00
C H B FABRICATION/ BANAWA 116.00
BLK 30 LOT 1-8 COLUMN 101.00
BLK 9 S O G LOT 1-16 86.00
BLK 31 BEAMLOT 1-8 76.00
R C P FABRICATION 56.00
C H B FABRICATION 36.00
C H B FAB. BANAWA 11.00
BLK 6 TUCALO -
BARROWED FR. KODIA 120.00
BLK 31 BEAM LOT 9-16 110.00
BARROWED FR. KODIA 230.00
BLK 6 TUKALO LOT 9-16 210.00
C H B C.R BLK 7 LOT 1-16 195.00
BLK 9 PLASTER LOT 1-16 180.00
C H B C.R BLK 31 LOT1-8 165.00
BLK19 LOT 1-31 SEPTIC TANK 130.00
LOADING TO ST-06 430.00
LOADING TO ST-06 730.00
TUCALO BLK 6 LOT 1-8 730.00
BLK 7 LOT 1-8 PLASTER 730.00
BLK 9 PLASTER LOT 1-16 730.00
BLK 8 FAB. DOOR JAMB. 730.00
BLK 31 C H B C.R 730.00
BLK 31 LOT 9-16 C H B LAYING 730.00
C H B FAB. / BANAWA 730.00
R C P FABRICATION 730.00
LOADING TO ST-06 1,030.00
LOADING TO ST-06 1,330.00
LOADING TO D-T 96 1,730.00
LOADING TO D-T 96 2,130.00
ROAD 9 C-CREATE POURING 1,680.00
BLK 31 LOT 1-16 BEAM 1,670.00
BLK 30 C H B LAYING 1,650.00
C- CREATE POURING ROAD 5 1,628.00
BLK 30 LOT 1-8 BEAM 1,608.00
R C P FABRICATION 1,578.00
S O G BLK 23 LOT 1-12 1,558.00
S O G BLK 23 LOT 1-12 1,538.00
COLUMN BLK 30 LOT 1-8 1,508.00
BLK 8 FAB. DOOR JAMB. 1,498.00
S O G BLK 23 LOT 1-12 1,476.00
S O G BLK 23 LOT 1-12 1,466.00
C H B FAB. / BANAWA 1,451.00
R C P FABRICATION 1,431.00
C H B FABRICATION/ LABAHO 1,421.00
1,421.00
1,421.00
1,421.00
1,421.00
1,421.00
1,421.00
1,421.00
1,421.00
193.00
C H B SEPTIC BLK 19 LOT 11-26 178.00
PIRE WALL BLK 23 LOT 1-12 163.00
FAB. DOOR JAMB 153.00
BLK 7 LOT 1-16 PLASTER 143.00
BLK 8 LOT 1-16 PLASTER 141.00
FAB. DOOR JAMB 126.00
BLK 19 SEPTIC TANK 111.00
BLK 7 LOT 1-16 PLASTER 96.00
FAB. DOOR JAMB 81.00
BLK 31 LOT 9-16 BEAM 61.00
BLK 19 LOT 11-31 PLASTER 41.00
FAB. DOOR JAMB 26.00
CHB LAYING BLK31 LOT1-16 -
LOADING TO D-T 39 400.00
BLK 6 C H B LOT 9-16 385.00
BLK 7 C H B C.R LOT1-16 370.00
PLASTER BLK 9 LOT 1-16 360.00
C H B BLK 6 LOT1-16 345.00
BLK 7 PLASTERRING LOT 1-16 335.00
PLASTER BLK 9 LOT 1-16 320.00
BLK 31LOT 1-16 C H B C. R 305.00
BLK 19 LOT 11-31 PLASTER 285.00
BLK 31 LOT 1-8 C H B C.R 265.00
BLK 30 C H B LAYING 245.00
CHB LAYING BLK 6 LOT9-16 225.00
FIRE WALL BLK 7 LOT 1-16 215.00
CHB BLK 31 LOT 1-8 200.00
CHB BLK 6 LOT 1-16 180.00
FIRE WALL BLK 7 LOT 9-16 170.00
BLK 9 PLASTERRING LOT 1-16 160.00
CHB BLK 31 LOT 1-16 150.00
BLK 30 C H B LAYING 120.00
CHB BLK 6 LOT 1-8 100.00
CHB BLK 7 LOT 1-16 90.00
CHB BLK 23 LOT 1-12 C.R 80.00
PLASTERRING BLK 9 LOT 1-16 70.00
PLASTER BLK 19 LOT 1-31 50.00
CHB BLK 6 LOT 1-16 30.00
BLK 7 LOT 1-16 FAB. DOOR JAMB. 20.00
PLASTER BLK 9 LOT 1-16 10.00
CHB BLK 23 LOT 1-12 C.R 5.00
5.00
5.00
5.00
5.00
529.00
FAB. DOOR JAMB 519.00
R C P FABRICATION 499.00
FAB. DOOR JAMB 479.00
R C P FABRICATION 439.00
FAB. DOOR JAMB 429.00
FAB. DOOR JAMB 409.00
BLK 8 FAB. DOOR JAMB. 408.00
R C P FABRICATION 348.00
BLK 8 FAB. DOOR JAMB. 338.00
BLK 8 FAB. DOOR JAMB. 318.00
R C P FABRICATION 258.00
BLK 8 FAB. DOOR JAMB. 238.00
MATTING BLK 23 LOT 1-12 188.00
BLK 8 FAB. DOOR JAMB. 168.00
BLK 8 FAB. DOOR JAMB. 128.00
BLK 23 MATTING 78.00
78.00
78.00
78.00
78.00
78.00
225.00
BEAM BLK 31 LOT 9-16 210.00
STYRUP BLK 6 LOT 9-16 110.00
BLK 7 LOT 1-16 DOWELL 100.00
BLK 6 LOT 9-16 VERTICAL 50.00
BLK 7 LOT 1-16 PLASTER 40.00
LOADING TO D-T 73 1,040.00
DOWELL BLK 31 LOT 9-16 1,020.00
BLK 6 VERTICAL LOT 9-16 960.00
CHB LAYING BLK31 LOT1-16 940.00
C H B C.R BLK 7 LOT 1-16 930.00
C H B C.R BLK 31 LOT1-8 920.00
BLK 31 LOT 9-16 DOWELL 900.00
BLK19 LOT 1-31 SEPTIC TANK 880.00
STYRUP BLK 6 LOT 1-8 815.00
BLK 7 LOT 1-8 PLASTER 805.00
BLK 31 LOT 8 HORIZONTAL VER. 800.00
BLK 30 LOT 1-8 STYRUP 730.00
BLK 6 C H B LOT 9-16 720.00
BLK 31 LOT 1-16 DOWELL 710.00
BLK 5 LOT 1-8 STYRUP 680.00
BLK 30 C H B LAYING 665.00
C H B BLK 6 LOT1-16 655.00
BLK 31LOT 1-16 C H B C. R 645.00
ROAD 9 STOCKA 615.00
BLK 30 LOT 1-8 STYRUP 565.00
BLK 5 LOT 1-8 STYRUP 515.00
BLK 31 LOT 1-8 C H B C.R 495.00
BLK 5 LOT 1-8 STYRUP 395.00
CHB LAYING BLK 6 LOT9-16 385.00
MATTING BLK 23 LOT 1-12 335.00
CHB BLK 31 LOT 1-8 320.00
CHB BLK 6 LOT 1-16 310.00
BLK 30 C H B LAYING 290.00
STYRUP BLK 30 LOT 1-8 230.00
STYRUP BLK 6 LOT 1-8 180.00
CHB BLK 7 LOT 1-16 170.00
CHB BLK 23 LOT 1-12 C.R 160.00
PLASTER BLK 19 LOT 1-31 150.00
CHB BLK 6 LOT 1-16 140.00
BLK 7 LOT 1-16 FAB. DOOR JAMB. 130.00
BLK 23 MATTING 80.00
80.00
80.00
80.00
80.00
80.00
80.00
808.00
BLK 30 HORIZONTAL 758.00
BLK 6 TUCALO 708.00
BLK 6 LOT 9-16 TUCALO 678.00
HORIZONTAL BLK 6 LOT 1-8 663.00
BLK 30 LOT 1-8 HORIZONTAL 643.00
BLK 31 LOT 8 HORIZONTAL VER. 638.00
BLK 30 LOT 1-8 STYRUP 618.00
TUCALO BLK 5 LOT 1-8 598.00
TUCALO BLK 5 LOT 1-8 586.00
586.00
586.00
586.00
586.00
586.00
586.00
586.00
131.00
BLK 30 COLUMN 31.00
BLK 6 LOT 9-16 COLUMN 19.00
STAGING VM-3 SILLION 3,619.00
BEAM BLK 6 LOT 9-16 3,555.00
BEAM BLK 30 LOT 1-8 3,543.00
BLK 30 LOT 1-8 BEAM 3,493.00
BLK 5 LOT 1-8 COLUMN 3,385.00
BLK 30 LOT 1-8 BEAM 3,373.00
BLK 30 LOT 1-8 BEAM 3,353.00
BLK 5 BEAM LOT 1-8 3,291.00
3,291.00
3,291.00
3,291.00
3,291.00
3,291.00
113.00
LOADING TO B-T 04 4,403.00
BEAM BLK 31 LOT 9-16 4,397.00
STYRUP BLK 6 LOT 9-16 4,391.00
FAB. DOOR JAMB 4,389.00
R C P FABRICATION 4,383.00
CHARGE TO KODIA 3,438.00
BLK 30 COLUMN 3,432.00
BLK 9 S O G LOT 1-16 3,426.00
BLK 7 LOT 1-16 DOWELL 3,424.00
FAB. DOOR JAMB 3,422.00
BLK 31 BEAMLOT 1-8 3,420.00
CHARE TO KAMP. 2,610.00
BLK 6 LOT 9-16 VERTICAL 2,602.00
BLK 7 LOT 1-16 PLASTER 2,600.00
FAB. DOOR JAMB 2,598.00
BLK 31 LOT 9-16 BEAM 2,595.00
BLK 30 LOT1-8 STYRUP 2,589.00
BLK 19 LOT 11-31 PLASTER 2,587.00
DOWELL BLK 31 LOT 9-16 2,583.00
BLK 6 VERTICAL LOT 9-16 2,577.00
CHB LAYING BLK31 LOT1-16 2,573.00
BLK 6 TUKALO LOT 9-16 2,571.00
C H B C.R BLK 7 LOT 1-16 2,569.00
BLK 9 PLASTER LOT 1-16 2,567.00
C H B C.R BLK 31 LOT1-8 2,565.00
HORIZONTAL BLK 6 LOT 1-8 2,559.00
BLK 7 LOT 1-8 PLASTER 2,557.00
BLK 8 FAB. DOOR JAMB. 2,555.00
BLK 31 C H B C.R 2,553.00
BLK 31 LOT 9-16 C H B LAYING 2,550.00
BLK 31 HORIZONTAL / VER. 2,548.00
BLK 30 LOT 1-8 STYRUP 2,498.00
BLK 5 LOT 1-8 COLUMN 2,494.00
BLK 6 C H B LOT 9-16 2,492.00
BLK 7 C H B C.R LOT1-16 2,490.00
BLK 8 FAB. DOOR JAMB. 2,488.00
PLASTER BLK 9 LOT 1-16 2,486.00
BLK 31 LOT 1-16 BEAM 2,484.00
BLK 5 LOT 1-8 STYRUP 2,454.00
BLK 30 C H B LAYING 2,450.00
C H B BLK 6 LOT1-16 2,446.00
BLK 8 FAB. DOOR JAMB. 2,444.00
PLASTER BLK 9 LOT 1-16 2,442.00
BLK 30 LOT 1-8 BEAM 2,438.00
BLK 5 LOT 1-8 STYRUP 2,434.00
BLK 31 LOT 1-8 C H B C.R 2,430.00
BLK 30 LOT 1-8 BEAM 2,426.00
BLK 5 LOT 1-8 STYRUP 2,422.00
R C P FABRICATION 2,418.00
BLK 8 FAB. DOOR JAMB. 2,414.00
MATTING BLK 23 LOT 1-12 2,410.00
ELECTRICAL BLK 19 LOT 11-31 2,406.00
BLK 5 STYRUP LOT 1-8 2,402.00
CHB BLK 6 LOT 1-16 2,400.00
BLK 8 FAB. DOOR JAMB. 2,396.00
CHB BLK 31 LOT 1-16 2,394.00
BLK 30 C H B LAYING 2,390.00
COLUMN BLK 30 LOT 1-8 2,386.00
TUCALO BLK 5 LOT 1-8 2,382.00
CHB BLK 7 LOT 1-16 2,380.00
BLK 8 FAB. DOOR JAMB. 2,378.00
PLASTER BLK 19 LOT 1-31 2,376.00
CHARGE TO FF TRADING 2,349.00
BLK 5 BEAM LOT 1-8 2,343.00
CHB BLK 6 LOT 1-16 2,339.00
BLK 7 LOT 1-16 FAB. DOOR JAMB. 2,335.00
2,335.00
2,335.00
2,335.00
2,335.00
2,335.00
2,335.00
49.00
BEAM BLK 31 LOT 9-16 47.00
BLK 31 BEAMLOT 1-8 45.00
BLK 31 LOT 9-16 BEAM 43.00
COLUMN BLK 30 LOT 1-8 41.00
BEAM BLK 6 LOT 1-8 40.00
40.00
40.00
40.00
40.00
40.00
312.00
BLK 30 COLUMN 310.00
BLK 9 S O G LOT 1-16 308.00
BLK 6 LOT 9-16 VERTICAL 306.00
BLK 6 TUKALO LOT 9-16 304.00
ROAD 9 C-CREATE POURING 262.00
BLK 30 LOT 1-8 BEAM 260.00
S O G BLK 23 LOT 1-12 258.00
LOADING TO DT-96 273.76
LOADING TO DT-73 289.67
LOADING TO DT-88 307.27
307.27
69.67
BEAM BLK 31 LOT 9-16 67.67
C H B SEPTIC BLK 19 LOT 11-26 65.67
PIRE WALL BLK 23 LOT 1-12 63.67
FAB. DOOR JAMB 61.67
C H B FABRICATION 58.67
C H B FABRICATION/ BANAWA 43.67
LOADING TO D-T 88 61.01
LOADING TO D-T 88 78.35
LOADING TO D-T 88 95.69
BLK 30 COLUMN 93.69
BLK 9 S O G LOT 1-16 90.69
BLK 7 LOT 1-16 PLASTER 88.69
BLK 8 LOT 1-16 PLASTER 86.69
FAB. DOOR JAMB 84.69
BLK 23 LOT 1-12 PLASTER 82.69
BLK 31 BEAMLOT 1-8 80.69
BLK 19 SEPTIC TANK 77.69
R C P FABRICATION 67.69
C H B FABRICATION 62.69
C H B FAB. / BANAWA 45.35
LOADING TO D-T 88 62.69
LOADING TO D-T 88 80.03
LOADING TO D-T 88 97.37
BLK 6 LOT 9-16 VERTICAL 95.37
BLK 7 LOT 1-16 PLASTER 93.37
FAB. DOOR JAMB 91.37
BLK 31 LOT 9-16 BEAM 88.37
BLK 19 LOT 11-31 PLASTER 86.37
LOADING TO D-T 88 103.71
C H B LAYING BLK 31 LOT 1-16 99.71
FAB. DOOR JAMB 97.71
BLK 6 TUKALO LOT 9-16 95.71
C H B C.R BLK 7 LOT 1-16 93.71
BLK 9 PLASTER LOT 1-16 91.71
C H B C.R BLK 31 LOT1-8 89.71
BLK19 LOT 1-31 SEPTIC TANK 87.71
BLK 9 PLASTER LOT 1-16 85.71
BLK 31 C H B C.R 83.71
BLK 31 LOT 9-16 C H B LAYING 80.71
C H B FAB. / BANAWA 77.71
R C P FABRICATION 73.71
ROAD 9 C-CREATE POURING 17.71
BLK 6 C H B LOT 9-16 15.71
BLK 7 C H B C.R LOT1-16 13.71
PLASTER BLK 9 LOT 1-16 12.71
BLK 31 LOT 1-16 BEAM 10.71
C H B BLK 6 LOT1-16 8.71
BLK 7 PLASTERRING LOT 1-16 7.71
BLK 31LOT 1-16 C H B C. R 6.71
BLK 19 LOT 11-31 PLASTER 5.71
BLK 30 LOT 1-8 C H B 3.71
FIRE WALL BLK 7 LOT 9-16 2.71
S O G BLK 23 LOT 1-12 -
LOADING TO D-T 39 13.48
CHB FABRICATION -
LOADING TO D-T 96 15.76
LOADING TO D-T 88 33.10
LOADING TO D-T 73 49.05
LOADING TO D-T 96 64.81
LOADING TO D-T 73 80.76
LOADING TO D-T 88 98.01
COLUMN BLK 30 LOT 1-8 96.01
BEAM BLK 6 LOT 1-8 95.01
CHB BLK 7 LOT 1-16 94.01
PLASTERRING BLK 9 LOT 1-16 93.01
PLASTER BLK 19 LOT 1-31 91.01
CHB FAB. / BANAWA 77.53
CHB BLK 6 LOT 1-16 75.53
BLK 7 LOT 1-16 FAB. DOOR JAMB. 73.53
PLASTER BLK 9 LOT 1-16 72.53
BLK 23 S O G 70.53
CHB BLK 23 LOT 1-12 C.R 69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
69.53
3,000.00
BLK 30 C H B LAYING 2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
2,000.00
192.00
79.00
ROOFING BLK 19 LOT 1-31 72.00
72.00
72.00
72.00
72.00
72.00
72.00
72.00
54.00
54.00
16.00
16.00
31.00
31.00
31.00
31.00
2,500.00
2,500.00
2,160.00
ROOFING BLK 19 LOT 1-31 2,100.00
2,100.00
2,100.00
2,100.00
2,100.00
2,100.00
2,100.00
3.00
10.00
-
140.00
BLK 31 STORM/SEWERLINE 130.00
BLK 31 STORM/SEWERLINE 115.00
BLK19 LOT 1-31 SEPTIC TANK 107.00
BLK 31 LOT 1-16 STORM / SEWER LINE 92.00
BLK 31 LOT 1-16 STORM / SEWER LINE 77.00
77.00
77.00
77.00
77.00
77.00
77.00
77.00
77.00
38.00
BLK 31 STORM/SEWERLINE 37.00
BLK 31 LOT 1-16 STORM / SEWER LINE 36.00
BLK 31 LOT 1-16 STORM / SEWER LINE 35.00
35.00
35.00
35.00
35.00
35.00
28.00
BLK 31 STORM/SEWERLINE 25.00
BLK 31 STORM/SEWERLINE 22.00
BLK 31 LOT 1-16 STORM / SEWER LINE 19.00
BLK 31 LOT 1-16 STORM / SEWER LINE 16.00
16.00
16.00
16.00
16.00
28.00
BLK 31 STORM/SEWERLINE 25.00
BLK 31 STORM/SEWERLINE 22.00
BLK 31 LOT 1-16 STORM / SEWER LINE 19.00
BLK 31 LOT 1-16 STORM / SEWER LINE 16.00
16.00
16.00
16.00
16.00
16.00
16.00
386.00
ELECTRICAL BLK 31 LOT 1-16 336.00
ELECTRICAL BLK 19 LOT 11-31 286.00
ELECTRICAL BLK 19 LOT 11-31 236.00
236.00
236.00
236.00
236.00
236.00
236.00
236.00
50.00
ELECTRICAL BLK 19 LOT 11-31 -
3.00
100.00
10.00
10.00
10.00
10.00
4.00
94.00
BLK 31 STORM/SEWERLINE 92.00
BLK 31 STORM/SEWERLINE 83.00
BLK 31 LOT 1-16 STORM / SEWER LINE 74.00
BLK 31 LOT 1-16 STORM / SEWER LINE 65.00
65.00
65.00
65.00
65.00
27.00
BLK 31 STORM/SEWERLINE 25.00
BLK 31 STORM/SEWERLINE 22.00
BLK 31 LOT 1-16 STORM / SEWER LINE 19.00
BLK 31 LOT 1-16 STORM / SEWER LINE 16.00
16.00
16.00
16.00
16.00
16.00
22.00
BLK 31 STORM/SEWERLINE 20.00
BLK 31 STORM/SEWERLINE 17.00
BLK 31 LOT 1-16 STORM / SEWER LINE 14.00
BLK 31 LOT 1-16 STORM / SEWER LINE 11.00
11.00
11.00
11.00
11.00
25.00
BLK 31 STORM/SEWERLINE 24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
2.00
13.00
1.00
2.00
2.00
1.00
3.00
5.00
303.00
28.00
1,050.00
80.00
33.00
C H B LAYING BLK 31 LOT 1-16 29.00
ELECTRICAL BLK 19 LOT 11-31 25.00
ELECTRICAL BLK 19 LOT 11-31 21.00
COLUMN BLK 30 LOT 1-8 19.00
19.00
19.00
19.00
19.00
18.00
FAB. DOOR JAMB 15.00
COLUMN BLK 30 LOT 1-8 12.00
12.00
12.00
12.00
12.00
1.00
4.00
19.00
PAINTING C- PURLINS 18.00
18.00
18.00
18.00
18.00
18.00
18.00
20
48.00
HORIZONTAL BLK 6 LOT 1-8 47.00
47.00
47.00
14.00
11.00
220.00
220.00
220.00
220.00
220.00
300.00
BLK 7 FORM WORKS 285.00
285.00
285.00
285.00
285.00
285.00
285.00
285.00
285.00
285.00
620.00
BLK 7 FORM WORKS 605.00
605.00
605.00
605.00
605.00
605.00
605.00
605.00
605.00
605.00
605.00
183.00
FAB. DOOR JAMB 182.00
BLK 8 FAB. DOOR JAMB. 179.00
179.00
179.00
179.00
179.00
179.00
179.00
145.00
TUCKING C- PURLINS BLK 23 140.00
DOOR JAMB INSTL. 135.00
TUCKING ROUND BAR BLK 7 130.00
130.00
130.00
130.00
130.00
130.00
130.00
186.00
CHRGE TO KODIA 176.00
CHAREGE TO KAMP. 164.00
CHRGE TO KODIA 154.00
PAINTING C- PURLINS 149.00
149.00
149.00
149.00
149.00
149.00
149.00
30.00
CHRGE TO KODIA 27.00
PAINTING C- PURLINS 26.00
26.00
26.00
26.00
26.00
10.00
40.00
5.00
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.0M
ANGLE BAR 3MMX50MMX50MMX6.0M
C-PURLINS1.2X2X6X4.0M 1,248
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
.
G. ASCARDA LOADING TO ST-06
56663 20 12/18/19 R. BATAIN CHB BLK 6 LOT 1-16
56664 20 12/18/19 R. BATAIN CHB BLK 7 LOT 1-17
56665 10 12/18/19 R. BATAIN PLASTER BLK 19 LOT 1-16
56666 10 12/18/19 R. BATAIN CHB BLK 23 LOT 1-16
56669 10 12/19/19 R. BATAIN CHB BLK 6 LOT 1-16
56670 10 12/19/19 R. BATAIN INST, DOOR JAMB BLK 7 LOT 1-16
56671 2 12/19/19 R. BATAIN CHB BLK 23 LOT 1-12
56677 15 12/20/19 R. BATAIN CHB BLK 6 LOT 1-16
56678 10 12/20/19 R. BATAIN INST, DOOR JAMB BLK 7 LOT 1-16
56679 15 12/20/19 R. BATAIN CHB BLK 23 LOT 1-12
56680 20 12/20/19 P. OPQUERIA CHB BLK 19 LOT 11-31
56686 10 12/21/19 R. BATAIN FAB. DOOR JAMB BLK 23
56691 5 12/21/19 OPLA CHB BLK 19 LOT 11-31
56694 20 12/23/19 R. BATAIN CHB BLK 6 LOT 1-16
56696 25 12/26/19 R. BATAIN CHB BLK 6 LOT 1-16
56697 15 12/27/19 R. BATAIN PLASTER BLK 7 LOT 1-16
FABRICATE ONSITE
56663 1233 12/18/19 R. BATAIN CHB BLK 6 LOT 1-16
FABRICATE ONSITE
56664 888 12/18/19 R. BATAIN CHB BLK 7 LOT 1-17
56667 1500 12/18/19 P. OPQUERIA CHB BLK 31 LOT 1-16
1,421.00
1,401.00
1,381.00
1,361.00
1,351.00
1,341.00
665.00
645.00
630.00
615.00
605.00
595.00
575.00
555.00
487.00
477.00
467.00
457.00
445.00
430.00
415.00
390.00
370.00
350.00
340.00
330.00
315.00
295.00
273.00
248.00
248.00
248.00
248.00
248.00
248.00
248.00
5.00
305.00
285.00
265.00
255.00
245.00
235.00
225.00
223.00
208.00
198.00
183.00
163.00
153.00
148.00
128.00
103.00
88.00
88.00
88.00
88.00
78.00
38.00
18.00
518.00
478.00
476.00
396.00
396.00
396.00
396.00
396.00
396.00
396.00
396.00
80.00
70.00
60.00
50.00
-
500.00
490.00
479.00
469.00
419.00
409.00
329.00
309.00
209.00
159.00
159.00
586.00
574.00
494.00
494.00
494.00
494.00
3,291.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
3,271.00
2,335.00
2,333.00
2,331.00
2,329.00
2,323.00
2,319.00
2,317.00
2,315.00
2,311.00
2,307.00
2,297.00
2,293.00
2,291.00
2,287.00
2,285.00
2,283.00
2,281.00
2,277.00
2,273.00
2,269.00
2,265.00
2,265.00
2,265.00
2,265.00
2,265.00
2,265.00
2,265.00
2,265.00
40.00
38.00
36.00
36.00
36.00
307.27
244.27
238.27
236.27
234.27
232.27
232.27
232.27
232.27
232.27
232.27
232.27
232.27
69.53
86.87
104.20
121.60
119.60
116.60
114.60
113.60
111.60
27.60
25.60
24.60
23.60
22.60
14.60
12.60
10.60
8.60
6.60
4.60
3.60
1.60
-
17.34
37.35
54.69
52.69
50.69
48.69
46.69
45.69
30.69
27.69
43.64
63.65
79.60
99.61
99.61
99.61
99.61
99.61
99.61
99.61
2,000.00
2,233.00
1,000.00
1,000.00
1,000.00
1,000.00
1,000.00
1,000.00
2,388.00
1,500.00
-
-
-
-
-
-
-
-
-
-
192.00
208.00
-
72.00
-
54.00
54.00
16.00
16.00
31.00
31.00
31.00
31.00
-
2,500.00
2,500.00
2,100.00
3.00
10.00
77.00
67.00
67.00
67.00
67.00
67.00
67.00
35.00
34.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
16.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
16.00
14.00
14.00
14.00
14.00
14.00
236.00
-
3.00
100.00
10.00
10.00
10.00
10.00
4.00
65.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
16.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
11.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
24.00
2.00
13.00
1.00
2.00
2.00
1.00
3.00
5.00
303.00
28.00
1,050.00
80.00
19.00
16.00
13.00
13.00
13.00
13.00
13.00
13.00
13.00
12.00
9.00
6.00
1.00
4.00
3.00
3.00
3.00
3.00
4.00
-
18.00
20
47.00
14.00
11.00
220.00
220.00
220.00
220.00
220.00
285.00
275.00
275.00
275.00
275.00
605.00
595.00
590.00
590.00
590.00
590.00
590.00
590.00
590.00
179.00
173.00
170.00
165.00
165.00
165.00
165.00
165.00
165.00
165.00
130.00
125.00
120.00
115.00
110.00
105.00
105.00
149.00
139.00
134.00
131.00
131.00
131.00
131.00
131.00
131.00
131.00
131.00
131.00
131.00
26.00
25.00
24.00
24.00
24.00
10.00
40.00
5.00
9.00
PROJE:VILLA MERCEDEZ 3 SILLON
SUBJE:MATERIALS DELIVERY & ISSUANCES MONITORING
DATE; JAN. 1 TO 15, 2020
ITEM DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS
QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 5,653
13507
MOV. 11 TO DEC. 12 2019 BANAWA C-CREATE
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6
ANGLE BAR 4MMX75MMX75MMX6. 192 PCS
3,000.00
ANGLE BAR 6MMX75MMX75MMX6.
ANGLE BAR 3MMX50MMX50MMX6.
C-PURLINS1.2X2X6X4.0M 1,456 PCS 208 1/14/20 KAMP.
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
DRAINAGE SYSTEM
RCP 900MM 303 PCS
EMPTY CONTAINER 10
HARDWARE CLOTH 14 MTRS 10 1/4/120
BANTAYAN HRDWR
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
Z. CABALQUINTO
56541 1890 1/14/20 P. OPQUERIA
Z. CABALQUINTO
Z. CABALQUINTO
44055 Z. CABALQUINTO
56519 1 1/11/20 R. BATAIN
44055 Z, CABALQUINTO
56519 1 1/11/20 R. BATAIN
248.00
TUCALO BLK 5 LOT 1-8 238.00
CHB BLK 6 LOT 1-16 223.00
BEAM BLK 5 LOT 1-8 213.00
FAB, DOOR JAMB BLK 31 LOT 1-16 203.00
CHB FIRE WALL BLK 30 LOT 1-8 183.00
PLASTER BLK 19 LOT 11-31 173.00
CURVE N' GUTTER ROAD 8 163.00
CHB FABRICATION / BANAWA 133.00
RCP. FABRICATION 105.00
OLADING TO DT-39 405.00
CHB BLK5 LOT 1-8 395.00
BEAM BLK 6 LOT 1-16 385.00
PLASTERRING BLK 7 LOT 1-16 380.00
PLASTER C,R BLK 9 LOT 1-16 375.00
INSTL. DOOR JAMB. BLK 31 LOT 1-16 365.00
CHB BLK 5 LOT 1-8 355.00
BEAM BLK 6 LOT 1-16 340.00
PLASTERRING BLK 7 LOT 1-16 330.00
CHB C,R BLK 23 LOT1-12 320.00
FAB. DOOR JAMB. BLK 31 LOT 1-16 310.00
PLASTER BLK 19 LOT 11-31 290.00
CHB PIRE WALL BLK 30 LOT 1-8 270.00
CHB. FAB. BANAWA 240.00
RCP. FABRICATION 204.00
ROAD 8 CURVE N' GUTTER 184.00
CHB PIRE WALL BLK 30 LOT 1-8 174.00
CHB BLK 5 LOT 1-8 154.00
BEAM BLK 6 LOT 1-16 134.00
PLASTER BLK 7 LOT 1-16 124.00
CHB C.R BLK 23 LOT 1-12 119.00
S O G BLK 23 LOT 1-12 99.00
ROAD 8 CURVE N' GUTTER 84.00
CHB BLK 5 LOT 1-16 64.00
BEAM BLK 6 LOT 1-16 49.00
PLASTER BLK 7 LOT V1-8 39.00
S O G BLK 8 LOT 1-16 27.00
CHB BLK 23 C.R LOT 1-12 22.00
PLASTER C. R BLK 9 LOT 1-16 19.00
CHB FABRICATION / BANAWA -
OLADING TO DT-39 300.00
CHB FAB./ BANAWA 270.00
RCP FABRICATION 260.00
BEAM BLK 6 LOT 1-16 250.00
S O G BLK 8 LOT 1-16 235.00
BEAM BLK 6 LOT 1-16 220.00
S O G BLK 8 LOT 1-16 205.00
CHB FAB./ BANAWA 180.00
RCP FABRICATION 150.00
CHB FABRICATION R. BATAIN 135.00
135.00
135.00
88.00
PLASTERRRING BLK 7 LOT 1-16 78.00
PLASTERRING BLK 8 LOT 1-16 73.00
INSTL. DOOR JAMB BLK 31 LOT 1-16 63.00
CHB. BLK 30 LOT 1-8 53.00
CURVE N' GUTTER ROAD 8 43.00
CHB LAYING BLK 6 LOT 1-8 28.00
PLASTERRING BLK 7 LOT 1-16 18.00
PLASTER C,R BLK 23 LOT 1-12 13.00
PLASTER BLK 23 LOT 1-12 -
LOADING TO DT-39 300.00
CHB BLK 5 LOT 1-8 290.00
CHB BLK 6 LOT 1-16 280.00
PLASTER BLK 7LOT 1-16 270.00
CHB C.R BLK 23 LOT 1-12 265.00
PLASTERRING BLK 31 LOT 1-16 245.00
CHB BLK 5 LOT 1-8 235.00
BEAM BLK 6 LOT 1-16 230.00
PLASTER BLK 7 LOT 1-16 220.00
CHB C.R BLK 23 LOT 1-12 215.00
CHB C.R BLK 31 LOT 1-16 195.00
CURVE N' GUTTER ROAD 8 175.00
PLASTER BLK 30 LOT 1-8 165.00
CHB BLK 5 LOT 1-8 155.00
PLASTER BLK 7 LOT 1-16 145.00
CHB C.R BLK 23 LOT 1-12 140.00
C H B C.R BLK 30 LOT 1-8 125.00
PLASTER BLK 31 LOT 1-16 105.00
CHB BLK 8 LOT 1-16 95.00
CHB BLK 6 LOT 1-16 85.00
PLASTER BLK 7 LOT 1-16 75.00
CHB C.R BLK 23 LOT 1-12 70.00
PLASTER BLK 31 LOT 1-16 50.00
CHB C.R BLK 30 LOT 1-8 40.00
40.00
40.00
40.00
396.00
FAB, DOOR JAMB BLK 31 LOT 1-16 356.00
RCP. FABRICATION 306.00
INSTL. DOOR JAMB. BLK 31 LOT 1-16 256.00
BEAM BLK 6 LOT 1-16 246.00
CHB C,R BLK 23 LOT1-12 236.00
FAB. DOOR JAMB. BLK 31 LOT 1-16 196.00
RCP. FABRICATION 96.00
LOADING TO TEN WHEELERS TRUCK 13,596.00
ROAD 8 CURVE N' GUTTER 13,586.00
CHB BLK 5 LOT 1-8 13,576.00
BEAM BLK 6 LOT 1-16 13,566.00
CHB C.R BLK 23 LOT 1-12 13,556.00
S O G BLK 23 LOT 1-12 13,516.00
ROAD 8 CURVE N' GUTTER 13,496.00
RCP FABRICATION 13,476.00
PLASTER BLK 7 LOT 1-16 13,466.00
S O G BLK 8 LOT 1-16 13,446.00
PLASTER BLK 7 LOT 1-16 13,436.00
RCP FABRICATION 13,376.00
BLK 7 LAVATORY FORM WORKS 13,366.00
13,366.00
13,366.00
13,366.00
13,366.00
13,366.00
159.00
CURVE N' GUTTER ROAD 8 149.00
VERTICAL/HRIZONAL BLK 5 109.00
CHB LAYING BLK 6 LOT 1-8 99.00
PLASTER BLK 23 LOT 1-12 89.00
CURVE N' GUTTER ROAD 8 69.00
DOWELL C,R BLK 23 LOT 1-12 59.00
HORIZONTAL BLK 5 LOT 108 49.00
CHB BLK 5 LOT 1-8 39.00
LOADING TO DT-39 1,039.00
ROAD 8 CURVE N' GUTTER 1,029.00
CHB BLK 5 LOT 1-16 999.00
BEAM BLK 6 LOT 1-16 989.00
CHB BLK 23 C.R LOT 1-12 979.00
DOWELL C.R BLK 30 LOT 1-8 964.00
CHB BLK 5 LOT 1-8 944.00
S O G BLK 8 LOT 1-16 934.00
CHB BLK 5 LOT 1-8 924.00
ROAD 4 STOCKA 874.00
CHB BLK 5 LOT 1-16 864.00
CHB C.R BLK 23 LOT 1-12 854.00
854.00
854.00
854.00
854.00
854.00
854.00
854.00
494.00
LOADING TO TEN WHEELERS TRUCK 544.00
544.00
544.00
544.00
544.00
544.00
544.00
544.00
3,271.00
BEAM BLK 5 LOT 1-8 3,223.00
3,223.00
3,223.00
3,223.00
3,223.00
3,223.00
3,223.00
3,223.00
2,265.00
BLK 6 STORM / SEWER LINE 2,263.00
CHB BLK 6 LOT 1-16 2,261.00
CHB. BLK 30 LOT 1-8 2,259.00
VERTICAL/HRIZONAL BLK 5 2,255.00
BEAM BLK 5 LOT 1-8 2,251.00
CHB LAYING BLK 6 LOT 1-8 2,249.00
PLASTER BLK 23 LOT 1-12 2,247.00
FAB, DOOR JAMB BLK 31 LOT 1-16 2,245.00
CHB FIRE WALL BLK 30 LOT 1-8 2,243.00
CURVE N' GUTTER ROAD 8 2,239.00
BEAM BLK 5 LOT 1-8 2,235.00
DOWELL C,R BLK 23 LOT 1-12 2,233.00
CHB BLK5 LOT 1-8 2,227.00
INSTL. DOOR JAMB. BLK 31 LOT 1-16 2,225.00
CHB BLK 5 LOT 1-8 2,223.00
BEAM BLK 6 LOT 1-16 2,221.00
FAB. DOOR JAMB. BLK 31 LOT 1-16 2,219.00
PLASTERRING BLK 30 LOT 1-8 2,217.00
CHB C.R BLK 23 LOT 1-12 2,215.00
S O G BLK 23 LOT 1-12 2,213.00
ROAD 8 CURVE N' GUTTER 2,211.00
CHB BLK 5 LOT 1-16 2,207.00
ELECTRICAL BLK 6 LOT 1-16 2,203.00
CHB BLK 5 LOT 1-8 2,201.00
CHB BLK 6 LOT 1-16 2,199.00
PLASTER BLK 7LOT 1-16 2,197.00
RCP FABRICATION 2,195.00
CHB BLK 5 LOT 1-8 2,193.00
CHB C.R BLK 31 LOT 1-16 2,191.00
BEAM BLK 6 LOT 1-16 2,189.00
S O G BLK 8 LOT 1-16 2,187.00
CHB MAN HOLE ROAD 4 2,185.00
2,185.00
2,185.00
2,185.00
2,185.00
2,185.00
2,185.00
2,185.00
36.00
TUCALO BLK 5 LOT 1-8 34.00
BEAM BLK 5 LOT 1-8 32.00
BEAM BLK 6 LOT 1-16 30.00
BEAM BLK 6 LOT 1-16 27.00
RCP. FABRICATION 22.00
BEAM BLK 6 LOT 1-16 20.00
BEAM BLK 6 LOT 1-16 18.00
S O G BLK 8 LOT 1-16 15.00
BEAM BLK 6 LOT 1-16 13.00
CURVE N' GUTTER ROAD 8 10.00
LOADING TO DT-96 25.76
LOADING TO DT-112 45.77
BEAM BLK 6 LOT 1-16 43.77
RCP FABRICATION 23.76
23.76
23.76
23.76
23.76
23.76
232.27
S O G BLK 23 LOT 1-12 229.27
S O G BLK 8 LOT 1-16 226.27
S O G BLK 8 LOT 1-16 223.27
223.27
223.27
223.27
223.27
223.27
223.27
223.27
223.27
223.27
99.61
TUCALO BLK 5 LOT 1-8 96.61
CHB BLK 6 LOT 1-16 93.61
PLASTERRRING BLK 7 LOT 1-16 91.61
PLASTERRING BLK 8 LOT 1-16 90.61
CHB. BLK 30 LOT 1-8 87.61
CURVE N' GUTTER ROAD 8 85.61
LOADING TO DT-96 101.37
LOADING TO DT-96 117.13
BEAM BLK 5 LOT 1-8 114.13
CHB LAYING BLK 6 LOT 1-8 111.13
PLASTERRING BLK 7 LOT 1-16 109.13
PLASTER C,R BLK 23 LOT 1-12 107.13
PLASTER BLK 23 LOT 1-12 105.13
CHB FIRE WALL BLK 30 LOT 1-8 102.13
PLASTER BLK 19 LOT 11-31 100.13
CURVE N' GUTTER ROAD 8 98.13
CHB FABRICATION / BANAWA 82.37
RCP. FABRICATION 66.61
CHB BLK5 LOT 1-8 63.61
BEAM BLK 6 LOT 1-16 61.61
PLASTERRING BLK 7 LOT 1-16 59.61
PLASTER C,R BLK 9 LOT 1-16 58.61
INSTL. DOOR JAMB. BLK 31 LOT 1-16 56.61
CHB BLK 5 LOT 1-8 54.61
BEAM BLK 6 LOT 1-16 51.61
PLASTERRING BLK 7 LOT 1-16 49.61
CHB C,R BLK 23 LOT1-12 47.61
PLASTERRING BLK 30 LOT 1-8 44.61
CHB PIRE WALL BLK 30 LOT 1-8 41.61
CHB. FAB. BANAWA 21.61
RCP. FABRICATION 6.61
LOADING TO DT-88 24.30
LOADING TO DT-112 44.31
CHB PIRE WALL BLK 30 LOT 1-8 42.31
CHB BLK 5 LOT 1-8 40.31
BEAM BLK 6 LOT 1-16 37.31
PLASTER BLK 7 LOT 1-16 35.31
CHB C.R BLK 23 LOT 1-12 33.31
S O G BLK 23 LOT 1-12 28.31
LOADING TO DT-88 46.00
LOADING TO DT-88 63.69
LOADING TO DT-88 81.38
CHB BLK 5 LOT 1-16 77.38
BEAM BLK 6 LOT 1-16 74.38
PLASTER BLK 7 LOT V1-8 72.38
S O G BLK 8 LOT 1-16 68.38
CHB BLK 23 C.R LOT 1-12 66.38
PLASTER C. R BLK 9 LOT 1-16 64.38
CHB FABRICATION / BANAWA 59.38
CHB FAB./ BANAWA 41.69
CHB BLK 5 LOT 1-8 39.69
CHB BLK 6 LOT 1-16 37.69
CHB C.R BLK 23 LOT 1-12 36.69
PLASTERRING BLK 31 LOT 1-16 33.69
CHB BLK 5 LOT 1-8 31.69
BEAM BLK 6 LOT 1-16 28.69
PLASTER BLK 7 LOT 1-16 26.69
S O G BLK 8 LOT 1-16 21.69
CHB C.R BLK 23 LOT 1-12 19.69
CHB C.R BLK 31 LOT 1-16 16.69
CURVE N' GUTTER ROAD 8 12.69
PLASTER BLK 30 LOT 1-8 10.69
LOADING TO DT-96 26.45
LOADING TO DT-96 42.21
LOADING TO DT-112 62.22
LOADING TO DT-112 82.23
CHB BLK 5 LOT 1-8 80.23
BEAM BLK 6 LOT 1-16 77.23
PLASTER BLK 7 LOT 1-16 75.23
S O G BLK 8 LOT 1-16 71.23
CHB BLK 30 LOT 1-8 68.23
CHB BLK 5 LOT 1-16 66.23
CHB BLK 6 LOT 1-16 64.23
PLASTER BLK 7 LOT 1-16 62.23
CHB C.R BLK 23 LOT 1-12 61.23
PLASTER BLK 31 LOT 1-16 58.23
CHB C.R BLK 30 LOT 1-8 56.23
CHB FAB./ BANAWA 46.23
RCP FABRICATION 30.47
CHB FABRICATION R. BATAIN 25.47
LOADING TO DT-112 45.48
LOADING TO DT-88 62.82
LOADING TO DT-96 78.58
LOADING TO DT-73 94.53
LOADING TO DT-39 108.01
LOADING TO DT-112 128.02
LOADING TO DT-88 145.36
LOADING TO DT-96 161.12
LOADING TO DT-39 174.60
LOADING TO DT-88 191.94
LOADING TO DT-96 207.07
LOADING TO DT-39 220.55
LOADING TO DT-112 240.56
1,000.00
CHB BLK 6 LOT 1-16 500.00
FABRICATE ON SITE 13,507.00
CHB BLK 5 LOT 1-8 9,859.00
CHB BLK 6 LOT 1-8 6,211.00
CHB MAN HOLE ROAD 4 5,511.00
5,511.00
5,511.00
5,511.00
192.00
72.00
ROOFING INSL. BLK 9 LOT 1-16 71.00
71.00
71.00
71.00
71.00
71.00
54.00
54.00
16.00
ROOFING INSTL. BLK 9 8.00
16.00
ROOFING INSTL. BLK 9 8.00
31.00
ROOFING INSTL. BLK 9 23.00
31.00
ROOFING INSTL. BLK 9 23.00
31.00
ROOFING INSTL. BLK 9 30.00
31.00
ROOFING INSTL. BLK 9 30.00
2,500.00
2,500.00
2,100.00
ROOFING INSL. BLK 9 LOT 1-16 2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
2,083.00
3.00
10.00
67.00
BLK 6 STORM / SEWER LINE 52.00
BLK 6 STORM / SEWER LINE 37.00
37.00
37.00
37.00
37.00
14.00
BLK 6 STORM / SEWER LINE 13.00
ROAD 4 WATER LINE 11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
14.00
BLK 6 STORM / SEWER LINE 11.00
BLK 6 STORM / SEWER LINE 8.00
8.00
8.00
8.00
8.00
8.00
14.00
BLK 6 STORM / SEWER LINE 11.00
BLK 6 STORM / SEWER LINE 8.00
8.00
8.00
236.00
ELECTRICAL BLK 6 LOT 1-16 221.00
ELECTRICAL BLK 5 LOT 1-8 201.00
201.00
201.00
201.00
3.00
100.00
10.00
10.00
10.00
10.00
4.00
56.00
BLK 6 STORM / SEWER LINE 47.00
BLK 6 STORM / SEWER LINE 38.00
38.00
38.00
38.00
38.00
38.00
38.00
14.00
BLK 6 STORM / SEWER LINE 11.00
BLK 6 STORM / SEWER LINE 8.00
8.00
8.00
8.00
8.00
8.00
9.00
BLK 6 STORM / SEWER LINE 6.00
BLK 6 STORM / SEWER LINE 3.00
3.00
3.00
3.00
24.00
2.00
13.00
1.00
2.00
2.00
1.00
3.00
WATER LINE CONECTION 2.00
WATER LINE CONECTION 1.00
5.00
303.00
28.00
1,050.00
80.00
REBARS COVERED -
13.00
CHB BLK 5 LOT 1-8 9.00
9.00
9.00
9.00
9.00
9.00
9.00
6.00
1.00
DAMBA BLK 30 LOT 1-8 -
3.00
LOADING TO MOTOR VEHICLE 13.00
CHB BLK 5 LOT 1-8 12.00
LAVATORY FORM WORKS 11.00
11.00
11.00
LOADING TO MOTOR VEHICLE 10.00
SAND STRAIN 9.00
ROAD 8 CURVE N' GUTTER 7.00
7.00
7.00
18.00
PAINTING C- PURLINS 17.00
17.00
17.00
17.00
17.00
17.00
17.00
20
47.00
14.00
WATER LINE CONECTION 10.00
10.00
10.00
10.00
10.00
HAND CARRY 5.00
ROOFING INSTL. BLK 9
11.00
220.00
220.00
220.00
220.00
220.00
275.00
DAMBA BLK 30 LOT 1-8 255.00
DAMBA BLK 30 LOT 1-8 240.00
240.00
240.00
590.00
DAMBA BLK 30 LOT 1-8 570.00
DAMBA BLK 30 LOT 1-8 562.00
DAMBA BLK 30 LOT 1-8 547.00
547.00
547.00
547.00
547.00
165.00
LAVATORY FORM WORKS 164.00
164.00
164.00
164.00
164.00
164.00
164.00
164.00
164.00
105.00
INSTL. DOOR JAMB. BLK 8 100.00
INSTL. TRUSSES BLK 30 LOT 1-18 95.00
95.00
95.00
95.00
95.00
131.00
CHARGE TO KAMP. 119.00
PAINTING C- PURLINS 114.00
CHARGE TO KODIA 109.00
PAINTING C- PURLINS 104.00
CHARGE TO KODIA 94.00
CHARGE TO KAMP. 86.00
CHARGE TO KODIA 78.00
78.00
78.00
78.00
24.00
PAINTING C- PURLINS 22.00
22.00
22.00
22.00
10.00
ROOFING CHB FAB. -
20.00
5.00
ROAD 4 LAY OUT 4.00
4.00
9.00
R. NECARTER C. SILFAVAN
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
JANUARY 16 TO 31 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 60,653
BAGS 150 1/16/20
BAGS 250 1/16/20
834
44026
DEF. BAR 12MMX6.0M 1,700 PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 MM
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
END WALL FLASHING 3660MM 31 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM PC 1 1/20/20
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
R. BATAIN Z. CABALQUINTO
R. BATAIN Z. CABALQUINTO
44034 500 1/30/20 R. BATAIN
44050 2345 1/31/20 P. OPQUERIA
44012 52 1/23/20 L. CANONIGO
KAMP. Z. CABALQUINTO
44046 5 1/30/20 D. BATAIN
KAMP. Z. CABALQUINTO
KAMP. Z. CABALQUINTO
KAMP. Z. CABALQUINTO
KAMP. Z. CABALQUINTO
KAMP. Z. CABALQUINTO
KAMP Z. CABALQUINTO
KAMP Z. CABALQUINTO
KAMP Z. CABALQUINTO
43953 1 1/31/20 R. BATAINM
56379 3 1/18/20 POGOY
56382 2 1/18/20 BARGOLA
.
135.00
LOADING TO ST 06 285.00
LOADING TO DT-39 535.00
BEAM BLK 6 LOT 1-16 520.00
ROAD 4 C-CREATE POURING 136.00
CHB FABRICATION 121.00
BEAM BLK 6 LOT 1-16 111.00
INSTL. LAVCATORY BLK 7 LOT 1-16 106.00
ROAD 4 CURVE N' GUTTER 86.00
ROAD 8 CURVE N; GUTTER 76.00
CHB FAB. BANAWA 51.00
CHB. FAB. R. BATAIN 31.00
RCP. FABRICATION -
LOADING TO ST-06 300
LOADING TO DT-39 600.00
S O G BLK 8 LOT 1-16 585.00
LOADING TO DT-39 885.00
ROAD 4 C-CREATE POURING 597.00
ROAD 4 RCP COLAR 572.00
LOQDING TO ST-06 872.00
R C P FABRICATION 842.00
C H B FAB. / BANAWA 817.00
ROAD 4 CURVE N; GUTTER 777.00
ROAD 4 C-CREATE POURING 539.00
BLK 19 SEPTIK TANK 519.00
CHB C. R BLK 5 LOT 1=8 509.00
CHB C.R BLK 6 LOT 1-16 494.00
ROAD 4 CURVE N; GUTTER 479.00
CHB FAB. R. BATAIN 449.00
CHB FAB. / BANAWA 429.00
429.00
429.00
40.00
LOADING TO ST 06 190.00
CHB BLK 5 LOT 1-8 180.00
PLASTER BLK 7 LOT 1-16 170.00
CHB C.R BLK 23 LOT 1-12 165.00
CHB C.R BLK 30 LOT 1-8 145.00
PLASTER BLK 31 LOT 1-16 130.00
LAVATORY BLK 7 LOT 1-16 125.00
CHB BLK 5 LOT 1-8 115.00
CHB BLK 6 LOT 1-16 105.00
PLASTER BLK 7 LOT 1-16 95.00
CHB C.R BLK 23 LOT 1-12 90.00
PLASTER BLK 31 LOT 1-16 70.00
PLASTER SEPTIK BLK 6-9 50.00
LOADING TO ST-06 350.00
SEPTIK TANK BLK 6-9 320.00
CHB C.R BLK 30 LOT 1-8 310.00
PLASTER BLK 31 LOT 1-16 300.00
CURVE N; GUTTER ROAD 8 290.00
CHB BLK 5 LOT 1-8 280.00
CHB BLK 6 LOT 1-16 270.00
PLASTER BLK 7 LOT 1-16 260.00
LAVATORY BLK 9 LOT 1-16 255.00
CHB C.R BLK 23 LOT 1-12 250.00
SEPTIK TANK BLK 6-9 235.00
CHB BLK 5 LOT 1-8 225.00
BEAM BLK 6 LOT 1-16 215.00
PLASTER BLK 7 LOT 1-16 205.00
CHB C.R BLK 23 LOT 1-12 200.00
FIRE WALL BLK 30 LOT 1-8 180.00
PLASTER BLK 31 LOT 1-16 160.00
PLASTER BLK 31 LOT 1-16 130.00
CHB BLK 5 LOT 1-8 125.00
SEPTIC ROAD 4 110.00
PLASTER BLK 30 LOT 1-8 80.00
CHB C. R BLKI 5 LOT 1-16 70.00
CHB FIRE WALL BLK 6 LOT 1-16 50.00
CHB C.R BLK 7 LOT 1-16 40.00
LOADING TO ST-06 340.00
340.00
340.00
13,376.00
LAVATORY BLK 7 LOT 1-16 13,356.00
INSTL. LAVCATORY BLK 7 LOT 1-16 13,346.00
ROAD 4 CURVE N' GUTTER 13,296.00
BLK 6 TO 9 SEPTIK TANK 13,276.00
DOWELL ESPTIK BLK 6-9 13,256.00
RCP. FABRICATION 13,176.00
ROAD 4 SEPTIK TANK 13,146.00
SEPTIK TANK BLK 6-9 13,126.00
LAVATORY BLK 9 LOT 1-16 13,116.00
ROAD 4 RCP COLAR 13,101.00
CHB BLK 5 LOT 1-8 13,091.00
SEPTIC ROAD 4 13,071.00
CHB C.R BLK 7 LOT 1-16 13,061.00
ROAD 4 CURVE N; GUTTER 13,011.00
ROAD 4 CURVE N; GUTTER 12,961.00
SEPTIK BLK 19 LOT 11-31 12,911.00
12,911.00
12,911.00
12,911.00
12,911.00
854.00
CHB BLK 5 LOT 1-8 844.00
CHB C.R BLK 23 LOT 1-12 834
CHB BLK 5 LOT 1-8 824
CHB BLK 6 LOT 1-16 814
ROAD 8 CURVE N; GUTTER 804
BLK 6 TO 9 SEPTIK TANK 784
DOWELL ESPTIK BLK 6-9 764
ROAD 4 SEPTIK TANK 754
SEPTIK TANK BLK 6-9 744
CHB BLK 5 LOT 1-8 734
CHB C.R BLK 23 LOT 1-12 724
SEPTIK TANK BLK 6-9 714
ROAD 4 RCP COLAR 699
CHB BLK 5 LOT 1-8 689
ROAD 4 SEPTIC BLK 6-9 669
SEPTIC ROAD 4 649
CHB C. R BLKI 5 LOT 1-16 639
ROAD 4 C-CREATE POURING 589
BLK 19 SEPTIK TANK 539
SEPTIK BLK 19 LOT 11-31 489
489
489
489
554.00
ROAD 4 C-CREATE POURING 504.00
504.00
504.00
504.00
504.00
504.00
504.00
3,223.00
2,185.00
BEAM BLK 6 LOT 1-16 2,183.00
ROAD 4 CURVE N' GUTTER 2,177.00
BLK 6 TO 9 SEPTIK TANK 2,175.00
PLASTER SEPTIK BLK 6-9 2,171.00
BEAM BLK 5 LOT 1-8 2,166.00
RCP. FABRICATION 2,158.00
ROAD 4 SEPTIK TANK 2,156.00
SEPTIK TANK BLK 6-9 2,150.00
CHB BLK 5 LOT 1-8 2,148.00
ELECTRICAL BLK 6- 5 2,146.00
ROAD 4 CURVE N; GUTTER 2,142.00
ELECTRICAL BLK 5 LOT 1-8 2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
2,140.00
23.76
BEAM BLK 6 LOT 1-16 21.76
S O G BLK 8 LOT 1-16 18.76
LOADING TO DT-39 32.24
BEAM BLK 6 LOT 1-16 30.24
LOADING TO DT-39 43.72
LOADING TO DT-39 57.20
LOADING TO DT-39 70.68
LOADING TO DT-39 84.16
LOADING TO DT-39 97.64
CHB C.R BLK 7 LOT 1-16 95.64
LOADING TO DT-39 109.12
CHB C.R BLK 6 LOT 1-16 107.12
LOADING TO DT-39 120.60
120.60
120.60
120.60
120.60
120.60
120.60
120.60
223.37
ROAD 4 C-CREATE POURING 187.37
ROAD 4 C-CREATE POURING 163.37
ROAD 4 C-CREATE POURING 142.37
142.37
142.37
142.37
142.37
142.37
142.37
25.47
LOADING TO DT-112 45.48
LOADING TO DT-88 62.82
LOADING TO DT-96 78.58
LOADING TO DT-73 94.53
LOADING TO DT-39 108.01
LOADING TO DT-112 128.02
LOADING TO DT-88 145.36
LOADING TO DT-96 161.12
LOADING TO DT-39 174.60
LOADING TO DT-88 191.94
LOADING TO DT-96 207.07
LOADING TO DT-39 220.55
LOADING TO DT-112 240.56
CHB BLK 5 LOT 1-8 238.56
BEAM BLK 6 LOT 1-16 234.56
PLASTER BLK 7 LOT 1-16 232.56
CHB C.R BLK 23 LOT 1-12 231.56
CHB C.R BLK 30 LOT 1-8 228.56
PLASTER BLK 31 LOT 1-16 213.56
ROAD 4 C-CREATE POURING 165.56
LAVATORY BLK 7 LOT 1-16 164.56
CHB FABRICATION 147.22
LOADING TO DT-73 163.17
LOADING TO DT-88 178.51
LOADING TO DT-112 198.52
LOADING TO DT-96 214.28
LOADING TO DT-39 227.76
LOADING TO DT-88 245.51
LOADING TO DT-112 265.52
LOADING TO DT-96 281.28
LOADING TO DT-39 294.76
LOADING TO DT-88 312.01
LOADING TO DT-112 332.02
LOADING TO DT-96 347.78
LOADING TO DT-39 361.26
LOADING TO DT-88 378.06
LOADING TO DT-96 393.82
CHB BLK 5 LOT 1-8 391.82
CHB BLK 6 LOT 1-16 387.82
PLASTER BLK 7 LOT 1-16 385.82
CHB C.R BLK 23 LOT 1-12 384.82
ROAD 8 CURVE N; GUTTER 381.82
PLASTER SEPTIK BLK 6-9 378.82
LOADING TO DT-88 396.16
LOADING TO DT-112 416.17
LOADING TO DT-96 431.93
LOADING TO DT-73 447.88
LOADING TO DT-88 465.22
LOADING TO DT-112 485.23
LOADING TO DT-96 500.99
LOADING TO DT-73 516.94
LOADING TO DT-88 534.28
LOADING TO DT-112 551.62
LOADING TO DT-96 571.63
LOADING TO DT-73 587.58
LOADING TO DT-88 604.92
LOADING TO DT-112 624.93
LOADING TO DT-96 640.69
LOADING TO DT-73 656.64
5,511.00
FABRICATE ON SITE 15,380.00
CHB C.R BLK 6 LOT 1-16 15,000.00
CHB C,R BLK 30 LOT 1-8 14,500.00
FABRICATE ON SITE 15,675.00
FABRICATE ON SITE 18,274.00
CHB C.R BLK 5 LOT 1-16 17,774.00
CHB PIRE WALL BLK 6 LOT 1-16 17,274.00
CHB C.R BLK 7 LOT 1-16 16,774.00
CHB C. R BLK 5 LOT 1=8 16,474.00
CHB C.R BLK 6 LOT 1-16 16,471.00
16,471.00
16,471.00
16,471.00
16,471.00
16,471.00
16,471.00
16,471.00
208.00
LOADING TO ST-06 468.00
TUCKING C-PRLNS BLK 6 LOT 1-16 260.00
260.00
260.00
21.00
TUCKING C-PRLNS BLK 6 LOT 1-16 -
71.00
LOADING TO ST-06 103.00
103.00
103.00
103.00
103.00
103.00
-
LOADING TO ST-06 128.00
54.00
54.00
8.00
8.00
23.00
23.00
30.00
30.00
2,500.00
2,500.00
2,083.00
ROOFING INSTL. BLK 7 1,843.00
1,843.00
1,843.00
1,843.00
LOADING TO ST-06 400.00
400.00
400.00
400.00
3.00
10.00
1.00
37.00
LOADING TO DT-88 197.00
SEPTIK TANK BLK 7 LOT 1-16 192.00
192.00
192.00
11.00
LOADING TO DT-88 64.00
64.00
64.00
64.00
64.00
64.00
64.00
64.00
64.00
64.00
8.00
LOADING TO DT-88 40.00
40.00
40.00
40.00
40.00
40.00
8.00
LOADING TO DT-88 40.00
40.00
40.00
40.00
201.00
ELECTRICAL BLK 5 LOT 1-8 161.00
161.00
161.00
161.00
3.00
100.00
10.00
10.00
10.00
10.00
4.00
38.00
LOADING TO DT-88 70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
8.00
LOADING TO DT-88 40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
3.00
LOADING TO DT-88 35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
35.00
24.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
6.00
24.00
24.00
ROAD 4 CURVE N' GUTTER 23.00
23.00
23.00
23.00
23.00
23.00
11.00
CHB C.R BLK 6 LOT 1-16 8.00
INSTL. DOOR JAMB 6.00
6.00
6.00
6.00
7.00
17.00
PAINTING C- PURLINS 16.00
16.00
16.00
16.00
16.00
16.00
16.00
20
47.00
10.00
4.00
11.00
220.00
220.00
220.00
220.00
220.00
240.00
547.00
164.00
95.00
BLK 6 TUCKING C- PURLINS 90.00
BLK 30 TUCKING C-PURLINS 85.00
BLK 6 TUCKING C- PURLINS 80.00
BLK 5 TUCKING C- PURLINS 75.00
86.00
PAINTING C- PURLINS 81.00
CHARGE TO KAMP. 73.00
PAINTING C- PURLINS 68.00
CHARGE TO KAMP. 60.00
PAINTING C- PURLINS 58.00
PAINTING C- PURLINS 53.00
CHARGE TO KODIA 48.00
PAINTING C- PURLINS 43.00
CHARGE TO KAMP. 35.00
35.00
35.00
35.00
22.00
PAINTING C- PURLINS 20.00
PAINTING C- PURLINS 18.00
PAINTING C- PURLINS 16.00
PAINTING C- PURLINS 14.00
14.00
20.00
4.00
9.00
GR. NECARTER C. SILFAVAN
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; FEBRUARY 1 TO 15 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 60,653
834
2/15/2020
DEF. BAR 12MMX6.0M 1,700 PCS
C-PURLINS1.2X2X6X4.0M 1,456
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
DRAINAGE SYSTEM
RCP 900MM 303 PCS
HACKSAW BLADE 23
RUBBERIZED HAND GLOVES 50 PAIRS
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
BANAWA Z. CABALQUINTO
BATAIN Z. CABALQUINTO
42171 J. FORROSUELO
429.00
C H B BLK 5 LOT 1-18 419.00
C H B BLK 6 LOT 1-16 409.00
SEPTIK BLK 19 LOT 11-31 389.00
CHB FAB. R. BATAIN 374.00
R C P FABRICATION 344.00
SIDE WALK ROAD 8 329.00
SEPTIK BLK 13.12 304.00
ROAD 4 CURVE N' GUTTER 279.00
LOADING TO ST-06 579.00
TUCALO BLK 4 LOT 9-16 569.00
TUCALO BLK 4 LOT 1-8 549.00
ROAD 12,13 C- CREATE POURING 215.00
SUCALO AND FOOTING BLK 4 195.00
CHB FABRICATION R. BATAIN 155.00
SUCALO BLK 4 135.00
SIDEWALK @ ROAD LOT 13 125.00
CHB LAYING BLK 4 105.00
CONCRETE POURING OF FLOORING 90.00
SOG BLK 18 78.00
CURB AND GUTTER ROAD LOT 4 53.00
LOADING TO ST-06 353.00
CHARGE TO FF TRADING 303.00
POURING INCLINE BEAM@ BLK 5 LOT 1-8 293.00
CURB AND GUITTER BLK 30 283.00
CHB LAYING @ BLK 4 273.00
CONCRETE POURING & BEAM @ BLK 5 268.00
SIDEWALK@ ROAD LOT 4 258.00
CHB LAYING BLK 4 248.00
340.00
RCP COLAR BLK 19 300.00
CHB BLK 7 LOT 1-16 290.00
CHB C.R BLK 6 LOT 1-16 275.00
PLASTER BLK 7 LOT 1-16 265.00
CHB C.R BLK 5 LOT 1-8 255.00
FIRE WALL BLK 6 LOT 1-16 245.00
SEPTIK COVER FAB. BLK 7 LOT 1-16 235.00
SEPTIK TANK BLK 13, 12 215.00
PLASTER BLK 6 LOT 1-16 205.00
CHB C.R BLK 5 LOT 1-8 200.00
CHB C.R BLK 7 LOT 1-16 190.00
PLASTER BLK 7 LOT 1-8 180.00
CURB AND GUTTER BLK ROAD 4 155.00
CHARGE TO FF TRADING 130.00
BEAM BLK 5 LOT 1-8 115.00
CHB CR 105.00
CHB LAYING BLK 4 LOT 1-6 95.00
CHB LAYING @ BLK 4 LOT 7-2 75.00
CHB LAYING@ BLK 4 LOT 7-12 65.00
CHB LAYING BLK 7 60.00
POURING OF CONCRETE OF SOG @ BLK 8 50.00
CHB LAYING @ BLK 4 LOT 1-6 40.00
CHB LAYING @ BLK 4 LOT 7-12 30.00
CHB LAYING BLK 4 LOT 1-6 20.00
12,911.00
FAB. DOOR JAMB. BLK 7 LOT 1-16 12,871.00
R C P FABRICATION 12,811.00
SEPTIK COVER FAB. BLK 7 LOT 1-16 12,791.00
ROAD 4 CURVE N' GUTTER 12,741.00
CURB AND GUTTER BLK ROAD 4 12,701.00
CURB AND GUTTER ROAD 13 12,681.00
ROAD 4 CURVE N' GUTTER 12,631.00
CHB LAYING BLK 4 LOT 1-6 12,621.00
CURB & GUTTER & SIDEWALK @ ROAD 4 12,571.00
CHB LAYING @ BLK 4 LOT 7-12 12,551.00
CURB & GUTTERFOR SEPTIC ROAD LOT 4 12,501.00
VERTICAL AND HORIZONTAL BLK 4 12,491.00
CHB LAYING @ BLK 4 LOT 7-12 12,481.00
CHB LAYING @ BLK 4 LOT 1-6 12,471.00
CHB LAYING@ BLK 4 LOT 7-12 12,461.00
SIDEWALK@ ROAD LOT4 12,451.00
489.00
C H B BLK 5 LOT 1-18 479.00
SEPTIK BLK 19 LOT 11-31 449.00
DOWELL CR BLK 5 LOT 1-8 439.00
SEPTIK BLK 19 LOT 11-31 419.00
CHB BLK 7 LOT 1-16 409.00
CHB C.R BLK 5 LOT 1-8 399.00
SEPTIK TANK BLK 13, 12 349.00
SEPTIK BLK 13.12 289.00
STOCKA ROAD 12, 13 269.00
HORIZONTAL BLK 4 259.00
MATTING BLK 4 LOT 1-16 159.00
DOWELL BLK 4 LOT 1-16 139.00
COLUMN AND FOOTING 99.00
DRAINAGE 89.00
H.O MANILA 8,089.00
CHB LAYING @ BLK 4 LOT 7-12 8,079.00
STIRRUPS BLK 1 8,029.00
COLUMN REBARS @ BLK 17 7,989.00
BLK 6 CR 7,987.00
CHB LAYING @ BLK 4 LOT 7-12 7,977.00
FABRICATION OF MATTING 7,927.00
504.00
SUCALO BLK 4 LOT 1-16 376.00
MATTING BLK 4 LOT 1-16 248.00
BEAM BLK 5 LOT 1-8 208.00
COLUMN AND FOOTING 168.00
FOR DRAINAGE 148.00
148.00
148.00
148.00
3,223.00
COLUMN BLK 4 LOT 1-8 3,119.00
MATTING BLK 4 LOT 1-16 2,996.00
COLUMN REBARS @ BLK 3 2,980.00
BEAM REBARS@ BLK 4 LOT 7-12 2,930.00
COLUMN REBARS @ BLK 4 2,914.00
SIDE BEAM BLK 4 2,890.00
COLUMN REBARS @ BLK 17 2,850.00
2,850.00
2,850.00
2,850.00
2,850.00
2,850.00
2,850.00
2,140.00
C H B BLK 5 LOT 1-18 2,138.00
SEPTIK BLK 19 LOT 11-31 2,136.00
SEPTIK BLK 19 LOT 11-31 2,134.00
CHB BLK 7 LOT 1-16 2,132.00
FAB. DOOR JAMB. BLK 7 LOT 1-16 2,130.00
R C P FABRICATION 2,126.00
CHB C.R BLK 5 LOT 1-8 2,124.00
SEPTIK COVER FAB. BLK 7 LOT 1-16 2,122.00
SEPTIK TANK BLK 13, 12 2,120.00
COLUMN BLK 4 LOT 1-8 2,116.00
TUCALO BLK 4 LOT 1-16 2,108.00
COLUMN BLK 4 LOT 1-16 2,102.00
STOCKA ROAD 12, 13 2,100.00
HORIZONTAL BLK 4 2,090.00
SEPTIK TANK BLK 7 LOT 1-16 2,086.00
TUCALO BLK 4 LOT 9-16 2,082.00
COLUMN BLK 4 LOT 1-16 2,074.00
MATTING BLK4 LOT 1-16 2,068.00
CURB AND GUTTER BLK ROAD 4 2,064.00
CURB AND GUTTER BLK 13 2,062.00
ROAD 4 2,060.00
BLK 5 LOT 1-8 BEAM 2,058.00
ROOFING INST. BLK 7 LOT 1-16 2,052.00
FOOTING @ BLK 3 2,049.00
PLUMING RAUGHING INST.@ BLK 5 LOT 6-8 2,048.00
ALLEY @ BLK19 2,042.00
BAEM FAB. BLK 4 2,032.00
SIDE BEAM BLK 4 2,031.00
CHB LAYING@ BLK 4 2,029.00
COLUMN REBARS @ BLK 17 2,028.00
CHB LAYING @ BLK 4 LOT 7-12 2,026.00
SIDEWALK @ ROAD LOT 4 2,024.00
120.60
ROAD 4 CURVE N' GUTTER 118.60
118.60
118.60
118.60
118.60
118.60
118.60
118.60
118.60
142.37
SIDE WALK ROAD 8 132.37
TUCALO BLK 4 LOT 9-16 129.37
TUCALO BLK 4 LOT 1-8 126.37
ROAD 12,13 C- CREATE POURING 96.37
SUCALO BLK 4 FOOTING 93.37
SUCALO BLK 4 91.37
91.37
531.28
C H B BLK 5 LOT 1-18 529.28
C H B BLK 6 LOT 1-16 527.28
SEPTIK BLK 19 LOT 11-31 524.28
C H B FAB. BANAWA 510.80
DOWELL CR BLK 5 LOT 1-8 508.80
CHB FAB. R. BATAIN 505.80
CHB BLK 7 LOT 1-16 503.80
CHB C.R BLK 6 LOT 1-16 500.80
FAB. DOOR JAMB. BLK 7 LOT 1-16 498.80
CHB C.R BLK 5 LOT 1-8 488.80
FIRE WALL BLK 6 LOT 1-16 478.80
SEPTIK COVER FAB. BLK 7 LOT 1-16 476.80
SEPTIK TANK BLK 13, 12 474.80
SEPTIK TANK BLK 13, 12 461.32
SIDE WALK ROAD 8 451.32
SEPTIK BLK 13.12 448.32
PLASTER BLK 6 LOT 1-16 446.32
ROAD 4 CURVE N' GUTTER 443.32
CHB C.R BLK 5 LOT 1-8 438.32
CHB C.R BLK 7 LOT 1-16 436.32
TUCALO BLK 4 LOT 9-16 433.32
PLASTER BLK 7 LOT 1-8 431.32
TUCALO BLK 4 LOT 1-8 427.32
ROAD 12,13 C- CREATE POURING 387.32
CURB AND GUTTER BLKROAD 4 383.32
CURB AND GUTTER BLKROAD 378.32
CHB FABRICATION R. BATAIN 363.32
BEAM BLK 5 LOT 1-8 358.32
CHB CR 356.32
SUCALO BLK 4 353.32
BEAM/ COLUMN BLK 4 339.84
CHARGES TO FF TRADING 319.83
16,471.00
FABRICATE ON SITE 20,213.00
FABRICATE ON SITE 22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
22,076.00
2,000.00
C H B BLK 5 LOT 1-18 1,500.00
C H B BLK 6 LOT 1-16 1,000.00
SEPTIK BLK 19 LOT 11-31 -
FABRICATE ON SITE 3,100.00
SEPTIK BLK 13.12 1,600.00
1,600.00
1,600.00
1,600.00
1,600.00
1,600.00
1,600.00
1,600.00
140.00
TRUSSES BLK 5 LOT 1-8 108.00
108.00
108.00
CHARGES TO KODIA
260.00
103.00
FROM VM1
128.00
ROOFING INSTL. BLK 7 LOT 1-16 98.00
ROOFING INSTL. BLK 19 LOT 11-31 78.00
ROOFING INSTL. BLK 19 LOT 11-31 53.00
ROOFING INSTL. BLK 7 LOT 1-16 13.00
ROOFING INSTL. BLK 7 LOT 1-16 (7.00)
ROOFING INST. BLK 19 LOT 11-31 (17.00)
ROOFING INST. BLK 23 LOT 1-12 (37.00)
FROM VM1 192.00
ROOFING INST. BLK 23 LOT 1-12 172.00
ROOFING INST. BLK 23 LOT 1-12 152.00
54.00
ROOFING INSTL. BLK 7 LOT 1-16 -
54.00
ROOFING INSTL. BLK 7 LOT 1-16 -
8.00
ROOFING INSTL. BLK 7 LOT 1-16 -
8.00
ROOFING INSTL. BLK 7 LOT 1-16 -
23.00
ROOFING INSTL. BLK 7 LOT 1-16 -
23.00
ROOFING INSTL. BLK 7 LOT 1-16 -
30.00
30.00
-
2,500.00
2,500.00
1,843.00
ROOFING INSTL. BLK 7 LOT 1-16 1,343.00
ROOFING INSTL. BLK 19 LOT 11-31 625.00
ROOFING INSTL. BLK 7 LOT 1-16 -
LOADING TO B-T 05 4,000.00
ROOFING INST. BLK 7 LOT 1-16 4,000.00
ROOFING INSTALLATION 3,000.00
INST. OF ROOFING @ BLK 23 2,600.00
INST. O F ROOFING 2,400.00
400.00
TRUSSES BLK 5 LOT 1-8 304.00
304.00
304.00
304.00
304.00
3.00
10.00
1.00
192.00
STORM / SEWER LINE 177.00
SEPTIK TANK BLK 7 LOT 1-16 172.00
SEPTIC TANK @ ALLEY 4 154.00
M-HOLE, SEPTIC BLK 19 134.00
INJECT M-HOLE FROM SEPTIC & ALLEY 14 116.00
PLUMBING RAUGHING INST.@BLK5 LOT 6-8 101.00
ALLEY BLK 19(SEPTIC TANK) 97.00
CR BLK 5 72.00
BLK 7 67.00
64.00
STORM / SEWER LINE 63.00
RAUGHING INST.@ BLK 5 LOT 6-8 62.00
BLK 5 CR 57.00
57.00
57.00
57.00
57.00
57.00
57.00
57.00
40.00
STORM / SEWER LINE 37.00
RAUGHING INST.@ BLK 5 LOT 6-8 34.00
BLK 5 CR 29.00
161.00
3.00
100.00
10.00
10.00
10.00
10.00
4.00
70.00
STORM / SEWER LINE 61.00
RAUGHING INST.@ BLK 5 LOT 6-8 52.00
BLK 5 CR 37.00
37.00
37.00
37.00
37.00
37.00
40.00
STORM / SEWER LINE 37.00
RAUGHING INST.@ BLK 5 LOT 6-8 34.00
BLK 5 CR 29.00
29.00
29.00
29.00
29.00
29.00
29.00
35.00
STORM / SEWER LINE 32.00
RAUGHING INST.@ BLK5 LOT 6-8 29.00
B;K 5 CR 24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
STORM / SEWER LINE 22.00
PLUMBING RAUGHING INST.@ BLK 5 LOT 6-8 21.00
21.00
21.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
1.00
BLK 7 LOT 1-16 TEMPACIL -
1.00
BLK 7 LOT 1-16 TEMPACIL -
1.00
BLK 7 LOT 1-16 TEMPACIL -
9.00
6.00
24.00
SEPTIK COVER BLK 6 TO 9 23.00
FORMS FOR THE BEAMS BLK 30 22.00
FORMWORKS BLK 4 LOT 1-6 21.00
COLUMN BLK 4 20.00
20.00
20.00
23.00
SEPTIK COVER BLK 6 TO 9 22.00
ROOFING BLK 19 LOT 11-31 21.00
ROOFING BLK 7 LOT 1-16 15.00
15.00
15.00
15.00
15.00
15.00
6.00
ROOFING INSTL. BLK 7 LOT 1-16 5.00
STEEL CUTTING 3.00
3.00
3.00
3.00
7.00
16.00
20.00
20.00
20.00
20.00
47.00
ROOFING INST. BLK 7 LOT 1-16 46.00
46.00
46.00
10.00
ROOFING INSTL. BLK 7 LOT 1-16 6.00
ROOFING INSTL. BLK 7 LOT 1-16 4.00
3.00
3.00
4.00
ROOFING INSTL. BLK 19 LOT 11-31 3.00
3.00
3.00
11.00
220.00
220.00
220.00
220.00
220.00
240.00
BARRACS 190.00
190.00
190.00
190.00
547.00
BARRACS 497.00
FORMS FOR THE BEAMS 491.00
491.00
491.00
491.00
491.00
491.00
BEAM BLK 5 164.00
BLK 4 159.00
75.00
ROOFING BLK 19 LOT 11-31 70.00
70.00
70.00
70.00
70.00
35.00
PAINTING C- PURLINS 30.00
CHARGE TO KODIA 25.00
CHARGE TO KAMPINGANON 17.00
CHARGE TO KAMPINGGANON 7.00
CHARGES TO KODIA 3.00
CHARGES TO KODIA -
-
-
-
14.00
PAINTING C- PURLINS 12.00
12.00
12.00
12.00
20.00
LOADING TO BT-05 420.00
ROAD 12,13 C- CREATE POURING 380.00
380.00
380.00
380.00
4.00
LAY OUT BLK 4 LOT 1-16 2.00
BLK 19 -
-
9.00
ROAD 4 CONCREATE VPOURING 3.00
3.00
3.00
3.00
3.00
420.00
R. NECARTER C. SILFAVAN
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
`
MASONRY CEMENT 39,750.00 5,900
8
55
C-PURLINS1.2X2X6X4.0M 1,456
PLAIN ROUND BAR 12MMX6.0M 1,500.00 229 PCS 100 2/2/20 KAMP.
CAPPING 1510MM 54 MM
CAPPING 1690MM 16 MM
CAPPING 3660MM 16 MM
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
PCS 50 2/26/20
PCS 20 2/26/20
PCS 30 2/26/20
PCS 20 2/26/20
PCS 20 2/26/20
PVC SOLVENT 400CC 26 CAN
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
HACKSAW BLADE 23
EMPTY CONTAINER 10
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
34678 40 2/20/250 REVO SUCALO BLK 1-3 LOT 1-14 AND 1-7
43804 40 2/22/20 R. BATAIN SUCALO BLK 1-3 LOT 1-14 AND 1-8
35587 Z. CABALQUINTO LOADING TO DT-39
55919 68 2/28/20 R. BATAIN TUCALO BLK 20 LOT 11-36
FABRICATE ON SITE
34675 1000 2/20/20 R. BATAIN BLK 4 CHB C.R LOT 1-10
34691 1600 2/21/20 B. BANSILOY CHARGE TO FF TRADING
43814 1000 2/23/20 REVO CHB LAYING BLK 1 LOT 1-14
43815 1500 2/23/20 R. BATAIN CHB BLK 4 LOT 1-10
FABRICATE AT SITE
FABRICATE AT SITE
43850 1400 2/27/20 B. BANSILOY CHARGE TO FF TRADING
55929 1,000 2/29/20 P. OFQUIRIA SEPTIC TANK BLK 18 LOT 11-13
FAB. ON SITE
FAB. ON SITE
34689 20 2/21/20 N. DESAMPARADO ROOFING INSTL. BLK 31 LOT 1-16
LOADING TO BT-05
34689 1 2/21/20 N. DESAMPARADO ROOFING INSTL. BLK 31 LOT 1-16
LOADING TO BT-05
34690 39 2/21/20 N. DESAMPARADO ROOFING INSTL. BLK 31 LOT 1-16
-
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
248.00
24.00
19.00
14.00
414.00
389.00
739.00
714.00
684.00
674.00
1,074.00
1,059.00
1,049.00
1,709.00
1,689.00
1,674.00
1,659.00
1,285.00
1,225.00
1,055.00
980.00
970.00
960.00
945.00
925.00
910.00
895.00
880.00
870.00
855.00
840.00
820.00
20.00
11.00
-
800.00
790.00
770.00
750.00
730.00
1,130.00
1,110.00
1,095.00
1,145.00
1,125.00
1,115.00
1,105.00
1,055.00
1,045.00
1,040.00
1,030.00
1,020.00
1,000.00
925.00
905.00
885.00
875.00
860.00
840.00
825.00
810.00
800.00
770.00
770.00
770.00
770.00
770.00
770.00
770.00
12,451.00
12,446.00
12,441.00
12,436.00
12,386.00
12,361.00
12,351.00
12,341.00
12,316.00
12,256.00
12,236.00
12,226.00
12,211.00
12,151.00
12,141.00
12,121.00
12,101.00
12,081.00
12,071.00
12,011.00
11,981.00
11,961.00
11,961.00
11,961.00
11,961.00
11,961.00
11,961.00
8,000.00
7,950.00
7,940.00
7,930.00
7,920.00
7,870.00
7,860.00
7,710.00
7,610.00
7,590.00
7,565.00
7,525.00
7,505.00
7,455.00
7,425.00
7,415.00
7,385.00
7,285.00
7,275.00
7,255.00
7,235.00
7,135.00
7,125.00
7,105.00
7,095.00
6,995.00
6,895.00
6,795.00
6,795.00
6,795.00
6,795.00
6,795.00
148.00
108.00
68.00
1,068.00
1,000.00
1,000.00
1,000.00
1,000.00
1,000.00
2850.00
2,682.00
2,642.00
2,626.00
2,586.00
2,566.00
2,554.00
2,554.00
2024.00
2,022.00
2,016.00
2,000.00
1,999.00
1,998.00
1,988.00
1,987.00
1,984.00
1,978.00
1,976.00
1,974.00
1,924.00
1,904.00
1,898.00
1,892.00
1,886.00
1,882.00
1,878.00
1,872.00
1,870.00
1,866.00
1,860.00
1,858.00
1,852.00
1,848.00
1,844.00
1,840.00
1,836.00
1,834.00
1,830.00
1,828.00
1,826.00
1,824.00
1,794.00
1,790.00
1,788.00
1,786.00
1,784.00
1,782.00
1,780.00
1,778.00
1,772.00
1,772.00
1,772.00
118.60
115.60
112.60
109.60
106.60
101.60
98.60
95.60
93.60
91.60
89.60
87.60
74.12
72.12
69.12
67.12
65.12
63.12
61.12
59.12
59.12
59.12
59.12
59.12
59.12
59.12
59.12
91.37
73.37
63.37
30.37
14.37
12.37
12.37
319.83
295.83
292.83
290.83
287.83
272.83
259.35
255.35
253.35
249.35
246.35
240.35
238.35
235.35
231.35
225.35
221.35
218.35
204.87
201.87
198.87
196.87
194.87
191.87
189.87
145.87
143.87
142.87
140.87
138.87
135.87
115.87
102.39
99.39
95.39
93.39
90.39
80.39
77.39
74.39
71.39
68.39
53.39
51.39
47.39
45.39
42.39
39.39
36.39
36.39
36.39
36.39
36.39
22076.00
15,692.00
16,603.00
16,713.00
20,019.00
20,323.00
22,268.00
22,268.00
22,268.00
22,268.00
22,268.00
22,268.00
22,268.00
22,268.00
1,600.00
6,644.00
5,644.00
4,044.00
3,044.00
1,544.00
3,520.00
4,614.00
3,214.00
2,214.00
3,120.00
4,662.00
108.00
88.00
88.00
88.00
88.00
260.00
76.00
76.00
76.00
100.00
80.00
80.00
80.00
103.00
151.00
145.00
135.00
99.00
99.00
99.00
99.00
192.00
182.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
54.00
8.00
-
8.00
-
23.00
-
23.00
-
30.00
-
30.00
-
-
2,500.00
2,500.00
4,000.00
3,950.00
3,750.00
3,550.00
3,350.00
2,950.00
2,000.00
2,000.00
2,000.00
350.00
344.00
319.00
311.00
303.00
279.00
279.00
279.00
279.00
279.00
279.00
3.00
10.00
1.00
67.00
52.00
152.00
127.00
97.00
97.00
97.00
97.00
97.00
97.00
57.00
51.00
50.00
20.00
70.00
68.00
67.00
67.00
67.00
67.00
67.00
37.00
34.00
54.00
49.00
46.00
46.00
46.00
29.00
26.00
46.00
41.00
41.00
161.00
141.00
121.00
121.00
3.00
100.00
10.00
10.00
10.00
10.00
4.00
-
5.00
4.00
4.00
3.00
2.00
1.00
3.00
2.00
1.00
37.00
21.00
12.00
3.00
33.00
18.00
-
-
-
-
29.00
26.00
46.00
41.00
35.00
35.00
35.00
24.00
21.00
41.00
36.00
30.00
30.00
30.00
21.00
20.00
20.00
20.00
20.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
1.00
-
1.00
-
1.00
-
3.00
3.00
9.00
6.00
20.00
18.00
16.00
14.00
6.00
2.00
1.00
1.00
3.00
7.00
16.00
20.00
20.00
20.00
20.00
46.00
46.00
3.00
-
5.00
4.00
4.00
4.00
4.00
39.00
-
3.00
11.00
220.00
220.00
220.00
220.00
220.00
190.00
140.00
140.00
140.00
140.00
491.00
441.00
159.00
156.00
155.00
149.00
149.00
149.00
149.00
149.00
149.00
70.00
65.00
55.00
45.00
35.00
235.00
230.00
230.00
230.00
230.00
230.00
230.00
230.00
230.00
230.00
230.00
10.00
5.00
-
12.00
380.00
360.00
360.00
360.00
360.00
360.00
2.00
3.00
-
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
C-PURLINS1.2X2X6X4.0M 1,456
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
DRAINAGE SYSTEM
RCP 900MM 303 PCS
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 23
RUBBERIZED HAND GLOVES 50 PAIRS
TANSI #100
DIGGING BAR
MASONRY DRILL BIT 1/2 PCS
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
FAB, ON SITE
FAB, ON SITE
FAB, ON SITE
44176 500 3/6/20 R. BATAIN CHB C.R FIRE WALL BLK 5 LOT 1-8
44178 5000 3/6/20 R. BATAIN CHB LAYING BLK 20
43883 500 3/7/20 R. BATAIN CHB C.R BLK 4 LOT 1-10
44189 500 3/10/20 R. BATAIN CHB C.R BLK 4 LOT 1-10
44198 1000 3/11/20 R. BATAIN CHB LAYING BLK 20
44199 500 3/11/20 P.OPQUERIA CHB C.R BLK 3 LOT 1-7
35851 1000 3/11/20 P.OPQUERIA HORIZONTAL BLK 17-18
35872 500 3/13/35 R. BATAIN CHB LAYING BLK 20 LOT 1-13
FAB, ON SITE
FAB, ON SITE
43877 600 3/6/20 P. OPQUERIA SEPTIK TANK BLK16-17
44174 700 3/6/20 P. OPQUERIA CHB C.R BLK 3 LOT 1-7
35854 500 3/11/20 GERONA CHB SEPTIK BLK 16 LOT 1-27
55939 32 3/1/20 IBARDOLASA ROOFING INSTL. BLK 31 LOT 1-16
3/20/00
LOADING TO ST-06
LOADING TO ST-06
43895 5 3/8/20 D. BATAIN WATER LINE ROAD 4
LOADING TO ST-06
LOADING TO ST-06
LOADING TO ST-06
LOADING TO ST-06
LOADING TO ST-06
44180 4 3/6/20 D. BATAIN INJECT SEPTIK BLK 8-9
LOADING TO ST-06
35875 20 3/13/20 GIDUCUS ELECTRICAL BLK 4 LOT 1-10
LOADING TO ST-06
LOADING TO ST-06
44159 3 3/4/20 D. BATAIN WATER LINE
LOADING TO ST-06
44159 2 3/4/20 D. BATAIN WATER LINE
LOADING TO ST-06
820.00
810.00
795.00
785.00
775.00
755.00
740.00
735.00
725.00
715.00
695.00
680.00
670.00
645.00
625.00
605.00
595.00
585.00
570.00
550.00
535.00
525.00
510.00
490.00
475.00
455.00
450.00
426.00
406.00
182.00
177.00
157.00
142.00
392.00
368.00
353.00
338.00
313.00
278.00
258.00
248.00
218.00
198.00
198.00
198.00
198.00
198.00
198.00
198.00
770.00
765.00
735.00
715.00
700.00
695.00
690.00
670.00
665.00
655.00
645.00
625.00
610.00
585.00
565.00
555.00
550.00
535.00
525.00
505.00
485.00
480.00
475.00
460.00
455.00
435.00
415.00
410.00
390.00
370.00
350.00
330.00
310.00
290.00
270.00
265.00
260.00
230.00
210.00
180.00
175.00
155.00
150.00
130.00
100.00
70.00
40.00
40.00
40.00
40.00
40.00
40.00
11,961.00
11,951.00
11,931.00
11,911.00
11,851.00
11,831.00
11,811.00
11,801.00
11,781.00
11,771.00
11,761.00
11,741.00
11,701.00
11,681.00
11,666.00
11,656.00
11,636.00
11,626.00
11,596.00
11,576.00
11,566.00
11,546.00
11,536.00
11,516.00
11,416.00
11,386.00
11,286.00
11,226.00
11,206.00
11,201.00
11,151.00
11,131.00
11,126.00
11,106.00
11,086.00
11,056.00
11,036.00
11,036.00
11,036.00
11,036.00
11,036.00
6,795.00
6,775.00
6,755.00
6,735.00
6,715.00
6,695.00
6,665.00 3/4/20 P.OPQUERIA
BEAM/TUCALO BLK 16-17
6,615.00
6,565.00
6,555.00
6,515.00
6,475.00
6,465.00
6,435.00
6,395.00
6,345.00
6,325.00
6,310.00
6,290.00
6,270.00
6,170.00
6,120.00
6,100.00
6,080.00
6,060.00
6,030.00
6,028.00
5,928.00
5,908.00
5,858.00
5,818.00
5,813.00
5,793.00
5,763.00
5,743.00
5,703.00
5,683.00
5,683.00
5,683.00
5,683.00
5,683.00
5,683.00
1,000.00
960.00
940.00
900.00
850.00
830.00
780.00
680.00
640.00
640.00
640.00
2554.00
2,524.00
2,504.00
2,464.00
2,414.00
2,374.00
2,366.00
2,296.00
2,246.00
2,196.00
2,156.00
2,096.00
2,056.00
1,956.00
1,906.00
1,906.00
1,906.00
1772.00
1,752.00
1,750.00
1,746.00
1,744.00
1,742.00
1,738.00
1,736.00
1,716.00
1,711.00
1,707.00
1,667.00
1,663.00
1,659.00
1,362.00
1,360.00
1,352.00
1,350.00
1,348.00
1,340.00
1,324.00
1,320.00
1,314.00
1,264.00
1,262.00
1,258.00
1,244.00
1,232.00
1,224.00
1,221.00
1,217.00
1,202.00
1,198.00
1,196.00
1,176.00
1,174.00
1,159.00
1,157.00
1,151.00
1,149.00
1,134.00
1,124.00
1,122.00
1,022.00
1,012.00
1,008.00
998.00
996.00
992.00
990.00
986.00
978.00
976.00
966.00
962.00
954.00
950.00
942.00
902.00
900.00
894.00
888.00
884.00
880.00
872.00
845.00
837.00
829.00
829.00
829.00
829.00
829.00
829.00
59.12
55.12
54.12
53.12
51.12
49.12
47.12
45.12
43.12
41.12
41.12
12.37
10.37
7.37
42.75
21.75
39.44
37.44
37.44
37.44
37.44
37.44
37.44
36.39
20.6
47.56
45.56
42.56
83
81
79
78
76
74
100.96
97.96
95.96
93.96
90.96
89.96
88.96
86.96
84.96
56.96
54.96
51.96
49.96
46.96
45.96
43.96
40.96
38.96
38.96
38.96
38.96
38.96
16713.00
20,019.00
20,323.00
22,268.00
21,768.00
16,768.00
16,268.00
15,768.00
14,768.00
14,268.00
13,268.00
12,768.00
12,768.00
12,768.00
12,768.00
12,768.00
12,768.00
2,214.00
3,120.00
4,662.00
4,062.00
3,362.00
2,862.00
2,862.00
2,862.00
2,862.00
2,862.00
88.00
56.00
56.00
56.00
76.00
80.00
99.00
75.00
59.00
53.00
43.00
-
-
100.00
76.00
-
256.00
160.00
60.00
-
-
-
-
-
-
2,500.00
2,500.00
2,000.00
1,000.00
800.00
-
4,000.00
3,500.00
3,000.00
2,500.00
2,000.00
1,400.00
900.00
400.00
-
-
-
279.00
263.00
253.00
238.00
214.00
198.00
198.00
198.00
198.00
3.00
10.00
1.00
97.00
77.00
73.00
1,073.00
1,069.00
1,044.00
1,039.00
1,036.00
1,036.00
1,036.00
1,036.00
1,036.00
67.00
867.00
46.00
846.00
841.00
841.00
841.00
841.00
841.00
841.00
200.00
200
41.00
1,041.00
200.00
600.00
596.00
121.00
833.00
813.00
813.00
813.00
200.00
3.00
100.00
-
10.00
10.00
10.00
4.00
2.00
1.00
5.00
3.00
3.00
50.00
35.00
33.00
33.00
33.00
33.00
3.00
-
3.00
1.00
30.00
28.00
28.00
28.00
28.00
28.00
20.00
19.00
219.00
218.00
218.00
218.00
218.00
218.00
218.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
1.00
5.00
303.00
28.00
1,050.00
1.00
-
1.00
-
1.00
-
3.00
3.00
150.00
9.00
-
6.00
-
20.00
19.00
18.00
18.00
18.00
18.00
18.00
18.00
1.00
-
25.00
25.00
25.00
25.00
3.00
-
6.00
3.00
-
20.00
20.00
20.00
20.00
20.00
7.00
6.00
6.00
6.00
6.00
16.00
14.00
14.00
14.00
14.00
20.00
20.00
20.00
20.00
46.00
44.00
42.00
42.00
25.00
60.00
45.00
30.00
30.00
4.00
41.00
41.00
41.00
41.00
3.00
11.00
220.00
220.00
220.00
220.00
220.00
190.00
140.00
100.00
50.00
50.00
491.00
441.00
300.00
250.00
250.00
250.00
250.00
250.00
149.00
147.00
144.00
144.00
144.00
144.00
230.00
225.00
215.00
205.00
205.00
205.00
205.00
205.00
205.00
205.00
12.00
10.00
360.00
2.00
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
C-PURLINS1.2X2X6X4.0M 1,456
PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
EMPTY CONTAINER 36
TANSI #100
DIGGING BAR
MASONRY DRILL BIT 1/2 PCS
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
SHOVEL 30 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
80
35906 20 3/17/20 S. ALOJACIN ROOFING INSTL. BLK 4
80
80
Z. CABALQUINTO LOADING TO BT-05
35923 600 3/19/20 RAMA ROOFING INSTL. BLK 31
35924 30 3/19/20 D. BATAIN STORM / SEWER LINE BLK 4
35689 30 3/28/20 D. BATAIN STORM/SEWER BLK 20 LOT 1-13
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
198.00
168.00
153.00
143.00
103.00
63.00
48.00
23.00
3.00
303.00
263.00
233.00
203.00
183.00
163.00
143.00
123.00
113.00
93.00
69.00
54.00
34.00
19.00
4.00
-
300.00
290.00
280.00
250.00
230.00
215.00
200.00
190.00
180.00
170.00
150.00
138.00
123.00
108.00
98.00
74.00
54.00
54.00
40.00
10.00
-
300.00
260.00
220.00
185.00
125.00
100.00
60.00
25.00
325.00
305.00 3/19/20 P.OPQUERIA
TUCALO BLK 11 LOT 1-8
285.00
275.00
260.00
240.00
210.00
200.00
190.00
180.00
170.00
167.00
132.00
122.00
112.00
87.00
37.00
737.00
637.00
612.00
602.00
562.00
537.00
527.00
507.00
487.00
477.00
462.00
438.00
408.00
388.00
368.00
362.00
327.00
312.00
297.00
287.00
252.00
252.00
252.00
11,036.00
11,016.00
10,986.00
10,956.00
10,926.00
10,896.00
10,876.00
10,846.00
10,816.00
10,716.00
10,696.00
10,656.00
10,636.00
10,596.00
10,576.00
10,516.00
10,496.00
10,486.00
10,436.00
10,386.00
10,376.00
10,356.00
10,336.00
10,296.00
10,286.00
10,266.00
10,256.00
10,241.00
10,211.00
10,191.00
10,171.00
10,151.00
10,131.00
10,071.00
10,031.00
9,981.00
9,981.00
9,981.00
5,683.00
5,663.00
5,633.00
5,603.00
5,553.00
5,453.00
5,433.00
5,333.00
4,827.00
4,807.00
4,777.00
4,747.00
4,717.00
4,697.00
4,397.00
4,297.00
4,197.00
4,177.00
4,127.00
4,077.00
4,027.00
3,977.00
3,957.00
3,857.00
3,847.00
3,797.00
3,782.00
3,762.00
3,742.00
3,732.00
3,732.00
3,732.00
640.00
610.00
590.00
570.00
530.00
430.00
380.00
280.00
230.00
190.00
170.00
160.00
160.00
160.00
1096.00
1,056.00
996.00
956.00
916.00
816.00
716.00
686.00
586.00
536.00
496.00
486.00
476.00
466.00
466.00
466.00
829.00
821.00
815.00
811.00
801.00
793.00
785.00
775.00
760.00
750.00
742.00
736.00
721.00
719.00
713.00
709.00
682.00
667.00
665.00
662.00
642.00
632.00
626.00
624.00
620.00
618.00
598.00
594.00
590.00
582.00
578.00
574.00
547.00
537.00
535.00
533.00
531.00
516.00
501.00
499.00
495.00
485.00
470.00
468.00
466.00
439.00
431.00
429.00
414.00
404.00
398.00
383.00
358.00
338.00
334.00
324.00
320.00
297.00
289.00
279.00
269.00
263.00
257.00
253.00
238.00
230.00
218.00
214.00
210.00
202.00
198.00
194.00
192.00
190.00
184.00
182.00
176.00
172.00
162.00
156.00
152.00
152.00
41.12
39.12
37.12
35.12
34.12
32.12
31.12
30.12
46.03
46.03
46.03
71.04
38.96
36.96
34.96
31.96
28.96
26.96
23.96
18.96
14.96
46.78
41.78
38.78
35.78
32.78
28.78
26.78
24.78
21.78
18.78
15.78
14.78
11.78
9.78
63.7
61.7
58.7
50.7
37.22
104.62
64.18
50.7
48.7
44.7
42.7
29.22
27.22
25.22
23.22
22.22
20.22
40.23
37.23
35.23
32.23
22.23
10
0
20.01
12768.00
11,768.00
11,268.00
10,268.00
9,768.00
9,618.00
8,118.00
6,118.00
4,118.00
2,618.00
2,616.00
2,000.00
2,087.00
2,087.00
2,087.00
2,087.00
2,862.00
1,362.00
1,062.00
-
1,811.00
-
585.00
2,834.00
56.00
76.00
80
60
-
2,500.00
2,500.00
2,600.00
2,000.00
2,000.00
2,000.00
2,000.00
198.00
3.00
10.00
1.00
1,036.00
1,006.00
976.00
976.00
976.00
867.00
863.00
861.00
858.00
856.00
856.00
856.00
841.00
835.00
829.00
829.00
829.00
200.00
200
1,041.00
1,035.00
1,029.00
1,029.00
1,029.00
1,029.00
1,029.00
1,029.00
200.00
596.00
813.00
783.00
753.00
723.00
693.00
693.00
693.00
200.00
180.00
180.00
180.00
3.00
10.00
10.00
10.00
4.00
2.00
1.00
3.00
50.00
32.00
14.00
33.00
27.00
21.00
21.00
1.00
28.00
22.00
16.00
16.00
16.00
218.00
217.00
217.00
217.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
1.00
-
1.00
-
1.00
-
3.00
3.00
150.00
18.00
17.00
15.00
14.00
13.00
13.00
25.00
22.00
19.00
29.00
50.00
46.00
45.00
45.00
45.00
12.00
6.00
-
50.00
40.00
30.00
20.00
10.00
-
6.00
-
20.00
16.00
14.00
12.00
10.00
7.00
5.00
3.00
6.00
5.00
14.00
20.00
20.00
20.00
20.00
42.00
25.00
24.00
24.00
10.00
30.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
50.00
-
250.00
200.00
200.00
200.00
144.00
143.00
140.00
139.00
136.00
135.00
205.00
200.00
195.00
190.00
185.00
180.00
180.00
180.00
10.00
360.00
2.00
3.00
-
SUBJECT :MATERIALS DELIVERY & ISSUANCES MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
35
C-PURLINS1.2X2X6X4.0M 1,456
PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
RCP 750MM 28 PCS
RCP 600MM
RCP 450MM 1,008 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
EMPTY CONTAINER 36
TANSI #100
DIGGING BAR
MASONRY DRILL BIT 1/2 PCS
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
80
80
35750 40 4/13/20 GERONA IN JECT SEPTIK BLK 14-15
36107 40 4/13/20 B. BANSILOY CHARGE TO FF TRADING
36113 15 4/14/20 D. BATAIN S O G BLK 20 LOT 1-13
36114 48 4/14/20 GERONA IN JECT SEPTIK BLK 14-15
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
54.00
254.00
244.00
234.00
219.00
199.00
179.00
159.00
149.00
139.00
134.00
114.00
89.00
56.00
31.00
-
176.00
171.00
156.00
141.00
121.00
96.00
72.00
62.00
42.00
30.00
30.00
30.00
30.00
252.00
232.00
212.00
202.00
197.00
173.00
153.00
143.00
118.00
93.00
-
124.00
94.00
79.00
64.00
49.00
34.00
24.00
-
-
-
9,981.00
9,961.00
9,901.00
9,881.00
9,861.00
9,841.00
9,821.00
9,811.00
9,811.00
9,811.00
3,732.00
3,722.00
3,702.00
3,692.00
3,672.00
3,667.00
3,659.00
3,639.00
3,624.00
3,604.00
3,594.00
3,594.00
3,594.00
160.00
150.00
466.00
458.00
458.00
458.00
152.00
148.00
144.00
142.00
134.00
128.00
98.00
90.00
70.00
64.00
56.00
44.00
29.00
19.00
15.00
11.00
9.00
9.00
9.00
9.00
46.03
43.03
43.03
43.03
43.03
71.04
32.01
30.01
28.01
18.01
15.01
12.01
10.01
8.01
0
86.99
76.99
70.99
65.99
52.51
49.51
46.51
36.51
33.51
30.51
20
20
20
2087.00
1,087.00
2,834.00
1,834.00
1,832.00
832.00
532.00
532.00
532.00
56.00
76.00
60
-
2,500.00
2,500.00
2,000.00
198.00
3.00
10.00
1.00
976.00
936.00
896.00
881.00
833.00
833.00
833.00
833.00
833.00
856.00
851.00
850.00
849.00
833.00
833.00
833.00
829.00
826.00
794.00
794.00
200.00
200
180
180
180
1,029.00
1,004.00
1,001.00
993.00
993.00
993.00
993.00
200.00
596.00
693.00
663.00
633.00
633.00
633.00
633.00
633.00
180.00
3.00
10.00
10.00
10.00
4.00
2.00
1.00
3.00
21.00
-
1.00
16.00
-
217.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
1.00
-
1.00
-
1.00
-
3.00
3.00
150.00
13.00
29.00
45.00
3.00
5.00
14.00
13.00
13.00
20.00
42.00
24.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
200.00
135
125.00
124.00
180.00
175.00
175.00
175.00
175.00
3.00
-
10.00
8.00
360.00
7.00
6.00
4.00
2.00
2.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE ; APRIL 16 TO 30 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMEN
TS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,252
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
RUBBERIZED HAND GLOVES 62
EMPTY DRUMS 9 PCS
EMPTY CONTAINER 36
HARDWARE CLOTH 14 MTRS
B-B ROLLER 4' 22 PCS
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
COCO LUMBER 2X2X6
COCO LUMBER 2X3X8 1200 PCS
.
36357 TIONGZON LOADED TO ST-06
36122 40 4/16/20 SEVILLENO PLASTER BLK 23 LOT 1-12
36124 30 4/16/20 R. BATAIN C H B BLK 34
36125 10 4/16/20 ALBASIETE CHB FAB. ISIDRA
36126 20 4/16/20 P.OPQUERIA CHB C.R BLK 17-18
36128 30 4/16/20 GERORA CHB BLK 14-15
36129 26 4/16/20 BANSILOY CHARGE TO FF TRADING
36130 10 4/17/20 P. OPQUERIA CHB C. R BLK 17-18
36131 40 4/17/20 SEVILLENO PLASTER BLK 23 LOT 1-12
36132 20 4/17/20 R. BATAIN C H B BLK 34
36138 30 4/18/20 SEVILLENO PLASTER BLK 23 LOT 1-12
36139 10 4/18/20 P. OPQUERIA CHB C. R BLK 17-18
36143 5 4/20/20 R. DESAMPARADO CHB LAYING BLK 11 LOT 17-24
36147 3 4/22/20 GIDUCUS BLK 20 ELECTRICAL
36057 5 4/25/20 A. TENORIO SEPTIK BLK 11 LOT 1`-8
36060 5 4/27/20 A. TENORIO SEPTIK BLK 11 LOT 1`-8
36063 5 4/28/20 A. TENORIO MANHOLE ROAD 13
36065 5 4/29/20 A. TENORIO MANHOLE ROAD 13
36066 6 4/29/20 B. BANSILOY CHARGE TO FF TRADING
80
36134 20 4/17/20 D, BATAIN STORM SEWER BLK 20 LOT 1-13
36144 200 4/21/20 P. FABRICANTE SOG CHARGE TO KAMP
36127 20 4/16/20 DELA PENA ALLEY 10,11 WATER LINE
36134 1 4/17/20 D, BATAIN STORM SEWER BLK 20 LOT 1-13
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
30.00
20.00
320.00
315.00
295.00
285.00
255.00
240.00
220.00
190.00
179.00
175.00
164.00
139.00
130.00
127.00
122.00
108.00
96.00
86.00
74.00
69.00
50.00
38.00
38.00
300.00
260.00
230.00
220.00
200.00
170.00
144.00
134.00
94.00
74.00
44.00
34.00
29.00
26.00
21.00
16.00
11.00
6.00
-
9,811.00
9,751.00
9,741.00
9,731.00
9,731.00
9,731.00
3,594.00
3,574.00
3,564.00
3,549.00
3,525.00
3,525.00
3,525.00
150.00
458.00
438.00
438.00
438.00
9.00
3.00
-
25.00
23.00
21.00
17.00
11.00
10.00
43.03
40.03
38.03
35.03
35.03
71.04
68.04
68.04
20
16
12
8
5
2
0
1087.00
500.00
1,861.00
1,861.00
1,861.00
532.00
5562
5,562.00
5,462.00
5,252.00
4,152.00
3,052.00
2,852.00 4/22/20 DESABILE
FABRICATE ON SITE 1,793.00
5,898.00
4,998.00
4,598.00
4,598.00
56.00
76.00
60
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
833.00
813.00
613.00
613.00
613.00
833.00
813.00
812.00
812.00
812.00
794.00
790.00
790.00
790.00
200.00
180
993.00
989.00
989.00
989.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
75.00
36.00
14.00
14.00
-
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
1,050.00
150.00
13.00
12.00
12.00
29.00
45.00
39.00
37.00
36.00
36.00
3.00
5.00
13.00
20.00
42.00
24.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
200.00
100.00
-
124.00
175.00
8.00
360.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE ; MAY 1 TO 15 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES UNIT COST
REQUIRME
NTS QTY UM QTY DATE SUPPLIER APR. 16 TO 30 202
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,252
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
TEFLON TAPE 5 PCS
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
38.00
13.00
1.00
-
100.00
70.00
48.00
48.00
48.00
9,731.00
3,525.00
150.00
438.00
10.00
35.00
68.00
1864.00
564.00
4,598.00
4,398.00
3,998.00
3,398.00
3,098.00
2,898.00
56.00
76.00
60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
613.00
603.00
601.00
561.00
453.00
353.00
303.00
812.00
790.00
782.00
782.00
782.00
200.00
192.00
180
989.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
14.00
55.00
45.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
34.00
54.00
602.00
562.00
526.00
483.00
443.00
400.00
400.00
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
24.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
124.00
175.00
8.00
360.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; MAY 16 TO 31 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,252
MASONRY CEMENT 39,750.00 59,150
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
48.00
36091 10 5/18/20 TENORIO SEPTIK TANK ROAD 7 38.00
36095 5 5/20/20 TENORIO INJECT COLVERT ROAD 9 33.00
36098 10 5/21/20 GOLDEN CHARGE TO FF TRADING 23.00
36099 3 5/22/20 TENORIO INJECT SEPTIK BLK 23 20.00
36100 15 5/23/20 GOLDEN] CHARGE TO FF TRADING 5.00
9,731.00
3,525.00
36091 10 5/18/20 TENORIO SEPTIK TANK ROAD 7 3,515.00
150.00
438.00
10.00
36091 2 5/18/20 TENORIO SEPTIK TANK ROAD 7 8.00
36092 6 5/18/20 GERONA BLK 14-15 COLUMN 2.00
35.00
68.00
564.00
2,898.00
36088 500 5/14/20 GOLDEN] CHARGE TO FF TRADING 2,398.00
36090 500 5/16/20 GOLDEN] CHARGE TO FF TRADING 1,898.00
36091 300 5/18/20 TENORIO SEPTIK TANK ROAD 7 1,598.00
36094 300 5/19/20 TENORIO SEPTIK TANK ROAD 7 1,298.00
1,298.00
56.00
76.00
80 60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
303.00
36088 50 5/14/20 GOLDEN] CHARGE TO FF TRADING 253.00
36091 50 5/18/20 TENORIO SEPTIK TANK ROAD 7 203.00
36093 87 5/18/20 L. CANONIGO CHARGE TO KODIA 116.00
36094 40 5/19/20 TENORIO SEPTIK TANK ROAD 7 76.00
36095 20 5/20/20 TENORIO INJECT COLVERT ROAD 9 56.00
36099 26 5/22/20 TENORIO INJECT SEPTIK BLK 23 30.00
36100 30 5/23/20 GOLDEN] CHARGE TO FF TRADING -
812.00
782.00
36093 100 5/18/20 L. CANONIGO CHARGE TO KODIA 682.00
682.00
192.00
180
989.00
36093 100 5/18/20 L. CANONIGO CHARGE TO KODIA 889.00
889.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
36089 54 5/16/20 TENORIO ROAD 12 -
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
24.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
124.00
175.00
8.00
360.00
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; JUNE 1-TO- 15 , 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,322 BAGS 70 6/23/20 KODIA
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
5.00
9,731.00
36006 30 6/2/20 R. ROSALES R.C.P FABRICATION 9,701.00
36007 40 6/3/20 R. ROSALES R.C.P FABRICATION 9,661.00
36026 150 6/23/20 R. ROSALES R.C.P FABRICATION 9,511.00
3,515.00
150.00
438.00
2.00
36007 2 6/3/20 R. ROSALES R.C.P FABRICATION -
35.00
68.00
51.92
R. ARQUIO LOADING TO DT-88 99.33
REFLACEMENT OF JFK 130.22
564.00
1,298.00
36010 298 6/3/20 DESAMPARADO MAN HOLE ALLEY 16 1,000.00
1,000.00
1,000.00
56.00
76.00
80 60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
812.00
682.00
192.00
180
899.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
310.00
36008 9 6/3/20 N.BERO CHARGE TO KAMP. 301.00
36009 30 6/3/20 R. ARQUIO CHARGE TO KAMP. 271.00
271.00
271.00
271.00
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
24.00
36005 1 6/1/20 DESAMPARADO REPAIR OF BACKHOE 23.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
124.00
175.00
36005 5 6/1/20 DESAMPARADO REPAIR OF BACKHOE 170.00
8.00
360.00
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATED JUNE 16 TO 30 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,322 BAGS 70 6/23/20 KODIA
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
5.00
36020 5 6/15/20 R. ROSALES RCP FABRICATION -
9,511.00
36026 150 6/23/20 R. ROSALES RCP FABRICATION 9,361.00
9,361.00
3,515.00
150.00
438.00
0.00
35.00
130.22
564.00
500.00
36025 500 6/22/20 GOLDEN CHARGE TO FF TRADING -
56.00
76.00
36024 50 6/19/20 R. ARIESGA CHARGE TO KODIA 26.00
80 60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
812.00
682.00
192.00
180
899.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
271.00
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
23.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
220.00
220.00
124.00
170.00
8.00
360.00
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATED JULY 1 TO 15 2020
ITEM NO. DESCRIPTION TOTAL DELIVERIES
TOTAL REQUIRMENTS
QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,322 BAGS 29 7/7/20
ROOFING
ANGLE BAR 4.5MMX75MMX75MM
ANGLE BAR 4MMX75MMX75MMX 192 PCS
ANGLE BAR 6MMX75MMX75MMX
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
HACKSAW BLADE 73
RUBBERIZED HAND GLOVES 62
EMPTY DRUMS 9 PCS
EMPTY CONTAINER 36
HARDWARE CLOTH 14 MTRS
B-B ROLLER 4' 22 PCS
CONSTRUCTION PAIL 17 PCS
CUT- OFF BLADE 12' 20
CUT-OFF BLADE 14'' 47
STEEL CUTTING DISC 4'' 20
29
0
9,361.00
9,261.00
3,515.00
150.00
438.00
0.00
35.00
68.00
130.22
114.26
564.00
56.00
60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
812.00
682.00
192.00
180
899.00
200.00
596.00
633.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
271.00
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
23.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
124.00
170.00
8.00
360.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATED JULY 16 TO 31 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,458 BAGS 50 7/15/20
BAGS 57 7/15/20
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
3,000.00
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
HINGES 2X4 3 SET
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
RUBBERIZED HAND GLOVES 62
EMPTY DRUMS 9 PCS
EMPTY CONTAINER 36
HARDWARE CLOTH 14 MTRS
B-B ROLLER 4' 22 PCS
CONSTRUCTION PAIL 17 PCS
CUT- OFF BLADE 12' 20
CUT-OFF BLADE 14'' 47
STEEL CUTTING DISC 4'' 20
50
0
57
0
9,261.00
9,211.00
9,161.00
9,047.00
3,515.00
150.00
438.00
21.00
21.00
35.00
68.00
114
98.04
564.00
56.00
60.00
-
2,500.00
2,000.00
198.00
3.00
10.00
1.00
812.00
682.00
677.00
192.00
180
899.00
200.00
596.00
633.00
608.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
271.00
150.00
12.00
29.00
36.00
3.00
5.00
13.00
20.00
42.00
23.00
10.00
15.00
4.00
41.00
3.00
11.00
220.00
124.00
170.00
8.00
360.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; AUGUST 1 TO 15 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 62,928 BAGS 70 8/3/20 KODIA
C-PURLINS1.2X2X6X4.0M 1,456
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
HACKSAW BLADE 73
RUBBERIZED HAND GLOVES 62
EMPTY DRUMS 9 PCS
EMPTY CONTAINER 46 10 8/25/20 PURCHASE
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
70
65
55
49
39
30
25
19
11
71
66
58
48
43
31
23
20
9
6
0
50
44
38
35
27
327
315
305
295
285
275
251
551
751
655
643
638
618
596
586
566
551
536
500
490
250
550
505
495
495
495
300.00
290.00
280.00
255.00
225.00
220.00
200.00
180.00
170.00
160.00
135.00
120.00
100.00
60.00
60.00
60.00
60.00
60.00
60.00
9,197.00
9,161.00
9,151.00
9,141.00
9,126.00
9,116.00
9,096.00
9,036.00
9,036.00
9,036.00
9,036.00
9,036.00
9,036.00
9,036.00
9,036.00
3,515.00
3,500.00
3,300.00
3,290.00
3,270.00
3,260.00
3,250.00
3,240.00
3,230.00
3,215.00
3,211.00
3,191.00
3,171.00
3,141.00
3,141.00
3,141.00
3,141.00
150.00
438.00
21.00
-
25.00
24.00
20.00
18.00
17.00
13.00
11.00
9.00
9.00
35.00
68.00
54.52
52.52
50.52
46.52
37.52
35.52
32.52
30.52
28.52
4.52
4.52
4.52
114.26
112.26
125.74
122.74
120.74
113.74
111.74
107.74
105.74
102.74
100.74
98.74
96.74
92.74
90.74
88.74
86.74
82.74
81
116.38
110.38
100.38
97.38
93.38
128.76
125.76
119.76
109.76
92.07
127.45
162.83
150.83
145.83
141.83
138.83
133.83
123.83
120.83
116.83
112.83
102.83
99.83
94.83
89.83
85.83
82.83
77.83
74.83
71.83
68.83
36.83
54.52
36.83
36.83
36.83
36.83
36.83
36.83
36.83
36.83
36.83
564.00
-
625.00
-
1,389.00
889.00
289.00
-
1,759.00
1,259.00
1,159.00
659.00
659.00
659.00
659.00
659.00
56.00
60.00
-
2,500.00
2,000.00
1,000.00
198.00
3.00
10.00
1.00
812.00
682.00
677.00
192.00
180
899.00
200.00
596.00
608.00
180.00
3.00
10.00
4.00
2.00
1.00
3.00
45.00
1.00
216.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
271.00
229.00
150.00
12.00
10.00
29.00
36.00
13.00
10.00
8.00
6.00
6.00
5.00
13.00
20.00
42.00
23.00
10.00
15.00
4.00
41.00
3.00
2.00
11.00
220.00
124.00
123.00
119.00
114.00
114.00
114.00
170.00
160.00
150.00
8.00
360.00
3.00
-
16,400.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; SEP 1 TO 15, 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 67,308
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
HINGES 2X4 3 SET
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
HACKSAW BLADE 73
SHOVEL 40 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
PREPARED BY: CHEKED BY:
Z. CABALQUINTO ENGR. JUPITER PORROSUELO
WAREHOUSEMAN PROJECT SITE ENGR.
DELIVERY FR. H.O
CHARGE MTRL'S
R.C.P. SILLION
C H B BANAWA
FROM VM-1
UNIT COST PO # STOCK AS OFISSUANCES REMARKS
APR. 16 TO 30 2020 MIS # QTY DATE ISSUED
FABRICATE ON SITE
1 400 9/1/20 GERONA CHB BLK 14-15
17 450 9/3/20 R. BATAIN FORM WORK S BLK 34
34 300 9/5/20 R, BATAIN COLUMN BLK 34
FABRICATE ON SITE
63019 1000 9/11/20 R. BATAIN CHB BLK 34
63020 1000 9/11/20 P. OPQUERIA CH B BLK 11
63025 977 9/11/20 LAYESE CHB BLK 14-15
FABRICATE ON SITE
1 500 9/1/20 GERONA CHB BLK 14-15
17 500 9/3/20 R. BATAIN FORM WORK S BLK 34
19 400 9/3/20 B. BANSILOY CHARGE TO FF. TRDNG.
24 130 9/4/20 SEVILLENO PLASTER BLK 23-8
26 500 9/4/20 R, BATAIN C H B BLK 34
27 500 9/4/20 P. OPQUERIA CH B BLK 11
46 500 9/7/20 SEVILLENO C H B BLK 34
50 33 9/7/20 P. POQUITA MAN HOLE BLK 33
FABRICATE ON SITE
63019 1000 9/11/20 R. BATAIN CHB BLK 34
63020 1000 9/11/20 P. OPQUERIA CH B BLK 11
63021 464 9/11/20 SEVILLENO C H B BLK3
Z. CABALQUINTO PURCHASE
35199 2 9/1/20 R. BATAIN FORM WORKS BLK 34
63021 3 9/11/20 SEVILLENO C H B BLK 3
Z. CABALQUINTO PURCHASE
Z CABALQUINTO PURCHASE
63034 1 9/14/20 IBARDOLASA PAINTING C PURLINS
63043 1 9/14/20 GERONA PAINTING C PURLINS
495
480
465
455
445
435
410
400
388
373
363
338
293
278
254
249
216
201
0
300
290
280
256
241
231
219
199
163
147
137
122
182
162
152
104
74
70
3310
3300
3290
3260
3250
4330
4330
4330
4330
4330
4330
60.00
20.00
-
300.00
285.00
585.00
560.00
550.00
500.00
490.00
450.00
410.00
400.00
385.00
365.00
345.00
320.00
260.00
230.00
185.00
155.00
130.00
100.00
55.00
355.00
340.00
320.00
280.00
260.00
245.00
225.00
425.00
395.00
345.00
325.00
305.00
285.00
275.00
243.00
228.00
198.00
188.00
138.00
128.00
118.00
418.00
398.00
378.00
368.00
345.00
305.00
275.00
267.00
265.00
245.00
230.00
195.00
185.00
165.00
149.00
129.00
99.00
89.00
79.00
49.00
44.00
34.00
19.00
319.00
314.00
304.00
289.00
274.00
264.00
259.00
254.00
234.00
184.00
172.00
1,252.00
1,247.00
1,242.00
1,237.00
1,227.00
1,197.00
Z. CABALQUINTO
LOADING TO THRILLERS
9,036.00
9,016.00
8,996.00
8,993.00
8,957.00
8,947.00
8,937.00
8,922.00
8,907.00
8,887.00
8,867.00
8,847.00
8,827.00
8,807.00
8,787.00
8,767.00
8,757.00
8,747.00
8,727.00
8,717.00
8,657.00
8,637.00
8,617.00
8,607.00
8,587.00
8,577.00
8,557.00
8,517.00
8,517.00
8,517.00
8,517.00
3,141.00
3,126.00
3,116.00
3,066.00
3,063.00
3,053.00
3,043.00
3,023.00
3,013.00
2,998.00
2,988.00
2,968.00
2,948.00
2,928.00
2,898.00
2,878.00
2,790.00
2,770.00
2,740.00
2,720.00
2,710.00
2,690.00
2,670.00
2,660.00
2,640.00
2,620.00
2,605.00
2,602.00
2,582.00
2,532.00
2,482.00
2,432.00
2,412.00
2,362.00
2,362.00
2,362.00
150.00
140.00
105.00
55.00
5.00
5.00
438.00
366.00
278.00
228.00
178.00
128.00
108.00
108.00
108.00
108.00
108.00
9.00
7.00
5.00
3.00
2.00
1.00
-
54.00
52.00
42.00
40.00
37.00
35.00
33.00
32.00
30.00
28.00
24.00
99.00
97.00
77.00
75.00
73.00
71.00
69.00
67.00
65.00
63.00
61.00
59.00
57.00
55.00
51.00
49.00
47.00
45.00
43.00
41.00
39.00
33.00
27.00
25.00
20.00
18.00
12.00
8.00
2.00
2.00
35.38
51.29
47.29
64.98
80.89
77.89
75.89
143.89
141.89
139.89
139.89
22.21
38.12
36.12
34.12
51.81
67.72
83.63
36.83
33.83
31.83
26.83
24.83
42.52
77.9
109.8
106.8
103.8
100.8
98.8
88.8
106.49
66.49
60.49
58.49
56.49
54.49
51.49
86.87
118.87
108.87
104.87
94.87
91.87
109.56
125.47
122.47
119.47
116.47
113.47
111.47
91.47
67.47
63.47
53.47
50.47
47.47
42.47
37.47
35.47
32.47
29.47
27.47
24.47
22.47
19.47
54.85
52.85
49.85
45.85
43.85
61.54
58.54
56.54
38.85
35.85
30.85
27.85
54.81
51.81
49.81
46.81
36.81
48.29
48.29
41.29
27.81
24.81
21.81
21.81
21.81
21.81
21.81
21.81
2350.00
1,950.00
1,500.00
1,200.00
3,977.00
2,977.00
1,977.00
1,000.00
1,000.00
1,000.00
3,063.00
2,563.00
2,063.00
1,663.00
1,533.00
1,033.00
533.00
33.00
-
2,464.00
1,464.00
464.00
-
56.00
495.00
400.00
300.00
300.00
300.00
60.00
0
-
2,500.00
1,000.00
198.00
26.00
26.00
100.00
100.00
100.00
100.00
100.00
100.00
3.00
10.00
812.00
807.00
807.00
807.00
807.00
677.00
672.00
672.00
672.00
192.00
187.00
187.00
187.00
180
899.00
200.00
596.00
608.00
558.00
556.00
556.00
556.00
180.00
160.00
3.00
10.00
4.00
2.00
1.00
5.00
4.00
45.00
1.00
216.00
211.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
5.00
303.00
28.00
54.00
229.00
150.00
6.00
2.00
-
5.00
3.00
5.00
3.00
-
5.00
5.00
-
10.00
9.00
7.00
7.00
29.00
27.00
36.00
34.00
31.00
28.00
25.00
25.00
25.00
25.00
6.00
4.00
1.00
-
5.00
-
13.00
12.00
11.00
20.00
42.00
41.00
41.00
23.00
10.00
15.00
4.00
41.00
2.00
11.00
220.00
114.00
113.00
111.00
108.00
108.00
108.00
150.00
140.00
120.00
100.00
100.00
2.00
1.00
-
8.00
360.00
10
8
7
6
4
0
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; SEP. 16 TO 30 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRME
NTS QTY UM QTY DATE SUPPLIER
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 67,308
MASONRY CEMENT 39,750.00 60,530
BAGS 2160 9/16/20 REPUBLIC
DEF.BARS 8MMX6.0M 16,100
DEF.BAR 10MMX6.0M 14,527 PCS
DEF. BAR 12MMX6.0M 2,150
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
C-PURLINS1.2X2X6X4.0M 1,856
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
PAINT THINNER 42
GAL 10 9/17/20 KAMP.
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
Z. CABALQUINTO LOADING SV 61
63106 2 9/23/20 R. BATAIN C H B BLK 35
63107 1 9/23/20 P. OPQUERIA C H B BLK 20
63018 3 9/23/20 DRSAMPARADO PAINTING C- PURLINS
63109 1 9/23/20 SEVILLENO C H B BLK 28
63110 2 9/23/20 J. CARATAO STACKA ROAD 10
Z. CABALQUINTO LOADING SV 61
63106 10 9/23/20 R. BATAIN C H B BLK 35
63107 10 9/23/20 P. OPQUERIA C H B BLK 20
63018 10 9/23/20 DRSAMPARADO PAINTING C- PURLINS
63110 10 9/23/20 J. CARATAO STACKA ROAD 10
63109 10 9/23/20 SEVILLENO C H B BLK 28
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
BALANCE
4330
4315
4285
4260
4248
4240
4195
4189
4154
4144
4128
4118
4103
4093
4058
4033
3997
3972
3966
3956
3932
3917
3821
3804
3789
3779
3774
3748
3738
3736
3729
3693
3683
3678
3668
3632
3622
3592
3572
3562
3552
3532
3507
3493
3487
3470
3434
3434
3434
1,197.00
3,357.00
3,342.00
3,332.00
3,317.00
3,287.00
3,267.00
3,247.00
3,237.00
3,197.00
3,177.00
3,165.00
3,150.00
3,130.00
3,120.00
3,080.00
3,040.00
3,010.00
3,000.00
2,985.00
2,955.00
2,950.00
2,910.00
2,870.00
2,862.00
2,822.00
2,797.00
2,777.00
2,741.00
2,716.00
2,686.00
2,661.00
2,636.00
2,612.00
2,592.00
2,562.00
2,552.00
2,547.00
2,539.00
2,529.00
2,519.00
2,499.00
2,489.00
2,479.00
2,474.00
2,454.00
2,448.00
2,442.00
2,427.00
2,417.00
2,407.00
2,377.00
2,337.00
2,334.00
2,329.00
2,323.00
2,308.00
2,287.00
2,275.00
2,255.00
2,255.00
2,255.00
8,517.00
8,507.00
8,487.00
8,467.00
8,447.00
8,407.00
8,337.00
8,307.00
8,287.00
8,247.00
8,227.00
8,207.00
8,147.00
8,122.00
8,082.00
8,062.00
8,042.00
8,032.00
8,012.00
7,992.00
7,942.00
7,912.00
7,902.00
7,842.00
7,822.00
7,812.00
7,802.00
7,792.00
7,732.00
7,722.00
7,712.00
7,662.00
7,652.00
7,642.00
7,642.00
7,642.00
7,642.00
2,362.00
2,362.00
2,352.00
2,342.00
2,322.00
2,272.00
2,242.00
2,222.00
2,132.00
2,112.00
2,092.00
2,072.00
2,022.00
1,997.00
1,977.00
1,957.00
1,937.00
1,917.00
1,907.00
1,897.00
1,887.00
1,837.00
1,827.00
1,807.00
1,757.00
1,747.00
1,737.00
1,687.00
1,677.00
1,627.00
1,617.00
1,607.00
1,587.00
1,572.00
1,572.00
1,572.00
5.00
-
450.00
400.00
400.00
400.00
108.00
78.00
28.00
0.00
500.00
460.00
430.00
400.00
350.00
350.00
350.00
2.00
-
54.00
52.00
40.00
36.00
28.00
78.00
72.00
66.00
65.00
64.00
60.00
56.00
54.00
48.00
46.00
42.00
40.00
35.00
85.00
80.00
70.00
67.00
63.00
62.00
32.00
28.00
21.00
19.00
17.00
15.00
10.00
-
50.00
46.00
40.00
35.00
33.00
29.00
25.00
22.00
19.00
15.00
11.00
9.00
7.00
5.00
-
250.00
248.00
248.00
248.00
248.00
139.89
136.89
207.65
241.25
239.25
237.25
234.25
233.25
231.25
227.25
227.25
227.25
83.63
117.08
114.08
111.08
99.08
98.08
95.08
91.08
91.08
21.81
37.52
33.52
30.52
27.52
22.52
89.72
74.72
58.81
50.81
34.9
94.19
94.19
91.19
81.19
65.28
57.28
54.28
137.39
221.63
205.72
188.03
172.12
170.12
160.12
157.12
142.12
137.12
132.12
102.12
97.12
81.12
77.12
90.06
88.06
85.06
80.06
78.06
161.17
158.17
156.17
153.17
149.17
147.17
182.55
180.55
176.55
172.55
167.55
159.55
212.62
210.62
208.62
205.62
203.62
199.62
195.62
191.62
184.62
178.62
173.62
168.62
164.62
164.62
164.62
1,865.00
3,739.00
2,865.00
2,365.00
1,865.00
1,365.00
865.00
565.00
265.00
165.00
-
-
2,085.00
4,246.00
3,685.00
3,185.00
2,685.00
1,685.00
1,185.00
985.00
685.00
585.00
185.00
185.00
185.00
56.00
495.00
471.00
471.00
471.00
300.00
253.00
248.00
248.00
-
2,500.00
1,000.00
198.00
26.00
1.00
100.00
89.00
89.00
100.00
89.00
89.00
3.00
10.00
807.00
799.00
799.00
672.00
671.00
671.00
671.00
187.00
186.00
186.00
180
899.00
200.00
596.00
556.00
548.00
542.00
540.00
500.00
500.00
500.00
160.00
140.00
140.00
140.00
3.00
10.00
4.00
2.00
1.00
4.00
2.00
45.00
1.00
211.00
210.00
2.00
13.00
1.00
2.00
2.00
1.00
1.00
303.00
28.00
54.00
229.00
150.00
3.00
1.00
-
5.00
3.00
2.00
27.00
25.00
25.00
25.00
21.00
19.00
17.00
47.00
44.00
40.00
39.00
37.00
33.00
30.00
29.00
27.00
26.00
25.00
24.00
24.00
24.00
10.00
8.00
6.00
5.00
3.00
1.00
11.00
10.00
9.00
20.00
41.00
23.00
10.00
15.00
4.00
41.00
2.00
11.00
220.00
108.00
104.00
101.00
100.00
100.00
90.00
70.00
60.00
55.00
40.00
25.00
20.00
10.00
5.00
20.00
18.00
16.00
15.00
14.00
12.00
12.00
12.00
12.00
8.00
18.00
17.00
16.00
15.00
14.00
360.00
10.00
8.00
7.00
4.00
3.00
1.00
1.00
50.00
40.00
30.00
20.00
10.00
-
33640
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE; OCT. 1 TO 15 2020
ITEM NO. DESCRIPTION TOTAL TOTAL DELIVERIES
REQUIRMENTS QTY UM QTY DATE
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 67,308
BAGS 1080 10/15/20
632
CU.M 33.06 10/10/20
C H B 6' 69,409 PCS 3098 9/30/20
PCS 2027 10/6/20
C H B 4' 47,815
PCS 248 9/30/20
PCS 219 10/6/20
PCS 6871 10/7/20
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
C-PURLINS1.2X2X6X4.0M 1,856
PLAIN ROUND BAR 12MMX6.0M 1,500.00 229
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
HARDWARE CLOTH 24
PCS 10 10/12/20
PAINT THINNER 42
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 41
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
KAMP Z. CABALQUINTO
63173 4 10/1/20 J. CARATAO
63174 2 10/1/20 R. BATAIN
63176 4 10/1/20 DESAMPARADO
63177 5 10/1/20 P. OPQUERIA
63186 3 10/2/20 J. CARATAO
63196 10 10/3/20 DESAMPARADO
63197 4 10/3/20 R. BATAIN
63227 13.48 10/7/20 R. BATAIN
63233 15 10/7/20 TENORIO
63253 13.48 10/10/20 DESAMPARADO
63252 5 10/10/20 R. BATAIN
63277 8 10/13/20 DESAMPARADO
63289 18 10/14/20 P. POQUITA
R. BATAIN Z. CABALQUINTO
R. BATAIN Z. CABALQUINTO
R. ARIESGA Z. CABALQUINTO
63237 1946 10/8/20 P. OPQUERIA
E. ARIESGA Z. CABALQUINTO
63268 500 10/12/20 P.OPQUERIA
63287 4 10/14/20 DESAMPARADO
KAMP. Z. CABALQUINTO
KODIA 64233 Z. CABALQUINTO
63197 18 10/3/20 R. BATAIN
63199 21 10/3/20 SEVILLENO
63215 7 10/6/20 SEVILLENO
63223 15 10/6/20 R. BATAIN
KODIA 64233 Z. CABALQUINTO
63269 15 10/12/20 SEVILLENO
63284 12 10/13/20 LAYESE
63299 18 10/15/20 SISDUYRO
63300 12 10/15/20 LAYESE
KODIA Z. CABALQUINTO
63215 35 10/6/20 SEVILLENO
63223 25 10/6/20 R. BATAIN
63254 35 10/10/20 R. BATAIN
63269 5 10/12/20 SEVILLENO
KAMP. Z. CABALQUINTO
63210 2 10/5/20 DESAMPARADO
63220 2 10/6/20 IBARDOLASA
63231 1 10/7/20 IBARDOLASA
63271 2 10/12/20 0PLA
63277 2 10/13/20 DESAMPARADO
63295 2 10/15/20 DESAMPARADO
U BEST Z CABALQUINTO
63215 4 10/6/20 SEVILLENO
63217 4 10/6/20 R. BATAIN
63218 4 10/6/20 DESAMPARADO
63219 4 10/6/20 P. OPQUERIA
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
REMARKS BALANCE
3434
SIDE WALK ROAD 10 3419
COLUMN BLK 35 3409
TUCALO BLK 28 3394
C H B FAB BANAWA 3379
C H B FAB. ARIESGA 3359
S O G BLK 34 3313
SIDE WALK ROAD 10 3293
TUCALO BLK 28 3278
C H B FAB. ARIESGA 3238
C H B FAB. BATAIN 3198
C H B FAB. ARIESGA 3178
C H B FAB BANAWA 3158
SIDE WALK ROAD 6 3138
S O G BLK 5 3126
C H B FAB. ARIESGA 3111
S O G BLK 34 3061
MANHOLE ROAD 11 3051
S O G BLK 28 2991
C H B FAB. ARIESGA 2971
COLUMN BLK14-15 2961
S O G BLK 34 2949
S O G BLK 5 2913
COLUMN BLK14-15 2893
S O G BLK 5 2857
COLUMN BLK 28 2852
C CREATE POURING ROAD 11 2692
C H B FAB. ARIESGA 2672
SIDE WALK ROAD 12 2662
C H B FAB. BATAIN 2652
R C P FAB. BANAWA 2632
S O G BLK 5 2608
C H B FAB BANAWA 2598
S O G BLK 3 LOT 1-7 2550
SIDE WALK ROAD 10 2544
S O G BLK 34-35 2460
C H B FAB BANAWA 2455
C H B FAB. BATAIN 2445
C H B FAB. ARIESGA 2425
S O G BLK 3 LOT 1-7 2370
SIDE WALK ROAD 12 2360
COLUMN BLK 28 2355
R C P FAB. BANAWA 2345
C H B FAB BANAWA 2338
C H B FAB. ARIESGA 2318
C H B FAB. BATAIN 2298
S O G BLK 11 LOT 1-6 2226
S O G BLK 34-35 2216
SIDE WALK ROAD 10 2196
COLUMN BLK 28 2181
BEAM BLK 14-15 2166
R C P FAB BANAWA 2156
C H B FAB. BANAWA 2150
C H B FAB. ARIESGA 2135
S O G BLK 20 2115
SIDE WALK ROAD 10 2105
COLUMN BLK 28 2090
S O G BLK 34-35 2030
COLUMN BLK 14-15 2020
FAB. SEPTIK COVER BLK 35 2010
S O G BLK 20LOT 27-29 1999
S O G BLK 11 LOT 1-6 1984
COLUMN BLK 28 1979
C- CREATE POURING ROAD 10 1787
R C P FAB BANAWA 1777
CURVE N' GUTTER ROAD 12 1762
S O G BLK 14 1752
STAGING AT SITE VM-3 2832
2832
2832
2832
2,255.00
PLASTERRING BLK 20 2,215.00
SIDE WALK ROAD 10 2,205.00
FAB. SEPTIK COVER BLK 35 2,195.00
C H B LAYING BLK 28 2,170.00
KITCHEN COUNTER BLK 20 2,164.00
PLASTERRING BLK 16 LOT 1-6 2,154.00
KITCHEN COUNTER BLK 6 LOT 1-3 2,148.00
PLASTER BLK16 2,128.00
C H B BLK 14-15 2,098.00
C H B LAYING BLK 28 2,078.00
PLASTER BLK 17 2,058.00
PLASTER BLK 33 2,048.00
PLASTER BLK 16 2,038.00
PLASTER BLK 20 2,013.00
PLASTER BLK16 2,003.00
MANHOLE ROAD 11 1,998.00
FIRE WALL BLK 20 1,988.00
C H B BLK 28 1,968.00
PLASTERRING BLK 17 LOT 1-8 1,958.00
C H B BLK 28 1,928.00
PLASTERRING BLK 17 LOT 1-8 1,908.00
KITCHEN COUNTER BLK 20 1,903.00
C H B LAYING BLK 28 1,888.00
PLASTERRING BLK 20 1,863.00
PLASTERRING BLK 4 1,853.00
CURVE N' GUTTER ROAD 11 1,838.00
C H B BLK 14-15 1,828.00
C H B LAYING BLK 28 1,804.00
KITCHEN COUNTER BLK 20 1,799.00
FIRE WALL BLK 20 1,789.00
C H B C.R BLK 28 1,784.00
PLASTERRING BLK 17 LOT 1-8 1,764.00
PLASTERRING BLK 20 1,734.00
C H B BLK 28 LOT 1-8 1,719.00
PLASTERRING BLK 17 LOT 1-8 1,714.00
C H B BLK 14-15 1,699.00
FIRE WALL BLK 20 1,689.00
COLUMN BLK 28 1,674.00
PLASTERRING BLK 17 LOT 1-8 1,654.00
PLASTERRING BLK 16 LOT 1-6 1,646.00
C H B BLK 14-15 1,626.00
FIRE WALL BLK 20 1,611.00
C H B BLK 28 1,606.00
PLASTERE BLK 20,33 1,591.00
PLASTERRING BLK 20 1,576.00
KITCHEN COUNTER BLK 28 1,561.00
C H B BLK 28 1,556.00
STAGING AT SITE VM-3 2,636.00
2,636.00
2,636.00
2,636.00
7,642.00
FAB. SEPTIK COVER BLK 35 7,592.00
C H B LAYING BLK 28 7,582.00
S O G BLK 5 7,522.00
S O G BLK 34 7,462.00
S O G BLK 5 7,407.00
S O G BLK 34 7,317.00
S O G BLK 28 7,226.00
MANHOLE ROAD 11 7,211.00
FIRE WALL BLK 20 7,201.00
C H B BLK 28 7,191.00
S O G BLK 34 7,141.00
C H B BLK 28 7,131.00
S O G BLK 34 7,071.00
CURVE N' GUTTER ROAD 11 7,061.00
MATTING S O G BLK3 LOT 5-6 7,037.00
S O G BLK 34 7,017.00
C H B LAYING BLK 28 7,007.00
S O G BLK 11 6,907.00
FIRE WALL BLK 20 6,897.00
S O G BLK 34-35 6,877.00
C H B BLK 28 LOT 1-8 6,862.00
S O G BLK 11 6,802.00
S O G BLK 20 6,742.00
COLUMN BLK 28 6,722.00
S O G BLK 34-35 6,692.00
S O G BLK 14-15 6,642.00
FAB. SEPTIK COVER BLK 35 6,592.00
KITCHEN COUNTER BLK 28 6,532.00
6,532.00
6,532.00
6,532.00
6,532.00
6,532.00
1,572.00
KITCHEN COUNTER BLK 5 1,562.00
STYRUP BLK 28 1,462.00
C H B BLK 28 1,452.00
C H B BLK 28 1,432.00
STOCKA BLK ROAD 11 1,392.00
CURVE N' GUTTER ROAD 11 1,382.00
C H B LAYING BLK 28 1,362.00
C H B BLK 28 LOT 1-8 1,347.00
VERTICAL / STYRUP BLK 1 1,297.00
STYRUP BLK 1LOT 1-14 1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
1,247.00
400.00
TUCALO BLK 1 350.00
TUCALO BLK 1 300.00
350.00
COLUMN BLK 28 310.00
COLUMN BLK 28 305.00
305.00
305.00
305.00
305.00
248.00
SIDE WALK ROAD 10 246.00
FAB. SEPTIK COVER BLK 35 242.00
C H B LAYING BLK 28 238.00
S O G BLK 5 233.00
TUCALO BLK 28 228.00
S O G BLK 34 223.00
S O G BLK 5 217.00
STYRUP BLK 28 210.00
SIDE WALK ROAD 6 209.00
S O G BLK 34 204.00
COLUMN BLK 28 198.00
ELECTRICAL BLK 34 196.00
MANHOLE ROAD 11 195.00
FIRE WALL BLK 20 185.00
C H B BLK 28 179.00
S O G BLK 34 175.00
C H B BLK 28 169.00
COLUMN BLK14-15 166.00
S O G BLK 34 162.00
C H B LAYING BLK 28 157.00
CURVE N' GUTTER ROAD 11 155.00
ELECTRICAL BLK 28 153.00
C H B BLK 28 148.00
SIDE WALK ROAD 12 147.00
C H B LAYING BLK 28 142.00
S O G BLK 11 138.00
SIDE WALK ROAD 12 136.00
C H B C.R BLK 28 131.00
COLUMN BLK14-15 129.00
C H B BLK 28 LOT 1-8 125.00
C H B BLK 14-15 124.00
R C P FAB BANAWA 123.00
ELECTRICAL BLK 28 121.00
S O G BLK 11 117.00
S O G BLK 20 115.00
COLUMN BLK 28 111.00
S O G BLK 14-15 109.00
FAB. SEPTIK COVER BLK 35 107.00
C H B BLK 28 105.00
R C P FAB BANAWA 103.00
VERTICAL / STYRUP BLK 1 98.00
KITCHEN COUNTER BLK 28 93.00
STYRUP / TUCALO BLK 1 43.00
43.00
43.00
43.00
227.00
S O G BLK 34 223.00
S O G BLK 28 220.00
S O G BLK 34 216.00
S O G BLK 28 209.00
COLUMN BLK14-15 204.00
S O G BLK 5 194.00
S O G BLK 3 LOT 1-7 189.00
S O G BLK 34-35 182.00
LOADING TO DT-73 DT88 DT39 229.08
S O G BLK 3 LOT 1-7 224.08
R C P FAB. BANAWA 220.08
S O G BLK 34-35 217.08
SIDE WALK ROAD 10 215.08
C H B BLK 28 LOT 1-8 212.08
S O G BLK 20 202.08
FAB. SEPTIK COVER BLK 35 198.08
S O G BLK 11 LOT 1-6 188.08
R C P FAB BANAWA 183.08
183.08
183.08
183.08
183.08
91.08
LOADING TO DT-88 144.15
SIDE WALK ROAD 10 140.15
FAB. SEPTIK COVER BLK 35 138.15
S O G BLK 5 134.15
TUCALO BLK 28 129.15
SIDE WALK ROAD 10 126.15
S O G BLK 5 116.15
S O G BLK 34 112.15
S O G BLK 34 98.67
C CREATE POURING ROAD 11 83.67
S O G BLK 11 LOT 1-8 70.19
S O G BLK 34-35 65.19
S O G BLK 11 57.19
C- CREATE POURING ROAD 10 39.19
91.08
PLASTERRING BLK 20 86.08
SIDE WALK ROAD 10 84.08
FAB. SEPTIK COVER BLK 35 80.08
S O G BLK 5 75.08
TUCALO BLK 28 71.08
C H B FAB BANAWA 61.08
C H B FAB. ARIESGA 55.08
PLASTERRING BLK 16 LOT 1-6 51.08
S O G BLK 34 46.08
SIDE WALK ROAD 10 44.08
S O G BLK 5 42.08
PLASTER BLK16 39.08
C H B FAB. ARIESGA 24.08
C H B FAB. BATAIN 20.08
C H B FAB BANAWA 15.08
S O G BLK 5 10.08
LOADING TO DT-88 45.46
S O G BLK 34 41.46
S O G BLK 28 33.46
C H B FAB. ARIESGA 30.46
LOADING TO DT-88 83.53
PLASTERRING BLK 20 79.53
S O G BLK 5 74.53
C H B BLK 28 69.53
PLASTERRING BLK 17 LOT 1-8 81.44
LOADING TO DT-73 81.44
S O G BLK 34-35 71.44
C H B LAYING BLK 28 64.44
C CREATE POURING ROAD 11 44.44
C H B FAB. ARIESGA 40.44
SIDE WALK ROAD 12 38.44
C H B FAB. BATAIN 36.44
C H B FAB. BATAIN 34.44
C H B FAB BANAWA 26.44
S O G BLK 3 LOT 1-7 19.44
S O G BLK 34-35 11.44
S O G BLK 11 1.44
LOADING TO DT-88 DT-73 35.04
C H B FAB. BATAIN 32.04
C H B FAB. ARIESGA 28.04
S O G BLK 3 LOT 1-7 23.04
C H B C.R BLK 28 17.04
R C P FAB. BANAWA 13.04
C H B FAB. ARIESGA 8.04
LOADING TO DT-88 43.42
PLASTERRING BLK 20 40.42
S O G BLK 34-35 38.42
C H B BLK 28 LOT 1-8 34.42
LOADING TO DT-88 DT-73 DT-39 81.5
S O G BLK 11 71.5
S O G BLK 20 61.5
COLUMN BLK 28 56.5
S O G BLK 34-35 53.5
PLASTERRING BLK 17 LOT 1-8 48.5
FAB. SEPTIK COVER BLK 35 44.5
S O G BLK 11 LOT 1-6 41.5
C H B BLK 28 38.5
C- CREATE POURING ROAD 10 14.5
R C P FAB BANAWA 9.5
PLASTERRING BLK 20 7.5
PLASTERRING BLK 17 LOT 1-8 4.5
PLASTERRING BLK6 LOY 1-6 0
LOADING TO DT-88 DT-73 33.06
33.06
33.06
33.06
185.00
FAB. ON SITE 433.00
FAB. ON SITE 652.00
FAB. ON SITE 7,523.00
C H B BLK28 LOT 1-7 5,577.00
FAB. ON SITE VM-3 12,448.00
C H B BLK 28 LOT 1-8 11,948.00
KITCHEN COUNTER BLK 28 11,944.00
11,944.00
11,944.00
11,944.00
11,944.00
11,944.00
11,944.00
56.00
471.00
248.00
ROOFING INSTL. BLK 17 152.00
152.00
152.00
152.00
152.00
2,500.00
1,000.00
198.00
1.00
BARROWED FM KODIA 91.00
S O G BLK 34 73.00
S O G BLK 28 52.00
S O G BLK 28 45.00
S O G BLK 34-35 30.00
BARROWED FM KODIA 130.00
STORM SEWER BLK 20 115.00
S O G BLK 14 103.00
S O G BLK 6 LOT 1-6 85.00
S O G BLK 14 73.00
73.00
89.00
STORM / SEWER BLK 11 81.00
S O G BLK 34 75.00
S O G BLK 28 68.00
S O G BLK 28 61.00
S O G BLK 34-35 56.00
S O G BLK 34-35 49.00
STORM SEWER BLK 20 44.00
S O G BLK 14 40.00
S O G BLK 6 LOT 1-6 34.00
S O G BLK 14 30.00
30.00
30.00
30.00
89.00
STORM / SEWER BLK 11 81.00
S O G BLK 34 75.00
S O G BLK 28 68.00
S O G BLK 28 61.00
S O G BLK 34-35 56.00
S O G BLK 34-35 49.00
STORM SEWER BLK 20 44.00
S O G BLK 14 40.00
S O G BLK 6 LOT 1-6 34.00
S O G BLK 14 30.00
30.00
30.00
30.00
3.00
10.00
799.00
STORM / SEWER BLK 11 798.00
STORM / SEWER BLK 28 797.00
STORM / SEWER BLK 28 796.00
STORM / SEWER BLK 34 794.00
S O G BLK 28 792.00
S O G BLK 34-35 791.00
S O G BLK 34-35 789.00
STORM SEWER BLK 20 787.00
S O G BLK 6 LOT 1-6 785.00
671.00
STORM / SEWER BLK 11 663.00
STORM / SEWER BLK 28 661.00
STORM / SEWER BLK 28 658.00
S O G BLK 28 651.00
S O G BLK 34-35 646.00
S O G BLK 34-35 639.00
STORM SEWER BLK 20 634.00
S O G BLK 14 630.00
S O G BLK 6 LOT 1-6 624.00
S O G BLK 14 620.00
620.00
186.00
180.00
899.00
STORM / SEWER BLK 11 891.00
STORM / SEWER BLK 28 889.00
STORM / SEWER BLK 28 886.00
S O G BLK 28 879.00
S O G BLK 34-35 874.00
S O G BLK 34-35 867.00
STORM SEWER BLK 20 862.00
S O G BLK 14 858.00
S O G BLK 6 LOT 1-6 852.00
S O G BLK 14 848.00
848.00
848.00
LAYESE S O G BLK 14
200.00
596.00
500.00
ELECTRICAL BLK 34 440.00
ELECTRICAL BLK 28 380.00
S O G BLK 34-35 359.00
ELECTRICAL BLK 28 299.00
299.00
299.00
140.00
3.00
10.00
4.00
2.00
1.00
2.00
45.00
1.00
210.00
S O G BLK 28 209.00
S O G BLK 34-35 208.00
S O G BLK 6 LOT 1-6 207.00
207.00
2.00
RETURN TO KAMP. -
13.00
RETURN TO KAMP. -
1.00
2.00
RETURN TO KAMP. -
2.00
RETURN TO KAMP. -
1.00
1.00
303.00
28.00
54.00
229.00
150.00
2.00
25.00
24.00
PLASTERRING BLK 20 23.00
C H B LAYING BLK 28 22.00
S O G BLK 5 21.00
STORM / SEWER BLK 11 20.00
C H B C.R BLK 28 18.00
KITCHEN COUNTER BLK 28 17.00
C H B BLK 28 15.00
15.00
15.00
1.00
C H B BLK 28 -
9.00
ROOFING INSTL. BLK 17 6.00
PICK UP 16.00
PAINTING ANGLE BARS 14.00
14.00
14.00
20.00
41.00
TUCKING ANGLE BAR BLK30 40.00
TUCKING ANGLE BAR BLK30 39.00
39.00
23.00
10.00
15.00
4.00
41.00
2.00
11.00
220.00
100.00
COLUMN BLK14-15 95.00
95.00
95.00
95.00
95.00
5.00
S O G BLK 5 -
LOADING TO DT-39 100.00
INTL. DOOR JAMB BLK 11 95.00
TUCKING C- PURLINS BLK 18 85.00
85.00
85.00
85.00
12.00
LOADING TO ST-06 64.00
PAINTING C PURLINS 62.00
PAINTING ANGLE BAR 60.00
PAINTING ANGLE BAR 59.00
PAINTING ANGLE BARS 57.00
PAINTING ANGLE BARS 55.00
PAINTING ANGLE BARS 53.00
53.00
14.00
PAINTING C PURLINS 12.00
PAINTING ANGLE BAR 10.00
PAINTING ANGLE BARS 8.00
PAINTING ANGLE BARS 7.00
PAINTING ANGLE BARS 6.00
360.00
1.00
PURCHASE 22.00
S O G BLK 28 18.00
S O G BLK 34 14.00
S O G BLK 5 10.00
C H B BLK 28 6.00
6.00
6.00
42900
SUBJECT MATERIALS MONITORING 54000
PROJECT :VILLA MERCEDEZ 3 SILLON 2860
DATE; OCT. 1 TO 15 2020
QTY UM
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 67,308
MASONRY CEMENT 39,750.00 60,630
BAGS
KLS
3/4 GRAVEL AGGREGATES 1,055.45 361
CU.M
CU.M
CU.M
CU.M
CU.M
C H B 6' 71,779
PCS
PCS
PCS
C H B 4' 47,815
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
SWITCH OMNI 5
2 GANG OUTLET 3
MALE FLUG 3
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
KLS
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 51 PCS
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
PREPARED BY:
Z. CABALQUINTO
WAREHOUSEMAN
DELIVERY FR. H.O
48.82 CHARGE MTRL'S
R.C.P. SILLION
85800 C H B BANAWA
215.8 FROM VM-1
UNI
T
TOTAL DELIVERIES COS PO # ISSUANCES
T STOCK AS OF
QTY DATE SUPPLIERAPR. 16 TO 30 2020 MIS # QTY DATE ISSUED
2832
CURVE N' GUTTER ROAD 10 2807
TUCALO BLK 1 2787
S O G BLK 14 2737
S O G BLK 17 2701
SIDE WALK ROAD 10 2686
SIDE WALK ROAD 12 2666
R C P FAB. BANAWA 2656
S O G BLK 14 2626
SIDE WALK ROAD 12 2611
S O G BLK 17 2587
SIDE WALK ROAD 12 2572
CROSS BEAM BLK 19 2557
S O G BLK 14 2509
SIDE WALK ROAD 12 2479
C H B BLK 1 2469
S O G BLK 17 2433
HEADER BLK 19 2428
S O G BLK 14 2388
R C P FAB. BANAWA 2378
SIDE WALK ROAD 11 2363
COLUMN BLK 1 2353
HEADER BLK 19 2348
PLASTERRING BLK 34 LOT 1-16 2318
LOADING TO ST-06 2168
SIDE WALK ROAD 11 2148
FAB. SEPTIK COVER BLK 19 2138
SIDE WALK ROAD 11 2118
COLUMN BLK 1 2108
FAB. SEPTIK COVER BLK 19 2098
ALLEY 11 2058
S O G BLK 19 2028
COLUMN BLK 1 2018
FAB. SEPTIK COVER BLK 19 2006
C HARGE TO KAMP. 1856
R C P FAB. BANAWA 1846
C H B FAB. R. BATAIN 1836
CHARGE TO KAMP. 1686
SIDE WALK ROAD 11 1671
S O G BLK 19 1659
S O G BLK 19 1623
C H B FAB. R. BATAIN 1603
BEAM BLK 1 1597
S O G BLK 19 1573
S O G BLK 19 1549
R C P FAB. BANAWA 1529
C H B FAB R. BATAIN 1499
LOADING TO ST-06 1199
C H B FAB. ARRIESGA 1189
S O G BLK 17 1165
S O G BLK 19 1135
1135
1135
1135
1135
1135
1135
1135
1135
2,636.00
CURVE N/GTTER 2,611.00
PLASTERRING BLK 33 2,581.00
PLASTERRING BLK 7 LOT 1-16 2,556.00
C H B BLK 14 2,526.00
PLASTERRING BLK 17 2,506.00
KITCHEN COUNTER BLK 3 2,491.00
PLASTERRING BLK 7 LOT 1-16 2,471.00
PLASTERRING BLK 33 2,447.00
PLASTERRING BLK 16 2,442.00
PLASTERRING BLK 33-34 2,402.00
KITCHEN COUNTER BLK 4 2,382.00
C H B BLK 1 LOT 1-14 2,362.00
PLASTERRING BLK 17 2,352.00
PLASTERRING BLK 8 LOT 1-16 2,322.00
C H B BLK 1 LOT 1-14 2,280.00
FIRE WALL BLK 17 2,250.00
PLASTERRING BLK 33-34 2,220.00
C H B BLK 19 LOT11-27 2,185.00
PLASTERRING BLK 5 LOT 1-8 2,155.00
PLASTERRING BLK 8 LOT 1-16 2,120.00
C H B BLK 1 LOT 1-14 2,070.00
PLASTERRING BLK 33-34 2,020.00
CH B LAYING BLK 19 1,990.00
PLASTER BLK 8, 9,23 1,960.00
KITCHEN COUNTER BLK 6.7 1,925.00
PLASTERRING BLK 5 LOT 1-8 1,900.00
C H B BLK 14-15 1,890.00
C H B BLK 1 1,850.00
HEADER BLK 19 1,825.00
PLASTERRING BLK 34 1,775.00
PLASTER BLK 23,31 1,730.00
C H B BLK 14 1,690.00
C H B BLK 14 1,655.00
C H B C.R BLK 1 1,635.00
C H B BLK 19 LOT11-27 1,610.00
C H B SEPTIK BLK 4 LOT 1-8 1,565.00
PLASTERRING BLK 34 1,535.00
PLASTERRING BLK 5 LOT 1-8 1,505.00
LOADING TO ST-06 1,355.00
C H B C.R BLK 1 LOT 1-8 1,325.00
KITCHEN COUNTER BLK 6.7 1,300.00
FAB. SEPTIK COVER BLK 19 1,290.00
C H B SEPTIK BLK 4 LOT 1-8 1,270.00
C H B C.R BLK 1 LOT 1-14 1,250.00
C H B SEPTIK BLK 4 LOT 1-8 1,205.00
FAB. SEPTIK COVER BLK 19 1,175.00
KITCHEN COUNTER BLK 6.7 1,145.00
PLASTERRING BLK 3 LOT 1-7 1,120.00
C H B BLK 15 LOT 1-10 1,100.00
MAN HOLE ROAD 11 1,090.00
KITCHEN COUNTER BLK 5,6,7 1,060.00
COLUMN BLK 1 1,050.00
COLUMN BLK 1 1,015.00
FAB. SEPTIK COVER BLK 19 990.00
PLASTERRING BLK 34 940.00
PLASTERRING BLK 5 LOT 1-6 910.00
C H B SEPTIK BLK 5 LOT 1-8 880.00
C HARGE TO KAMP. 730.00
C H B LAYING BLK 14 695.00
CHARGE TO KAMP. 545.00
FAB. SEPTIK COVER BLK 19 530.00
KITCHEN COUNTER BLK 6.7 494.00
PLASTERRING BLK 5 LOT 1-6 464.00
C H B SEPTIK BLK 5 LOT 1-8 444.00
PLASTERRING BLK 34 414.00
C H B BLK 3 LOT 1-8 394.00
C H B SEPTIK BLK 22 LOT 1-16 364.00
SEPTIK BLK 21 C H B 343.00
PLASTERRING BLK 5 LOT 1-8 318.00
PLASTERRING BLK 34 248.00
MAN HOLE ROAD 12 228.00
C H B BLK 14-15 198.00
LOADING TO ST-06 298.00
C H B SEPTIK BLK 22 LOT 1-16 278.00
C H B SEPTIK BLK 22 LOT 1-16 263.00
PLASTERRING BLK 5 LOT 1-8 248.00
PLASTERRING BLK 3 243.00
C H B SEPTIK BLK 21 223.00
C H B SEPTIK BLK 21 198.00
FIRE WALL BLK 16 174.00
FAB. SEPTIK COVR BLK 19 144.00
C H B SEPTIK BLK 22 LOT 1-16 124.00
PLASTERRING BLK 34-35 99.00
PLASTERRING BLK 3 89.00
89.00
89.00
MATTING BLK 28
S O G BLK 14
FAB. SEPTIK COVER 6,532.00
SIDE WALK ROAD 10 6,472.00
S O G BLK 17 6,412.00
C H B BLK 1 LOT 1-14 6,312.00
S O G BLK 14 6,292.00
C H B BLK 1 LOT 1-14 6,232.00
S O G BLK 17 6,212.00
C H B BLK 19 LOT11-27 6,197.00
C H B BLK 1 LOT 1-14 6,177.00
CROSS BEAM BLK 19 6,117.00
C H B BLK 1 6,107.00
C H B C.R BLK 1 6,097.00
C H B SEPTIK BLK 4 LOT 1-8 6,082.00
C H B C.R BLK 1 LOT 1-8 6,072.00
KITCHEN COUNTER BLK 6.7 6,057.00
FAB. SEPTIK COVER BLK 19 6,027.00
C H B C.R BLK 1 LOT 1-14 6,017.00
KITCHEN COUNTER BLK 6.7 6,002.00
C H B BLK 15 LOT 1-10 5,972.00
COLUMN BLK 1 5,962.00
C H B SEPTIK BLK 5 LOT 1-8 5,947.00
FAB. SEPTIK COVER BLK 19 5,927.00
S O G BLK 19 5,827.00
S O G BLK 19 5,787.00
R C P FAB. BANAWA 5,747.00
C H B SEPTIK BLK 22 LOT 1-16 5,717.00
C H B SEPTIK BLK 22 LOT 1-16 5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
5,707.00
1,572.00
STYRUP BLK 1 1,522.00
DPWELL BLK 28 1,502.00
STYRUP BLK 1 1,477.00
C H B BLK 1 LOT 1-14 1,457.00
STYRUP BLK 14 1,257.00
C H B BLK 1 LOT 1-14 1,237.00
C H B BLK 1 LOT 1-14 1,227.00
CROSS BEAM BLK 19 1,212.00
C H B C.R BLK 1 1,202.00
C H B SEPTIK BLK 4 LOT 1-8 1,172.00
C H B C.R BLK 1 LOT 1-8 1,162.00
C H B SEPTIK BLK 4 LOT 1-8 1,152.00
C H B C.R BLK 1 LOT 1-14 1,142.00
COLUMN BLK 1 1,132.00
C H B SEPTIK BLK 5 LOT 1-8 1,102.00
C H B SEPTIK BLK 22 LOT 1-16 1,072.00
S O G BLK 19 1,057.00
S O G BLK 19 1,037.00
DOWELL ROAD ROAD 12 1,017.00
C H B SEPTIK BLK 22 LOT 1-16 1,007.00
1,007.00
1,007.00
1,007.00
330.00
DOWELL HEADER BLK 20 320.00
MATTING BLK 14-15 290.00
290.00
305.00
COLUMN BLK 1 285.00
ENCLINE BEAM BLK 1 260.00
BEAM BLK 14 150.00
MATTING BLK 14 135.00
135.00
135.00
44.00
FAB. SEPTIK COVER 43.00
SIDE WALK ROAD 10 41.00
ENCLINE BEAM BLK 1 40.00
SIDE WALK ROAD 12 35.00
DOWELL HEADER BLK 20 34.00
R C P FAB. BANAWA 32.00
C H B BLK 1 LOT 1-14 30.00
S O G BLK 17 27.00
C H B BLK 19 LOT11-27 24.00
C H B BLK 1 LOT 1-14 22.00
CROSS BEAM BLK 19 18.00
KITCHEN COUNTER BLK 6.7 16.00
SIDE WALK ROAD 12 14.00
C H B BLK 1 12.00
C H B C.R BLK 1 LOT 1-8 8.00
KITCHEN COUNTER BLK 6.7 6.00
FAB. SEPTIK COVER BLK 19 4.00
SIDE WALK ROAD 11 2.00
PICK UP TO KODIA 1.00
C H B C.R BLK 1 LOT 1-14 51.00
FAB. SEPTIK COVER BLK 19 48.00
KITCHEN COUNTER BLK 6.7 44.00
C H B BLK 15 LOT 1-10 40.00
COLUMN BLK 1 37.00
FAB. SEPTIK COVER BLK 19 34.00
SIDE WALK ROAD 11 32.00
C H B SEPTIK BLK 21 29.00
S O G BLK 19 25.00
S O G BLK 19 22.00
R C P FAB. BANAWA 20.00
S O G BLK 19 16.00
C H B SEPTIK BLK 22 LOT 1-16 14.00
PLASTERRING BLK 34-35 13.00
MATTING BLK 14 10.00
10.00
10.00
227.00
S O G BLK 17 223.00
SIDE WALK ROAD 12 221.00
FAB. SEPTIK COVER BLK 19 218.00
R C P FAB. BANAWA 214.00
KITCHEN COUNTER BLK 6.7 211.00
S O G BLK 19 201.00
FAB. SEPTIK COVR BLK 19 196.00
196.00
196.00
S O G BLK 14 1,625.00
FIRE WALL BLK 17 1,125.00
ENCLINE BEAM BLK 1 825.00
S O G BLK 17 325.00
C H B BLK 14-15 125.00
LOADING TO ST-06 800.00
C H B BLK 1 LOT 1-8
LOADING TO DT-73 -
C H B BLK 15 LOT 1-10 800.00
LOADING TO ST-06
C H B FIRE WALL BLK 17 LOT 1-8 770.00
-
800.00
-
11,944.00
S O G BLK 14 10,944.00
DOWELL HEADER BLK 20 7,886.00
BEAM BLK 14 7,386.00
KITCHEN COUNTER BLK 6.7 7,086.00
C H B BLK 14-15 4,306.00
MAN HOLE ROAD 12 4,106.00
C H B BLK 1 3,606.00
C H B BLK 19 3,106.00
PLASTER BLK 23,31 2,906.00
C H B BLK 19 LOT11-27 2,606.00
C H B SEPTIK BLK 4 LOT 1-8 2,106.00
C H B BLK 1 1,606.00
C H B SEPTIK BLK 5 LOT 1-8 1,306.00
C H B SEPTIK BLK 22 LOT 1-16 1,006.00
C H B SEPTIK BLK 22 LOT 1-16 506.00
-
471.00
KITCHEN COUNTER BLK 6.7 457.00
457.00
457.00
198.00
KITCHEN COUNTER BLK 6.7 168.00
168.00
168.00
-
198.00
STORM SEWER BLK 28 190.00
STORM SEWER BLK17,19,20 125.00
125.00
30.00
STORM SEWER BLK 28 22.00
STORM SEWER BLK 17 17.00
STORM SEWER BLK 19 9.00
9.00
30.00
STORM SEWER BLK 28 22.00
STORM SEWER BLK 17 17.00
STORM SEWER BLK 19 9.00
9.00
3.00
10.00
785.00
STORM SEWER BLK 28 783.00
STORM SEWER BLK 17 782.00
782.00
782.00
782.00
782.00
782.00
782.00
620.00
STORM SEWER BLK 28 612.00
STORM SEWER BLK 17 607.00
607.00
607.00
607.00
607.00
607.00
186
186.00
186.00
200.00
848.00
STORM SEWER BLK 28 840.00
STORM SEWER BLK 17 835.00
835.00
835.00
835.00
835.00
835.00
835.00
200.00
596.00
1500
299.00
ELECTRICAL BLK 17 239.00
239.00
239.00
239.00
239.00
140.00
3.00
10.00
4.00
2.00
1.00
2.00
45.00
1.00
207.00
S O G BLK 17 206.00
206.00
206.00
-
1.00
1.00
303.00
28.00
54.00
229.00
150.00
2.00
25.00
S O G BLK 17 23.00
S O G BLK 17 21.00
ROOFING INSTL. BLK 17 16.00
ROOFING INSTL. BLK 17 14.00
14.00
14.00
14.00
15.00
PICK UP TO BNTN HRWR 20.00
KITCHEN COUNTER BLK 6.7 15.00
KITCHEN COUNTER BLK 6.7 13.00
S O G BLK 19 11.00
C H B SEPTIK BLK 22 LOT 1-16 9.00
9.00
9.00
PURCHASE 5.00
ROOFING INSTL. BLK 17 3.00
C H B SEPTIK BLK 4 LOT 1-8 1.00
STORM SEWER BLK 28 -
PURCHASE 5.00
S O G BLK 19 4.00
4.00
4.00
4.00
14.00
KITCHEN COUNTER BLK 6.7 12.00
12.00
12.00
20.00
39.00
7.00
PICK UP 5.00
S O G BLK 17 1.00
KITCHEN COUNTER BLK 6.7 1.00
1.00
23.00
10.00
15.00
4.00
41.00
2.00
11.00
220.00
95.00
85.00
TUCKING C PURLINS BLK 17 75.00
S O G BLK 17 70.00
ROOFING INSTL. BLK 17 65.00
TUCKING C-PURLINS 60.00
60.00
60.00
53.00
PAINTING ANGLE BAR 49.00
ROOFING INSTL. BLK 17 42.00
KITCHEN COUNTER BLK 6.7 40.00
S O G BLK 19 38.00
C H B BLK 14-15 36.00
36.00
36.00
36.00
6.00
PAINTING ANGLE BAR 4.00
PICK UP TO KODIA 3.00
PAINTING ANGLE BAR 2.00
C H B BLK 14-15 1.00
360.00
PICK UP 10.00
C H B SEPTIK BLK 22 LOT 1-16 8.00
C H B SEPTIK BLK 21 6.00
S O G BLK 19 4.00
S O G BLK 19 2.00
DOWELL ROAD ROAD 12 -
-
COLUMN BLK 1
-
DELIVERY FR. H.O
42900 48.82 CHARGE MTRL'S
SUBJECMATERIALS MONITORING 54000 R.C.P. SILLION
PROJEC:VILLA MERCEDEZ 3 SILLON 2860 85800 C H B BANAWA
DATE; NOV. 3 TO 15 2020 215.8 FROM VM-1
ITEM NODESCRIPTION TOTAL TOTAL DELIVERIES UNIT COST PO # STOCK AS ISSUANCES REMARKS BALANCE
REQUIRMENTS OF
QTY UM QTY DATE SUPPLIER APR. 16 TO 30 2020 MIS # QTY DATE ISSUED
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 68,388 1135
BAGS 1080 11/3/20 REPUBLIC Z. CABALQUINTP LOADING TO THRILLER 2215
62914 10 11/3/20 D. RAMIREZ C H B FAB . ARIESGA 2205
62924 10 11/3/20 R. ROSALES R C P. FAB. BANAWA 2195
62927 10 11/4/20 J. CARATAO CURVE' N ' GUTER ROAD 11 2185
62930 36 11/4/20 P.OPQUERIA S O G BLK 19 2149
62932 15 11/4/20 SEVILLENO C H B BLK 21 2134
62940 15 11/5/20 SEVILLENO COLUMN BLK 21 2119
62941 5 11/5/20 LAYESE COLUMN BLK 14 2114
62943 10 11/5/20 R. ROSALES R C P. FAB. BANAWA 2104
62944 10 11/5/20 MATA C H B ARIESGA 2094
62946 96 11/5/20 P.POQUITA C- POURING ROAD 12 1998
62947 36 11/6/20 DESAMPARADO S O G BLK 17 1962
62851 10 11/6/20 SEVILLENO COLUMN BLK 21 1952
62852 10 11/6/20 REBOSITO PLATER BLK 16 1942
62854 12 11/6/20 C.M LAO S O G BLK10 LOT1 1930
62857 180 11/6/20 A. TENORIO C-C POURING ROAD 7 1750
62862 10 11/7/20 D. RAMIREZ C H B FAB . ARIESGA 1740
62865 30 11/9/20 MATA C H B FAB . ARIESGA 1710
62868 10 11/9/20 R. ROSALES R C P. FAB. BANAWA 1700
62877 30 11/9/20 LAYESE BEAM BLK 15 1670
62878 20 11/9/20 R. BATAIN C H B FAB. R. BATAIN 1650
62879 224 11/10/20 A. TENORIO C-C POURING ROAD 7 1426
62881 10 11/10/20 P.OPQUERIA COLUMN BLK 20 1416
62883 30 11/10/20 R.ROSALES C H B FAB. BANAWA 1386
62884 25 11/10/20 SEVILLENO COLUMN BLK 22 1361
62887 70 11/12/20 DESAMPARADO S O G BLK 17 1291
62888 20 11/12/20 J. CARATAO CURVE N' GUTTER ROAD 7 1271
62889 5 11/12/20 R. BATAIN BEAM BLK 22 1266
62890 15 11/12/20 P.OPQUERIA COLUMN BLK 20 1251
62891 20 11/12/20 SEVILLENO COLUMN BLK 22 1231
62893 30 11/12/20 DEMORAL C H B FAB BANAWA 1201
62894 10 11/12/20 R.ROSALES C H B FAB. BANAWA 1191
62897 30 11/13/20 SEVILLENO COLUMN BLK 22 1161
62898 20 11/13/20 R. BATAIN BEAM BLK 22 1141
62899 36 11/13/20 DESAMPARADO S O G BLK 17 1105
62900 15 11/13/20 CARATAO CURVE N; GUTTER ROAD 7 1090
63358 20 11/14/20 R. BATAIN COLUMN BLK 22 1070
63359 30 11/14/20 P.OPQUERIA COLUMN BLK 20 1040
63360 20 11/14/20 SEVILLENO COLUMN BLK 22 1020
63363 15 11/14/20 R. BATAIN C H B FAB. R. BATAIN 1005
63365 20 11/14/20 D. RAMIREZ C H B FAB . ARIESGA 985
985
985
985
985
WASHED SAND 6,811.13 2448.44 CU,M 17.69 11/3/20 KAMP. 61927 R. ARQUIO LOADING TO DT-88 17.69
62921 2 11/3/20 ARONALE PLASTER BLK 16 15.69
CU,M 33.6 11/3/20 KAMP. 61927 R. ARQUIO LOADING TO DT-88 49.29
62928 3 11/4/20 R. BATAIN C H B BLK 22 46.29
62929 2 11/4/20 NIPANGUE PLASTER BLK 3 44.29
62930 3 11/4/20 P.OPQUERIA STYRUP BLK 19 41.29
62933 2 11/4/20 ARONALES PLASTER BLK 16 39.29
62935 2 11/4/20 L. GARCIA PLASTER BLK 5 37.29
62936 4 11/5/20 R. BATAIN C H B BLK 22 33.29
62939 10 11/5/20 DEAMPARADO S O G BLK 17 23.29
62941 5 11/5/20 LAYESE COLUMN BLK 14 18.29
62944 3 11/5/20 MATA C H B ARIESGA 15.29
62946 12 11/5/20 P.POQUITA C- POURING ROAD 12 3.29
CU,M 17.69 11/3/20 KAMP. 61927 R. ARQUIO LOADING TO DT-88 20.98
62950 4 11/6/20 R. BATAIN C H B BLK 22 16.98
62854 5 11/6/20 C.M LAO S O G BLK10 LOT1 11.98
CU,M 33.6 11/7/20 KAMP. 61927 ARQUIO/ BARDINAS LOAD TO DT-88/ 73 45.58
62854 5 11/6/20 L. GARCIA PLASTER BLK 5 40.58
62857 18 11/6/20 P.POQUITA C-C POURING ROAD 7 22.58
62862 3 11/7/20 D. RAMIREZ C H B FAB . ARIESGA 19.58
CU,M 17.69 11/9/20 KAMP. R. ARQUIO LOADING TO DT-88 54.96
62864 3 11/9/20 P.OPQUERIA C H B BLK 20 51.96
62865 5 11/9/20 MATA C H B ARIESGA 46.96
62868 4 11/9/20 R. ROSALES R C P. FAB. BANAWA 42.96
62869 4 11/9/20 NIPANGUE PLASTER BLK 3 38.96
62871 4 11/9/20 L. GARCIA PLASTER BLK 5 34.96
CU,M 17.69 11/10/20 KAMP. 61341 R. ARQUIO LOADING TO DT-88 52.65
62879 28 11/10/20 A. TENORIO C-C POURING ROAD 7 24.65
62880 5 11/10/20 R. BATAIN C HB BLK 22 19.65
62883 5 11/10/20 R.ROSALES C H B FAB. BANAWA 14.65
62884 5 11/10/20 SEVILLENO COLUMN BLK 22 9.65
62886 5 11/10/20 DESAMPARADO S O G BLK 17 4.65
CU,M 2 11/10/20 KAMP. J. LADAO LOADING TO MDT 06 6.65
CU,M 17.69 11/11/20 KAMP. 61365 R. ARQUIO LOADING TO DT-88 24.34
CU,M 17.69 11/12/20 KAMP. 61391 R. ARQUIO LOADING TO DT-88 42.03
CU,M 3 11/10/20 KAMP. J. LADAO LOADING TO MDT 06 45.03
62888 4 11/12/20 J. CARATAO CURVE N' GUTTER ROAD 7 41.03
62889 2 11/12/20 R. BATAIN STYRUP BLK 22 39.03
62891 5 11/12/20 SEVILLENO BEAM BLK 22 34.03
62892 4 11/12/20 L. GARCIA PLASTER BLK 3 . 5 30.03
62893 8 11/12/20 DEMORAL C H B FAB BANAWA 22.03
CU.M 83.11 11/13/20 KAMP. R. ARQUIO/BARDINAS LOADING TO DT-88/DT73 105.14
62898 6 11/13/20 R. BATAIN C H B BLK 22 105.14
63351 4 11/13/20 P.OPQUERIA C H B BLK 20 105.14
63352 5 11/13/20 CANOY PLASTER BLK34 105.14
63355 4 11/13/20 LAYESE C H B BLK 15 105.14
CU.M 3 11/13/20 KAMP. J. LADAO LOADING TO MDT-06 107.14
CU.M 3 11/14/20 KAMP. J. LADAO LOADING TO MDT-06 109.14
CU,M 17.69 11/14/20 KAMP. 61541 R. ARQUIO LOADING TO DT-88 126.93
63358 6 11/14/20 R. BATAIN COLUMN BLK 22 120.93
63359 5 11/14/20 P.OPQUERIA C H B BLK 22 115.93
63360 5 11/14/20 SEVILLENO STYRUP BLK 22 110.93
63361 17.69 11/14/20 L. GARCIA PLASTERRING BLK 11 93.24
63362 2 11/14/20 CANOY PLASTERRING BLK 20 91.24
63363 8 11/14/20 R. BATAIN C H B FAB. R. BATAIN 83.24
63364 2 11/14/20 ARONALES PLASTER BLK 16-17 81.24
63365 7 11/14/20 D. RAMIREZ C H B FAB . ARIESGA 74.24
63364 3 11/14/20 ARONALES PLASTER BLK 16-17 71.24
71.24
71.24
71.24
C H B 6' 76,239 PCS 550 11/4/20 KAMP. TIONGZON LOADING TO ST-06 550.00
62928 550 11/4/20 R. BATAIN C H B BLK 22 -
PCS 550 11/5/20 KAMP. 61759 550 Z. CABALQUINTO LOADING CARGO TRUCK 550.00
62936 550 11/5/20 R. BATAIN C H B BLK 22 -
PCS. 600 11/7/20 KAMP. Z. CABALQUINTO LOADING TO ST-06 600.00
PCS. 800 11/9/20 KAMP. Z. CABALQUINTO LOADING TO ST-06 1,400.00
62864 1400 11/9/20 P.OPQUERIA C H B BLK 20 0.00
61337 600 11/10/20 Z. CABALQUINTO C H B BLK 22 600.00
PCS. 600 11/10/20 KAMP. 62880 6 11/10/20 R. BATAIN LOADING TO ICHIBAN -
PCS. 800 11/10/20 KAMP. Z. CABALQUINTO LOADING TO ST-06 500.00
62884 500 11/10/20 SEVILLENO C H B BLK 22 -
PCS. 560 11/12/20 KAMP. 62880 6 11/10/20 R. BATAIN LOADING TO ICHIBAN 530.00
C H B 4' 53,614 PCS 2719 11/3/20 R. BATAIN Z. CABALQUINTO FAB. ONSITE 2,719.00
62918 500 11/3/20 SEVILLENO SEPTIK DOWELL BLK 21 2,219.00
62938 400 11/5/20 P. OPQUERIA CH B BLK 20 1,819.00
62950 500 11/6/20 R. BATAIN C H B BLK 22 1,319.00
62851 500 11/6/20 SEVILLENO STYRUP BLK 21 819.00
62858 200 11/7/20 R. BATAIN C H B BLK 22 619.00
62862 60 11/7/20 CM. LAO CHARGE TO FF TRADING 559.00
PCS 3080 11/11/20 R. BATAIN Z. CABALQUINTO FAB. ONSITE 3,639.00
62895 400 11/12/20 LAYESE C H B C.R BLK 15 3,239.00
3,239.00
3,239.00
3,239.00
3,239.00
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
UPVC THREADED TEE 1/2 PCS 1000 11/3/20 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 1,000.00
UPVC TREADED ELBOW 1/2 PCS 2000 11/3/20 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 2,000.00
UPVC GATE VALVE/BALL VALVE 20MM PCS 500 11/3/20 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 500.00
UPVC CHECK VALVE 20MM PCS 500 11/3/20 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 500.00
PE COUPLING 1/2
PE TEE 3/4 15 PCS 3.00
FAUCET 1/2
-
-
-
PVC ELBOW 100MMX90 500 11/3/20 186
PCS 300 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 486.00
11/3/20 186.00
PVC ELBOW 100MMX45 300 PCS 300 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 486.00
PVC ELBOW 75MMX90
PVC ELBOW 50MMX45 380 380.00
11/3/20
PVC P-TRAP 50MM 1,000 PCS 1000 H.O MANILA Z. CABALQUINTO LOADING TO ST-06 1,000.00
11/12/20
MALE FLUG 3 BTYN HRDW Z. CABALQUINTO PICK UP 5.00
62899 1 11/13/20 DESAMPARADO ELECTRICAL BLK 19 5.00
5.00
5.00
11/12/20
SAFETY BREAKER 60 AMP. 10 PCS BTYN HRDW Z. CABALQUINTO PICK UP 5.00
63354 1 11/13/20 MALINAO C H B FAB. BANAWA 4.00
62899 1 11/13/20 DESAMPARADO ELECTRICAL BLK 19 3.00
3.00
2.00
WATER LINE PIPE,FITTINGS & SERVICE CONNECTION
UPVC PIPE 100MMX6.0M
UPVC PIPE 75MMX 6.0M W/ O RING 116
45.00
UPVC PIPE 50MMX6.0M PCS
PE TUBING 1/2' 7
1.00
TEFLON TAPE 5 PCS
DRAINAGE SYSTEM 1.00
RCP 900MM 303 PCS
303.00
RCP 750MM 28 PCS
RCP 600MM 54
RCP 450MM 1,558 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WOODEN DOOR & PVC DOOR
PVC DOOR WB-A WHITE W/LOUVER 600MMX2100MM
WOODEN DOOR 700X21000
WOODEN DOOR 100X21000
AMERILOCK 588 LOCKSET STAINLESS
DOOR KNOB 3 PCS
11/5/20
COMMON NAIL 3' 130 KLS 5 BNTY HRWR. Z. CABALQUINTO PURCHASE 5.00
11/11/20 62880 6 11/10/20 R. BATAIN FORM WORKS BLK 22 -
KLS 10 LYN RMJ Z. CABALQUINTO LOADING MDT-06 10.00
62897 2 11/13/20 SEVILLENO C H B BLKI 22 8.00
63351 2 11/13/20 P.OPQUERIA C H B BLK 20 6.00
63358 3 11/14/20 R. BATAIN COLUMN BLK 22 3.00
3.00
3.00
3.00
11/11/20
COMMON NAIL 2'' 10 KLS 10 11/5/20 LYN RMJ Z. CABALQUINTO LOADING MDT-06 10.00
COMMON NAIL 1 1/2'' 60 KLS 5 BNTY HRWR. Z. CABALQUINTO PURCHASE 5.00
62940 5 11/5/20 SEVILLENO COLUMN BLK 21 10.00
63351 2 11/13/20 P.OPQUERIA C H B BLK 22 8.00
UMBRELLA NAIL 3' 4 KLS 8.00
CONCRETE NAIL 4''
CONCRETE NAIL 3'' 25 KLS
CONCRETE NAIL 2'' 60 14.00
11/19/20
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL. 360.00
SHOVEL 51 PCS
11/12/20
MASONRY DRILL BIT 1. 1/2 5 11/12/20 BNTYN HRWR Z. CABALQUINTO PICK UP 5.00
METAL DRILL BIT 1/2 5 BNTYN HRWR Z. CABALQUINTO PICK UP 5.00
11/11/20
HAND GLOVES 20 PCS 20 LYN RMJ Z. CABALQUINTO LOADING MDT-06 20.00
62897 2 11/13/20 SEVILLENO C H B BLKI 22 18.00
62898 2 11/13/20 R. BATAIN C H B BLK 22 16.00
62899 2 11/13/20 DESAMPARADO KTCHN COUNTER BLK19.12 14.00
14.00
14.00
14.00
14.00
14.00
14.00
RUST CONVERTER
ABC SILICONE SEALANT -
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
BAGS
MASONRY CEMENT 39,750.00 62,790
BAGS
DEF.BARS 8MMX6.0M 16,100
DEF.BAR 10MMX6.0M 14,527 PCS
KLS
3/4 GRAVEL AGGREGATES 1,055.45 361
G1 GRAVEL AGGREGATES 4,765.95 505.82
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M.
CU.M.
CU.M.
C H B 6' 84,360
PCS
PCS
PCS
PCS
PCS
PCS
PCS
PCS
C H B 4' 54,278
PCS
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
C-PURLINS1.2X2X6X4.0M 3,056
PLAIN ROUND BAR 12MMX6.0M 1,500.00 229
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
STORM/SEWER LINE
PVC PIPE 100MMX3.0M W/HUB
PVC PIPE 100MMX3.0M W/ O HUB 2575 PCS
PVC PIPE 75MMX3.0M W/HUB
PVC PIPE 75MMX3.0M W/ O HUB
PVC PIPE 50MMX3.0M W/HUB 1458
SWITCH OMNI 5
MALE FLUG 7
PE TUBING 1/2' 7
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 12 PCS
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
WELDING GLOVES 3
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 51 PCS
HAND GLOVES 20
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
PREPARED BY:
Z. CABALQUINTO
WAREHOUSEMAN
DELIVERY FR. H.O
CHARGES TO KAMP. AND KODIA
R.C.P. SILLION
CHARGE MTRL'S
FROM VM-1
UNIT
TOTAL DELIVERIES COST PO # ISSUANCES
STOCK AS OF
QTY DATE SUPPLIER MIS # QTY
63372 15
63375 20
63376 15
1080 11/17/20 REPUBLIC
63379 24
63381 10
63384 30
63386 20
63401 30
63403 10
63391 60
63395 30
63400 24
63411 36
63422 20
63431 20
63437 180
63440 30
63442 24
63443 50
63446 40
63454 20
63455 40
63458 24
63475 60
63476 20
63486 24
62202 10
62215 15
62212 20
62215 150
62221 20
62224 10
62228 20
62230 20
62231 20
62232 15
62232 10
62235 30
62236 10
63369 20
63370 15
63371 20
63372 20
63373 15
63374 10
63375 20
63377 20
1080 11/17/20 REPUBLIC
63379 10
63381 5
63382 5
63383 15
63385 10
63401 20
63402 15
63404 20
63405 10
63406 20
63408 10
63387 30
63388 20
63389 15
63392 10
63393 40
63394 15
63396 10
63397 15
63411 15
63412 20
63413 3
63414 40
63417 13
63418 30
63419 10
63421 20
63425 15
63426 10
63428 20
63429 30
63430 10
63432 30
63435 15
63436 20
63439 10
63442 10
63443 10
63444 12
63445 40
63449 15
63450 10
63451 10
63452 10
63453 10
63457 15
63459 20
63460 10
63461 20
63462 10
63464 20
63465 15
63466 20
63467 30
63468 10
63469 15
63471 10
63472 30
63473 60
63474 20
63476 12
63477 10
63478 15
63479 30
63480 20
63481 40
20 11/26/2020 KAMP 66925
150 11/26/20 KODIA 61108
63483 20
63487 30
63486 15
63493 30
63482 15
63485 20
63488 40
63496 20
63499 20
63491 40
62214 13
62213 7
62207 30
62208 10
62209 40
62211 40
62206 30
62204 20
62205 20
150 11/27/20 KODIA
62216 20
62217 15
62218 20
62219 15
62221 20
62223 30
62250 20
100 11/29/20 KODIA
63369 80
63370 20
63371 20
63372 30
63375 80
63401 70
63402 20
63403 10
63404 80
63387 20
63389 80
63392 40
63400 20
63417 20
63418 30
63420 40
63427 124
63428 20
63429 80
63446 50
63454 20
63456 60
63457 15
63464 20
63471 100
63483 40
63487 30
62210 92
62206 20
62205 100
62212 40
62230 50
62231 40
62233 50
63471 20
63477 10
62212 20
63369 5
63372 4
63375 3
250 11/17/20 KODIA
63380 3
63381 4
63401 3
63402 5
63404 4
63387 5
63389 4
63392 3
63400 2
63415 1
63418 2
63423 2
63425 15
63426 3
63428 3
63429 3
63431 2
63435 1
63446 2
63456 1
63457 6
63461 2
63471 5
63472 2
63476 7
63483 4
63484 9
63487 1
63482 2
62201 2
63484 9
62213 1
62207 2
62210 1
62206 1
62205 4
62212 7
62216 2
62219 2
62230 4
62228 2
62230 4
62231 1
62233 1
62236 5
63369 5
63401 10
63403 3
63389 10
63391 10
63400 3
63458 3
33.6 11/17/20 KAMP.
33.6 11/17/20 KAMP.
15.91 11/17/20 KAMP.
31.8 11/17/20 KAMP.
15.91 11/21/20 KAMP.
63426 3
63437 18
63441 8
63442 4
63443 10
63457 10
17.69 11/25/20 KAMP
63486 5
62205 5
17.69 11/27/20 KAMP
62225 8
63369 10
63370 2
63372 4
63373 3
63374 3
63375 3
63376 5
63377 3
118.5 11/16/20 STA FE
63379 2
49.5 11/16/20 STA FE
63383 3
63384 10
63386 10
63401 5
63402 5
17.69 11/16/20 STA FE
63405 2
63406 3
63408 10
63387 3
63388 3
63389 10
63391 10
63392 2
63393 6
63394 6
63395 10
63396 2
63397 3
63400 3
63411 3
63413 3
63414 3
63417 5
63418 3
63422 6
63425 15
63426 2
63426 3
63428 3
63429 3
63430 2
63437 24
63439 4
63440 5
63441 8
63443 10
63445 2
63449 2
63457 5.32
63472 2
15.95 11/25/20 STA.FE
13.48 11/25/20 STA.FE
17.34 11/25/20 STA.FE
63483 4
63484 5
63487 3
63486 7
63482 2
63492 5
63485 10
63488 9
63496 2
63499 2
63494 2
63491 4
63484 5
62213 2
62207 2
62209 2
62206 3
62204 2
62205 2
62212 3
62216 2
62219 2
62220 2
62223 2
63369 10
63429 44
62205 2
63369 93
63429 286
63472 10
63477 40
62207 2
62204 20
62205 15
62217 10
63378 20
1
63371 5
63410 5
63391 15
63398 12
63415 12
63433 6
63438 24
63447 12
63463 21
63470 100
63371 5
63410 6
63391 5
63398 12
63415 12
63433 6
63438 8
63447 16
63463 7
63470 200
63371 5
63410 9
63391 5
63398 12
63415 12
63433 6
63438 8
63447 24
63458 17
63463 7
63371 25
63382 60
63404 4
63409 30
63391 25
63398 6
63415 6
63438 40
63447 6
63461 8
63463 35
63490 35
62219 18
62226 2
62229 8
63371 2
63409 3
63391 2
63398 12
63415 12
63433 5
63438 2
63447 12
63463 3
63490 2
63497 21
63371 5
63409 9
63391 5
63398 12
63415 12
63433 9
63438 8
63447 24
63463 7
63490 7
63497 21
62226 24
63370 2
63498 8
62226 8
62229 1
63433 3
63447 8
63497 8
62226 8
63409 3
63398 12
63415 18
63433 6
63447 24
63497 24
62226 24
63371 5
63409 6
63391 5
63398 12
63433 6
63438 8
63447 16
63458 9
63463 7
63490 7
63497 16
62226 16
63409 3
63398 6
63415 6
63433 3
63447 8
63497 8
62226 8
63409 3
63398 6
63415 6
63433 3
63447 8
63497 8
62226 8
63409 3
63398 6
63415 6
63433 3
63447 8
63497 8
62227 8
63380 10
63391 10
63400 5
63423 50
63446 6
62201 60
66932 50
62210 8
62203 50 MTRS
63379 50
11/18/20 KAMP.
11/18/20 KAMP.
62203 1
11/18/20 KAMP.
62203 1
11/18/20 KAMP.
63379 4
63379 1
11/18/20 KAMP.
62203 1
11/18/20 KAMP.
62203 1
11/18/20 KAMP.
11/18/20 KODIA
11/18/20 KODIA
11/18/20 KODIA
63490 21
62227 16
63490 7
63498 4
63497 16
62227 16
63490 7
63497 24
62227 24
63401 2
63409 3
63433 1
63438 1
63447 1
63489 1
63490 1
63498 2
62201 1
62226 1
62234 1
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
11/18/20 KAMP.
3 11/20/20 BTYNHRWR
62205 2
20 11/20/20 BTYNHRWR
2 11/20/20 BTYNHRWR
63442 4
63369 3
50 11/20/20 BTYNHRWR
63425 1
63426 1
63426 1
63428 4
63433 1
63456 1
63474 1
63485 1
62204 1
62212 1
62217 2
62228 1
62230 1
62231 4
63490 2
63377 2
63383 1
63385 2
63405 1
63389 1
63413 1
63452 1
63465 1
63468 10
63474 1
63478 1
62213 1
62208 1
62209 1
63404 4
63486 1
63484 1
150 11/28/20 FRM KAMP
63453 10
63462 2
62203 2
62212 3
63404 5
63424 5
63442 4
63442 5
63477 5
63486 5
63378 2
63404 4
63389 2
63442 2
63486 2
62205 2
5 11/17/20 KODIA
63404 1
63389 1
63442 1
63486 1
62205 1
3 11/20/20 BTYNHRWR
62213 1
62230 1
63487 10
63485 4
DATE ISSUED
985
11/16/20 P.OPQUERIA COLUMN BLK 20 970
11/16/20 VILLARUEL COLUMN BLK 22 950
11/16/20 MALINAO C H B FAB. BANAWA 935
Z. CABZLQUINTO WAREHOSE 2015
11/17/20 DESAMPARADO S O G BLK 33 1991
11/17/20 P.OPQUERIA BEAM BLK 20 1981
11/17/20 D. MATA C H B FAB. ARRIESGA 1951
11/17/20 DEMORAL C H B FAB. BANAWA 1931
11/18/20 R. BATAIN S O G BLK 22 1901
11/18/20 R. RASALES R C P FAB. BANAWA 1891
11/19/20 R. BATAIN S O G BLK 22 1831
11/19/20 D. MATA C H B FAB. ARRIESGA 1801
11/20/20 P.OPQUERIA S O G BLK 20 1777
11/20/20 DESAMPARADO S O G BLK 33 1741
11/20/20 MALINAO C H B FAB. BANAWA 1721
11/21/20 R. RASALES R C P FAB. BANAWA 1701
11/21/20 P.POQUITA C- CREATA POURING ROAD 7 1521
11/21/20 D. MATA C H B FAB. ARRIESGA 1491
11/23/20 DESAMPARADO S O G BLK 17 1467
11/23/20 R. BATAIN S O G BLK 22 1417
11/23/20 P.OPQUERIA S O G BLK 20 1377
11/23/20 R. RASALES R C P FAB. BANAWA 1357
11/23/20 D. MATA C H B FAB. ARRIESGA 1317
11/24/20 SEVILLENO S O G BLK 22 1293
11/25/20 SEVILLENO SOG BLK 22 LOT 27-41 1233
11/25/20 C.M.LAO CHARGE TO FF TRADING 1213
11/26/20 DESAMPARADO SOG BLK 3 LOT 1-7 UNITS 1189
11/26/20 R. ROSALES RCP FABRICATION 1179
11/27/20 C.M LAO CHARGE TO FF TRADING 1164
11/27/20 C.M LAO CHARGE TO FF TRADING 1144
11/27/20 L.CANONIGO CHARGE TO KODIA 994
11/28/20 C.M.LAO CHARGE TO FF TRADING 974
11/28/20 A. VILLAROSA PLASTERING BLK 28/3 UINTS 964
11/29/20 P.OFQUIRIA PARAPET @ BLK 34/10 UNITS 944
11/29/20 R.BATAIN CHB FILING & SEPTIC @ BLK 20 924
11/29/20 L. SEVILLENO SEPTIC TANK BLK 22/8 UNITS 904
11/29/20 P.CARABAÑA PLASTERING @ BLK 22/15 UNITS 889
11/29/20 R.DESAMPARADO FIREWALL @ BLK 17 879
11/29/20 R. DELOS REYES PLASTERING BLK 28/3 UINTS 849
11/29/20 C.M.LAO CONCRETE POURING OF COLUMN BLK 32/8 UNITS 839
839
839
839
839
248.00
11/16/20 DESAMPARADO KITCHEN COUNTER BLK 20 228.00
11/16/20 J. CARATAO COLAR RCP ALLEY 15 213.00
11/16/20 R. BATAIN C H B BLK 22 193.00
11/16/20 P.OPQUERIA C H B BLK 20 173.00
11/16/20 NIPANGUE PLASTERRING BLK 3 158.00
11/16/20 SANTILLAN PLASTERRING BLK 16 148.00
11/16/20 VILLARUEL C H B BLK 22 128.00
11/16/20 CANOY PLASTERRING BLK 34 108.00
Z. CABZLQUINTO WAREHOSE 1,188.00
11/17/20 DESAMPARADO KITCHEN COUNTER BLK 20 1,178.00
11/17/20 P.OPQUERIA BEAM BLK 20 1,173.00
11/17/20 J. CARATAO INJECK SEPTIK ALLEY 15 1,168.00
11/17/20 CARABANIA PLASTER BLK20 1,153.00
11/17/20 CANOY PLASTER BLK 34 1,143.00
11/18/20 R. BATAIN C H B BLK 22 1,123.00
11/18/20 SEVILLENO C H B BLK 22 1,108.00
11/18/20 DESAMPARADO KITCHEN COUNTER BLK 20 1,088.00
11/18/20 P.OPQUERIA PLASTERRING BLK 28 1,078.00
11/18/20 CANOY PLASTER BLK 34 1,058.00
11/18/20 CARABANIA PLASTER BLK20 1,048.00
11/19/20 SEVILLENO C H B BLK 22 1,018.00
11/19/20 CANOY PLASTER BLK 34 998.00
11/19/20 DESAMPARADO KITCHEN COUNTER BLK 20 983.00
11/19/20 P.OPQUERIA PLASTERRING BLK 4 973.00
11/19/20 L. GARCIA PLASTERRING BLK 11 933.00
11/19/20 CARABANIA PLASTER BLK20 918.00
11/19/20 SANTILLAN PLASTER BLK 35 908.00
11/19/20 J. CARATAO CURVE N' GUTTER ROAD 7 893.00
11/20/20 DESAMPARADO FIRE WALL BLK 17 878.00
11/20/20 CARABANIA PLASTER BLK20 858.00
11/20/20 YSULAN PLASTERRING BLK 28 855.00
11/20/20 L. GARCIA PLASTERRING BLK 11 815.00
11/20/20 SEVILLENO C H B BLK 22 802.00
11/20/20 C.M.LAO CHARGE TO FF TRADING 772.00
11/20/20 SANTILLAN PLASTER BLK 35 762.00
11/20/20 LAYESE C H B BLK 15 742.00
11/20/20 C.M.LAO CHARGE TO FF TRADING 727.00
11/20/20 SEVILLENO C H B BLK 22 717.00
11/21/20 J. CARATAO C H B SEPTIK BLK 23 697.00
11/21/20 DESAMPARADO FIRE WALL BLK 17 667.00
11/21/20 P.OPQUERIA PLASTER BLK 28 657.00
11/21/20 MAHINAY PLASTER BLK 11 627.00
11/21/20 CARABANIA PLASTER BLK20 612.00
11/21/20 LAYESE C H B BLK 15 592.00
11/21/20 DERDER C H B FAB. DESABILLE 582.00
11/23/20 DESAMPARADO KITCHEN COUNTER BLK 20 572.00
11/23/20 R. BATAIN FIRE WALL BLK 28 562.00
11/23/20 C.M LAO CHARGE TO FF TRADING 550.00
11/23/20 L. GARCIA PLASTERRING BLK 11 510.00
11/23/20 YHAPON PLASTERRING BLK 35 495.00
11/23/20 J. CARATAO C H B SEPTIK BLK 23 485.00
11/23/20 YSULAN PLASTERRING BLK 28 475.00
11/23/20 CARABANIA PLASTER BLK20 465.00
11/23/20 LAYESE C H B BLK 15 455.00
11/24/20 DESAMPARADO FIRE WALL BLK 20 440.00
11/24/20 CANOY PLASTER BLK 33-34 420.00
11/24/20 R. BATAIN FIRE WALL BLK 28 410.00
11/24/20 J. CARATAO C H B SEPTIK BLK 23 390.00
11/24/20 C.M LAO CHARGE TO FF TRADING 380.00
11/24/20 P. OPQUERIA PLASTER FIRE WALL BLK 20 360.00
11/24/20 YHAPON PLASTER BLK 35 345.00
11/24/20 NIPANGUE PLASTER BLK 11 325.00
11/24/20 CARABANIA PLASTER BLK20 295.00
11/24/20 YSULAN PLASTERRING BLK 28 285.00
11/24/20 LAYESE C H B BLK 15 270.00
11/24/20 C.M LAO CHARGE TO FF TRADING 260.00
11/25/2020 P. OPQUERIA FIREWALL BLK 20 230.00
11/25/2020 MAHINAY PLASTER @ BLK 19 170.00
11/25/2020 R. BATAIN FIREWALL BLK 20 150.00
11/25/2020 C.M. LAO CHARGE TO FF TRADING 138.00
11/25/2020 R. DESAMPARADO PLASTERING OF FIREWALL BLK 17 128.00
11/25/2020 J.CARATAO RCP COLAR ALLEY 1 AND ROAD 1 113.00
11/25/2020 P.CARABAÑA PLASTERING BLK 20/ 5 UNITS 83.00
11/25/2020 R.YSULAN PLASTERING @ BLK 28&1 LOT 1-7,2-14 63.00
11/25/2020 L. GARCIA PLASTERING BLK 11 23.00
E.CASEÑO SV-61 43.00
A.BATILO MDT-06 193.00
11/26/2020 C.M.LAO CHARGE TO FF TRADING 173.00
11/26/2020 J.CARATAO RCP COLAR&septic tank blk 31 163.00
11/6/2020 DESAMPARADO PLASTERING FIREWALL BLK 17/1-6 148.00
11/26/2020 YHAPON PLASTERING BLK-35 LOT 1-7 118.00
11/26/2022 OFQUERIA FIINISHING FOR PARAPET WALL BLK 20/8 UNITS 103.00
11/26/2020 BATAIN BLK 28&3 FINISHING FOR PARAPET 83.00
11/26/2020 CARABANIA BLK 22/15 UNITS PLASTERING 43.00
11/26/2020 R.NEPANGUE PLASTERING BLK 17 / 6 UNITS FOR RETACHING 23.00
11/26/2020 R. YSULAN PLASTERING BLK 28 3.00
11/26/2020 L. GARCIA PLASTERING BLK 19/21 UNITS (37.00)
11/27/2020 R. YSULAN BLK 1 LOT 13 (50.00)
11/27/2020 R. DELOSREYES PLASTERING BLK 28/3 UNITS (57.00)
11/27/2020 P. OFQUERIA PARAPET BLK 34/10 UNITS (87.00)
11/27/2020 J. CANOY BLK 33 RETACHING OF ENDWALL (97.00)
11/27/2020 L. GARCIA BLK 19 PLASTER (137.00)
11/27/2020 P. CARABANA BLK 22/15 UNITS (177.00)
11/27/2020 J. CARATAO M-HOLE FOR ROAD LOT 1 (207.00)
11/27/2020 R. BATAIN FIREWALL BLK 8/7 UNITS BLK 28/7 UNITS (227.00)
11/27/2020 DESAMPARADO KITCHEN COUNTER BLK 20 LOT 11-25 (247.00)
JR LADAO MDT-06 150.00
11/28/2020 P.OFQUIRIA PARAPET BLK 34/10 UNITS 130.00
11/28/2020 R.BATAIN PARAPET WALL BLK 3 LOT 1-7 115.00
11/28/2020 J.CANOY PLASTERING BLK 20 LOT 12 & 36 95.00
11/28/2020 J.CARATAO MANHOLE ROAD LOT 1 80.00
11/28/2020 C.M. LAO CHARGE TO FF TRADING 60.00
11/28/2020 L.GARCIA PLASTERING BLK 19/21 UNITS 30.00
11/29/2020 R.NEPANGUE PLASTERING FOR RETOUCH BLK 16 10.00
CASILLANO DT-39 110.00
4,837.00
11/16/20 DESAMPARADO S OG BLK 33 34 4,757.00
11/16/20 J. CARATAO COLAR RCP ALLEY 15 4,737.00
11/16/20 R. BATAIN C H B BLK 22 4,717.00
11/16/20 P.OPQUERIA DOWELL BLK 20 4,687.00
11/16/20 VILLARUEL STYRUP BLK 22 4,607.00
11/18/20 R. BATAIN S O G BLK 22 4,537.00
11/18/20 SEVILLENO C H B BLK 22 4,517.00
11/18/20 R. RASALES R C P FAB. BANAWA 4,507.00
11/18/20 DESAMPARADO KITCHEN COUNTER BLK 20 4,427.00
11/19/20 SEVILLENO C H B BLK 22 4,407.00
11/19/20 DESAMPARADO S O G BLK 28 4,327.00
11/19/20 P.OPQUERIA S O G BLK 20 4,287.00
11/20/20 P.OPQUERIA S O G BLK 20 4,267.00
11/20/20 SEVILLENO C H B BLK 22 4,247.00
11/20/20 SEVILENO CHARGE TO FF TRADING 4,217.00
11/20/20 P.POQUITA CURVE N; GUTTER ROAD 7 4,177.00
11/20/20 R. BATAIN S O G BLK 22 4,053.00
11/21/20 J. CARATAO C H B SEPTIK BLK 23 4,033.00
11/21/20 DESAMPARADO S O G BLK 28 3,953.00
11/23/20 P.OPQUERIA S O G BLK 20 3,903.00
11/23/20 R. RASALES R C P FAB. BANAWA 3,883.00
11/23/20 SEVILLENO MATTING BLK 22 3,823.00
11/24/20 DESAMPARADO S O G BLK 28 3,808.00
11/24/20 P. OPQUERIA PLASTER FIRE WALL BLK 20 3,788.00
11/24/20 C.M LAO CHARGE TO FF TRADING 3,688.00
11/26/20 C.M LAO CHARGE TO FF TRADING 3,648.00
11/26/20 J. CARATAO COLAR RCP AND CHB LAYING BLK 31 3,618.00
11/27/20 L. SEVILLENO ELECTRICAL INS BLK 22 LOT 27-41 3,526.00
11/27/20 J. CARATAO MANHOLE ROAD LOT 1 3,506.00
11/27/20 R.DESAMPARADO PREPARATION FOR SOG BLK 3 LOT 1-7 3,406.00
11/27/20 C.M LAO CHARGE TO FF TRADING 3,366.00
11/29/20 R.BATAIN CHB FILING & SEPTIC TANK @ BLK 20/8 UNITS 3,316.00
11/29/20 L.SEVILLENO SEPTIC TANK @ BLK 22/8 UNITS 3,276.00
11/29/20 R.DESAMPARDO KITCHEN COUNTER LK 19 3,226.00
3,226.00
3,226.00
3,226.00
225.00
11/24/20 C.M LAO CHARGE TO FF TRADING 205.00
11/25/20 DESAMPARADO, R. ROOFING INS. BLK 35 195.00
11/27/20 C.M LAO CHARGE TO FF TRADING 175.00
175.00
712.00
12.00
11/16/20 DESAMPARADO S OG BLK 33 34 7.00
11/16/20 P.OPQUERIA C H B BLK 20 3.00
11/16/20 VILLARUEL STYRUP BLK 22 0.00
250.00
11/17/20 R. BATAIN ELECTRICAL BLK 22 247.00
11/17/20 P.OPQUERIA BEAM BLK 20 243.00
11/18/20 R. BATAIN S O G BLK 22 240.00
11/18/20 SEVILLENO C H B BLK 22 235.00
11/18/20 DESAMPARADO KITCHEN COUNTER BLK 20 231.00
11/19/20 SEVILLENO C H B BLK 22 226.00
11/19/20 DESAMPARADO S O G BLK 28 222.00
11/19/20 P.OPQUERIA S O G BLK 20 219.00
11/20/20 P.OPQUERIA S O G BLK 20 217.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 216.00
11/20/20 SEVILENO CHARGE TO FF TRADING 214.00
11/20/20 GIDUCUS ELECTRICAL BLK 20 212.00
11/21/20 SEVILLENO CHARGE TO FF TRADING 197.00
11/20/20 SEVILLENO C H B BLK 22 194.00
11/21/20 J. CARATAO C H B SEPTIK BLK 23 191.00
11/21/20 DESAMPARADO FIRE WALL BLK 17 188.00
11/21/20 R. RASALES R C P FAB. BANAWA 186.00
11/21/20 CARABANIA PLASTER BLK20 185.00
11/23/20 P.OPQUERIA S O G BLK 20 183.00
11/23/20 SEVILLENO MATTING BLK 22 182.00
11/24/20 DESAMPARADO S O G BLK 28 176.00
11/24/20 J. CARATAO C H B SEPTIK BLK 23 174.00
11/24/20 C.M LAO CHARGE TO FF TRADING 169.00
11/25/20 P.OPQUERIA FIREWALL BLK 20 167.00
11/25/20 C.M.LAO CHARGE TO FF TRADING 160.00
11/26/20 C.M.LAO CHARGE TO FF TRADING 156.00
44,161.00 C.M.LAO CHARGE TO FF TRADING 147.00
44,161.00 J.CARATAO RCP COLARING AND CHB LAYING BLK 31 146.00
44,891.00 OFQUERIA FIINISHING FOR PARAPET WALL BLK 20/8 UNITS 144.00
44,161.00 A. GIDUCOS ELECTRICAL INSTALLATION BLK14&29 142.00
44,161.00 C.M LAO BLK 9 133.00
44,162.00 R. DELOSREYES PLASTERING BLK 28/3 UNITS 132.00
44,162.00 P. OFQUERIA PARAPET BLK 34 / 10 UNITS 130.00
44,162.00 L.SEVILLENO BLK 22 LOT 27-41 129.00
44,162.00 J. CARATAO M-HOLE FOR ROAD LOT 1 128.00
44,162.00 DESAMPARADO PREPARATION SOG FOR RIK 3 LOT 1-7 124.00
44,162.00 C.M LAO BLK 32/8 UNITS CONCRETING OF COLUMN 117.00
44,163.00 P.OFQUIRIA PARAPET BLK 34 / 10 UNITS 115.00
44,163.00 J.CARATAO MANHOLE @ ROAD LOT 1 113.00
44,164.00 R.BATAIN CHB ILING & SEPTIC TANK @ BLK 2-/8 UNITS 109.00
44,164.00 P.OFQUIRIA PARAPET @ BLK 344444444444/10 UNITS 107.00
44,164.00 R.BATAIN CHB FILING & SEPTIC @ BLK 20 103.00
44,164.00 L.SEVILLENO SEPTIC TANK @ BLK 22/8 UNITS 102.00
11/29/2020 R.DESAMPARADO KITCHEN COUNTER BLK 19 101.00
11/29/2020 C.M.LAO CONCRETE POURING OF COLUMN @ BLK 32/8 UNITS 96.00
96.00
133.00
11/16/20 DESAMPARADO S OG BLK 33 34 128.00
11/18/20 R. BATAIN S O G BLK 22 118.00
11/18/20 R. RASALES R C P FAB. BANAWA 115.00
11/19/20 DESAMPARADO S O G BLK 28 105.00
11/19/20 R. BATAIN S O G BLK 22 95.00
11/20/20 P.OPQUERIA S O G BLK 20 92.00
11/24/20 SEVILLENO S O G BLK 22 89.00
89.00
89.00
89.00
89.00
89.00
89.00
89.00
-
Z. CABALQUINTO WAREHOUSE 33.06
Z. CABALQUINTO WAREHOUSE 66.12
Z. CABALQUINTO WAREHOUSE 82.03
Z. CABALQUINTO WAREHOUSE 113.63
Z. CABALQUINTO WAREHOUSE 129.54
11/20/20 SEVILLENO C H B BLK 22 126.54
11/21/20 P.POQUITA C- CREATA POURING ROAD 7 108.54
11/21/20 P.OPQERIA S O G BLK 20 100.54
11/23/20 DESAMPARADO S O G BLK 17 96.54
11/23/20 R. BATAIN S O G BLK 22 86.54
11/24/20 DESAMPARADO S O G BLK 28 76.54
MELANIE DT-88 94.23
11/26/20 DESAMPARADO SOG BLK 3 LOT 1-7 UNITS 89.23
11/27/20 DESAMPARADO PREPARATION SOG FOR RIK 3 LOT 1-7 84.23
J. FORROSUELO DT-88 101.92
11/28/20 L.SEVILLENO GRAVEL BEDDING BLK 22 LOT 27-41 101.92
101.92
101.92
71.24
11/16/20 DESAMPARADO S OG BLK 33 34 61.24
11/16/20 J. CARATAO COLAR RCP ALLEY 15 59.24
11/16/20 P.OPQUERIA C H B BLK 20 55.24
11/16/20 NIPANGUE PLASTERRING BLK 3 52.24
11/16/20 SANTILLAN PLASTERRING BLK 16 49.24
11/16/20 VILLARUEL STYRUP BLK 22 46.24
11/16/20 MALINAO C H B FAB. BANAWA 41.24
11/16/20 CANOY PLASTERRING BLK 34 38.24
Z. CABALQUINTO STOCK FILE 156.73
11/17/20 DESAMPARADO KITCHEN COUNTER BLK 20 154.73
Z. CABALQUINTO STOCK FILE 204.23
11/17/20 CARABANIA PLASTER BLK20 201.23
11/17/20 D. MATA C H B FAB. ARRIESGA 191.23
11/17/20 DEMORAL C H B FAB. BANAWA 181.23
11/18/20 R. BATAIN S O G BLK 22 176.23
11/18/20 SEVILLENO C H B BLK 22 171.23
Z. CABALQUINTO STOCK FILE 188.32
11/18/20 P.OPQUERIA PLASTERRING BLK 28 185.32
11/18/20 CANOY PLASTER BLK 34 175.32
11/18/20 CARABANIA PLASTER BLK20 172.32
11/19/20 SEVILLENO C H B BLK 22 169.32
11/19/20 CANOY PLASTER BLK 34 159.32
11/19/20 DESAMPARADO S O G BLK 28 149.32
11/19/20 R. BATAIN S O G BLK 22 147.32
11/19/20 P.OPQUERIA S O G BLK 20 141.32
11/19/20 L. GARCIA PLASTERRING BLK 11 135.32
11/19/20 CARABANIA PLASTER BLK20 129.32
11/19/20 D. MATA C H B FAB. ARRIESGA 119.32
11/19/20 SANTILLAN PLASTER BLK 35 117.32
11/19/20 J. CARATAO CURVE N' GUTTER ROAD 7 114.32
11/20/20 P.OPQUERIA S O G BLK 20 111.32
11/20/20 DESAMPARADO FIRE WALL BLK 17 108.32
11/20/20 YSULAN PLASTERRING BLK 28 105.32
11/20/20 L. GARCIA PLASTERRING BLK 11 102.32
11/20/20 SEVILLENO C H B BLK 22 97.32
11/20/20 SEVILENO CHARGE TO FF TRADING 94.32
11/20/20 MALINAO C H B FAB. BANAWA 88.32
11/21/20 SEVILLENO CHARGE TO FF TRADING 73.32
11/21/20 SEVILLENO C H B BLK 22 71.32
11/20/20 SEVILLENO C H B BLK 22 68.32
11/21/20 J. CARATAO C H B SEPTIK BLK 23 65.32
11/21/20 DESAMPARADO FIRE WALL BLK 17 62.32
11/21/20 P.OPQUERIA PLASTER BLK 28 60.32
11/21/20 P.POQUITA C- CREATA POURING ROAD 7 36.32
11/21/20 DERDER C H B FAB. DESABILLE 32.32
11/21/20 D. MATA C H B FAB. ARRIESGA 27.32
11/21/20 P.OPQERIA S O G BLK 20 19.32
11/23/20 R. BATAIN S O G BLK 22 9.32
11/23/20 L. GARCIA PLASTERRING BLK 11 7.32
11/23/20 YHAPON PLASTERRING BLK 35 5.32
11/24/20 DESAMPARADO S O G BLK 28 -
11/25/20 MAHINAY PLASTERING @ BLK 19 (2.00)
Z. CABALQUINTO STOCKFILE 13.95
Z. CABALQUINTO STOCKFILE 27.43
Z. CABALQUINTO STOCKF\ 44.77
11/26/20 C.M.LAO CHARGE TO FF TRADING 40.77
11/26/20 C.M.LAO CHARGE TO FF TRADING 35.77
11/26/20 J. CARATAO SEPTIC TANK AND RCP COLARING 32.77
11/26/20 DESAMPARADO PLASTERING FIREWALL BLK 17/1-6 25.77
11/26/20 OFQUERIA FIINISHING FOR PARAPET WALL BLK 20/8 UNITS 23.77
11/26/20 LAYESE CHB LAYING BLK 15 18.77
11/26/20 BATAIN BLK 28&3 FINISHING FOR PARAPET 8.77
11/26/20 CARABANIA BLK 22/15 UNITS PLASTERING (0.23)
11/26/20 R. NEPANGUE PLASTERING BLK 17 / 6 UNITS FOR RETACHING (2.23)
11/26/20 R. YSULAN PLASTERING BLK 28 (4.23)
11/26/20 R. PISCANTE PLASTERING BLK 1 (6.23)
11/26/20 L. GARCIA PLASTERING BLK 19/21 UNITS (10.23)
11/26/20 C.M.LAO BLK 9 (15.23)
11/27/20 R.DELOSREYES PLASTERING BLK 28/3 UNITS (17.23)
11/27/20 P. OFQUERIA PARAPET BLK 34 / 10 UNITS (19.23)
11/27/20 L. GARCIA BLK 19 PLASTER (21.23)
11/27/20 J.CARATAO M-HOLE FOR ROAD LOT 1 (24.23)
11/27/20 R.BATAIN FIRREWALL BLK 8/7 UNITS BLK 28/7 UNITS (26.23)
11/27/20 DESAMPARADO KITCHEN COUNTER BLK 20 LOT 11-25 (28.23)
11/27/20 C.M.LAO BLK 32/8 UNITS CONCRETING OF COLUMN (31.23)
11/28/20 P. OFQUIRIA PARAPET BLK 34 / 10 UNITS (33.23)
11/28/20 J.CARATAO MANHOLE @ ROAD LOT 1 (35.23)
11/28/20 P.CARABAÑA PLASTERING BLK 22 (37.23)
11/28/20 L. GARCIA PLASTERING BLK 19/21 UNITS (39.23)
(39.23)
(39.23)
3,235.00
11/18/20 SEVILLENO C H B BLK 22 3,035.00
11/20/20 SEVILLENO C H B BLK 22 2,735.00
Z. CABALQUINTO FABRICATE ON SITE 3,399.00
11/24/20 J. CARATAO C H B SEPTIK BLK 23 2,599.00
11/24/20 C.M LAO CHARGE TO FF TRADING 2,499.00
11/26/20 J. CARATAO SEPTIC TANK AND RCP COLAR BLK 31 1,899.00
11/28/20 J. CARATAO MANHOLE @ ROAD LOT 1 1,399.00
11/28/20 D.ALLAMORIN KITCHEN COUNTER BLK 17 1,299.00
11/29/20 P.OFQUIRIA PARAPET @ BLK 34/10 UNITS 1,199.00
11/29/20 R.BATAIN CHB FILING & SEPTIC BLK 20 699.00
11/29/20 L.SEVILLENO SEPTIC TANK @ BLK 22/8 UNITS 599.00
11/29/20 J.FLORES CHARGE TO KAMPINNGANON 29.00
11/29/20 R.TIONGSON CHARGE TO KAMPINGGANON (771.00)
(771.00)
(771.00)
(771.00)
457.00
11/16/20 DESAMPARADO ROOFING INSTL. BLK 33 34 447.00
11/21/20 DESAMPARADO ROOFING INSTL.BLK 33.34.35 403.00
11/27/20 DESAMPARADO ROOFING INSTL.BLK 35 LOT 37 401.00
401.00
1,163.00
11/16/20 DESAMPARADO ROOFING INSTL. BLK 33 34 1,070.00
11/21/20 DESAMPARADO ROOFING INSTL.BLK 33.34.35 784.00
11/25/20 O.OFQUIRIA FIREWALL BLK 20 774.00
11/25/20 R.DESAMPARADO ROOFING INS. BLK 35 734.00
11/27/20 P.OFQUERIA PARAPET BLK 34 / 10 UNITS 732.00
11/27/20 R. BATAIN FIREWALL BLK 8/7 UNITS BLK 28/7 UNITS 712.00
11/27/20 DESAMPARADO BLK 35 LOT 37 697.00
11/28/20 R.BATAIN PARAPET WALL BLK 3 LOT 1-7 687.00
687.00
687.00
72.00
11/16/20 LAYESE, EJ ROOFING INSTALLATION BLK 15 52.00
52.00
52.00
52.00
-
2,500.00
168.00
-
1,718.00
11/16/20 R. BATAIN S O G BLK 212 1,713.00
11/18/20 P.OPQUERIA WATER BLK 28 1,708.00
11/19/20 R. BATAIN S O G BLK 22 1,693.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 1,681.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 1,669.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 1,663.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 1,639.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 1,627.00
11/24/20 SISDUYRO S O G BLK 1 1,606.00
11/24/20 PINEDO LOADING TO MULTI CAB 1,506.00
1,506.00
1,506.00
1,506.00
1,506.00
1,506.00
1,506.00
1,432.00
11/16/20 R. BATAIN S O G BLK 212 1,427.00
11/18/20 P.OPQUERIA WATER BLK 28 1,421.00
11/19/20 R. BATAIN S O G BLK 22 1,416.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 1,404.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 1,392.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 1,386.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 1,378.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 1,362.00
11/24/20 SISDUYRO S O G BLK 1 1,355.00
11/24/20 PINEDO LOADING TO MULTI CAB 1,155.00
1,155.00
1,155.00
1,155.00
1,155.00
1,000.00
2,000.00
1,436.00
11/16/20 R. BATAIN S O G BLK 212 1,431.00
11/18/20 P.OPQUERIA WATER BLK 28 1,422.00
11/19/20 R. BATAIN S O G BLK 22 1,417.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 1,405.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 1,393.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 1,387.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 1,379.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 1,355.00
11/24/20 SEVILLENO S O G BLK 22 1,338.00
11/24/20 SISDUYRO S O G BLK 1 1,331.00
1,331.00
1,331.00
1,331.00
1,331.00
1,331.00
1,000.00
500.00
500.00
3.00
936
11/16/20 R. BATAIN C H B BLK 22 911
11/17/20 J. CARATAO INJECK SEPTIK ALLEY 15 851
11/18/20 DESAMPARADO S OG BLK 20 847
11/18/20 P.OPQUERIA WATER LINE SANITARY 817
11/19/20 R. BATAIN S O G BLK 22 792
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 786
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 780
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 740
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 734
11/24/20 J. CARATAO C H B SEPTIK BLK 23 726
11/24/20 SISDUYRO S O G BLK 1 691
11/26/20 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 656
11/28/20 J. CARATAO MANHOLE @ ROAD LOT 1 638
11/28/20 R.VILLAFLOR PLUMBING WORKS@BLK 31 LO 9-16 636
11/29/20 J.CARATAO INJECT TOSEPTIC TANK & RCP @ALLEY 1 628
628
978.00
11/16/20 R. BATAIN S O G BLK 212 976.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 973.00
11/19/20 R. BATAIN S O G BLK 22 971.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 959.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 947.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 942.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 940.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 928.00
11/24/20 SISDUYRO S O G BLK 1 925.00
11/26/20 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 923.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 902.00
902.00
902.00
1,010.00
11/16/20 R. BATAIN S O G BLK 212 1,005.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 996.00
11/19/20 R. BATAIN S O G BLK 22 991.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 979.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 967.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 958.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 950.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 926.00
11/24/20 SISDUYRO S O G BLK 1 919.00
11/26/20 SEVILLENO BLK 22 LOT 27-41 UNIT LIVING AREA 912.00
11/26/22 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 891.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 867.00
867.00
867.00
867.00
867.00
486.00
11/16/20 J. CARATAO INJECKT SEPTIK BLK 22 484.00
11/26/20 R.VILLAFLOR BLK 21 FOR CR & WATERLINE 482.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 474.00
11/29/20 J.CARATAO INJECT FOR SEPTIC & RCP @ ALLEY 1 466.00
465.00
465.00
465.00
486.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 483.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 475.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 467.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 459.00
459.00
459.00
459.00
380.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 377.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 365.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 347.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 341.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 317.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 293.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 269.00
269.00
269.00
2,318.00
11/16/20 R. BATAIN S O G BLK 212 2,313.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 2,307.00
11/19/20 R. BATAIN S O G BLK 22 2,302.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 2,290.00
11/21/20 VILLAFLOR WATER LINE SANITARY BLK 7 2,284.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 2,276.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 2,260.00
11/24/20 SEVILLENO S O G BLK 22 2,251.00
11/24/20 SISDUYRO S O G BLK 1 2,244.00
11/26/20 SEVILLENO BLK 22 LOT 27-41 UNITS LIVING AREA 2,237.00
11/26/22 R. VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 2,221.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 2,205.00
2,205.00
1,000.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 997.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 991.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 985.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 982.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 974.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 966.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 958.00
958.00
958.00
958.00
360.00
736.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 733.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 727.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 721.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 718.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 710.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 702.00
11/28/20 R.VILLAFLOR BLK 31 LOT 9-15 FOR CR & WATERLINE 694.00
694.00
694.00
694.00
694.00
694.00
1,500.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 1,497.00
11/19/20 SISDUYRO WATER LINE SANITARY BLK4 1,491.00
11/20/20 VILLAFLOR WATER LINE SANITARY BLK4 1,485.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 1,482.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 1,474.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 1,466.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LO 9-16 1,458.00
1,458.00
1,458.00
239.00
11/17/20 R. BATAIN ELECTRICAL BLK 22 229.00
11/19/20 R. BATAIN ELECTRICAL BLK 22 219.00
11/20/20 P.OPQUERIA S O G BLK 20 214.00
11/20/20 GIDUCUS ELECTRICAL BLK 20 164.00
11/23/20 P.OPQUERIA S O G BLK 20 158.00
11/26/20 A. GIDUCOS ELECTRICAL INSTALLATION BLK 14&29 98.00
11/26/2020 M.POSADAS LOADED TO MDT-06 148.00
11/27/20 L. SEVILLENO ELECTRICAL INSTALLATION 140.00
140.00
150.00
11/17/20 DESAMPARADO FOR EXTENSION 100.00
100.00
10.00
4.00
5.00
11/260/20 R. DESAMPARADO BLK 7 LOT 9 FORTEMPORARY FACILITY 4.00
4.00
11/17/20 DESAMPARADO KITCHEN COUNTER BLK 20 -
3.00
11/17/20 DESAMPARADO KITCHEN COUNTER BLK 20 2.00
2.00
2.00
45.00
620.00
11/26/2020 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 599.00
11/28/2020 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 583.00
583.00
583.00
128
11/26/20 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 121.00
11/26/20 R.VILLAFLOR BLK21 FOR CR & WATERLINE 117.00
11/26/20 R.VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 101.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 85.00
85.00
160.00
11/26/20 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 153.00
11/26/20 R. VILLAFLOR BLK 31 LOT 1-8 FOR CR & WATERLINE 129.00
11/28/20 R. VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 105.00
105.00
706.00
11/18/20 R. BATAIN S O G BLK 22 704.00
11/18/20 P.OPQUERIA WATER LINE SANITARY 701.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 700.00
11/21/20 SEVILLENO S O G BLK 22 LOT 27-41 699.00
11/23/20 VILLAFLOR WATERLINE SSANITARY BLK 30 698.00
11/26/26 VILLAFLOR BLK 300/PLUMBER 697.00
11/26/20 SEVILLENO BLK 22 LOT 27-41 LIVING AREA 696.00
11/26/20 R.VILLAFLOR BLK 21 FOR CR & WATERLINE 694.00
11/26/20 A. GIDUCOS ELECTRICAL INSTALLATION BLK 14&29 693.00
11/28/20 R.VILLAFLOR PLUMBING WORKS @ BLK 31 LOT 9-16 692.00
11/29/20 R.VILLAFLOR PLUMBING WORKS 691.00
691.00
1.00
1.00
303.00
3.00
8.00
14.00
11/23/20 DESAMPARADO KITCHEN COUNTER BLK 20 10.00
10.00
10.00
10.00
10.00
3.00
11/16/20 DESAMPARADO ROOFING INSTL. BLK 33 34 -
Z. CABALQUINTO WAREHOUSE 50.00
11/21/20 SEVILLENO CHARGE TO FF TRADING 49.00
11/21/20 SEVILLENO C H B BLK 22 48.00
11/20/20 SEVILLENO C H B BLK 22 47.00
11/21/20 J. CARATAO C H B SEPTIK BLK 23 43.00
11/251/20 VILLAFLOR WATER LINE SANITARY BLK 7 42.00
11/23/20 SEVILLENO MATTING BLK 22 41.00
11/25/20 R.BATAIN FIREWALL BLK 28 40.00
11/26/20 BATAIN BLK 28&3 FINISHING FOR PARAPET 39.00
11/27/20 R. BATAIN FIREWALL BLK 8/7 UNITS BLK 28/7 UNITS 38.00
11/27/20 C.M LAO BLK 32/8 IUNITS CONCRETING OF COLUMN 37.00
11/28/20 R.BATAIN PARAPET WALL BLK 3 LOT 1-7 35.00
11/29/20 P.OFQUIRIA PARAPET @ BLK 34/10 UNITS 34.00
11/29/20 R.BATAIN CHB FILING & SEPTIC @BLK 20 33.00
11/29/20 L. SEVILLENO CUTTING OF REBARS SEPTIC TANK 29.00
29.00
56.00
11/26/20 SEVVILLENO BLK 22 LOT 27-41 LIVING AREA 54.00
27.00
11/16/20 CANOY PLASTERRING BLK 34 25.00
11/17/20 CARABANIA PLASTER BLK20 24.00
11/17/20 CANOY PLASTER BLK 34 22.00
11/18/20 P.OPQUERIA PLASTERRING BLK 28 21.00
11/19/20 DESAMPARADO PLASTER BLK 35 20.00
11/20/20 YSULAN PLASTERRING BLK 28 19.00
11/23/20 CARABANIA PLASTER BLK20 18.00
11/24/20 YHAPON PLASTER BLK 35 17.00
11/24/20 YSULAN PLASTERRING BLK 28 7.00
11/25/20 R.BATAIN FIREWALL BLK 28 6.00
11/25/20 J. CARATAO RCP COLAR @ALLEY 1& ROAD 1 5.00
11/27/20 R. DELOSREYES PLASTERING BLK 28/3 UNITS 4.00
11/27/20 J. CANOY BLK 33 RETACHING OF ENDWALL 3.00
11/27/20 L. GARCIA BLK 19 PLASTER 2.00
2.00
8.00
11/18/20 DESAMPARADO S OG BLK 20 4.00
11/26/20 DESAMPARADO C-PURLINS &ROUMD BAR 3.00
3.00
3.00
15.00
36.00
11/26/20 C.M.LAO CHARGE TO FF TRADING 35.00
1.00
23.00
15.00
4.00
41.00
2.00
11.00
150.00
47.00
220.00
299.00
53.00
11/23/20 LAYESE C H B BLK 15 43.00
11/24/20 C.M LAO CHARGE TO FF TRADING 41.00
11/26/20 R. DESAMPARADO BLK 7 LOT 9 FOR TEMPORARY FACILITIES 39.00
11/27/20 C.M LAO BLK 32/8 IUNITS CONCRETING OF COLUMN 36.00
36.00
35.00
11/18/20 DESAMPARADO S OG BLK 20 30.00
11/20/20 TINGA TUCKING C- PURLINS 25.00
11/23/20 DESAMPARADO KITCHEN COUNTER BLK 20 21.00
11/23/20 DESAMPARADO KITCHEN COUNTER BLK 20 16.00
11/25/20 DESAMPARADO PLASTER FIREWALL BLK 17 11.00
11/26/20 DESAMPARADO TUCKING C- PURLINS 6.00
6.00
34.00
11/16/20 LAYESE PAINTING C- PURLINS 32.00
11/18/20 DESAMPARADO PAINTING C- PURLINS 28.00
11/19/20 DESAMPARADO PLASTER BLK 35 26.00
11/23/20 DESAMPARADO PAINTING C- PURLINS 24.00
11/26/20 DESAMPARADO PAINTING C- PURLINS & ROUNDBAR 22.00
11/27/20 DESAMPARADO PAINTING C- PURLINS & ROUNDBAR 20.00
Z. CABALQUINTO WAREHOUSE 5.00
11/18/20 DESAMPARADO PAINTING C- PURLINS 4.00
11/19/20 DESAMPARADO PLASTER BLK 35 3.00
11/23/20 DESAMPARADO PAINTING C- PURLINS 2.00
11/26/20 DESAMPARADO PAINTING C- PURLINS & ROUNDBAR 1.00
11/27/20 DESAMPARADO PAINTING C-PURLINS ROUNDBARS -
360.00
1.00
11/29/20 R.BATAIN FOR CHB FILING AND SEPTIC TANK BLK 20 -
5.00
5.00
14.00
11/26/20 J.CARATAO FOR COLARING AND HAULNG OF RCP AND CHB 4.00
11/26/20 BATAIN BLK 28&3 FINISHING FOR PARAPET -
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
50
58.54
3172
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE: DEC 1-15,2020
BAGS
BAGS
BAGS
BAGS
BAGS
DEF.BARS 8MMX6.0M 16,100
DEF.BAR 10MMX6.0M 14,527 PCS
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
CU.M
C H B 6' 86,393
PCS
PCS
PCS
PCS
C H B 4' 55,078
PCS
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
PCS
PCS
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
FAUCET 6 PCS
FAUCET 1/2
SWITCH OMNI 5
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 12 PCS
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
B/S FLAT LATEX 701
CONSTRUCTION MATERIALS & CONSUMABLES
SAKULIN
KLS
WELDING GLOVES 3
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 51 PCS
HAND GLOVES 20
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
PREPARED BY:
Z. CABALQUINTO
WAREHOUSEMAN
DELIVERY FR. H.O
CHARGES TO KAMP. AND KODIA
R.C.P. SILLION
CHARGE MTRL'S
FROM VM-1
FROM KODIA
UNIT
TOTAL DELIVERIES COST PO # ISSUANCES
STOCK AS OF
QTY DATE SUPPLIER MIS #
62241
62249
62248
61606
61609
61610
61611
61613
61616
61625
61629
61640
61649
61650
61654
61655
61656
61657
61658
61659
61665
61666
61668
1080 12/8/20 A.T.TAN CORP.
61669
61673
61676
61677
61679
61684
61685
61686
61690
61695
61952
61953
61954
1080 12/14/20 REPUBLIC CEMENT
A.T.TAN CORP.
61959
61962
61969
61975
61979
61981
61985
61988
61994
61995
62051
62239
62240
62241
62242
62245
62246
62247
61601
61602
300 3/12/20 KAMP
61605
61614
61615
61616
61616
61621
61623
61618
61626
61627
61629
61637
61631
61632
61634
61636
61638
61639
61642
61643
61645
61650
61653
61662
61664
61667
1080 12/8/20 A.T.TAN CORP
61670
61671
61672
61674
61675
61679
61687
61688
61689
61692
61693
61694
61696
61697
61698
61951
61955
61956
61958
1080 12/14/20 A.T. TAN CORP.
61959
61960
61961
61963
61965
61970
61973
61974
61978
61982
61983
61984
61985
61986
61989
61992
61993
61995
61997
61998
61999
62000
62052
62053
62239
61601
61609
61612
61614
61616
61619
61620
61621
61622
61618
61629
61631
61640
61643
61657
61664
61669
61673
61685
61687
61695
61697
61962
61966
61982
61984
61630
62240
61602
61603
61604
61606
61609
61611
61614
61615
61616
61616
61620
61622
61681
61626
61629
61630
61633
61636
61638
61639
61643
250 12/7/20 KODIA
61650
61653
61657
61659
61668
61669
61673
61674
61685
61687
61688
61690
61695
61696
61951
61958
61962
61966
61973
61977
61978
61982
61984
61986
61999
61612
61618
61657
61686
61967
61981
61995
61638
61639
61639
61646
168.74 12/8/20 BANAWA
61649
61650
61655
61656
61657
61658
61659
61659
61662
61663
61664
61665
61666
61667
61668
47.62 12/8/20 BANAWA
61669
61672
61673
61674
61675
61676
61677
61679
95.19 12/9/20 BANAWA
61685
61686
61687
61692
61693
211.11 12/10/20 BANAWA
61696
61697
61698
61953
61954
69.85 12/11/20 BANAWA
61957
61957
61961
61960
61965
61967
61969
61970
61973
61974
61981
61983
61985
61986
61987
61988
61989
61991
15.91 12/14/20 KAMPINGGANON 65382
13.48 12/14/20 KAMPINGGANON 65386
61992
61995
62000
17.69 12/15/20 KAMPINGGANON 65113
62063
62055
62248
61614
61621
61618
61626
61639
61647
61683
61687
800 12/14/2020 KAMPINGGANON 61990
61993
61618
61626
61639
61648
61957
61618
61626
400 12/4/20 KODIA
61639
61648
300 12/7/20 KODIA
61957
50 12/2/20
61648
62244
61628
61625
61641
61644
61678
61700
61622
61661
61682
61685
61700
61959
61972
61980
61997
61700
61622
61628
61635
61644
61661
61682
61685
61700
61959
61972
61980
61997
61678
61678
4
62244
61628
61700
61959
61622
61635
61644
61660
61661
61682
61685
61972
61980
61997
61678
61678
62243
62248
61614
61628
61631
61641
61643
61691
1450 61699
61959
61980
61996
61997
62243
61622
61628
61631
61640
61660
61669
61691
61699
61952
51959
61967
61980
61996
62243
61622
61628
61631
61640
61660
61681
61691
61699
61959
61971
61979
61996
62243
61628
61631
61640
61660
61671
61681
61691
61699
61959
61959
61971
61979
61996
61997
62243
61631
61640
61660
61681
61691
61699
61959
61700
61971
61979
61996
62243
61628
61631
61640
61660
61681
61691
61699
61959
61971
61980
61996
62243
61616
61628
61631
61640
61660
61681
61691
61699
61959
61971
61979
61996
62243
61616
61628
61631
61640
61660
61681
61691
61699
61959
61971
61979
61996
61971
61979
619996
62243
61628
61631
61640
61660
61681
61691
61699
61959
61971
61979
61996
62244
61628
61631
61640
61660
61681
61691
61699
61700
61959
61971
61979
61996
61622
61663
61663
61697
61663
61626
61697
61626
61663
61618
61680
62243
61616
61622
61628
61635
61669
61682
61685
61695
61959
61971
61980
61997
61678
61671
61671
61616
61642
61678
61642
61609
61642
61671
100 12/7/25 KAMP
61601
61680
61697
20 12/3/20
61959
61671
3 12/7/20 KAMP
61601
61618
61629
61628
61634
61635
61978
61980
61985
10 12/3/20
61620
61621
61618
62249
61602
61662
61665
61668
61675
61697
61976
62000
61607
61630
61672
61968
61608
61687
62242
61618
61634
100 12/7/20 KODIA
130 12/7/20 KAMP
61639
61648
61650
61687
61697
61957
61974
61993
61618
2 12/7/20 KODIA
8 12/7/20 KAMP
61650
61687
61697
61957
61982
11 12/9/20 KAMP
61650
61672
61687
61697
61957
61968
61982
61605
61617
61618
61650
61669
61964
CHEKED BY:
ENGR. JUPITER PORROSUELO
PROJECT SITE ENGR.
P. AND KODIA
15 1/12/2020 P. CARABAÑA
15 1/12/2020 R. PESCANTE
20 2/12/2020 R.BATAIN
15 2/12/2020 P.OFQUIRIA
4 2/12/2020 R.VILLAFLOR
6 2/12/2020 E. ALAMO
20 2/12/2020 L. SEVILLENO
10 2/12/2020 J. MIBATO
25 3/12/2020 R. BATAIN
20 4/12/2020 L. SEVILLENO
10 4/12/2020 R. BATAIN
10 7/12/2020 R. BATAIN
50 8/12/2020 L. SEVILLENO
30 8/12/2020 R. DESAMPARADO
2 8/12/2020 R. ROSOS
20 8/12/2020 P. CARABAÑA
40 8/12/2020 L. GARCIA
10 8/12/2020 R. ROSALES
10 8/12/2020 T. DERDER
10 8/12/2020 C. M. LAO
20 8/12/2020 R. YSULAN
30 8/12/2020 C. O. DEAMORAL
10 8/12/2020 R. YSULAN
10 12/9/2020 R.BATAIN
30 9/12/2020 C. SEVILLENO
30 9/12/2020 R. RAMIREZ
10 9/12/2020 E. DERDER
10 9/12/2020 C.M. LAO
15 9/12/2020 L. CARATAO
10 10/12/2020 R. CARATAO
30 10/12/2020 L. SEVILLENO
10 10/12/2020 C. M. LAO
15 11/12/2020 R. BATAIN
330 11/12/2020 J. CARATAO
8 11/12/2020 I DERDER
30 11/12/2020 J. DESPI
10 12/12/2020 R. BATAIN
10 12/12/2020 R. ROSALES
20 12/13/2020 J. DEMORAL
10 12/13/2020 R. ROSALES
10 12/14/2020 R. BATAIN
95 12/14/2020 L. SEVILLENO
20 12/14/2020 C. M. LAO
15 12/14/2020 DESABILLE
20 12/15/2020 C. O. DEMORAL
15 12/15/2020 J. CARATAO
15 12/15/2020 HERONA
15 1/12/2020 R. BATAIN
15 1/12/2020 P. OPQUIRIA
15 1/12/2020 P. CARABAÑA
15 1/12/2020 D. ALLAMORIN
10 1/12/2020 R. NEPANGUE
10 1/12/2020 J. CANOY
10 1/12/2020 R. YSULAN
10 1/12/2020 D. ESCARAN
5 1/12/2020 D. MIBATO
R.TUHAO
10 2/12/2020 D.ALLAMORIN
15 2/12/2020 J. CARATAO
30 3/12/2020 P. QFQUIRIA
5 3/12/2020 R. BATAIN
4 3/12/2020 R. ROSOS
10 12/3/2020 J.CARATAO
11 12/3/2020 R. PESCANTE
10 12/3/2020 R.DESAMPARADO
10 4/12/2020 R. DESAMPARDO
26 4/12/2020 P. OFQUIRIA
2 4/12/2020 R. BATAIN
20 5/12/2020 C. M. LAO
10 5/12/2020 R. BATAIN
19 5/12/2020 P. OFQUIRIA
15 5/12/2020 R. DESAMPARADO
10 5/12/2020 J. CARATAO
20 7/12/2020 P. OFQUIRIA
20 7/12/2020 R. DESAMPARADO
3 7/12/2020 R. ROSOS
21 7/12/2020 J. CARATAO
10 7/12/2020 A. J. LAYESE
15 8/12/2020 R. DESAMPARADI
11 8/12/2020 P. OFQUIRIA
15 8/12/2020 J. CARATAO
10 8/12/2020 G. NIETO
30 8/12/2020 R. BATIANCILA
20 12/9/2020 P. OFQUIRIA
1 12/9/2020 R.ROSOS
4 9/12/2020 E. NEDAMO
20 9/12/2020 P. CARABAÑA
40 9/12/2020 L. GARCIA
10 9/12/2020 C. M. LAO
10 10/12/2020 R. DESAMPARADO
15 10/12/2020 P. OFQUIRIA
40 10/12/2020 P. GARCIA
10 10/12/2020 R. YSULAN
15 10/12/2020 L. CARATAO
20 10/12/2020 P. CARABAÑA
30 11/12/2020 P. OFQUIRIA
30 11/12/2020 R. DESAMPARADO
40 11/12/2020 L. GARCIA
10 11/12/2020 C. M. LAO
20 11/12/2020 P. CARABAÑA
30 11/12/2020 A. FERNANDEZ
20 12/12/2020 P. OFQUIRIA
3 1212/20 R. BATAIN
10 12/12/2020 R. BATAIN
40 12/12/2020 P. GARCIA
18 12/12/2020 R. SINANGOTE
5 12/12/2020 R. YSULAN
30 12/13/2020 P. OFQUIRIA
15 12/13/2020 J. CARATAO
15 12/13/2020 R. DELOS REYES
25 12/14/2020 P. OFQUIRIA
30 12/14/2020 R. DESAMPARADO
40 12/14/2020 A. FERNANDEZ
15 12/14/2020 J. CARATAO
15 12/14/2020 C. M. LAO
10 12/14/2020 R. YSULAN
15 12/14/2020 BATIANCILA
20 12/15/2020 P. OFQUIRIA
20 12/15/2020 R. DESAMPARADO
5 12/15/2020 J. CARATAO
1 12/15/2020 R. BATAIN
20 12/15/2020 R. BATAIN
10 12/15/2020 R. YSULAN
20 12/15/2020 P. CARABANA
30 12/15/2020 ARRIESGA
20 12/15/2020 A. FERNANDEZ
20 1/12/2020 R. BATAIN
10 1/12/2020 D. ESCARAN
6 2/12/2020 R.VILLAFLOR
50 2/12/2020 C.M. LAO
10 2/12/2020 J. CARATAO
50 3/12/2020 R. BATAIN
20 3/12/2020 L.SEVLLENO
40 3/12/2020 C.M. LAO
20 12/3/2020 J. CARATAO
20 12/3/2020 C.M.LAO
60 12/3/2020 R.DESAMPARADO
20 4/12/2020 R. BATAIN
20 12/5/2020 R. BATAIN
20 7/12/2020 R. BATAIN
10 7/12/2020 J. CARATAO
20 8/12/2020 R. ROSALES
20 8/12/2020 G. NIETO
20 12/9/2020 R.BATAIN
35 9/12/2020 C. SEVILLENO
20 10/12/2020 R. BATAIN
100 10/12/1/20 R. DESAMPARADO
20 11/12/2020 R. BATAIN
100 11/12/2020 R. DESAMPARADO
20 12/12/2020 R. ROSALES
20 12/12/2020 L. IGFUARA
100 12/14/2020 R. DESAMPARADO
20 12/14/2020 J. CARATAO
2 1/12/2020 P. OPQUIRIA
1 1/12/2020 D. MIBATO
5 1/12/2020 A.J. LAYESE
1 1/12/2020 C.M. LOA
1 2/12/2020 P.OFQUIRIA
1 2/12/2020 R.VILLAFLOR
1 2/12/2020 L. SEVILLENO
1 2/12/2020 J. CARATAO
1 3/12/2020 P. OFQUIRIA
2 3/12/2020 R. BATAIN
1 3/12/2020 R. ROSOS
5 3/12/2020 C.M.LAO
5 12/3/2020 C.M.LAO
4 12/3/2020 R.DESAMPARADO
4 4/12/2020 R. DESAMPARADO
2 4/12/2020 R. BATAIN
10 4/12/2020 C. M. LAO
8 5/12/2020 C. M. LAO
1 5/12/2020 J. CARATAO
1 7/12/2020 P. OFQUIRIA
6 7/12/2020 R. DESAMPARADO
2 7/12/2020 J. CARATAO
JR LADAO
5 8/12/2020 R. DESAMPARADO
1 8/12/2020 P. OFQUIRIA
2 8/12/2020 R. ROSALES
5 8/12/2020 C. M. LAO
2 8/12/2020 R. YSULAN
2 12/9/2020 R.BATAIN
1 9/12/2020 C. SEVILLENO
1 9/12/2020 P. CARABAÑA
2 10/12/2020 R. BATAIN
6 10/12/2020 R. DESAMPARADO
1 10/12/2020 P. OFQUIRIA
1 10/12/2020 C. M. LAO
3 11/12/2020 R. BATAIN
1 11/12/2020 P. OFQUIRIA
5 11/12/2020 C. M. LAO
1 12/12/2020 P. OFQUIRIA
2 12/12/2020 R. ROSALES
1 12/12/2020 L. IGFUARA
2 12/13/2020 J. CARATAO
1 12/13/2020 P. M. DECKER
1 12/14/2020 P. OFQUIRIA
6 12/14/2020 R. DESAMPARADO
1 12/14/2020 J. CARATAO
1 12/14/2020 R. YSULAN
1 12/15/2020 R. YSULAN
3 02/12/82020 C.M. LAO
5 12/3/2020 R.DESAMPARADO
6 8/12/2020 R. ROSALES
2 10/12/2020 L. SEVILLENO
6 13/12/2020 L. SEVILLENO
2 12/14/2020 L. SEVILLENO
1 12/15/2020 J. CARATAO
5 7/12/2020 P. OFQUIRIA
12 7/12/2020 R. DESAMPARADO
7 7/12/2020 R. DESAMPARADO
10 7/12/2020 L. SEVILLENO
2 8/12/2020 L. SEVILLENO
3 8/12/2020 R. DESAMPARADO
6 8/12/2020 P. CARABAÑA
4 8/12/2020 L. GARCIA
6 8/12/2020 R. ROSALES
4 8/12/2020 T. DERDER
4 8/12/2020 C. M. LAO
3 8/12/2020 C. M. LAO
2 8/12/2020 J. CARATAO
3 8/12/2020 R. YSULAN
10 8/12/2020 G. NIETO
9 8/2/2020 R. YSULAN
16 8/12/2020 C. O. DEMORAL
10 8/12/2020 R. BATIANCILA
6 8/12/2020 R. YSULAN
3 12/9/2020 R.BATAIN
6 9/12/2020 E. NEDAMO
6 9/12/2020 C. SEVILLENO
6 9/12/2020 P. CARABAÑA
4 9/12/2020 L . GARCIA
15 9/12/2020 R. RAMIREZ
6 9/12/2020 E. DERDER
5 9/12/2020 C. M. LAO
3 10/12/2020 R. BATAIN
6 10/12/2020 L. SEVILLENO
3 10/12/2020 R. DESAMPARADO
6 10/12/2020 R. YSULAN
2 10/12/2020 L. CARATAO
5 11/12/2020 P. OFQUIRIA
6 11/12/2020 R. DESAMPARADO
2 11/12/2020 L. GARCIA
6 11/12/2020 I. DERDER
10 11/12/2020 J. DESPI
30 12/12/2020 R. DESAMPARADO
3 12/12/2020 R. DESAMPARADO
7 12/12/2020 P. GARCIA
3 12/12/2020 C. M. LAO
5 12/12/2020 R. YSULAN
10 13/12/2020 L. SEVILLENO
10 12/13/2020 J. DEMORAL
5 12/13/2020 P. OFQUIRIA
2 12/13/2020 J. CARATAO
3 12/13/2020 R. DESLOS REYES
5 12/14/2020 L. SEVILLENO
6 12/14/2020 A. FERNDNDEZ
3 12/14/2020 C. M. LAO
3 12/14/2020 R. YSULAN
3 12/14/2020 R. YSULAN
10 12/14/2020 DESABILLE
6 12/14/2020 BATIANCILA
10 12/14/2020 R. ROSALES
E. CASINO
H. ANOS
3 12/15/2020 P. OFQUIRIA
2 12/15/2020 J. CARATAO
9 12/15/2020 P. CARABANA
R. ARQUIO
10 12/16/2020 ARRIESGA
2 12/16/2020 J. CARATAO
R. ARQUIO
200 12/3/2020 AJ. LAYESE
300 4/12/2020 R. DESAMPARADO
400 7/12/2020 R. DESAMPARADO
302 8/12/2020 G. NIETO
200 7/12/2020 E. NEDAMO
200 9/12/2020 C. M. LAO
200 10/12/2020 R. DESAMPARADO
300 11/12/2020 C. M. LAO
320 12/12/2020 C. M. LAO
12/12/2020 R. DINAPO
12/12/2020 JR. LADAO
400 12/13/2020 P. OFQUIRIA
300 12/14/2020 C. M. LAO
FLORES
200 12/15/2020 P. OFQUIRIA
350 12/15/2020 DINADO
10 12/3/2020 R.DESAMPARADO
15 4/12/2020 DESAMPARADO
20 7/12/2020 R. DESAMPARDO
24 7/12/2020 R. DELOS REYES
12 12/12/2020 R. DESAMPARDO
52 12/3/2020 R.DESAMPARADO
52 4/12/2020 R. DESAMPARADO
R.TIONGSON
72 7/12/2020 R.DESAMPARADO
104 7/12/2020 R. DELOS REYES
R.TIONGSON
72 12/12/2020 R. DESAMPARADO
R.TUHAO
8 7/12/2020 R. DELOS REYES
14 1/12/2020 R. ROSOS
15 4/12/2020 R. BATAIN
15 5/12/2020 R. BATAIN
2 7/12/2020 C.M. LAO
15 7/12/2020 R. BATAIN
2 9/12/2020 R. ROSOS
33 12/12/2020 R. BATAIN
13 12/3/2020 C.M.LAO
15 8/12/2020 R. BATAIN
16 9/12/2020 R. BATAIN
16 10/12/2020 R. BATAIN
26 11/12/2020 R. BATAIN
20 12/12/2020 R. BATAIN
20 12/13/2020 R. BATAIN
24 12/14/2020 R. BATAIN
24 12/15/2020 R. BATAIN
22 11/12/2020 R. BATAIN
5 12/3/2020 C.M.LAO
20 4/12/2020 R. BATAIN
20 5/12/2020 R. BATAIN
14 7/12/2020 R. BATAIN
18 8/12/2020 R. BATAIN
20 9/12/2020 R. BATAIN
20 10/12/2020 R. BATAIN
4 11/12/2020 R. BATAIN
20 12/12/2020 R. BATAIN
20 12/13/2020 R. BATAIN
24 12/14/2020 R. BATAIN
24 12/15/2020 R. BATAIN
8 9/12/2020 R. ROSOS
2 9/12/2020 R. ROSOS
21 1/12/2020 R.ROSOS
30 4/12/2020 R. BATAIN
39 11/12/2020 R. BATAIN
36 12/12/2020 R. BATAIN
5 12/3/2020 C.M.LAO
30 5/12/2020 R. BATAIN
21 7/12/2020 R. BATAIN
2 8/12/2020 R. BATAIN
27 8/12/2020 R. BATAIN
32 9/12/2020 R. BATAIN
30 10/12/2020 R. BATAIN
30 12/13/2020 R. BATAIN
36 12/14/2020 R. BATAIN
36 12/15/2020 R. BATAIN
2 9/12/2020 R. SUSOS
6 9/12/2020 R. RUSOS
3 1/12/2020 R. ROSOS
5 2/12/2020 R.BATAIN
8 2/12/2020 J. CARATAO
5 4/12/2020 R. BATAIN
10 5/12/2020 R. BATAIN
10 7/12/2020 C. M. LAO
12 7/12/2020 J. CARATAO
5 10/12/2020 R. BATAIN
6 11/12/2020 R. BATAIN
7 12/12/2020 R. BATAIN
5 12/14/2020 R. BATAIN
7 12/15/2020 R. BATAIN
2 12/15/2020 R. BATAIN
14 1/12/2020 R. ROSOS
5 12/3/2020 C.M.LAO
10 4/12/2020 R. BATAIN
10 5/12/2020 R. BATAIN
11 7/12/2020 R. BATAIN
12 8/12/2020 R. BATAIN
2 12/9/2020 R.BATAIN
26 10/12/2020 R. BATAIN
17 11/12/2020 R. BATAIN
6 11/12/2020 J. CARATAO
16 12/12/2020 R. BATAIN
8 12/13/2020 R.BATAIN
13 12/14/2020 R. BATAIN
24 12/15/2020 R. BATAIN
21 1/12/2020 R. ROSOS
5 12/3/2020 C.M.LAO
1/29/1900 4/12/2020 R. BATAIN
1/29/1900 5/12/2020 R. BATAIN
21 7/12/2020 R. BATAIN
27 8/12/2020 R. BATAIN
30 9/12/2020 R. BATAIN
30 10/12/2020 R. BATAIN
33 11/12/2020 R. BATAIN
30 12/12/2020 R. BATAIN
20 12/13/2020 R. BATAIN
25 12/14/2020 R. BATAIN
24 12/15/2020 R. BATAIN
7 1/12/2020 R. ROSOS
10 4/12/2020 R. BATAIN
10 5/12/2020 R. BATAIN
7 7/12/2020 R. BATAIN
9 8/12/2020 R. BATAIN
1 9/12/2020 R. ROSOS
10 9/12/2020 R. BATAIN
10 10/12/2020 R. BATAIN
11 11/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
10 12/13/2020 R. BATAIN
12 12/14/2020 R. BATAIN
12 12/15/2020 R. BATAIN
4 12/15/2020 R. BATAIN
7 1/12/2020 R. ROSOS
10 5/12/2020 R. BATAIN
7 7/12/2020 R. BATAIN
9 8/12/2020 R. BATAIN
10 9/20/2020 R. BATAIN
10 10/12/2020 R. BATAIN
11 11/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
1 11/12/2020 R. BATAIN
10 12/13/2020 R. BATAIN
12 12/14/2020 R. BATAIN
12 12/15/2020 R. BATAIN
21 1/12/2020 R. ROSOS
23 4/12/2020 R. BATAIN
30 5/12/2020 R. BATAIN
24 7/12/2020 R. BATAIN
27 8/12/2020 R. BATAIN
30 9/12/2020 R. BATAIN
30 10/12/2020 R. BATAIN
33 11/12/2020 R. BATAIN
30 12/12/2020 R. BATAIN
30 12/13/2020 R. BATAIN
12 12/14/2020 R. BATAIN
24 12/15/2020 R. BATAIN
14 1/12/2020 R. ROSOS
1 3/12/2020 R. BATAIN
20 4/12/2020 R. BATAIN
20 5/12/2020 R. BATAIN
14 7/12/2020 R. BATIAN
18 8/12/2020 R. BATAIN
20 9/12/2020 R. BATAIN
20 10/12/2020 R. BATAIN
22 11/12/2020 R. BATAIN
20 12/12/2020 R. BATAIN
20 12/13/2020 R. BATAIN
37 12/14/2020 R. BATAIN
48 12/15/2020 R. BATAIN
7 1/12/2020 R. ROSOS
1 3/12/2020 R. BATAIN
10 4/12/2020 R. BATAIN
10 5/12/2020 R. BATAIN
7 7/12/2020 R. BATAIN
9 8/12/2020 R. BATAIN
10 9/12/2020 R. BATAIN
10 10/12/2020 R. BATAIN
11 11/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
10 12/13/2020 R. BATAIN
12 12/14/2020 R. BATAIN
12 12/15/2020 R. BATAIN
10 12/13/2020 R. BATIN
12 12/14/2020 R. BATAIN
12 12/15/2020 R. BATAIN
7 1/12/2020 R. ROSOS
10 4/12/2020 R.BATAIN
10 5/12/2020 R. BATAIN
7 7/12/2020 R. BATAIN
9 8/12/2020 R. BATAIN
10 9/12/2020 R. BATAIN
10 10/12/2020 R. BATAIN
11 11/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
10 12/13/2020 R. BATAIN
14 12/14/2020 R. BATAIN
12 12/15/2020 R. BATAIN
7 1/12/2020 R.ROSOS
10 4/12/2020 R. BATAIN
10 5/12/2020 R. BATAIN
7 7/12/2020 R. BATAIN
9 8/12/2020 R. BATAIN
10 9/12/2020 R. BATAIN
10 10/12/2020 R. BATAIN
11 11/12/2020 R. BATAIN
1 11/12/2020 R. BATAIN
10 12/12/2020 R. BATAIN
10 12/13/2020 R. BATAIN
12 12/14/2020 R. BATAIN
12.00 12/15/2020 R. BATAIN
8 12/3/2020 C.M.LAO
57 8/12/2020 R. YSULAN
1 8/12/2020 R. YSULAN
1 11/12/2020 R. DESAMPARADO
1 8/12/2020 R. YSULAN
2 4/12/2020 R. DESAMPARADO
1 11/12/2020 R. DESAMPARADO
1/1/1900 4/12/2020 R. DESAMPARADO
10 12/3/2020 R.DESAMPARADO
30 9/12/2020 R. DESAMPARADO
2 1/12/2020 R. ROSOS
1 3/12/2020 R. BATAIN
1 12/3/2020 C.M.LAO
2 4/12/2020 R. BATAIN
1 5/12/2020 R. BATAIN
1 12/9/2020 R.BATAIN
2 9/12/2020 R. BATAIN
2 10/12/2020 R. BATAIN
3 11/12/2020 R. BATAIN
2 12/12/2020 R. BATAIN
2 12/13/2020 R. BATAIN
3 12/14/2020 R. BATAIN
4 12/15/2020 R. BATAIN
2 9/12/2020 R. ROSOS
8 12/9/2020 R.ROSOS
26 3/12/2020 R. BATAIN
2 7/12/2020 R. ROSOS
2 9/12/2020 R. ROSOS
2 7/12/2020 R. ROSOS
1 2/12/2020 R. VILLAFLOR
1 7/12/2020 R. ROROS
1 12/9/2020 R.ROSOS
M.POSADAS
1 1/12/2020 D. MIBATO
1 9/12/2020 R. DEAMPARADO
1 11/12/2020 R. DESAMPARADO
M.POSADAS
M.POSADAS
1 12/12/2020 R. BATAIN
M. POSADAS
M. POSDAS
0.50 12/14/2020 P. OFQUIRIA
1 12/9/2020 R.ROSOS
M.POSADAS
1 1/12/2020 D. ESCARAN
1 12/3/2020 R.DESAMPARADO
1 4/12/2020 R. BATAIN
2 4/12/2020 R. BATAIN
3 5/12/2020 R. DESAMPARADO
1 5/12/2020 R. BATAIN
3 12/14/2020 P. OFQUIRIA
3 12/14/2020 R. BATAIN
3 12/14/2020 C. M. LAO
E.CASEÑO
1 12/3/2020 C.M.LAO
2 12/3/2020 J.CARATAO
2 12/3/2020 R.DESAMPARADO
1 1/12/2020 R. PESCANTE
1 1/12/2020 D. MIBATO
1 8/2/2020 J. CARATAO
1 8/12/2020 R. YSULAN
1 8/12/2020 R. YSULAN
1 9/12/2020 L. GARCIA
1 11/12/2020 R. DESAMPARADO
1 12/13/2020 R. DELOS REYES
2 12/15/2020 P. CARABANA
JR. LADAO
4 12/3/2020 R.DESAMPARDO
3 5/12/2020 R. DESAMPARADO
JR. LADAO
2 3/12/2020 P .OFQUIRIA
2 3/12/2020 R. BATAIN
2 3/12/2020 R. ROSOS
M. POSADAS
1 2/12/2020 R. VILLAFLOR
3 10/12/2020 R. DESAMPARADO
5 1/12/2020 D. ALLAMORIN
10 12/3/2020 R.DESAMPARADO
5 5/12/2020 R. DESAMPARADO
J.LADAO
M.POSADAS
15 7/12/2020 R. DESAMPARADO
5 7/12/2020 R. DELOS REYES
5 8/12/2020 R. DESAMPARADO
10 10/12/2020 R. DESAMPARADO
10 11/12/2020 R. DESAMARDO
10 12/12/2020 R. DESAMPARDO
5 12/13/2020 R. DELOSREYES
10 12/15/2020 R. DESAMPARADO
2 12/3/2020 R.DESAMPARADO
JR LADAO
M.POSADAS
3 8/12/2020 R.DESAMPARADO
3 10/12/2020 R.DESAMPARADO
3 11/12/2020 R. DESAMPARADO
3 12/12/2020 R. DESAMPARADO
1 12/14/2020 R. DESAMPARADO
M.POSADAS
1 8/12/2020 R. DESAMPARADO
1 12/9/2020 E.NEDAMO
1 10/12/2020 R. DESAMPARADO
1 11/12/2020 R. DESAMPARADO
1 12/12/2020 R. DESAMPARADO
1 13/2/20 J. L. MEDAMO
1 12/14/2020 R. DESAMPARADO
4 2/12/2020 D. ALLAMORIN
2 3/12/2020 R. ROSOS
1 12/3/2020 R.DESAMPARADO
1 8/12/2020 R. DESAMPARADO
1 12/9/2020 R.BATAIN
1 12/12/2020 L. SEVILLENO
M.POSADAS
7 4/12/2020 R. DESAMPARADO
1 10/12/2020 R. DESAMPARADO
3 12/14/2020 R. DESAMPARADO
APPROVED BY:
ENGR. NECARTER SILFAVAN
PROJECT MANAGER
26470
23823
REMARKS BALANCE
839
BLK 22, 15 UNITS PLASTERING 824
BLK 1, 7 UNITS 809
CHB FILING FOR SEPTIC TANK @ BLK 789
PLASTERING OF PARAPET @ BLK 34 774
CR FLOORING BLK 7 LOT 6 BLK 8 LO 1 770
MANHOLE ROAD LOT 1 764
BLK 22, LOT 27-41 PLASTERING & FILING CHB IN SEPTIC TANK 744
BLK 28, LOT 1-5 PLASTERING 734
BLK 30 POURING CR SOG 709
BLK 4 12 UNITS 689
BLK 7 POURING CR SOG 679
BLK 9, 7 UNITS CR PLUMBING WORKS 669
SOG BLK 22 LOT 28, 30, 32, 34, 36, 38, 40 619
SOG BLK 1 LOT 5-7 589
BLK 7/ LOT 9 587
BLK 22/ 15 UNITS PLASTERING 567
BLK 19 / LOT PLASTERING 527
RCP FABRICATION 517
CHB FABRICATION 507
BLK 32 CONCRETING OF BEAM 497
BLK 1, 7 UNITS PLASTERING 477
CHB 447
BLK 28/ 7 UNITS PLASTERING 437
1517
CONCRETE POURING OF SOG @ NLK 8 LO1-8 1507
CONCRETE POURING @BLK 22 LOT 27-41 1477
FUBRICATION OF CHB 4 1447
FUBRICATION OF CHB 4 1437
CONC. POURING @BEAM @BLK 32 1427
CURB AND GUTTER @ROAD 7 1412
BLK 23, 8 & 7 PIPING & SOG 1402
SOG @ BLK 28 LOT 13, 14, & 15 1372
BLK 32 LOT# 1362
CONCRETE POURINGOF SOG ON CR. @BLOCK 19 LOT 11-25 1347
CONCRETE POURING OF ROAD LOT 4 & 5 1017
CHB FABRICATION 1009
CHB FABRICATION 979
2059
2059 1814
PLUMBING WORKS BLK 20 2049 1814 BAGS
RCP FABRICATION 2039
CHB FABRICATION 2019
FABRICATION OF RCP 450MM 2009
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 1999
SOG FOR ALLEY 15 1904
BLK 32 & 19 CHB LAYING FOR CR &COCRETE POURING OF COLOUM 1884
CHB FABRICATION 1869
CHB FAB. 1849
POURING CURB & GATTER ROAD 4 1834
BLK 15 POURING COLUMN 3 UNITS 1819
110.00
BLK 30, FILING CHB FOR SEPTIC TANK 95.00
BLK 34, PARAPET AND PLASTERING 80.00
BLK 22, 15 UNITS 65.00
PLASTERING IN PARAPET WALL IN BLK 17, LOT 1-13 50.00
PLASTERING @ BLK 19, LOT 11-31 40.00
PLASTERING @ BLK 20 ,LOT 34 30.00
PLASTERING @ BLK 28, LOT 1-7 20.00
MANHOLE @ ROADLOT 1 10.00
PLASTERING @ BLK 28, LOT 8-12 5.00
LOADED TO DT-39 305.00
FIREWALL FOR CR @ BLK 16 295.00
FILING CHB IN MANHOLE @ ROADLOT 5 280.00
BLK 35, PLASTERING PARAPET WALL 250.00
BLK 30 POURING CR SOG 245.00
BLK 7 PLASTERING WORKS @ CR WALL AND K.COUNTER 241.00
RCP LAYING ROAD LOT 3 @ BLK 231.00
PLASTERING @ BLK 1 LOT 7 220.00
KITCHEN COUNTER 210.00
FILING CHB BLK 35 200.00
BLK 33 PARAPET WALL 174.00
BLK 7 TILING WORKS 172.00
CHB LAYING@ BLOCK 19 LOT 1-10 152.00
POURING CR SOG @ BLK 7 142.00
FILING CHB IN PARAPET WALL @ BLK 33 123.00
FILING CHB PARAPET WALL BLK 35 108.00
BLK 31 INJECT TO RCP 98.00
BLK 43 PARAPET WALL 78.00
POOR JAMB, K. COUNTER & PARAPET WALL BLK 3 58.00
BLK 7, 2 UNITS 55.00
INSTALLATION OF PIPE IN DRAINAGE 34.00
CHB LAYING BLOCK 15 COT 1-8 24.00 34.00
PLASTERING OF PARAPET & K.C.BLK 17/ 4 UNITS 9.00
BLK 20/ PARAPET/ 8 UNITS (2.00)
MANHOLE ROAD 3 (17.00)
BLK 15 FILING CHB (27.00)
BLK 22/ LOT 1-10 PLASTERING (57.00)
1080
CHB LAYING & PLASTERING IN PARAPET @ BLK 8 LOT 10-25 1,060.00
INSTALL @ BLK 7 LOT 8& 9 1,059.00
PLASTERING & CHB LAYING 1,055.00
PLASTERING @BLK 22 LOT 27-41 1,035.00
PLASTERING @ BLK 19 LOT 11- 31 995.00
CHB LAYING @ BLK 19 LOT LOT 2-10 985.00
KITCHEN COUNTER BLK 16, 17, & CONCRETING DOOR JAMB 975.00
BLK 20/ UNITS 960.00
BLK 22 LOT 2, 4, 6,8,10 PLASTERING 920.00
BLK 28 LOT #2 PLASTERING 910.00
CURB N' GUTTER@ ROAD LOT 7 895.00
BLK 22 , 29, 31, 33, 37, AND 39 PLASTERING 875.00
CHB LAYING & PLASTERING IN PARAPET WALL @ BLK 20 845.00
CHB LAYING & PLASTERING OF PARAPET WALL @BLK 35& 1 815.00
PLASTERING @BLK 19 LOT 11-31 775.00
CHB LAYING 765.00
BLK 22 LOT 27, 29, 31, 33, 35, 37, 39,& 41 PLASTERING 745.00
BLK 19 LOT 11-31 21 UNITS 715.00
BLK 20/5 UNITS PLASTERING OF PARAPET 695.00
1,775.00 1,382.00
PLUMBING WORKS BLK 20 1,772.00 1382 BAGS
CHARGE TO FF TRADING 1,762.00
BLK 22/ 2 UNITS LOT 2 & 4 1,722.00
BLK 1 LOT 13 1,704.00
BLK 28 LOT 11 1,699.00
BLK 11/8 UNITS PLASTERING OF PARAPET 1,669.00
RCP LAYING ROAD LOT 1 1,654.00
BLK 29/3 UNITS 1,639.00
BLK 11/8 UNITS PLASTERING OF PARAPET 1,614.00
BLK 1 PLASTERING WALL 1,584.00
PLASTERING BLK 19 1,544.00
MANHOLE ROADLOT 1 1,529.00
BLK 32 & 19 CHB LAYING FOR CR &COCRETE POURING OF COLOUM 1,514.00
PLASTERING BLK 28 1,504.00
BLK 22/ LOT 2&4 PLASTERING 1,489.00
BLK 11/8 UNIT PLASTERING 1,469.00
BLK 1 PLASTERING PARAPET WALL, FAB. K. COUNTER 1,449.00
POURING CURB & GATTER ROAD 4 1,444.00
SEPTIC TANK LOT 7 1,443.00
PLASTERING BLK 22 1,423.00
PLASTERING BLK 28 1,413.00
BLK 22/15 UNITS PLASTERING 1,393.00
CHB FAB. 1,363.00
BLK 9/21 UNITS PLASTERING 1,343.00
1,343.00
1,343.00
1,343.00
1,343.00
1,343.00
3,226.00
BLK 30, REBARS FOR SEPTIC TANK 3,206.00
MANHOLE @ ROADLOT 1 3,196.00
CR FLOORING BLK 7 LOT 16 BLK 8 LOT 1 3,190.00
CHARGE TO FF TRADING 3,140.00
FILING CHB IN MANHOLE @ ROADLOT 5 3,130.00
BLK 30 POURING CR SOG 3,080.00
MATTIG FOR CR BLK 30 & 4 3,060.00
CHARGE TO FF TRADING 3,020.00
RCP LAYING ROAD LOT 3 @ BLK 31 3,000.00
CHARGE TO FF TRADING 2,980.00
PREPARATION FOR SOG 2,920.00
BLK 7 POURING CR SOG 2,900.00
POURING CR SOG @BLK 7 2,880.00
BLK 9, 7 UNITS CR PLUMBING WORKS 2,860.00
INSTALLATION OF PIPE IN DRAINAGE 2,850.00
RCP FABRICATION 2,830.00
BLK 15 FILING CHB 2,810.00
CONCRETE POURING OF SOG @ BLK 8 LOT 1-8 2,790.00
REBARS INSTALLATION OF SOG @ BLOCK 28 LOT 13-15 2,755.00
BLK 23, 8 & 7 PIPING & SOG 2,735.00
KITCHEN COUNTER BLK 16, 17, & CONCRETING DOOR JAMB 2,635.00
CONCRETE POURINGOF SOG ON CR. @BLOCK 19 LOT 11-25 2,615.00
FAB. OF KITCHEN COUNTER 2,515.00
RCP FABRICATION 2,495.00
FORMWORKS FOR ALLEY 2,475.00 3226
BLK 1 KITCHEN COUNTER PILE & FABRICATE 2,375.00
MANHOLE ROADLOT 1 2,355.00
2,355.00
-
-
175.00
712.00
BLK 18 LOT 1,4,8,6 BLK 32 LOT 1-8 BEAM REBARS 652.00
652.00
652.00
96.00
BLK 34, PARAPET AND PLASTERING 94.00
PLASTERING @ BLK 28, LOT 8-12 93.00
CHB LAYING @ BLK 15, LOT 1-8 88.00
CHARGE TO FF TRADING 87.00
PLASTERING OF PARAPET @ BLK 34 86.00
CR FLOORING BLK 7 LOT 16 BLK 8 LOT 1 85.00
BLK 22, LOT 27-41 PLASTERIING & FILING OF SEPTIC TANK 84.00
FILING CHB IN MANHOLE @ ROADLOT 5 83.00
BLK 35 FILING CHB IN PARAPET WALL 82.00
BLK 30 POURING CR SOG 80.00
BLK 7 , K.COUNTER REBARS 79.00
CHARGE TO FF TRADING 74.00
CHARGE TO FF TRADING 69.00
KITCHEN COUNTER BLK 17 65.00
FILING CHB BLK 35 61.00
BLK 7 TILING WORKS 59.00
BLK 18 LOT 1,4,8,6 BLK 32 LOT 1-8 BEAM REBARS 49.00
CHARGE TO FF TRADING 41.00
BLK 31 INJECT TO RCP 40.00
BLK 43 PARAPET WALL 39.00
POOR JAMB, K. COUNTER & PARAPET WALL BLK 3 33.00
INSTALLATION OF PIPE DRAINAGE (ROADLOT 3) 31.00
LOADED TO MDT-06 281.00
PLASTERING OF PARAPET & K.C.BLK 17/ 4 UNITS 276.00
BLK 20/ PARAPET/ 8 UNITS 275.00
RCP FABRICATION 273.00
BLK 32 CONCRETING OF BEAM 268.00
BLK 28/ 7 UNITS PLASTERING 266.00
CONCRTE POURING OF SOG @ BLK 8 LOT 1-8 264.00
REBARS INSTALLATION OF SOG @ BLOCK 28 LOT 13-15 263.00
PLASTERING @BLK 22 LOT 27-41 262.00
BLK 23, 8 & 7 PIPING & SOG 260.00
KITCHEN COUNTER BLK 16, 17, & CONCRETING DOOR JAMB 254.00
BLK 20 / 8 UNITS 253.00
BLK 32 LOT # 252.00
CONCRETE POURINGOF SOG ON CR. @BLOCK 19 LOT 11-25 249.00
CHB LAYING & PLASTERING IN PARAPET WALL @ BLK 20 248.00
BLK 19 243.00
BLK 20/5 UNITS PLASTERING OF PARAPET 242.00
RCP FABRICATION 240.00
FORMWORKS FOR ALLEY 239.00
RCP LAYING ROAD LOT 1 237.00
CHB LAYING OF PARAPET @ BLK 1 236.00
BLK 11/8 UNITS PLASTERING OF PARAPET 235.00
BLK 1 KITCHEN COUNTER PILE & FABRICATE 229.00
MANHOLE ROADLOT 1 228.00
PLASTERING BLK 28 227.00
PLASTERING BLK 28 226.00
226.00
89.00
101.92
CHARGE TO FF TRADING 98.92
PREPARATION OF SOG 93.92
RCP FABRICATION 87.92
SOG @BLK 28 LOT 13, 14, &15 85.92
BLK 22 ALLEY 15 PREPARATION 79.92
SOG FOR ALEEY 15 77.92
POURING CURB & GATTER ROAD 4 76.92
76.92
76.92
76.92
-
BLK PARAPET 43 (5.00)
BLK 19 & BLK 35 PLATERING (17.00)
BLK 1 SOG (24.00)
BLK 22 LOT 28, 30, 32, 34, 36, 38, 40 POURING SOG (34.00)
168.74
SOG BLK 22 LOT 28, 30, 32, 34, 36, 38, 40 166.74
CONCRETING DOOR JAM 163.74
BLK 22 / 15 UNITS PLASTERING 157.74
BLK 19 / LOT PLASTERING 153.74
RCP FABRICATION 147.74
CHB FABRICATION 143.74
BLK 32 CONCRETING OF BEAM 139.74
BLK 19/ CHB LAYING 136.74
MANHOLE ROAD 3 134.74
BLK 28 PLASTERING 3 UNITS 131.74
BLK 15 FILING CHB 121.74
BLK 1, 7 UNITS PLASTERING 112.74
CHB 96.74
BLK 22/ LOT 1-10 PLASTERING 86.74
BLK 28/ 7 UNITS PLASTERING 80.74
128.36
CONCRETE POURING OF SOG @ BLK 8 LOT 1-8 125.36
PLASTERING & CHB LAYING 119.36
CONCRETE POURING @BLK 22 LOT 27-41 113.36
PLATERING @BLK 22 LOT 27-41 107.36
PLASTERING @ BLK 19 LOT 11- 31 103.36
FUBRICATION OF CHB 4 88.36
FUBRICATION OF CHB 4 82.36
CHB LAYING @ BLK 19 LOT LOT 2-10 77.36
172.55
BLK 23, 8 & 7 PIPING & SOG 169.55
SOG @BLK 28 LOT 13, 14, & 15 163.55
BLK 1 PARAPET 160.55
BLK 28 LOT #2 PLASTERING 154.55
CURB N' GUTTER @ ROAD LOT 7 152.55
363.66
CHB LAYING & PLASTERING IN PARAPET WALL @ BLK 20 358.66
PLASTERING OF PARAPET BLK 1 352.66
PLASTERING BLOCK 19 LOT 11-31 350.66
CHB FABRICATION 344.66
CHB FABRICATION 334.66
404.51
BLK 1 & 35 PLASTERING 374.51
BLK 1 & 35 PLASTERING 371.51
BLK 22/ 2 UNITS LOT 2 & 4 364.51
CHARGE FF TRADING 361.51
BLK 28 LOT 11 356.51
BLK 22 ALLEY 15 PREPARATION 346.51
CHB FABRICATION 336.51
BLK 11/8 UNITS PLASTERING OF PARAPET 331.51
RCP LAYING ROAD LOT 1 329.51
BLK 29/3 UNITS 326.51
SOG FOR ALEEY 15 321.51
PLASTERING BLK 19 315.51
BLK 32 & 19 CHB LAYING FOR CR &COCRETE POURING OF COLOUM 312.51
PLASTERING BLK 28 309.51
PLASTERING 306.51
CHB FABRICATION 296.51
BLK 22/ LOT 2&4 PLASTERING 290.51
CHB & RCP FABRICATION 280.51
CHARGE TO SILLON 296.42
CHARGE TO SILLON 309.90
BLK 11/8 UNIT PLASTERING 306.90
POURING CURB & GATTER ROAD 4 304.90
BLK 22/15 UNITS PLASTERING 295.90
CHARGE TO SILLON 313.59
CHB FABRICATION 303.59
CONCRETE POURING OF CURB N' GUTTER ROAD LOT 7 301.59
301.59
301.59
4,661.00
DT-88 5,461.00
CHB LAYING @ BLK 15 5,261.00
FILING CHB BLK 35 4,961.00
BLK 1 PARAPET WALL 4,561.00
BLK 15 FILING CHB 4,259.00
BLK 7 4,059.00
CHB LAYING @BLK 19 LOT 2-10 3,859.00
PARAPET @ BLK 1 3,659.00
BLK 19 3,359.00
CHARGE TO FF TRADING 3,039.00
CHARGE TO SILLON 3,389.00
CHARGE TO SILLON 3,552.00
BLK 11/8 UNITS PLASTERING OF PARAPET 3,152.00
BLK 32 & 19 CHB LAYING FOR CR &COCRETE POURING OF COLOUM 2,752.00
CHARGE TO SILLON 3,472.00
BLK 11/8 UNIT PLASTERING 3,272.00
CHARGE TO SILLON 3,992.00
3,992.00
3,992.00
2,338.00
CHB FILING FOR SEPTIC TANK @ BLK 30 2,138.00
FILING CHB IN MANHOLE @ ROADLOT 5 2,038.00
RCP LAYING ROAD LOT 3 @ BLK 31 1,888.00
PREPARATION OF SOG 1,688.00
FILING CHB BLK 35 1,488.00
BLK 1 PARAPET WALL 1,388.00
CHRAGE TO KAMP. / LOADED TO :ST: 06 888.00
CHB LAYING @BLK 19 LOT 2-10 688.00
BLK 1 PARAPET WALL 588.00
CHARGE TO KAMPINGGANON 1,388.00
BLK 11/8 UNIT PLASTERING PARAPET WALL, FAB. K. COUNTER 1,188.00
401.00
INSTALLATION @ blk 1 391.00
FILING CHB BLK 35 376.00
BLK 11 FRAMING 356.00
ROOF FRAMING @ BLK 22 LOT 27-41 332.00
BLK 11 LOT 1-8 320.00
320.00
687.00
INSTALLATOIN @ BLK 1 635.00
FILKING CHB BLK 35 583.00
LOADED TO ST-06 983.00
BLK 11 FRAMING 911.00
FOR ROOF FRAMING BLOCK 22 LOT 37-41 807.00
LOADED TO ST-06 1,107.00
BLK 11 LOT 1-8 1,035.00
52.00
LOADED TO: DT-39 102.00
FOR ROOF FRAMING BLK 22 LOT 27-41 94.00
94.00
54.00
54.00
16.00
16.00
31.00
31.00
93.00
93.00
31.00
31.00
-
2,500.00
168.00
-
2,126.00
FOR PLUMBING WORKS @ BLK 7,LOT 1-7 2,112.00
BLK 7 2 UNITS 2,097.00
INTERIOR WATERLINE WORKS @ BLK 5 2,082.00
CHARGE TO FF TRADING 2,080.00
BLK 9 CR PLUMBING WORKS 7 UNITS 2,065.00
PLUMBING WORKS @BLK 7 LOT 8-9 2,063.00
INSTALLATON OF WATERLINE BLK 19 2,030.00
CHARGE TO FF TRADING 2,017.00
BLK 23, 9 UNITS CR PUMBLING WORKS 2,002.00
BLK 8 CR PLUMBING WORKS 10 UNITS 1,986.00
PLUMBING WORKS 1,970.00
INSTALLATION OF WATERLINE BLK 19 1,944.00
PLUMBING WORKS BLK 20 1,924.00
INSTALLATION FOR WATER LINE 1,904.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 1,880.00
INSTALLATION FOR WATER LINE BLK 33-35 1,856.00
1,283.00
INSTALLATON OF WATERLINE BLK 19 1,261.00
CHARGE TO FF TRADING 1,256.00
BLK 7 2 UNITS 1,236.00
INTERIOR WATERLINE WORKS @ BLK 5 1,216.00
BLK 9 CR PLUMBING WORKS 7 UNITS 1,202.00
BLK 23, 9 UNITS CR PUMBLING WORKS 1,184.00
BLK 8 CR PLUMBING WORKS 10 UNITS 1,164.00
PLUMBING WORKS BLK 20 1,144.00
INSTALLATION OF WATERLINE BLK 19 1,140.00
PLUMBING WORKS BLK 20 1,120.00
INSTALLATION FOR WATER LINE 1,100.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 1,076.00
INSTALLATION FOR WATER LINE BLK 33-35 1,052.00
1,000.00
PLUMBING WORKS @BLK 7 LOT 8 -9 992.00
992.00
992.00
992.00
992.00
2,000.00
PLUMBING WORKS @BLK 7 LOT 8 -9 1,998.00
1,998.00
1,491.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 1,470.00
BLK 7 2 UNITS 1,440.00
INSTALLATON OF WATERLINE BLK 19 1,401.00
PLUMBING WORKS BLK 20 1,365.00
CHARGE TO FF TRADING 1,360.00
INTERIOR WATERLINE WORKS @ BLK 5 1,330.00
BLK 9 CR PLUMBING WORKS 7 UNITS 1,309.00
BLK 23, 9 UNITS CR PUMBLING WORKS 1,307.00
BLK 23, 9 UNITS CR PUMBLING WORKS 1,280.00
BLK 8 CR PLUMBING WORKS 10 UNITS 1,248.00
PLUMBING WORKS BLK 20 1,218.00
INSTALLATION FOR WATER LINE 1,188.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 1,152.00
INSTALLATION FOR WATER LINE BLK 33-35 1,116.00
2.00
PLUMBING WORKS @BLK 7 LOT 9-8 -
6.00
PLUMBING WORKS @BLK 7 LOT 9-8 -
1,000.00
500.00
500.00
3.00
628
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 625
CHB FILING FOR SEPTIC TANK @ BLK 30 620
FILING CHB IN MANHOLE @ ROADLOT 5 612
BLK 7 2 UNITS 607
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 597
CHARGE TO FF TRADING 587
INSTALLATION OF PIPE IN DRAINAGE 575
BLK 20 CR PLUMBING WORKS 13 UNITS 570
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 564
PLUMBING WORKS BLK 20 557
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 552
INSTALLATION FOR PLUMBING WORKS BLK 33-35 545
SEPTIC TANK LO 7 543
543
543
902.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 888.00
CHARGE TO FF TRADING 883.00
BLK 7 2 UNITS 873.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 863.00
BLK 9, 7 UNITS CR PLUMBING WORKS 852.00
BLK 23, 9 UNITS CR PUMBLING WORKS 840.00
BLK 1LOT 1-8 PLUMBING WORKS 838.00
BLK 20 CR PLUMBING WORKS 13 UNITS 812.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 795.00
PIPE SLEEVE ROAD LOT 5 789.00
PLUMBING WORKS BLK 20 773.00
PREPARAION FOR ALLEY 15 @ BLK 22 765.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 752.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 728.00
728.00
728.00
773.00
867.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 846.00
CHARGE TO FF TRADING 841.00
BLK 6 8 UNITS 811.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 781.00
BLK 9, 7 UNITS CR PLUMBING WORKS 760.00
BLK 23, 9 UNITS CR PLUMBING WORKS 733.00
BLK 8 CR PLUMBING WORKS 10 UNITS 703.00
BLK 20 CR PLUMBING WORKS 13 UNITS 673.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 640.00
PLUMBING WORK 610.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 590.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 565.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 541.00
541.00
541.00
486.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 479.00
BLK 6 8 UNITS 469.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 459.00
BLK 9, 7 UNITS CR PLUMBING WORKS 452.00
BLK 23, 9 UNITS CR PUMBLING WORKS 443.00
INSTALL @ BLK 7 LOT 8-9 442.00
BLK 8 CR PLUMBING WORKS 10 UNITS 432.00
BLK 20 CR PLUMBING WORKS 13 UNITS 422.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 411.00
PLUMBING WORKS 401.00
PLUMBING WORKS BLK 20 391.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 381.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 369.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 357.00
SEPTIC TANK LOT 7 353.00
459.00
FOR PLUMBING WORKS @ BLK 7,LOT 1-7 452.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 442.00
BLK 9, 7 UNITS CR PLUMBING WORKS 435.00
BLK 23, 9 UNITS CR PUMBLING WORKS 426.00
BLK 8 CR PLUMBING WORKS 10 UNITS 416.00
BLK 20 CR PLUMBING WORKS 13 UNITS 406.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 395.00
PLUMBING WORKS BLK 20 385.00
INSTALLATION OF WATERLINE BLK 19 384.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 374.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 362.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 350.00
350.00
350.00
350.00
350.00
362.00
910.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 889.00
BLK 6 8 UNITS 866.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 836.00
BLK 9, 7 UNITS CR PLUMBING WORKS 812.00
BLK 23, 9 UNITS CR PUMBLING WORKS 785.00
BLK 8 CR PLUMBING WORKS 10 UNITS 755.00
BLK 20 CR PLUMBING WORKS 13 UNITS 725.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 692.00
PLUMBING WORKS BLK 20 662.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 632.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 620.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 596.00
596.00
596.00
2,205.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 2,191.00
FOR PLUMBING WORK @ BLK 30 2,190.00
BLK 6 8 UNITS 2,170.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 2,150.00
BLK 9, 7 UNITS CR PLUMBING WORKS 2,136.00
BLK 23, 9 UNITS CR PUMBLING WORKS 2,118.00
BLK 8 CR PLUMBING WORKS 10 UNITS 2,098.00
BLK 20 CR PLUMBING WORKS 13 UNITS 2,078.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 2,056.00
PLUMBING WORKS BLK 20 2,036.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 2,016.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 1,979.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 1,931.00
1,931.00
1,931.00
1,931.00
958.00
FOR PLUMBING WORKS @ BLK 7, LOT 1-7 951.00
BLK 30 CR FLOOR DRAIN 950.00
BLK 7 2 UNITS 940.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 930.00
BLK 9, 7 UNITS CR PLUMBING WORKS 923.00
BLK 23, 9 UNITS CR PUMBLING WORKS 914.00
BLK 8 CR PLUMBING WORKS 10 UNITS 904.00
BLK 20 CR PLUMBING WORKS 13 UNITS 894.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 883.00
PLUMBING WORKS BLK 20 873.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 863.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 851.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 839.00
839.00
839.00
360.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 350.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 338.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 326.00
326.00
326.00
694.00
FOR PLUMBING WORKS BLK 7, LOT 1-7 687.00
BLK 6 8 UNITS 677.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 667.00
BLK 9, 7 UNITS CR PLUMBING WORKS 660.00
BLK 23, 9 UNITS CR PUMBLING WORKS 651.00
BLK 8 CR PLUMBING WORKS 10 UNITS 641.00
BLK 20 CR PLUMBING WORKS 13 UNITS 631.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 620.00
PLUMBING WORKS 610.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 600.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 586.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 574.00
574.00
1,458.00
FOR PLUMBING WORKS @ BLK 7,LOT 1-7 1,451.00
1,500.00
BLK 7 2 UNITS 1,490.00
INSTALLATION OF PLUMBNG SYSTEM @BLK 5 & BLK 7 10 UNITS BLK 5 8 UNITS BLK 7 2 UNITS 1,480.00
BLK 9, 7 UNITS CR PLUMBING WORKS 1,473.00
BLK 23, 9 UNITS CR PUMBLING WORKS 1,464.00
BLK 8 CR PLUMBING WORKS 10 UNITS 1,454.00
BLK 20 CR PLUMBING WORKS 13 UNITS 1,444.00
PLUMBING WORK FOR BLK 19 &20 LOT 16 & 13 1,433.00
INSTALLATION OF WATERLINE BLK 19 1,432.00
PLUMBING WORKS BLK 20 1,422.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 1,412.00
INSTALLATION FOR PLUMBING WORKS BLK 20, 35, 34, & 33 1,400.00
INSTALLATION FOR PLUMBING WORKS BLK 33-35 1,388.00
1,388.00
1,388.00
140.00
CHARGE TO FF TRADING 140.00
140.00
140.00
140.00
140.00
3.00
100.00
BLK 28/ 3 UNITS 43.00
10.00
24.00
11.00
BLK 28/ 3 UNITS 10.00
FOR EXTENTION WIRE 9.00
9.00
12.00
5.00
BLK 28/ 3 UNITS 4.00
4.00
4.00
4.00
4.00
FILING CHB BLK 35 2.00
FOR EXTENTION WIRE
12.00
4.00
FILING CHB BLK 35 2.00
2.00
11.00
23.00
BLK 28/ 3 UNITS 22.00
22.00
3.00
-
10.00
INSTALLATON FOR WELDING MACHINE -
108.00
1.00
FOR EXTENTION WIRE USED IN BATCHING OF PCCP
1.00
45.00
691.00
FOR PLUMBING WORKS @ BLK 7,LOT 1-7 689.00
FOR PLUMBING WORKS @ BLK 30 688.00
CHARGE TO FF TRADING 687.00
BLK 7 2 UNITS 685.00
INTERIOR WATERLINE WORKS @ BLK 5 684.00
CONCRETE POURING OF SOG @ BLK 8-LOT 1-8 683.00
BLK 8 CR PLUMBING WORKS 10 UNITS 681.00
BLK 23, 8 & 7 PIPING & SOG 679.00
CONCRETE POURINGOF SOG ON CR. @BLOCK 19 LOT 11-25 676.00
PLUMBING WORKS BLK 20 674.00
PLUMBING WORKS @BLK 19&20 /13 UNITSLOT 2 672.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 669.00
INSTALLATION FOR WATER LINE BLK 33-35 665.00
665.00
-
1.00
5.00
PLUMBING WORKS @BLK 7 LOT 7-8 3.00
3.00
303.00
12.00
4.00
195.00
INSTALL @ BLK 7 LOT 8-9 65.00
12.00
INSTALL @ BLK 7 LOT 8-9 4.00
4.00
84.00
BLK 7 LOT 8 58.00
3.00
6.00
BLK 7, 2 UNITS 4.00
PLUMBING WORKS @BLK 7LOT 7-8 2.00
3.00
BLK 7, 2 UNITS 1.00
1.00
3.00
CR FLOORING BLK 7 LOT 16 BLK 8 LOT 1 2.00
BLK 7, 2 UNITS 1.00
INSALL @ blk 7 lot 8-9 -
3.00
3.00
3.00
LOADED TO MDT-06 100.00
-
-
3.00
PLASTERING @BLK 28, LOT 8-12 2.00
FOR EXTENTION WIRE USED IN BATCHING OF PCCP 1.00
PLASTERING OF PARAPET BLK 1 -
102.00
1.00
20.00
LOADED TO : MDT-06
PLUMBING WORKS BLK 20 19.00
19.00
2.00
CHARGE TO SILLON
10.00
CHARGE TO SILLON 11.00
8.00
4.00
BLK 11/8 UNITS PLASTERING OF PARAPET 3.50
25.00
FOR INSTALL @ BLK 7 LOT 8-9 24.00
LOADED TO MDT-06 27.00
10.00
10.00
29.00
MANHOLE @ ROADLOT 1 28.00
CUTTING OF REBARS 27.00
BLK 7 POURING CR SOG 26.00
BLK 7 2 UNITS 24.00
TUCKING C-PURLINS BLK 20 21.00
INTERIOR WATERLINE WORKS @ BLK 5 20.00
BLK 11/8 UNITS PLASTERING OF PARAPET 17.00
BLK 20 & 35, 33, 34 INSTALLATION FOR WATERLINE 14.00
BLK 32 & 19 CHB LAYING FOR CR &COCRETE POURING OF COLOUM 11.00
11.00
-
SV-61 10.00
POURING OF BEAMS 9.00
RCP0 LAYING ROAD LOT 3 @ BLK 31 7.00
FOR POURING OF FIREWALL 5.00
5.00
5.00
20.00
BLK 1, 7 UNITS PLASTERING 19.00
PLASTERING @ BLK 28,LOT 8-12 18.00
MANHOLE ROAD 3 17.00
BLK 1, 7 UNITS PLASTERING 16.00
BLK 28/ 7 UNITS PLASTERING 15.00
PLASTERING @ BLK 19 LOT 11-31 14.00
PLASTERING OF PARAPET BLK 1 13.00
AYAGAN @ BLK 28 12.00
BLK 22/15 UNITS PLASTERING 10.00
10.00
10.00
3.00
MDT-O6 13.00
PAINTING C- PURLINS 9.00
FOR PAINTING OF C-PURLINS 6.00
6.00
MDT- 06 10.00
15.00
BLK 35 PARAPET PLASTERING 13.00
BLK 30 POURING CR SOG 11.00
BLK 7, PLASTERING WORKS 9.00
20.00
35.00
CUTTING OF ANGLE BAR @ BLK 28 34.00
BLK 18 LOT 1,4,8,6 BLK 32 LOT 1-8 BEAM REBARS 33.00
FOR INS. OF C-PURLINS 32.00
CUTTING OF AGLE BAR 31.00
31.00
1.00
BLK 7 FOR CUTTING OF ANGLE BAR -
23.00
15.00
4.00
41.00
2.00
11.00
150.00
47.00
220.00
36.00
FORMS OF CONCRETING DOOR JUMB 33.00
33.00
33.00
6.00
INSTALLATION OF ANGLE BAR FOR BLK 1 1.00
TACKING OF C PURLINS (9.00)
TUCKING C-PURLINS BLK 20 (14.00)
LOADED TO MDT-06 100.00
LOADED TO MDT-06 230.00
POOR JAMB, K. COUNTER & PARAPET WALL BLK 3 215.00
FOR ROOF FRAMING BLK 22 LOT 27-41 210.00
TACKING OF C PURLINS 205.00
TACKING OF C PURLINS @BLK 11, & 3 195.00
WEILDING OF C-POURLNS @BLK 11 185.00
WEIDING OF C POURLINS 175.00
BLK 22/8 UNITS 170.00
BLK 11/8 UNIT PLASTERING WALL, FAB. K. COUNTER 160.00
20.00
PAINTING C-PURLINS BLK 2 20.00
LOADED TO MDT-06 20.00
LOADED TO MDT-06 20.00
PAINTING C-PURLINS 17.00
PAINTING C-PURLINS 14.00
PAINTING C-POURLINS 11.00
PAINTING C-POURLINS 8.00
PAINTING C-POURLINS 7.00
-
LOADED TO MDT-06 11.00
PAINTING C-PURLINS 10.00
PAINTING C -PURLINS 9.00
PAINTING C -PURLINS 8.00
PAINTING C -PURLINS 7.00
PAINTING C -PURLINS 6.00
PAINTING C -PURLINS 5.00
PAINTING C -PURLINS 4.00
360.00
30.00
FIREWALL FOR CR @ BLK 16 26.00
BLK 7,PLASTERING 24.00
TACKING FOR C PURLINS 23.00
TACKING FOR C PURLINS 22.00
CONCRETE POURING OF SOG @ BLK 1 LOT 1-8 21.00
SIDING FOR ALLEY 15 20.00
20.00
20.00
20.00
MDT-06 20.00
FILING CHB BLK 35 13.00
__________ 12.00
BLK 1 KITCHEN COUNTER PILE & FABRICATE 9.00
9.00
-
839
45
794 december 1,2020
184
REPORTED DEC. 15,20
839
40
REPORTED DEC. 15,20
168.74 12/7/2020
47.62 12/8/2020
95.19 12/9/2020
211.11 12/10/2020
69.85 12/11/2020
50
3172
65
63
3
131
158
43
31
77
120
65
130
195
9.4286253064303
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE: DEC 1-15,2020
cu.m 107.42
CU.M 56.2
CU.M 80
G1 GRAVEL AGGREGATES 4,765.95 610.6
CU.M 17.69
CU.M 34.02
CU.M 53.07
CU.M 62.6
CU.M 140.6
C H B 6' 94,204
PCS 2360
PCS 350
PCS 811
PCS 130
PCS 800
PCS 750
PCS 1000
PCS 400
PCS 860
PCS 350
C H B 4' 64,958
PCS 584
PCS 3655
PCS 5641
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
PCS 5000
PCS 1750
UPVC TEE 1/2 1,283 PCS
FAUCET 6 PCS
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
PE ELBOW 1/2 THREADED
PE ELBOW 1/2 PLAIN
PVC TEE ADOPTOR 1/2
TEPLON TAPE
STAINLESS KITCHEN SINK 16''X24''
STORM/SEWER LINE
PVC PIPE 100MMX3.0M W/HUB
PVC PIPE 100MMX3.0M W/ O HUB 3675 PCS
PCS 1100
PCS 10
PCS 200
PCS 140
PCS 1200
SWITCH OMNI 5
MALE FLUG 7
PE TUBING 1/2' 7
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 12 PCS
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
B/S FLAT LATEX 701
CONSTRUCTION MATERIALS & CONSUMABLES
SAKULIN
WELDING GLOVES 3
GLASS CUTTER
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 51 PCS
MASONRY DRILL BIT 1. 1/2
METAL DRILL BIT 1/2
HAND GLOVES 20
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
BLIND RIVETS
HILTI GAS NAIL
HILTI GAS CAN
1819.00
62063 30 12/16/2020 ARRIESGA
62064 30 12/17/2020 R. DESAMPARADO
62065 100 12/17/2017 SEVILLENO
62069 15 12/17/2020 J. CARATAO
62072 20 12/17/2020 R. ROSALES
62076 8 12/17/2020 DERDER
62081 40 12/18/2020 RAMIREZ
62091 3 12/19/2020 C. M. LAO
62096 20 12/20/2020 SEVILLENO
62097 30 12/20/2020 J. CARATAO
65601 10 12/20/2020 DERDER
65604 20 12/21/2020 P. OFQUIRIA
65608 10 12/21/2020 E. ALMOHALLLAS
65613 30 12/21/2020 D. MATA
65616 20 12/22/2020 R. BATAIN
65617 30 12/22/2020 SEVILLENO
65621 20 12/22/2020 P. OFQUIRIA
65622 10 12/22/2020 ALMOJALAS
65624 10 12/22/2020 C. M. LAO
65627 16 12/23/2020 L. SEVILLENO
65629 15 12/23/2020 P. OFQUIRIA
65635 10 12/023/2020 C. M. LAO
65638 15 12/23/2020 DERDER
65639 20 12/23/2020 DESPI
65640 5 12/26/2020 R. BATAIN
65641 20 12/26/2020 P. OFQUIRIA
65643 8 12/26/2020 SEVILLENO
65645 10 12/26/2020 DERDER
65648 20 12/27/2020 J. CARATAO
65802 6 12/27/2020 SEVILLENO
65806 5 12/28/2020 R. BATAIN
65812 15 12/28/2020 ALMOJALAS
65813 7 12/28/2020 M. ALOLOR
65815 10 12/28/2020 R. ROSALES
65822 10 12/29/2020 P. OFQUIRIA
65826 6 12/29/2020 SEVILLENO
65828 30 12/29/2020 DARIO
65829 15 12/29/2020 DERDER
1343.00
62062 10 12/16/2020 R. YSULAN
62054 20 12/16/2020 P. OFQUIRIA
62055 15 12/16/2020 J. CARATAO
2355.00
62058 60 12/16/2020 R. DESAMPARADO
62059 10 12/16/2020 L. SEVILLENO
62066 50 12/17/2020 R. BAAIN
62077 20 12/18/2020 SEVILLENO
62078 60 12/18/2020 DESAMPARADO
62079 20 12/18/2020 R. BATAIN
62086 70 12/19/2020 R. BATAIN
62087 50 12/19/2020 P. OFQUIRIA
62092 20 12/19/2020 J. CARATAO
62095 70 12/19/2020 VELLIROSA
62095 100 12/19/2020 VILLAROSA
62100 150 12/20/2020 NEDAMO
62096 40 12/20/2020 SEVILLENO
62097 100 12/20/2020 J. CARATAO
62098 200 12/20/2020 R. BATAIN
62099 80 12/20/2020 P. OFQUIRIA
65603 20 12/21/2020 R. BATAIN
65604 40 12/21/2020 P. OFQUIRIA
65605 40 12/21/2020 VELIGANIO
65610 100 12/21/2020 SEVILLENO
65616 150 12/22/2020 R. BATAIN
65617 120 12/22/2020 SEVILLENO
65620 100 12/22/2020 J. CARATAO
65621 140 12/22/2020 P. OFQUIRIA
65627 120 12/23/2020 L. SEVILLENO
65628 200 12/23/2020 R. BATAIN
65629 15 12/23/2020 P. OFQUIRIA
65630 20 12/23/2020 J. CARATAO
65632 40 12/23/2020 ARIESGADO
65643 20 12/26/2020 SEVILLENO
65641 10 12/26/2020 P. OFQUIRIA
65649 40 12/27/2020 R. BATAIN
65802 20 12/27/2020 SEVILLENO
65807 10 12/28/2020 P. OFQUIRIA
65808 40 12/28/2020 VELIGANIO
65822 10 12/29/2020 P. OFQUIRIA
175.00
69092 3 12/19/2020 J. CARATAO
62098 50 12/20/2020 R. BATAIN
65621 20 12/22/2020 P. CARATAO
65641 10 12/26/2020 P. OFQUIRIA
226.00
62059 2 12/16/2020 L. SEVILLENO
62066 2 12/17/2020 R. BATAIN
62067 1 12/17/2020 P. OFQUIRIA
62075 2 12/17/2020 C.M. LAO
62077 4 12/18/2020 SEVILLENO
62079 2 12/18/2020 R. BATAIN
62092 4 12/19/2020 J. CARATAO
62100 2 12/20/2020 NEDAMO
62096 5 12/20/2020 SEVILLENO
62097 3 12/20/2020 J. CARATAO
62098 3 12/20/2020 R. BATAIN
62099 1 12/20/2020 P. OFQUIRIA
65603 8 12/21/2020 R. BATAIN
65616 8 12/22/2020 R. BATAIN
65617 10 12/21/2020 SEVILLENO
65620 4 12/22/2020 J. CARATAO
65621 8 12/22/2020 P. OFQUIRIA
65624 2 12/22/2020 C. M. LAO
65625 4 12/22/2020 LAYESE
65627 3 12/23/2020 L. SEVILLENO
65628 4 12/23/2020 R. BATAIN
65629 5 12/23/2020 P. OFQUIRIA
65630 2 12/23/2020 J. CARATAO
65635 3 12/23/2020 C. M. LAO
65640 4 12/26/2020 R. BATAIN
65641 5 12/26/2020 P. OFQUIRIA
65642 2 12/26/2020 SAPAPO
65643 3 12/26/2020 SEVILLENO
65647 2 12/26/2020 TUHAO
65649 4 12/27/2020 R. BATAIN
65650 2 12/27/2020 P. OFQUIRIA
65802 10 12/27/2020 SEVILLENO
65806 4 12/28/2020 R. BATAIN
65807 3 12/28/2020 P. OFQUIRIA
65808 4 12/28/2020 VELIGAÑO
65822 4 12/29/2020 P. OFQUIRIA
65823 4 12/29/2020 R. BATAIN
65824 2 12/29/2020 VELIGAÑO
65826 10 12/29/2020 SEVILLENO
65827 2 12/29/2020 CARATAO
43.00
12/20/20 BANAWA ARQUIO/ ANOS
65616 8 12/22/2020 R. BATAIN
65617 2 12/22/2020 SEVILLENO
65621 2 12/22/2020 P. OFQUIRIA
12/22/20 BANAWA Z.CABALQUINTO
12/23/20 BANAWA Z. CABALQUINTO
12/27/20/ BANAWA
65822 2 12/29/2020 P. OFQUIRIA
76.00
62059 4 12/16/2020 L. SEVILLENO
62065 4 12/17/2020 SEVILLENO
62069 2 12/17/2020 J. CARATAO
12/20/20
12/21/20
65603 3 12/21/2020 R. BATAIN
65604 2 12/21/2020 P. OFQUIRIA
12/23/20 Z. CABALQUINTO
65648 2 12/27/2020 J. CARATAO
301.59
62063 10 12/16/2020 ARRIESGA
62055 2 12/16/2020 J. CARATAO
62059 12 12/16/2020 L. SEVILLENO
62064 9 12/17/2020 R. DESAMPARADO
62065 5 12/17/2020 SEVILLENO
62066 4 12/17/2020 R. BATAIN
62067 3 12/17/2020 P. OFQUIRIA
62069 4 12/17/2020 J. CARATAO
62071 3 12/17/2020 YSULAN
62072 10 12/17/2020 R. ROSALES
62077 6 12/18/2020 SEVILLENO
62078 9 12/18/2020 DESAMPARADO
62080 3 12/18/2020 P. OFQUIRIA
62081 20 12/18/2020 RAMIREZ
62083 6 12/18/2020 BATIANCILA
62085 9 12/18/2020 CARABAÑA
62086 2 12/19/2020 R. BATAIN
62094 6 12/19/2020 BATIANCILA
62100 2 12/20/2020 NEDAMO
62096 6 12/20/2020 SEVILLENO
62097 2 12/20/2020 J. CARATAO
62098 5 12/20/2020 R. BATAIN
65601 2 12/20/2020 DER DER
12/21/20 BANAWA
65603 5 12/21/2020 R. BATAIN
65604 3 12/21/2020 P. OFQUIRIA
65605 3 12/21/2020 VELIGANIO
65606 2 12/21/2020 J. CARATAO
65607 6 12/21/2020 YSULAN
65608 8 12/21/2020 E. ALMOHALLAS
65616 5 12/22/2020 R. BATAIN
65617 6 12/21/2020 SEVILLENO
65621 2 12/22/2020 P. OFQUIRIA
65622 5 12/22/2020 ALMOJALAS
65624 3 12/22/2020 C. M. LAO
65630 2 12/23/2020 J. CARATAO
65635 3 12/23/2020 C. M. LAO
65627 6 12/23/2020 SEVELLINO
65638 6 12/23/2020 DERDER
65639 8 12/23/2020 DESPI
65640 5 12/26/2020 R. BATAIN
65641 3 12/26/2020 P. OFQUIRIA
65642 1 12/26/2020 SAPAPO
65643 6 12/26/2020 SEVILLENO
65648 3 12/27/2020 J. CARATAO
12/27/20 BANAWA Z. CABALQUINTO
65806 5 12/28/2020 R. BATAIN
65807 3 12/28/2020 P. OFQUIRIA
65812 5 12/28/2020 ALMOJALAS
65815 8 12/28/2020 R. ROSALES
65816 1 12/28/2020 CARABAÑA
12/28/20 BANAWA
65822 2 12/29/2020 OFQUIRIA
65828 10 12/29/2020 DARIO
1188.00
12/11/20 BANAWA 43732
62058 200 12/16/2020 R. DESAMOARADO
12/16/20 KODIA 66255 DINAPO
12/16/20 KODIA 66260 ARQUE
62067 400 12/17/2020 P. OFQUIRIA
12/18/20 KAMP. 65484 JR. LADAO
12/18/20 KODIA 66294 R. ARQUIO
12/19/20 KODIA 65659 AÑOS
12/19/20 KODIA 65661 FLORES
12/19/20 KODIA 65653 DINAPO
12/19/20 KAMP. 65496 E. CASIÑO
62096 500 12/20/2020 SEVILLENO
62098 500 12/20/2020 R. BATAIN
65616 800 12/22/2020 R. BATAIN
65640 1500 12/26/2020 R. BATAIN
65641 500 12/26/2020 P. OFQUIRIA
65643 300 12/26/2020 SEVILLENO
12/28/20 KODIA
1,188.00
12/11/20 BANAWA
12/14/20 ARRIESGA
62066 700 12/17/2020 R. BATAIN
62077 500 12/18/2020 SEVILLENO
62078 200 12/18/2020 DESAMPARADO
62079 700 12/18/2020 R. BATAIN
62086 200 12/19/2020 R. BATAIN
62096 500 12/20/2020 SEVILLENO
12/22/20 ARRIESGA Z CABALQUINTO
65616 1000 12/22/2020 R. BATAIN
65620 50 12/22/2020 J. CARATAO
65643 500 12/26/2020 SEVILLENO
65819 500 12/28/2020 SEVILLENO
65820 513 12/28/2020 BACOLOD
65831 200 12/29/2020 SEARES
358.00
62064 16 12/17/2020 R. DESAMPARADO
62070 24 12/17/2020 DELOS REYES
65633 40 12/23/2020 CATHUTAY
65642 32 12/26/2020 SAPAPO
65814 15 12/28/2020 SULLERA
65824 20 12/29/2020 VELIGAÑO
1033.00
62064 104 12/17/2020 R. DESAMPARADO
62070 91 12/17/2020 DELOS REYES
62078 24 12/18/2020 DESAMPARADO
65614 182 12/22/2020 DESAMPARADO
65808 208 12/28/2020 VELIGAÑO
34.00
65635 8 12/23/2020 C. M. LAO
65642 10 12/26/2020 SAPAPO
65814 9 12/28/2020 SULLERA
1856.00
62057 24 12/16/2020 R. BATAIN
12/21/20 H.O MANILA
1052.00
62057 24 12/16/2020 R. BATAIN
62088 10 12/19/2020 R. ROSOS
65811 8 12/28/2020 ROSOS
1116.00
62057 24 12/16/2020 R. BATAIN
62066 6 12/17/2020 R. BATAIN
62088 15 12/19/2020 R. ROSOS
62811 12 12/28/2020 ROSOS
62057 7 12/16/2020 R. BATAIN
62093 100 12/19/2020 B. DAWA
12/21/20 H.O MANILA
65615 341 12/21/2020 R. ARRIEGA
65630 11 12/13/2020 J. CARATAO
12/22/20BANTAYAN HARWARE
62084 1 12/18/2020 C. M. LAO
65616 1 12/22/2020 R. BATAIN
65806 2 12/28/2020 R. BATAIN
65807 1 12/28/2020 P. OFQUIRIA
REMARKS BALANCE
1819.00
CHB FAB 1789.00
BLK 28 FIREWALL 1759.00
ALLEY 15 1659.00
SIDE WALK COLAR RCP ROAD 7 1644.00
CHB FAB. BANAWA 1624.00
CHB FAB. DESABILLE 1616.00
CHB FAB. ARRIESGA 1576.00
CHRAGE TO FF. TRADING 1573.00
COLUMN L TUCALO 32 1553.00
SIDE WALK ROAD 1523.00
CHB FAB DESABILE 1513.00
FAB SEPTIK COVER BLK 20 1493.00
CHB FAB. 1483.00
CHB FAB. ARRIESGA 1453.00
COLUMN BLK 20 1433.00
CHB LAYAING BLK 32 STYRUP 1403.00
STYRUP/ TUCALO COLUMN 1383.00
CHB FAB. DESABILLE 1373.00
CHARGE TO FF TRADING 1363.00
COLUMN BLK 32 1347.00
COLUMN BLK 21 1332.00
CHARGE TO FF TRADING 1322.00
CHB FAB. DESABILLE 1307.00
CHB FAB DESABILE 1287.00
BLK 20 CHB 1282.00
BLK 21 CHB LAYING 1262.00
BLK 32 CHB LAYING, COLUMN 1254.00
CHB FAB. DESABILLE 1244.00
SIDE WALK ROAD 11 1224.00
BLK 32 STYRUP BEAM CHM LAYING 1218.00
BLK 20 BEAM 1213.00
CHB FAB. DESABILLE 1198.00
CURVE GUTTERROAD 11 1191.00
CHB FAB. BANAWA 1181.00
BLK 20 COLUMN 1171.00
BLK 32 COLUMN 1165.00
CHB FAB. ARIESGA 1135.00
CHB FAB. DESBILLE 1120.00
1343.00
PLASTERING BLK 28 1333.00
PARAPPET BLK 11 LOT 17-24 1313.00
CURB N' GUTTER R ROAD LOT 7 1298.00
BLK 35,11, 16,17 PLUMBING 1283.00
BLK 22 LOT 1 &3 1263.00
BLK 28 LOT 1-3 UNITS PARAPET 1243.00
PREPARATION OF ALEEY 15 1228.00
BLK 20 LOT 28,30,32,34,36,38,40 1188.00
CHB C.R BLK 32 1173.00
SEPTIK BLK 3 1153.00
BLK 22 FIRE WALL BLK 22 1086.00
PLASTERING BLK 22 1061.00
SIDE WALK COLAR RCP ROAD 7 1046.00
ROOFING INST'L BLK22,28,30,32,34,36,38,40 1036.00
PLASTERING BLK 28 1031.00
PLASTERING BLK 1 1022.00
BLK 32 CHB LAYING 982.00
BLK 1-28 962.00
CHB LAYING SEPTIK BLK 3 942.00
CHB LAYING BLK 22 922.00
PLASTERRING BLK 22 907.00
BLK 22 PLASTERRING 892.00
BLK 22 LOT 27-41 PLASTERRING 872.00
CHB SEPTIK BLK 3,28 852.00
FIREWALL BLK 22 PLASTERING 832.00
PLASTERRINGBLK 19 LOT 12-26 822.00
PLASTERING BLK1 818.00
CHRAGE TO FF. TRADING 815.00
PLASTERRING BLK 35 805.00
KIT. COUNTER BLK 28 795.00
CHB LAYING BLK 32 755.00
CHB BLK 20 735.00
CHB BLK 22 HORZONTAL/VERTIVAL 725.00
PLASTERRING BLK 22 655.00
TUCALO BLK 20 635.00
KITCHEN COUNTER BLK 19 615.00
CURVE N' GUTTER 590.00
BLK 28 PLASTTERING 570.00
BLK1 LOT 2-14 PLASTERRING 564.00
BLK 35 PLASTERING 554.00
C H B BLK 20 534.00
KIT. COUNTER BLK 19, BLK 28 519.00
PLASTERING 509.00
RCP COLAR ROAD STYRUP 489.00
CHARGE TO FF TRADING 484.00
C H B BLK 32 464.00
MAN HOLE ROAD 1 449.00
PLASTERRING BLK 22 419.00
KITCHEN COUNTER BLK 19 399.00
CHARGE TO FF TRADING 389.00
PLASTERING BLK 22 379.00
PLASTERING BLK 28 375.00
BLK 20 CHB LAYING 360.00
FAB. DOOR JAMB 345.00
BLK 32 CHB LAYING, COLUMN 325.00
PLASTERING BLK 28 317.00
PLASTERING BLK 28 312.00
BLK 20 HORIZONTAL BEAM 302.00
BLK 21 CHB LAYING 287.00
BLK 32 STYRUP BEAM CHB LAYING 277.00
PLASTERING BLK 20 269.00
BLK 20 BEAM 254.00
CHB BLK 21 234.00
BLK 32 ROO 219.00
CURVE GUTTERROAD 11 214.00
BLK 20 PLASTERING 211.00
PLASTERING BLK 28 206.00
NEAM BLK 20 201.00
CIT. COUNTER BLK 19 196.00
BLK 7 LOT 8,9 TILES FOR CR 194.00
PLASTERING BLK 28 191.00
2355.00
DOOR JUMB & KIT. COUNTER BLK 28 2295.00
PREPARATION OF ALEEY 15 2285.00
SEPTIK BLK 3 2235.00
BLK 32 CHB LAYING 2215.00
BLK 1-28 2155.00
CHB LAYING SEPTIK BLK 3 2135.00
CHB SEPTIK BLK 3,28 2065.00
FIREWALL BLK 22 PLASTERRING 2015.00
MANHOLE TOP SLAP ALLEY 15 1995.00
WALL PUTTING BLK 32 1925.00
STYRUP BLK 32 1825.00
BLK 28 FAB. DOOR JAMB 1675.00
COLUMN BLK 32 1635.00
SIDE WALK ROAD 1535.00
CHB BLK 20 1335.00
CHB BLK 22 HORZONTAL/VERTIVAL 1255.00
STYRUP BLK 20 1235.00
FAB SEPTIK COVER BLK 20 1195.00
KITCHEN COUNTER BLK 19 1155.00
STYURUP BLK 22 1055.00
STYRUP BLK 20 905.00
CHB LAYAING BLK 32 STYRUP 785.00
RCP COLAR ROAD STYRUP 685.00
STYRUP/ TUCALO COLUMN 545.00
STYRUP BLK 32 425.00
STYRUP BLK 20 225.00
STYRUP BLK 21 210.00
MAN HOLE ROAD 1 190.00
KITCHEN COUNTER BLK 19 150.00
BLK 32CHB LAYING, COLUMN 130.00
BLK 21 CHB LAYING 120.00
BLK 20 HORIZONTAL BEAM 80.00
BLK 32 STYRUP BEAM CHB LAYING 60.00
CHB BLK 21 50.00
KIT. COUNTER BLK 19 10.00
BLK 20 CULOMN 0.00
0.00
175.00
MANHOLE TOP SLAP ALLEY 15 172.00
CHB BLK 20 122.00
STYRUP/ TUCALO COLUMN 102.00
TUCALO BLK 21 92.00
652.00
COLUMN BLK 32 632.00
COLUMN BLK20 652.00
COLUMN BLK 22 502.00
STYRUP/ TUCALO COLUMN 462.00
BLK 20 HORIZONTAL 432.00
BLK 32 STYRUP BEAM
226.00
PREPARATION OF ALEEY 15 224.00
SEPTIK BLK 3 222.00
BLK 22 FIREWALL 221.00
FORM WORKS BLK 19 LOT 2,4,6,8, 219.00
BLK 32 CHB LAYING 215.00
CHB LAYING SEPTIK BLK 3 213.00
MANHOLE TOP SLAP ALLEY 15 209.00
BLK 28 FAB. DOOR JAMB 207.00
CHB LAYING CLK 32 202.00
SIDE WALK ROAD 199.00
CHB BLK 20 196.00
CHB BLK 22 HORZONTAL/VERTIVAL 195.00
STYRUP BLK 20 187.00
COLUMN BLK 22 179.00
CHB LAYING BLK 32 STYRUP 169.00
RCP COLAR ROAD STYRUP 165.00
STYRUP/ TUCALO COLUMN 157.00
CHARGE TO FF TRADING 155.00
BLK 15 BEAM 151.00
C H B BLK 32 148.00
STYRUP BLK 20 144.00
STYRUP BLK 21 139.00
MAN HOLE ROAD 1 137.00
CHARGE TO FF TRADING 134.00
BLK 20 CHB LAYING 130.00
BLK 21 CHB LAYING 125.00
FAB DOOR JAMB 123.00
BLK 32 CHB LAYING, COLUMN 120.00
SIDE WALK ROAD 7 118.00
BLK 20 HORIZONTAL BEAM 114.00
BLK 21 CHB LAYING 112.00
BLK 32 STYRUP BEAM & CHB LAYING 102.00
BLK 20 BEAM 98.00
CHB BLK 21 95.00
KIT. COUNTER BLK 19 91.00
BLK 20 COLUMN 87.00
BEAM BLK 20 83.00
KIT. COUNTER BLK 19 81.00
BLK 32 COLUMN STYRUP 71.00
CURVE N' GUTTER 69.00
69.00
43.00
74.20
COLUMN BLK 22 66.20
CHB LAYING BLK 32 STYRUP 64.20
STYRUP/ TUCALO COLUMN 62.20
LOADING TO DT-88 DT-39 DT-96 169.62
LOADING TO DT-88 DT-39 DT-96 225.77
305.77
BLK 20 COLUMN 303.77
303.77
303.77
303.77
303.77
303.77
303.77
303.77
76.00
PREPARATION OF ALEEY 15 72.00
CREATE POUTING 68.00
SIDE WALK COLAR RCP ROAD 7 66.00
LOADING TO DT-88 103.34
LOADING TO DT-88 137.36
TUCALO BLK 20 134.36
FAB SEPTIK COVER BLK 20 132.36
STOCK FILE 185.43
SIDE WALK ROAD 11 185.43
183.43
183.43
183.43
183.43
183.43
183.43
183.43
183.43
301.59
CHB FAB. 291.59
CURB N' GUTTER R ROAD LOT 7 289.59
PREPARATION OF ALEEY 15 277.59
BLK 28 FIREWALL 268.59
CREATE POUTING 263.59
SEPTIK BLK 3 259.59
BLK 22 FIREWALL 256.59
SIDE WALK COLAR RCP ROAD 7 252.59
PLASTERING BLK 28 249.59
CHB FAB. BANAWA 239.59
BLK 32 CHB LAYING 233.59
BLK 1-28 224.59
CHB LAYING BLK 22 221.59
CHB FAB. ARRIESGA 201.59
BLK 22 PLASTERRING 195.59
BLK 22 LOT 27 -41 PLASTERRING 186.59
CHB SEPTIK BLK 3,28 184.59
PLASTERRING BLK 35 178.59
NLK 28 FAB. DOOR JAMB 176.59
CHB LAYING BLK 32 170.59
SIDE WALK ROAD 168.59
CHB BLK 20 163.59
CHB FAB. DESABILE 161.59
LOADING TO DT-39 296.28
TUCALO BLK 20 291.28
FAB SEPTIK COVER BLK 20 288.28
KITCHEN COUNTER BLK 19 285.28
CURVE N' GUTTER 283.28
BLK 28 PLASTERRING 277.28
CHB FAB. 269.28
COLUMN BLK 22 264.28
CHB LAYING BLK 32 STYRUP 258.28
STYRUP/ TUCALO COLUMN 256.28
CHB FAB. DESABILLE 251.28
CHARGE TO FF TRADING 248.28
MAN HOLE ROAD 1 246.28
CHARGE TO FF TRADING 243.28
CHB BLK 32 237.28
CHB FAB. DESABILLE 231.28
CHB FAB. ARRIESGA 223.28
BLK 20 CHB LAYING 218.28
BLK 21 CHB LAYING 215.28
FAB. DOOR JAMB 214.28
BLK 32 CHB LAYING 208.28
SIDE WALK ROAD 11 205.28
LOADING TO DT-88 DT-39 DT-96 267.34
BLK 20 BEAM 262.34
CHB BLK 21 259.34
CHB FAB. DESABILLE 254.34
CHB FAB. BANAWA 246.34
BLK 20 PLASTERING 245.34
LOADING TO DT-88 DT-39 DT-96 385.98
BLK 20 COLUMN 383.98
CHB FAB. ARIESGA 373.98
373.98
1188.00
FAB. ONSITE
BLK 28 LOT 1-3 UNITS PARAPET 988.00
@BT-04 1338.00
@DT-88 2149.00
BLK 22 FIREWALL 1749.00
MDT 06 1879.00
@DT-88 2679.00
@DT-39 3429.00
@ICHIBAN 4429.00
@BT-04 4829.00
DT 73 5689.00
CHB LAYING 32 5189.00
CHB BLK 20 4689.00
COLUMN BLK 22 3889.00
BLK 20 CHB LAYING 2389.00
BLK 21 CHB LAYING 1889.00
BLK 32 CHB LAYING 1589.00
1939.00
1939.00
1939.00
1939.00
1,188.00
FAB. ONSITE 1,772.00
FAB. ONSITE 5,427.00
SEPTIK BLK 3 4727.00
BLK 32 CHB LAYING 4227.00
KET. COUNTER 4027.00
CHB LAYING SEPTIK BLK 3 3327.00
CHB SEPTIK BLK 3,28 3127.00
CHB LAYING BLK 32 2627.00
FAB. ON SITE VM 3 8268.00
COLUMN BLK 22 7268.00
RCP COLAR ROAD STYRUP 7218.00
BLK 32 CHB LAYING 6718.00
BLK 32 CHB LAYING 6218.00
CHARGE TO KAMP 5705.00
CHARGE TO FF TRADING 5505.00
320.00
BLK 28 FIREWALL 304.00
ROOFING INST'L BLK22,28,30,32,34,36,38,40 280.00
PAINTING C-POURLINS 240.00
ROOFING INST'L BLK 1,3 208.00
ROOFING INST'L BLK 22 193.00
ROOFING INS'L BLK 4,5, & 19 173.00
173.00
1033.00
BLK 28 FIREWALL 929.00
ROOFING INST'L BLK22,28,30,32,34,36,38,40 838.00
BLK 4 ROOFING INST'L 814.00
ROOFING INSTL BLK 3, 28, 14 UNIT 632.00
BLK 32 ROOFING INST'L 424.00
424.00
424.00
424.00
424.00
34.00
CHARGE TO FF TRADING 26.00
ROOFING INST'L BLK 1,3 16.00
ROOFING INST'L BLK 22 7.00
@BT-04 112.00
@BT-04 241.00
@BT-04 321.00
BLK 4 ROOFING INTL LOT 7-17 309.00
ROOFING INST'L BLK 1,3,4 281.00
ROOFING INST'L BLK 1,3 265.00
ROOFING INST'L BLK 5 LOT 1-7 247.00
ROOFING INST'L BLK 5& 8 227.00
227.00
227.00
227.00
@BT-04 153.00
@BT-04 282.00
@BT-04 522.00
BLK 4 ROOFING INTL LOT 7-17 486.00
@BT-04 596.00
ROOFING INST'L BLK 1,3,4 548.00
ROOFING INST'L BLK 1,3 524.00
ROOFING INST'L BLK 5 LOT 1-7 474.00
ROOFING INST'L BLK 5& 8 414.00
414.00
54.00
54.00
16.00
16.00
31.00
31.00
93.00
93.00
31.00
31.00
0.00
2500.00
BLK 4 ROOFING INTL LOT 7-17 2000.00
PICK UP 7000.00
ROOFING INST'L BLK 1,3,4 6400.00
ROOFING INST'L BLK 1,3,4 4400.00
ROOFING BLK 20 3400.00
ROOFING INST'L BLK 1,3 2400.00
ROOFING INST'L BLK 5 LOT 1-7 1800.00
ROOFING INST'L BLK 5& 8 1200.00
ROOFING INS'L BLK 4,5,&19 0.00
0.00
4400.00
PICK UP 12.00
BLK 4 ROOFING INSL LOT 7- 12 11.00
11.00
11.00
11.00
168.00
0.00
1856.00
BLK 35,11, 16,17 PLUMBING 1832.00
3582.00
3582.00
3582.00
3582.00
3582.00
3582.00
3582.00
3582.00
3582.00
1052.00
BLK 35,11, 16,17 PLUMBING 1028.00
BLK 16,17 STORM SEWER 1018.00
BLK 17 SANITARY WATER LINE 1010.00
1010.00
1010.00
1010.00
1010.00
992.00
1998.00
1116.00
BLK 35,11, 16,17 PLUMBING 1092.00
HORIZONTAL/VERTICAL 1086.00
BLK 16,17 STORM SEWER 1071.00
BLK 17 SANITARY WATER LINE 1059.00
1059.00
1059.00
1059.00
1059.00
1059.00
1059.00
1059.00
1000.00
500.00
500.00
3.00
543.00
BLK 35,11, 16,17 PLUMBING 536.00
CHARGE TO KAMP. 436.00
LOADING TO ICHIBAN 1536.00
CHARGE TO KAMP. 1195.00
INJECT SEPTIK BLK 2 1184.00
1184.00
728.00
INSTALLATION BLK 35,11,16, & 17 704.00
CHARGE TO KAMP 554.00
LOADING TO ICHIBAN 554.00
554.00
554.00
554.00
0.00
541.00
INSTALLATION BLK 35,11,16, & 17 517.00
BLK 16,17 STORM SEWER 514.00
524.00
CHARGETO KAMPINGGANON 424.00
BLK 17 SANITARY WATER LINE 416.00
416.00
416.00
416.00
353.00
INSTALLATION BLK 35,11,16, & 17 341.00
BLK 16,17 STORM SEWER 340.00
CHARGE TO KAMP 190.00
BLK 17 SANITARY WATER LINE 186.00
CHARGE TO KAMP 136.00
136.00
136.00
350.00
INSTALLATION BLK 35,11,16, & 17 338.00
BLK 16,17 STORM SEWER 337.00
LOADING TO ICHIBAN 537.00
BLK 17 SANITARY WATER LINE 533.00
533.00
533.00
533.00
533.00
533.00
533.00
0.00
536.00
BLK 35,11, 16,17 PLUMBING 524.00
INSTALLATION BLK 35,11,16, & 17 500.00
BLK 16,17 STORM SEWER 494.00
BLK 17 SANITARY WATER LINE 486.00
486.00
486.00
486.00
486.00
486.00
1331.00
INSTALLATION BLK 35,11,16, & 17 1307.00
BLK 16,17 STORM SEWER 1293.00
BLK 17 SANITARY WATER LINE 1281.00
1281.00
1281.00
1281.00
1281.00
1281.00
1281.00
1281.00
1281.00
1281.00
839.00
INSTALLATION BLK 35,11,16, & 17 827.00
BLK 16,17 STORM SEWER 825.00
BLK 17 SANITARY WATER LINE 821.00
821.00
821.00
821.00
821.00
821.00
821.00
821.00
821.00
821.00
326.00
INSTALLATION BLK 35,11,16, & 17 314.00
LOADING TO ICI 454.00
CHARGETO KAMPINGGANON S
BLK 17 SANITARY WATER LINE #VALUE!
#VALUE!
#VALUE!
#VALUE!
574.00
INSTALLATION BLK 35,11,16, & 17 562.00
BLK 16,17 STORM SEWER 561.00
LOADING TO ICHIBAN 1761.00
BLK 17 SANITARY WATER LINE 1757.00
1757.00
1378.00
INSTALLATION BLK 35,11,16, & 17 1366.00
BLK 16,17 STORM SEWER 1365.00
BLK 17 SANITARY WATER LINE 1361.00
1361.00
1361.00
1361.00
1361.00
1361.00
1361.00
1361.00
140.00
140.00
1.00
CHARGE TO FF TRADING 1.00
STAYED AT WAREHOUSE 0.00
3.00
BLK 3 43.00
10.00
24.00
9.00
12.00
4.00
BLK 3
4.00
1.00
12.00
2.00
2.00
ROOFING INSTL BLK 3, 28, 14 UNITS 0.00
11.00
22.00
3.00
0.00
108.00
150.00
ISTALLATION OF WIRE IN OFFICE 140.00
1.00
45.00
655.00
BLK 35,11, 16,17 PLUMBING 652.00
WATER LINE BLK 34 651.00
BLK 17 SANITARY WATER LINE 650.00
650.00
650.00
650.00
650.00
650.00
650.00
0.00
1.00
3.00
303.00
12.00
4.00
65.00
4.00
58.00
BLK 7 LOT 8-9 TILES FOR C.R 2.00
3.00
3.00
3.00
BLK 7 LOT 8,9 TILE FOR C.R 1.00
3.00
3.00
3.00
6.00
6.00
3.00
3.00
1.00
3.00
3.00
3.00
100.00
FORM WORKS BLK 19 , 2-10 99.00
CHB LAYING BLK 32 STYRUP 97.00
STYRUP/ TUCALO COLUMN 95.00
FORM WORKS BLK 19 , 2-10 94.00
CHB BLK 21 93.00
BLK 32 92.00
BLK 20 COLUMN 88.00
BLK 32 87.00
87.00
100.00
FORM WORKS BLK 19 , 2-10 99.00
BLK 20 98.00
BLK 20 BEAM 96.00
CHB BLK 21 95.00
95.00
95.00
95.00
95.00
95.00
95.00
95.00
1.00
19.00
SIDE WALK COLAR RCP ROAD 7 12.00
STYRUP BLK 20 0.00
0.00
0.00
0.00
2.00
10.00
8.00
BLK 20 BEAM 7.00
3.00
25.00
10.00
10.00
11.00
10.00
PLASTERRING BLK 22 9.00
ROOFING INST'L BLK 1,3,4 8.00
8.00
8.00
6.00
PAINTING C-POURLINS 1.00
10.00
31.00
FAB. BOOM 30.00
BLK 19 29.00
29.00
1.00
23.00
15.00
4.00
41.00
2.00
11.00
150.00
220.00
33.00
BLK 20 BEAM 29.00
29.00
29.00
160.00
TACKING C-POURLINS BLK 1 150.00
BLK 11 140.00
TACKING C-POULINS BLK 20 125.00
BLK 22 LOT 1-10 120.00
BLK 32 INST'L 115.00
BLK 22 110.00
INST'L BLK 19 105.00
105.00
105.00
105.00
105.00
105.00
14.00
PAINTING C-POURLINS 12.00
CHARGE TO FF TRADING 11.00
PAINTING C-POURLINS 9.00
PAINTING C-POURLINS 7.00
PAINTING C-POURLINS 6.00
PAINTING C-POURLINS 3.00
3.00
11.00
PAINTING C-POURLINS 10.00
PAINTING C-POURLINS 9.00
PAINTING C-POURLINS 8.00
PAINTING C-POURLINS 7.00
PAINTING C-POURLINS 6.00
PAINTING C-POURLINS 5.00
5.00
5.00
360.00
20.00
BLK 32 19.00
BLK 22 LOT 1-10 18.00
CHB LAYING BLK 21 17.00
17.00
5.00
5.00
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
DATE;JAN. 1 TO 15 2021
BAG 1080
MASONRY CEMENT 39,750.00 64,170
BAGS 1080
DEF.BARS 8MMX6.0M 16,100
CU.M 93.79
CU.M 178.81
CU.M 76.07
CU.M 86.47
CU.M 155.85
C H B 6' 100,330
PCS 250
PCS 426
PCS 350
PCS 100
PCS 800
PCS 1000
PCS 350
PCS 350
PCS 800
PCS 600
PCS 500
PCS 600
C H B 4' 71,498
PCS 2132
PCS 4408
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
3,000.00
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
C-PURLINS1.2X2X6X4.0M 3,056
PCS 41
SPANDEK 3800MM 1918
PCS 174
PCS 121
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
CAPPING 1510MM 54
CAPPING 1690MM 16
CAPPING 3660MM 16
FAUCET 6 PCS
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
PCS 200
-
PVC ELBOW 50MMX90 1901
SWITCH OMNI 5
MALE FLUG 7
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 51 PCS
SET 39
WELDING GLOVES 3
FINISHING NAIL 1
GLASS CUTTER
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
GAL. 3
CORROGATED SHEET 26 X 8 33
CURING COMPOUND GAL.
SHOVEL 51 PCS
1120.00
65501 30 1/2/2021 R. ROSALES
65835 5 1/2/2021 POSADAS
65836 10 1/2/2021 DERDER
65837 40 1/2/2021 RAMIREZ
65839 3 1/3/2021 SEVILLENO
65840 30 1/4/2021 J. CARATAO
65841 10 1/4/2021 R. BATAIN
65251 10 1/4/2021 C.M. LAO
65253 5 1/5/2021 R. BATAIN
65254 16 1/5/2021 SEVILLENO
65255 20 1/5/2021 P. OFQUIRIA
65257 10 1/5/2021 J. CARATAO
65268 20 1/6/2021 C.M. LAO
65263 5 1/6/2021 R. BATAIN
65274 10 1/7/2021 R. BATAIN
65277 6 1/7/2021 SEVILLENO
65274 30 1/7/2021 J. CARATAO
65280 20 1/8/2021 J. CARATAO
65281 5 1/8/2021 R. BATAIN
65282 5 1/8/2021 SEVILLENO
62002 5 1/9/2021 R. BATAIN
62003 8 1/9/2021 SEVILLENO
65296 10 1/12/2021 P. OFQUIRIA
65858 10 1/14/2021 P. OFQUIRIA
65859 10 1/14/2021 R. BATAIN
65867 15 1/15/2021 P. OFQUIRIA
1/15/2021 TAN
191.00
65833 20 1/2/2021 P.POQUITA
65835 5 1/2/2021 POSADAS
65838 15 1/3/2021 BATIANCILA
92.00
382.00
65835 5 1/2/2021 POSADAS
65841 16 1/4/2021 R. BATAIN
65264 10 1/6/2021 SEVILLENO
65275 40 1/7/2021 P. OFQUIRIA
65852 4 1/13/2021 P. OFQUIRIA
65860 84 1/14/2021 SEVILLENO
65867 10 1/15/2021 P. OFQUIRIA
69.00
65839 6 1/3/2021 SEVILLENO
65841 4 1/4/2021 R. BATAIN
65842 2 1/4/2021 P. OFQUIRIA
65843 4 1/4/2021 DESAMPARADO
65845 6 1/4/2021 SEVILLENO
65252 4 1/5/2021 DESAMPARADO
65253 4 1/5/2021 R. BATAIN
65254 5 1/5/2021 SEVILEENO
65255 4 1/5/2021 P. OFQUIRIA
65257 3 1/5/2021 J. CARATAO
65262 5 1/6/2021 OFQUIRIA
65264 4 1/6/2021 SEVIILENO
65263 5 1/6/2021 R. BATAIN
65274 4 1/7/2021 R. BATAIN
65275 7 1/7/2021 P. OFQUIRIA
65277 2 1/7/2021 SEVILLENO
1/6/2021 KODIA BARDINAS
65280 1 1/8/2021 J. CARATAO
65281 2 1/8/2021 R. BATAIN
65282 6 1/8/2021 SEVILLENO
65283 5 1/8/2021 P. OFQUIRIA
65284 1 1/8/2021 BATIANCILA
65285 4 1/8/2021 DESAMPARADO
62001 3 1/9/2021 P. OFQUIRIA
62002 4 1/9/2021 R. BATAIN
62003 4 1/9/2021 SEVILLENO
62005 2 1/10/2021 VELIGAÑO
65294 3 1/12/2021 R. BATAIN
65296 6 1/12/2021 P. OFQUIRIA
65297 4 1/12/2021 SEVILLENO
65299 4 1/12/2021 J. CARATAO
65851 2 1/13/2021 GIDUCUS
65858 5 1/14/2021 P. OFQUIRIA
65859 3 1/14/2021 R. BATAIN
65860 15 1/14/2021 SEVILLENO
65861 3 1/14/2021 DESAMPARADO
65867 5 1/15/2021 P. OFQUIRIA
65871 15 1/15/2021 SEVILLENO
65872 1 1/15/2021 R. BATAIN
907.77
65833 2 1/2/2021 P.POQUITA
65840 3 1/4/2021 J. CARATAO
65841 3 1/4/2021 R. BATAIN
65842 3 1/4/2021 P. OFQUIRIA
65251 6 1/4/2021 C.M. LAO
65278 3 1/7/2021 C.M. LAO
65282 2 1/8/2021 SEVILLENO
65283 2 1/8/2021 P. OFQUIRIA
65294 2 1/12/2021 R. BATAIN
65300 3 1/12/2021 J. CARATAO
65867 2 1/15/2021 P. OFQUIRIA
183.43
65833 3 1/2/2021 P.POQUITA
65845 2 1/4/2021 SEVILLENO
65268 3 1/6/2021 C.M. LAO
65280 3 1/8/2021 J. CARATAO
373.98
65501 13.48 1/2/2021 R. ROSALES
65836 10 1/2/2021 DERDER
65837 25 1/2/2021 RAMIREZ
1/2/2021 BANAWA
65838 5 1/3/2021 BATIANCILA
1939.00
1/4/2021 KODIA
1/4/2021 KODIA
65845 929 1/4/2021 SEVILLENO
1/5/2021 KODIA
1/5/2021 KODIA VILLAFLOR
65263 500 1/6/2021 R. BATAIN
1/6/2021 KODIA A. BARDINAS
1/6/2021 KODIA A. DINAPO
1/6/2021 KODIA E. CASEÑO
65274 1000 1/7/2021 R. BATAIN
65275 800 1/7/2021 P. OFQUIRIA
1/8/2021 KODIA E. CASEÑO
65282 1000 1/8/2021 SEVILLENO
65283 486 1/8/2021 P. OFQUIRIA
1/9/2021 KODIA Z. CABALQUINTO
1/12/2021 KODIA Z. CABALQUINTO
1/14/2021 KODIA AÑOS
1/15/2021 KODIA AÑOS
5,505.00
65839 500 1/3/2021 SEVILLENO
1/3/2021 BANAWA Z. CABALQUITO
1/3/2021 ARIESESGA Z. CABALQUITO
65842 500 1/4/2021 P. OFQUIRIA
65845 500 1/4/2021 SEVILLENO
65252 200 1/4/2021 DESAMPARADO
65259 1100 1/5/2021 BARDINAS
65270 300 1/6/2021 CASENO
65271 500 1/6/2021 BARDINAS
65263 1000 1/6/2021 R. BATAIN
65273 502 1/6/2021 M. ORTELLANO
65270 300 1/6/2021 E. CASEÑO
65279 300 1/7/2021 BARDINSA
65286 200 1/8/2021 R. BATAIN
65289 300 1/8/2021 BARDINAS
65855 500 1/13/2021 SEVILLENO
65860 200 1/14/2021 SEVILLENO
65861 300 1/14/2021 DESAMPARADO
65865 250 1/15/2021 J. CARATAO
211.00
65843 21 1/4/2021 DESAMPARADO
65285 24 1/8/2021 DESAMPARADO
424.00
65252 72 1/5/2021 DESAMPARDO
65278 57 1/7/2021 C.M. LAO
65285 72 1/8/2021 DESAMPARDO
7.00
1/8/2020 KODIA Z. CABALQUINTO
1/8/2021 KODIA CABALQUINTO
65866 15 1/15/2021 DESAMPARADO
227.00
65834 16 1/2/2021 DEMORAL
65846 30 1/4/2021 DEMORAL
65252 12 1/5/2021 DESAMPARDO
65265 24 1/6/2021 DESAMPARDO
65276 24 1/7/2021 DESAMPARDO
1/7/2021 BARDINAS
65285 24 1/8/2021 DESAMPARDO
65851 20 1/13/2021 GIDUCUS
65861 24 1/14/2021 DESAMPARDO
65866 24 1/15/2021 DESAMPARDO
414.00
65834 20 1/2/2021 DEMORAL
65846 60 1/4/2021 DEMORAL
65252 50 1/5/2021 DESAMPARDO
65265 100 1/6/2021 DESAMPARDO
65276 100 1/7/2021 DESAMPARDO
1/7/2021 KODIA
1/8/2021 KODIA
65851 80 1/13/2021 GIDUCUS
65861 100 1/14/2021 DESAMPARDO
65866 100 1/15/2021 DESAMPARDO
11.00
65843 3 1/4/2021 DESAMPRADO
168.00
65843 20 1/4/2021 DESAMPARADO
65281 32 1/8/2021 R. BATAIN
5/1/2021 KODIA
65856 100 1/13/2021 ROSoS
1832.00
65251 13 1/4/2021 C. M. LAO
65864 15 1/15/2021 R. BATAIN
1010.00
65251 4 1/4/2021 C.M. LAO
65864 5 1/15/2021 R. BATAIN
992.00
65251 4 1/4/2021 C. M. LAO
1,998.00
1,059.00
65251 4 1/4/2021 C.M. LAO
65864 5 1/15/2021 R. BATAIN
1,000.00
500.00
500.00
3
1,184.00
65251 15 1/4/2021 C. M. LAO
65850 170 1/4/2021 ARISGA
65258 8 1/5/2021 C. M. LAO
65259 100 1/5/2021 BARDINAS
65864 25 1/15/2021 R. BATAIN
6.00
111.00
62006 50 1/10/2021 B. SIBLA
227
62006 150 1/10/2021 B. SEBLA
12/21/2020 H. O MANILA
775.00
65291 100 1/9/2021 A. BARDINAS
1,281.00
65251 5 1/4/2021 C. M. LAO
1.00
65260 50 1/6/2021 CASIÑO
65272 100 1/6/2021 CASIÑO
65864 5 1/15/2021 R. BATAIN
840.00
350.00
65259 75 1/5/2021 BARDINAS
1950.00
1257.00
65260 50 1/5/2021 CASAÑO
65272 150 1/6/2021 CASAÑO
1.00
1/13/2021 KAMP. Z. CABALQUINTO
65856 2 1/13/2021 ROSAS
1/8/2021 A. BARDINAS
65295 1 1/12/2021 DEMORAL
65866 1 1/15/2021 DESAMPARDO
APPROVED BY:
ENGR. JUPITER PORROSUELO ENGR. ARIEL MARASIGAN
PROJECT SITE ENGR. PROJECT MANAGER
26470
23823
REMARKS BALANCE
1120.00
C H B FAB. BANAWA 1090.00
COLUMN BLK 32 1085.00
C H B FAB. DESABILLE 1075.00
C H B FAB. E. ARRIESGA 1035.00
COLUMN BLK 32 1032.00
SIDE WALK ROAD 11 1002.00
COLUMN/CHB LAYING BLK 20 992.00
CHARGE TO FF FOR TRADING 982.00
BLK 20 CHB LAYING 977.00
BLK 32 CHB LAYING 961.00
BLK 21 COLUMN 941.00
CURVE N' GUTTER 931.00
CHARGE TO FF FOR TRADING 911.00
CHB LAYING BLK 20 906.00
BLK 20 896.00
BLK 32 CHB LAYING 890.00
SIDE WALKROAD 07 860.00
SIDE WALK ROAD 7 840.00
BEAM/CHB C.R BLK 20 835.00
CHB LAYING / BEAM 830.00
CHB C.R COLUMN POURING 825.00
CHB BLK 32 COLUMN 817.00
COLUMN CHB LAYING 807.00
COLUMN/CHB LAYING BLK 21 797.00
COLUMN/ CHB BLK 20 787.00
BEAM/ COLUMN BLK 20 772.00
1852.00
1852.00
191.00
SIDE WALKROAD 10 171.00
C H B BLK 32 166.00
PLASTERRING BLK 31 151.00
COLUMN BLK 32 141.00
COLUMN/CHB LAYING BLK 20 131.00
BLK 21 COLUMN POURING 111.00
BLK 22 FAB. DOOR JAMP 91.00
FORM WORKS BLK 32 71.00
BLK 20 PLASTERING 61.00
PLASTERRING BLK 32, 22 31.00
BLK 21 PLASTERING 1.00
ACTUAL INVENTORY AS OFJAN. 5 2021 451.00
KITCHEN COUNTER BLK 20 431.00
BLK 20 CHB LAYING 411.00
BLK 32 CHB LAYING 391.00
PLASTERING BLK 20 386.00
PLASTERING BLK 32 366.00
BLK 21 CHB LAYING 346.00
PLASTERING BLK 32 326.00
CHARGE TO FF TRADING 316.00
BLK 32 COLUMN 291.00
PLASTERING BLK 32 271.00
BLK 20 261.00
CHB LAYING BLK 21 241.00
BLK 32 CHB LAYING 226.00
BEAM/CHB C.R BLK 20 211.00
CHB LAYING / BEAM 196.00
CHB BLK 21 FORM WORK 176.00
PLASTERING BLK 32 151.00
KITCHEN COUNTER BLK 22 131.00
PLASTERING BLK 20 111.00
PLASTERING BLK 20 LOT 1-10 91.00
BLK 21 CHB C.R 81.00
CHB C.R COLUMN POURING 71.00
CHB BLK 32 COLUMN 51.00
STOCK WAREHOUSE VM-3 1131.00
COLUMN/CHB LAYING BLK 21 1121.00
COLUMN/ CHB BLK 20 1111.00
CHB LAYING BLK 32 1096.00
KIT. COUNTER BLK 3 1076.00
PLASTERING BLK 32 1061.00
MANHOLE COLAR ROAD 3 1031.00
KIT. COUNTER 1011.00
BLK 20 LOT 1,10 PLASTERING 981.00
PLASTERING BLK 32 956.00
PLASTERING BLK 20 936.00
936.00
92.00
382.00
COLUMN BLK 32 377.00
COLUMN BLK 20 361.00
BLK 32 COLUMN 351.00
CHB LAYING BLK 21 311.00
BLK 21 BEAM 307.00
COLUMN BLK 1 223.00
BEAM/ COLUMN BLK 20 213.00
69.00
COLUMN BLK 32 63.00
CHB LAYING BLK 20 59.00
BLK 21 COLUMN POURING 57.00
BLK 22 FAB. DOOR JAMP 53.00
FORM WORKS BLK 32 47.00
KITCHEN COUNTER BLK 20 43.00
BLK 20 CHB LAYING 39.00
BLK 32 CHB LAYING 34.00
BLK 21 COLUMN 30.00
CURVE N' GUTTER 27.00
BLK 21 CHB LAYING 22.00
BLK 32 COLUMN 18.00
CHB LAYING BLK 20 13.00
BLK 20 9.00
CHB LAYING BLK 21 2.00
BLK 32 CHB LAYING 0.00
LOADED @ ST-06 250.00
SIDE WALK ROAD 7 249.00
BEAM/CHB C.R BLK 20 247.00
CHB LAYING / BEAM 241.00
CHB BLK 21 FORM WORK 236.00
PLASTERING BLK 32 235.00
KITCHEN COUNTER BLK 22 231.00
BLK 21 CHB C.R 228.00
CHB C.R COLUMN POURING 224.00
CHB BLK 32 COLUMN 220.00
KIT. COUNTER 218.00
BEAM BLK 20 215.00
COLUMN CHB LAYING 209.00
BLK 32 CHB LAYING 205.00
SIDE WALK ROAD 7 201.00
TUCKING ANGLE BAR BLK 20 199.00
COLUMN/CHB LAYING BLK 21 194.00
COLUMN/ CHB BLK 20 191.00
COLUMN BLK 1 176.00
KIT. COUNTER BLK 3 173.00
BEAM/ COLUMN BLK 20 168.00
STYRUP BLK 1 COLUMN 153.00
PLASTERING BLK 20 152.00
303.77
SIDE WALKROAD 10 301.77
SIDE WALKROAD 11 298.77
COLUMN BLK 20 295.77
BLK 21 COLUMN POURING 292.77
CHARGE TO FF TRADING 286.77
CHARGE TO FF TRADING 283.77
CHB LAYING / BEAM 281.77
CHB BLK 21 FORM WORK 279.77
BEAM BLK 20 277.77
ROAD 7 SIDE WALK 274.77
BEAM/ COLUMN BLK 20 272.77
183.43
SIDE WALKROAD 10 180.43
FORM WORKS BLK 32 178.43
CHARGE TO FF TRADING 175.43
SIDE WALK ROAD 7 172.43
172.43
172.43
172.43
172.43
172.43
373.98
C H B FAB. BANAWA 360.50
C H B FAB. DESABILLE 350.50
C H B FAB. E. ARRIESGA 325.50
LOADED2DT-96,DT-88,DT-39 419.29
PLASTERRING BLK 31 414.29
COLUMN BLK 32 411.29
COLUMN BLK 20 408.29
BLK 21 COLUMN POURING 405.29
FORM WORKS BLK 32 402.29
BLK 21 PLASTERING 399.29
CHARGE TOFF TRADING 393.29
LOADED2DT-96,DT-88,DT-39 572.10
BLK 20 CHB LAYING 569.10
BLK 32 CHB LAYING 563.10
BLK 21 COLUMN 560.10
PLASTEING BLK 20 558.10
PLASTERING BLK 32 552.10
LOADED2DT-96,DT-88,DT-39 628.17
CHARGE TOFF TRADING 625.17
BLK 21 CHB LAYING 619.17
BLK 32 COLUMN 616.17
CHB LAYING BLK 20 613.17
BLK 32 CHB LAYING 610.17
LOADED TO @DT-88,DT-96 696.64
SIDE WALK ROAD 7 693.64
BEAM/CHB C.R BLK 20 688.64
CHB LAYING / BEAM 685.64
PLASTERING BLK 20 682.64
PLASTERING BLK 20 LOT 1-10 679.64
LOADED TO @DT-88,DT-96 835.49
CHB C.R COLUMN POURING 832.49
CHB BLK 32 COLUMN 829.49
BEAM BLK 20 826.49
BLK 32 CHB LAYING 823.49
PLASTERING BLK 32 817.49
ROAD 7 SIDE WALK 814.49
BLK 20 PLASTERING 811.49
BLK 32 805.49
COLUMN/CHB LAYING BLK 21 800.49
COLUMN/ CHB BLK 20 795.49
SOG BLK 20 792.49
MANHOLE COLAR ROAD 3 789.49
BEAM/ COLUMN BLK 20 786.49
BLK 20 LOT 1,10 PLASTERING 783.49
PLASTERING BLK 20 778.49
1939.00
2189.00
2615.00
FORM WORKS BLK 32 1686.00
2036.00
LOADED @ MDT-06 2136.00
CHB LAYING BLK 20 1636.00
LOADED @ ST-06 1136.00
LOADED @ ICHI BAN 1936.00
LOADED @ BT-04 2936.00
BLK 20 1936.00
BLK 21 1136.00
LAODED @BT-O4 1486.00
CHB LAYING BLK 20 486.00
CHB BLK 21 0.00
LOADING TO ST-06 800.00
LOADING TO ST-06 1400.00
LOADIED @ DT-39 1900.00
LOADED @ DT-39 2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
5,505.00
COLUMN BLK 32 5,005.00
FAB. ON SITE VM3 7,137.00
FAB. ON SITE VM3 11,545.00
BLK 21 COLUMN POURING 11,045.00
FORM WORKS BLK 32 10,545.00
CHB LAYING 10345.00
CHARGE TO KAMP. 9245.00
LOADED TO BT-04 CHARGE TO KAMPINGGANON 8945.00
LOADED TO ST-06 CHARGE TO KAMP. 8445.00
CHB LAYING BLK 20 7445.00
CHARGE TO KAMPINGGANON 6943.00
CHARGE TO KAMPINGGANON 6643.00
CHARGE TO KAMPINGGANON 6343.00
BLK 20 6143.00
CHARGE TO KAMPINGGANON 5843.00
BLK 32 5343.00
CHB LAYING BLK 32 5143.00
KIT. COUNTER BLK 3 4843.00
MANHOLE COLAR ROAD 3 4593.00
211.00
BLK 32 ROOOFING INST'L 190.00
BLK 20, 35 ROOFING INST'L 166.00
166.00
166.00
424.00
BLK 32 ROOFING INST'L 352.00
CHARGE TO FF TRADING 295.00
BLK 20, 35 ROOFING INST'L 223.00
223.00
223.00
223.00
7.00
LOADNG TO MDT06 257.00
LOADING TO MINI DUMP 487.00
BLK 16,17 ROOFING INST'L 472.00
227.00
ROOFING INST'L BLK 6.7 211.00
FORM WORKS BLK 32 181.00
BLK 33 ROOFING INST'L 169.00
ROOFING INT'L BLK 34, BLK 20 145.00
ROOFING INST'L BLK 20 121.00
LOADED@ ST-06 162.00
BLK 20, 35 ROOFING INST'L 138.00
ROOFING INST'L 118.00
ROOFING INST'L BLK 11, 35 94.00
BLK 16,17 ROOFING INST'L 70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
414.00
ROOFING INST'L BLK 6.7 394.00
FORM WORKS BLK 32 334.00
BLK 33 ROOFING INST'L 284.00
ROOFING INT'L BLK 34, BLK 20 184.00
ROOFING INST'L BLK 20 84.00
258.00
379.00
ROOFING INST'L 299.00
ROOFING INST'L BLK 11, 35 199.00
BLK 16,17 ROOFING INST'L 99.00
99.00
99.00
99.00
99.00
99.00
99.00
99.00
99.00
99.00
99.00
11.00
BLK 32 ROOOFING INST'L 8.00
2500.00
INST/L BLK V6 2450.00
168.00
BLK 32 ROOOFING INST'L 148.00
BEAM/CHB C.R BLK 20 116.00
116.00
800.00
WINDOW INS/TL 700.00
700.00
700.00
700.00
3582.00
CHARGE TO FF TRADING 3569.00
SOG BLK 20 3554.00
3554.00
3554.00
1010.00
CHARGE TO FF TRADING 1006.00
SOG BLK 20 1001.00
1001.00
1001.00
992.00
CHARGE TO FF TRADING 988.00
988.00
988.00
1998.00
1059.00
CHARGE TO FF TRADING 1055.00
SOG BLK 20 1050.00
1050.00
1000.00
500.00
500.00
3.00
1184.00
CHARGE TOFF TRADING 1169.00
CHARGE TO KAMP. 999.00
CHARGE FOR FF. TRADING 991.00
CHARGE TO KAMP. 891.00
SOG BLK 20 866.00
866.00
866.00
554.00
CHARGE TO KAMP. 454.00
CHARGE TO KODIA 404.00
CHARGE TO KODIA 304.00
CHARGE TO KAMPINGGANON 104.00
SOG BLK 20 102.00
416.00
CHARGE TO FF TRADING 411.00
CHARGE TO KAMP. 341.00
CHARGE TO KAMP. 266.00
ACTUAL INVENTORY AS OF JAN.6 2021 152.00
CHARGE TO FF TRADING 152.00
SOG BLK 20 152.00
350.00
CHARGE TO KAMP. 275.00
ACTUAL INVENTORY AS OF JAN.6 2021 200.00
ACTUAL INVENTORY AS OF JAN.6 2021 1950.00
140.00
CHARGE TO FF TRADING 110.00
LOADED @ MDT-06 310.00
SOG BLK 20 300.00
140.00
3.00
43.00
10.00
24.00
INST'L OF OUTLET 19.00
9.00
TUCKING ANGLE BAR BLK 20 8.00
12.00
4.00
1.00
BLK 34 0.00
12.00
INST'L OUTLET 10.00
2.00
11.00
22.00
3.00
0.00
108.00
140.00
1.00
650.00
CHARGE TOFF TRADING 649.00
SOG BLK 20 648.00
648.00
648.00
0.00
1.00
3.00
303.00
12.00
BLK 6,7 2 UNITS 0.00
VM3 SILLON 39.00
4.00
BLK 6,7 2 UNITS 0.00
65.00
BLK 6,7 2 UNITS 0.00
4.00
BLK 6,7 2 UNITS 0.00
2.00
FOR C.R LAVATORY LOT 8
3.00
BLK 6,7 2 UNITS 0.00
3.00
1.00
3.00
3.00
3.00
6.00
6.00
3.00
3.00
1.00
LOADING TO MDT-06 3.00
INST/L BLK V6 1.00
3.00
VM-3 SILLON 13.00
FOR C.R BLK 7 LOT 8,9 10.00
3.00
3.00
LOADING TYO MDT-06 12.00
INST/L BLK V6 6.00
87.00
FORM WORKS BLK 32 83.00
CHB BLK 21 FORM WORK 82.00
82.00
95.00
CHB BLK 21 FORM WORK 94.00
FORM WORKS BLK 20 93.00
93.00
93.00
93.00
1.00
2.00
10.00
7.00
3.00
0.00
1.00
LOADED TO: MDT-06 11.00
10.00
LOADED TO:ST-06 40.00
29.00
CUTTING OF ANGLE BARBLK 1,2 28.00
BLK 16,17 ROOFING INST'L 27.00
27.00
27.00
1.00
23.00
15.00
4.00
41.00
2.00
11.00
150.00
220.00
29.00
105.00
BLK 32 ROOOFING INST'L 95.00
BLK 32 ROOOFING INST'L 90.00
ROOFING INT'L BLK 34, BLK 20 80.00
ROOFING INST'L BLK 20 75.00
TUCKING ANGLE BAR BLK 20 55.00
55.00
3.00
PAINTING C-PURLINS 2.00
PAINTING C-PURLINS 0.00
LOADING TO ST06 3.00
5.00
PAINTING C-PURLINS 4.00
17.00
5.00
5.00
BAGS 1020
MASONRY CEMENT 39,750.00 65,170
ROLLS 75
CU.M 15.76
CU.M 17.69
CU.M 13.48
CU.M 15.76
CU.M 17.69
WASHED SAND 6,811.13 4294.05
C H B 6' 109650
PCS 600
PCS 350
PCS 1000
C H B 4' 64,958
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
ANGLE BAR 4MMX75MMX75MMX6.0M 192 PCS
ANGLE BAR 6MMX75MMX75MMX6.0M
3,000.00
3,000.00
PCS 100
PCS 615
C-PURLINS1.2X2X6X4.0M 3,113
PCS 57
PCS 37
PCS 220
SPANDEK 3800MM 2680
PCS 378
PCS 384
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54
6 MM 6
CAPPING 1510MM 54
6 MM 6
CAPPING 1690MM 16
2 MM 2
CAPPING 3660MM 16
2 MM 2
PCS 1337
FAUCET 6 PCS
UPVC PIPE 25MMX3.0M
UPVC ELBOW 20MMX90
UPVC TEE 20MM
UPVC MALE ADAPTOR1/2MM 1,000 PCS
PE COUPLING 1/2
PE TEE 3/4 15 PCS
FAUCET 1/2
PCS 200
BOX 1
MTRS 300
SWITCH OMNI 5
MALE FLUG 7
SAFETY BREAKER 60 AMP. 10 PCS
12 PCS
RECEPTACLE
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M 906 PCS 6
PCS 200
PCS 700
PCS 700
SHTS 110
SHEETS 100
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 51 PCS
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER
ISLAND 2800C TEX A KOTE CAST
ISLAND FLAT LATEX 300FL
WELDING GLOVES 3
FINISHING NAIL 1
COMMON NAIL 2'' 10
PCS 2
GLASS CUTTER
PCS 20
PCS 35
HINGES 3''X3''
COCO LUMBER 2X2X10
COCO LUMBER 2X2X8 700 PCS
KLS. 100
SHOVEL 75 PCS 10
PCS 14
RUST CONVERTER
ABC SILICONE SEALANT
SUPER VULCASEAL SEALANT
CAULKING GUN
RIVETER
DAMAGE SPANDEK 5200 SHTS 8
1852.00
92.00
213.00
65507 20 1/19/2021 SEVILLENO
272.77
1/26/2021 KAMP. 65046 A.DINAPO
172.43
2500.00
4,593.00
65882 600 1/17/2021 SEVILLENO
223.00
1/22/2021 KAMP.
62012 50 1/23/2021 DESAMPARDO
472.00
70.00
65875 24 1/16/2021 DESAMPARDO
142.00
3.00
1/16/2021 KAMP. 65224 Z. CABALQUINTO
1,400.00
65875 1000 1/16/2021 DESAMPARADO
Z. CABALQUINTO
8.00
2,450.00
116.00
700.00
65523 150 1/20/2021 ROSOS
3582.00
988.00
1,998.00
1,050.00
65888 6 1/18/2021 TENEPRE
500.00
500.00
866.00
65882 7 1/17/2021 SEVILLENO
102.00
65888 2 1/18/2021 TENEPRE
152.00
65888 6 1/18/2021 TENEPRE
6.00
61.00
65582 2 1/17/2021 SEVILLENO
77
12/21/2020 H. O MANILA
675.00
465.00
65888 6 1/18/2021 TENEPRE
840.00
200.00
65945 2 1/30/2021 CORONEL
1950.00
65882 5 1/17/2021 SEVILLENO
1057.00
65549 3 1/25/2021 R.BATAIN
300
65875 10 1/16/2021 DESAMPARDO
1/19/2021
65515 1 1/19/2021 J.LADAO
2.00
65515 1 1/19/2021 J. LADAO
1/27/2021
65906 36 1/27/2021 J. VILLACERAN
3.00
43.00
10.00
65906 1 1/27/2021 J. VELLACERAN
19.00
65880 7 1/16/2021 DELAPEÑA
8.00
65875 6 1/16/2021 DESAMPARADO
7.00
65515 2 1/19/2021 J. LADAO
4.00
10.00
62021 8 1/23/2021 DESAMPARDO
2.00
62021 4 1/23/2021 DESAMPARDO
11.00
22.00
3.00
65585 2 1/17/2021 ROSOS
108.00
65875 20 1/16/2021 DESAMPARDO
1.00
65515 140 1/19/2021 J. LADAO
1.00
3.00
39.00
9.00
3.00
1.00
3.00
3.00
3.00
6.00
6.00
3.00
3.00
1.00
1.00
10.00
65508 4 1/19/2021 ROSOS
6.00
82.00
65900 6 1/22/2021 SEVILLENO
93.00
65880 4 1/16/2021 FARIOLIN
2.00
65545 1 1/24/2021 ROSOS
10.00
62019 1 1/23/2021 B. BARDAJI
4
65874 1 1/16/2021 R. BATAIN
12.00
65876 2 1/16/2021 SEVILLENO
9.00
12.00
65887 1 1/18/2021 NEDAMO
11.00
65880 1 1/16/2021 DELAPIÑA
40.00
1/29/2021 KODIA CABALQUINTO
27.00
65875 1 1/16/2021 DESAMPARADO
1/18/2021 KODIA
65532 2 1/20/2021 R.CALINA
1.00
23.00
3.00
65875 1 1/16/2021 DESAMPARADO
15.00
4.00
41.00
2.00
11.00
65541 8 1/21/2021 B. BARDJE
220.00
65536 50 1/21/2021 FARIOLEN
29.00
65893 6 1/19/2021 VILLACERAN
55.00
65883 5 1/17/2021 NEDAMO
KAMP. Z. CABALQUINTO
4.00
65524 2 1/20/2021 DESAMPARADO
5.00
5.00
65523 1 1/20/2021 ROSOS
2.00
1/26/2021 KODIA E. CASEÑO
23823
REMARKS BALANCE
1852.00
BEAM BLK 21 1832.00
BLK 24 TUCALO 1812.00
COLUMN/CHB BLK 21 1807.00
BLK 20 S.O.G 1767.00
BLK 24 MATTING 1742.00
S.O.G BLK 21 1682.00
C- CREATA PORING ROAD 3 1412.00
C- CREATA PORING ROAD 3 1172.00
S.O.G BLK 20 1137.00
BLK 24 CHB LAYING 1122.00
BLK 21 S.O.G 1082.00
C-CREATE POURING ROAD 3 912.00
BEAM BLK 24 892.00
C-CREATE POURING ROAD 3 742.00
BLK 8 COLUMN 722.00
DELIVERED ON SITE 1742.00
BLK 24 BEAM PORING 1722.00
S.O.G BLK 21 1662.00
C-CREATE POURING ROAD 3 1362.00
BLK 22 S.O.G CHB LAYING 1332.00
CHB SEPTIK 1322.00
PLASTERING BLK 8 LOT 1-16 1292.00
BLK 20 PLASTERING 1272.00
ROAD 3 C-CREATE POURING 1047.00
COLUMN/CHB BLK 21 1037.00
FAB. SEPTIK COVER BLK 3 1017.00
C-CREATE POURING ALLEY 1 867.00
S.O.G BLK 24 837.00
1917.00
1917.00
1917.00
1917.00
1917.00
1917.00
1917.00
1917.00
1917.00
1917.00
936.00
PLASTERING WALL BLK 13 75.00
CHB BLK 18 55.00
PLASTERING MAN HOLE ROAD 3 52.00
1132.00
1132.00
1132.00
1132.00
1132.00
1132.00
1132.00
1132.00
13.00
92.00
BLK 24 TUCALO 60.00
ROAD 1 DOWELL 40.00
CHB BLK 22 35.00
35.00
35.00
213.00
BLK 24 MATTING 193.00
BLK 24 CHB LAYING 173.00
STYRUP BLK 24 113.00
CHB BLK 21 93.00
BEAM/BLK 21 WTYRUP 73.00
PLASTERING BLK 21 BEAM/BLK 2 63.00
152.00
PLASTERING BLK 11 43.00
S.O.G BLK 10 41.00
LOADING TO MDT-06 116.00
43.00
272.77
LOADING TO DT-96 224.53
S.O.G BLK 21 224.53
LOADING TO DT-96 240.29
LOADING TO DT-88 257.98
LOADING TO DT-39 271.46
LOADING TO DT-96 287.22
COLUMN/CHB BLK 21 284.22
INJECT SEPTIK BLK 4 281.22
S.O.G BLK 24 276.22
S.O.G BLK 10 271.22
271.22
172.43
S.O.G BLK 20 169.43
BLK 24 TUCALO 167.43
ROAD 1 DOWELL 165.43
S.O.G BLK 20 160.43
C- CREATA PORING ROAD 3 136.43
C- CREATA PORING ROAD 3 100.43
DOWELL ROAD 3 93.43
S.O.G BLK 20 85.43
LOADING TO DT-88 103.12
C-CREATE POURING ROAD 3 79.12
C-CREATE POURING ROAD 3 64.12
S.O.G BLK 21 62.12
C-CREATE POURING ROAD 3 32.12
ROAD 3 C-CREATE POURING 4.12
CHB C.R 2.12
S.O.G BLK 10 0.00
0.00
778.00
PLASTERING BLK 20 225.65
PLASTERING BLK 11 219.65
PLASTERING BLK 11 204.65
S.O.G BLK 24 198.65
PLASTERING WALL BLK 13 196.65
196.65
196.65
196.65
196.65
196.65
196.65
196.65
196.65
2500.00
BLK 20 PLATERING 0.00
LOADING TO ST-06 600.00
LOADING TO ST-06 950.00
LOADING 1950.00
CHB C.R BLK 8 1450.00
BLK 22 S.O.G CHB LAYING 850.00
BLK 20 CHB FIREWALL 400.00
BLK 21 CHB LAYING 0.00
0.00
0.00
0.00
0.00
0.00
4,593.00
EPTIK INJECT BLK 24 3,993.00
CHB C.R BLK 9,10 2,993.00
MAN HOLE 2,893.00
BLK 22 LOT 25&26 CHB LAYING@C.R 2,393.00
BLK 8 CHB LAYING 1,393.00
KIT. COUNTER BLK 20 1,193.00
CHB. C.R BLK 8 693.00
BLK 11 CHB KIT. COUNTER 493.00
CHB SEPTIK 293.00
BLK 21 CHB LAYING -
166.00
CHB FIR WALL BLK 22 LOT 1-10 151.00
ROOFING I NST'L BLK 10 131.00
CHB. LAYING BLK 10 123.00
CHB/PLASTERING BLK 22 111.00
ROOFING INST'L 105.00
FIRE WALL BLK 210 77.00
LOADING TO ST-06 197.00
PLASTER DOR C.R BLK 10 172.00
FIREWALL BLK 20 142.00
ROOFING INST'L BLK 32 112.00
PLASTERING BLK 10 LOT 1-16 87.00
LOADING TO ICHIBAN 702.00
S.O.G BLK 10 615.00
615.00
615.00
223.00
BLK 20 183.00
BLK 22 LOT 25&26 CHB LAYING@C.R 60.00
VM-3 SILLON 117.00
BLK 20 67.00
CHB C.R BLK 8 55.00
PLASTERING BLK 10 LOT 1-15 43.00
BLK 22 S.O.G CHB LAYING 19.00
PLASTER DOR C.R BLK 10 0.00
VM-3 SILLON 37.00
472.00
BLK 20 456.00
BLK 10 CHB C.R ROOFING INDT'L 446.00
INSTL'L BLK 9 430.00
430.00
70.00
ROOFING INST'L 46.00
ACTUAL INVENTORY AS OF JAN. 16 2021 116.00
BLK 22 ROOFING INST'L 106.00
LOADING TO BT-04 326.00
BLK 20 314.00
ROOFING INST'L BLK 8,9 292.00
PLASTER DOR C.R BLK 10 260.00
260.00
99.00
ACTUAL INVENTORY AS OF JAN. 16 2021 264.00
ROOOFING INST'L 164.00
BLK 22 ROOFING INST'L 124.00
LOADING TO BT-04 502.00
BLK 20 402.00
LOADING TO BT-04 786.00
PLASTER DOR C.R BLK 10 690.00
690.00
690.00
690.00
690.00
690.00
690.00
142.00
1400.00
ROOFING INST'L 400.00
BLK 8,9 395.00
BLK 22 ROOFING INST'L 0.00
PURCASE 1337
8.00
2450.00
166.00
700.00
FOR CEILING BLK 7 LOT 8,9 550.00
CELLING INST'L BLK 7 LOT 8,9 450.00
450.00
3582.00
S.O.G BLK 21 3566.00
S.O.G BLK 20 3551.00
S.O.G BLK 21 3530.00
BLK 22 S.O.G CHB LAYING 3525.00
S.O.G BLK 24 LOT 1-6 3507.00
3507.00
3507.00
1001.00
SOG BLK 21 995.00
S.O.G BLK 20 990.00
S.O.G BLK 21 983.00
BLK 22 S.O.G CHB LAYING 981.00
S.O.G BLK 24 LOT 1-6 975.00
S.O.G BLK 22 973.00
973.00
973.00
973.00
973.00
973.00
988.00
988.00
1998.00
1050.00
S.O.G BLK 21 1044.00
S.O.G BLK 20 1039.00
S.O.G BLK 21 1032.00
S.O.G BLK 24 LOT 1-6 1026.00
1026.00
1026.00
1026.00
1026.00
1026.00
1026.00
1026.00
1000.00
500.00
500.00
3.00
866.00
SEPTIK INJECT BLK 24 859.00
SOG BLK 21 829.00
S.O.G BLK 20 804.00
S.O.G BLK 21 769.00
BLK 22 S.O.G CHB LAYING 759.00
S.O.G BLK 24 LOT 1-6 729.00
INJECT SEPTIK BLK 4 717.00
C-CREATE POURING ALLEY 1 702.00
702.00
702.00
702.00
702.00
702.00
702.00
102.00
SOG BLK 21 100.00
S.O.G BLK 20 98.00
S.O.G BLK 21 96.00
FOR MOCK UP 90.00
BLK 22 S.O.G CHB LAYING 89.00
S.O.G BLK 24 LOT 1-6 87.00
152.00
SOG BLK 21 146.00
S.O.G BLK 20 141.00
S.O.G BLK 21 134.00
CHARGE TO KAMP. 34.00
BLK 22 S.O.G CHB LAYING 32.00
S.O.G BLK 24 LOT 1-6 26.00
26.00
26.00
26.00
ACTUAL INVENTORY AS OF JAN.6 2021 6.00
61.00
EPTIK INJECT BLK 24 59.00
CHARGE TO KAMP. 29.00
29.00
29.00
29.00
77.00
675.00
465.00
SOG BLK 21 459.00
S.O.G BLK 20 454.00
S.O.G BLK 21 447.00
FOR MOCK UP 441.00
S.O.G BLK 24 LOT 1-6 435.00
INJECT SEPTIK BLK 4 423.00
S.O.G BLK 22 421.00
S.O.G BLK 10 420.00
200.00
S.O.G BLK 22 198.00
198.00
198.00
198.00
1057.00
CHB C.R BLK 8 1054.00
1054.00
1054.00
1054.00
300.00
INST'L OF WIRE 290.00
MATTING 280.00
ELECTRICAL 263.00
BLK 22 S.O.G CHB LAYING 259.00
ELECTRICAL BLK 24 LOT 1-6 244.00
244.00
244.00
244.00
244.00
244.00
140.00
1.00
BLK 7 LOT 8,9 ELECTRICAL INS'L 0.00
LOADING TO MDT-06 150.00
2.00
BLK 7 LOT 8,9 ELECTRICAL INS'L 1.00
300.00
FOR EXTINCTION 264.00
3.00
43.00
10.00
FOR EXTINCTION 9.00
19.00
BLK 7 LOT 6, 7 12.00
INST'L OF WIRE 0.00
8.00
INST'L OF WIRE 2.00
BLK 7 LOT 6, 7
12.00
BLK 20 6.00
4.00
4.00
4.00
7.00
BLK 7 LOT 8,9 ELECTRICAL INS'L 5.00
BLK 6 4.00
CUTTING ANGLE BAR 3.00
BLK 8, 9 1.00
FOR EXTINCTION 0.00
0.00
4.00
0.00
10.00
BLK 6 2.00
2.00
12.00
BLK 6 8.00
CUTTING ANGLE BAR 4.00
4.00
11.00
11.00
11.00
22.00
3.00
BLK 8,9 1.00
0.00
108.00
INST'L OF WIRE 88.00
BLK 8,9 74.00
CHB C.R BLK 8 71.00
71.00
71.00
71.00
1.00
BLK 7 LOT 8,9 ELECTRICAL INST'L 0.00
150.00
LOADING TO MDT-06
648.00
SOG BLK 21 647.00
S.O.G BLK 20 646.00
BLK 22 S.O.G CHB LAYING 645.00
S.O.G BLK 24 LOT 1-6 644.00
INJECT SEPTIK BLK 4 643.00
643.00
643.00
643.00
643.00
643.00
643.00
643.00
1.00
3.00
0.00
39.00
9.00
3.00
1.00
3.00
BLK 7 LOT 6, 7 1.00
3.00
3.00
6.00
6.00
3.00
3.00
1.00
1.00
10.00
BLK 7 LOT 8,9 INST'L DOOR KNOB 6.00
3.00
6.00
82.00
CHB BLK 24 LOT 1-6 76.00
76.00
76.00
76.00
76.00
93.00
PERIMETER FENCE 89.00
PERIMETER FENCE 87.00
PERIMETER FENCE 82.00
PERIMETER FENCE 80.00
BLK 7 LOT 8,9 79.00
PERIMETER FENCE 73.00
CHB BLK 22 72.00
BLK 21 CHB LAYING 70.00
BLK 18 LOT 1-5 67.00
ROOFING INST'L BLK 32 66.00
PLASTERING BLK 11 SEPTIK 65.00
2.00
FOR MOCK UP 1.00
10.00
CHB BLK 22 9.00
9.00
9.00
9.00
9.00
4.00
S.O.G BLK 20 3.00
FOR MOCK UP 2.00
BEAM/BLK 21 WTYRUP 1.00
12.00
BLK 24, TUCALO 10.00
ROOFING I NST'L BLK 10 9.00
CHB. LAYING BLK 10 8.00
CHB SEPTIL BLK 6 7.00
FORM WORKS BLK 18 6.00
BEAM/BLK 21 WTYRUP 5.00
CUTTING DEF. BARS 4.00
CHB BLK 24 2.00
PLASTERING BLK 8 LOT 1-16 1.00
1.00
9.00
PURCHASE 1
12.00
SAND STRAIN 11.00
SAND STRAIN 10.00
SAND STRAIN 9.00
SAND STRAIN 8.00
SAND STRAIN 6.00
SAND STRAIN 5.00
SAND STRAIN 3.00
SAND STRAIN 2.00
SAND STRAIN 1.00
SAND STRAIN 0.00
11.00
BLK 7 LOT 6, 7 10.00
PAINTING C-PURLINS 8.00
PAINTING C-PURLINS 6.00
6.00
40.00
LOADING TO MINIDUM 60.00
27.00
1.00
23.00
3.00
WELDING 2.00
15.00
4.00
41.00
2.00
11.00
BLK 22 LOT 25 & 26 CHB LAYING 3.00
TRNSFER TO VM-3 23.00
FORM WORKS SCRAPHOLDING BLK 33 17.00
17.00
17.00
150.00
220.00
CHB BLK 18,19 LOT 1,10 170.00
BLK 8 COLUMN 120.00
TRNSFER TO VM-3 155.00
INJECT SEPTIK BLK 4 173.00
BLK 11 LOT 1-8 173.00
173.00
29.00
BUNK HOUSE 23.00
BLK 22 S.O.G CHB LAYING 20.00
FAB. DOOR JAMP 18.00
18.00
55.00
TUCKING C-PURLINS 50.00
TUCKING ANGLE BAR 45.00
ROOFING I NST'L BLK 10 35.00
KITCHEN CENTER BLK 22 25.00
BLK 20 20.00
BLK 22 PLASTERING FIREWAL 15.00
LOADING TO MDT-06 115.00
FIRE WALL BLK 210 115.00
BLK 10 CHB C.R ROOFING INDT'L 115.00
ROOFING INST'L BLK 8,9 115.00
ROOFING INST'L BLK 32 115.00
PLASTERING BLK 10 LOT 1-16 115.00
115.00
115.00
115.00
115.00
115.00
115.00
115.00
115.00
4.00
PAINTING C-PURLINS 2.00
PAINTING C-PURLINS 1.00
PAINTING C-PURLINS 0.00
17.00
ROOFING INST'L 16.00
CHB C.R BLK 9,10 15.00
BLK 20 14.00
CHB BLK 18,19 LOT 1,10 13.00
BLK 8 CHB LAYING 12.00
PLASTERING BLK 10 LOT 1-15 11.00
CHB SEPTIK BLK 6 10.00
BLK 21 CHB LAYING 9.00
5.00
5.00
2.00
LOADING TO BT-04 8.00
C H B 4' 64,958
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 6
CAPPING 1510MM 54
6
CAPPING 1690MM 16
2
CAPPING 3660MM 16
2
FAUCET 6 PCS
PE COUPLING 1/2
FAUCET 1/2
TEPLON TAPE
STORM/SEWER LINE
PVC PIPE 100MMX3.0M W/HUB
H. O MANILA
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 1,412
MALE FLUG 7
12 PCS
RECEPTACLE
BREAKER 20A
BREAKER 10A
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M 1166
PCS 260 2/9/2021 KODIA
WALL ANGLE 1X1X3.0M 969
PCS 260 2/9/2021 KODIA
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 1391 PCS
PCS 1340 2/6/2021
MATTE WHITE TILES 30X30 ROUGH 780 PCS 780 2/3/2021 KODIA
GLAZED WHITE TILES 30X30 PLAIN 1309 PCS 459 2/3/2021 KODIA
PCS 850 2/15/2021 KAMP
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER 50 GAL 50 2/2/2021 KODIA
FINISHING NAIL 1 X 1/ 2 1
GLASS CUTTER
DIGGING BAR
SCREW BIT 29
HINGES 3''X3''
SHOVEL 75
RUST CONVERTER
RIVETER
837.00 837.00
1295.00
1295.00
1295.00
1295.00
1295.00
52.00 52.00
3.00
3.00
3.00
3.00
3.00
3.00
351.00 351.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00 35.00
63.00 63.00
152.00
116.00 116.00
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
75.50
271.00 271.00
361.72
361.72
361.72
195.14 195.14
65957 3 2/1/2021 LINA PLASTERING BLK 13 192.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
52.14
0.00 0.00
FAB. ON SITE 65737 153 2/10/2021 SEVILLENO CHB LAYING BLK 6 0.00
FAB. ON SITE 65752 136 2/11/2021 SEVILLENO CHB LAYING BLK 6 0.00
FAB. ON SITE 65772 225 2/12/2021 SEVILLENO CHB LAYING BLK 6 0.00
615.00 615.00
333.00
333.00
0.00
430.00 430.00
368.00
260.00 260.00
131.00
131.00
690.00 690.00
422.00
422.00
422.00
422.00
422.00
142.00 142.00
41.00
41.00
41.00
41.00
1,337.00 1337.00
6420.00
8.00 8.00
65576 1 2/5/2021 L. GARCIA PLASTERING BLK 21 7.00
2,450.00 2450.00
2176.00
116.00 166.00
450.00 450.00
2100.00
2100.00
ABRAHAM LOADING TO BT-04 1.00
51.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
3507.00 3507.00
3403.00
3403.00
3403.00
973.00 973.00
922.00
922.00
922.00
922.00
988.00 988.00
988.00
1,998.00 1998.00
1,026.00 1,026.00
900.00
900.00
900.00
900.00
900.00
900.00
900.00
900.00
900.00
900.00
900.00
1,000.00 1000.00
985.00
985.00
500.00 500.00
500.00 500.00
3 3.00
702.00 702.00
65959 5 2/1/2021 PATATAG INJECT SEPTIK BLK 4 697.00
525.00
525.00
525.00
525.00
87.00 87.00
26.00 26.00
-24.00
-24.00
-24.00
77 77.00
H. O MANILA 60.00
60.00
675.00 675.00
645.00
645.00
645.00
420.00 420.00
363.00
825.00
198.00 198.00
1945.00 1945.00
939.00
939.00
939.00
244 244.00
217.00
217.00
217.00
217.00
217.00
217.00
217.00
217.00
217.00
140.00 140.00
0.00
150.00 150.00
144.00 144.00
114.00 264.00
0.00
3.00 3.00
43.00 43.00
9.00 9.00
0.00
0.00
4 4.00
0.00
4.00
- 0.00
10.00 10.00
97.00
97.00
2.00 2.00
12.00
4.00
11.00 11.00
11.00
11.00
22.00 22.00
1.00 1.00
0.00
71.00 71.00
69.00
69.00
69.00
69.00
69.00
69.00
100.00 100.00
643.00 643.00
638.00
638.00
638.00
638.00
638.00
638.00
638.00
638.00
1.00 1.00
3.00 3.00
0.00
900.00 900.00
700.00 700.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
953.00
210.00 210.00
250.00 250.00
400.00
39.00 39.00
1270.00
1270.00
1270.00
1270.00
1270.00
1270.00
690.00
690.00
690.00
690.00
690.00
92.00
92.00
92.00
92.00
92.00
812.00
812.00
812.00
9.00 9.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
55.00
3.00 3.00
1.00 1.00
1.00 1.00
3.00 3.00
3.00 3.00
6.00 6.00
6.00 6.00
3.00 3.00
3.00 3.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
6.00 6.00
3.00
6.00 6.00
39.00
39.00
32.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
PATATAG 30.00
41.00
76.00 76.00
74.00
74.00
74.00
74.00
65.00 65.00
55.00
1.00 1.00
1.00
9.00 9.00
1 1.00
1.00 1.00
6.00
0.00
9.00 9.00
5.00
5.00
5.00
5.00
1.00 1
2.00
0.00
5.00
7.00
7.00
7.00
7.00
6.00 6.00
200.00 200.00
175.00
175.00
175.00
14.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
1.00 1.00
10.00 10.00
23.00 23.00
2.00 2.00
15.00 15.00
4.00 4.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
41.00 41.00
2.00 2.00
17.00 17.00
150.00
175.00 175.00
18.00 18.00
14.00
14.00
14.00
115.00 115.00
20.00
20.00
90.00
90.00
90.00
90.00
90.00
90.00
6.00 6.00
0.00
0.00
14.00
14.00
14.00
14.00
14.00
14.00
0 0.00
11.00 11.00
5.00 5.00
4.00 4.00
2.00 2.00
Z. CABALQUINTO LOADING TO BT-04 551.00
8.00
110.00
5.00
259.00
APPROVED BY:
ENGR. ARIEL MARASIGAN
PROJECT MANAGER
H
SUBJECT MATERIALS MONITORING
PROJECT :VILLA MERCEDEZ 3 SILLON
FEB, 16-28 2021
ITEMS DESCRIPTION
TOTAL TOTAL DELIVERIES
REQUIRMENTS
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 78,108 BAGS
h
ROOFING
ANGLE BAR 3MMX50MMX50MMX6 3,000.00 2468 PCS
CAPPING 250CM
FLASHING 250CM 72
FAUCET 6 PCS
UPVC MALE ADAPTOR1/2MM 1,000 PCS
PE COUPLING 1/2
FAUCET 1/2
TEPLON TAPE
STORM/SEWER LINE
PVC PIPE 100MMX3.0M W/HUB
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 1,412
PVC CONDUIT PIPE 3/4X3.0M 566
BOX 1 12/25/2021
SWITCH OMNI 5
MALE FLUG 7
RECEPTACLE
BREAKER 20A
BREAKER 10A
DRAINAGE SYSTEM
RCP 900MM 303 PCS
RCP 750MM 28 PCS
RCP 600MM 54
RCP 450MM 1,558 PCS
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M 1166
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 1559 SET
1700 12/25/2021
1700 12/25/2021
50 12/25/2021
PAIL FLUSH TOILET BOWL 3 PCS
WELDING GLOVES 3
VULCA SEAL 2 GAL.
FINISHING NAIL 1 X 1/ 2 1
PCS 10 2/27/2021
1 PCS 1 2/27/2021
MASONRY DRILL BIT 1/4
PCS 2 2/27/2021
MTR 20 2/19/2021
B-B ROLLER 4' 42
GLASS CUTTER
DIGGING BAR
SCREW BIT 29
HINGES 3''X3''
KL 50 2/23/2021
PCS 3 2/27/2021
RUST CONVERTER
CAULKING GUN
RIVETER
T 2021
837.00
62113 30 2/16/2021 LINA
A.T. TAN
3.00
200.00
152.00
75.00
361.00
33.00
52.00
140.00
333.00
368.00
131.00
422.00
41.00
6,420.00
6.00
2,176.00
116.00
2,100.00
5.00
112219 24 2/26/2021 PATATAG
48.00
3403.00
922.00
988.00
1,998.00
900.00
112242 30 2/28/2021 DIONGSON
985.00
500.00
500.00
525.00
62129 20 2/16/2021 SISDURYO
36.00
62125 1 2/16/2021 SISDURYO
6.00
112242 6 2/28/2021 DIONGSON
77
112188 1 2/24/2021 PATATAG
645.00
112188 2 2/24/2021 PATATAG
363.00
62129 4 2/16/2021 SISDURYO
852.00
112188 1 2/24/2021 PATATAG
198.00
1936.00
112189 2 2/24/2021 PATATAG
1054.00
112188 2 2/24/2021 PATATAG
217
62162 10 2/18/2021 GULFO
140.00
62162 10 2/18/2021 GULFO
105.00
112156 105 2/22/2021 GULFO
144.00
112156 8 2/22/2021 GULFO
3.00
43.00
9.00
10.00
62162 2 2/18/2021 GULFO
2.00
11.00
22.00
1.00
112156 1 2/22/2021 GULFO
69.00
70.00
112156 1 2/22/2021 GULFO
KODIA H. PINEDO
638.00
62125 1 2/16/2021 SISDURYO
900.00
62117 13 2/16/2021 PATATAG
953.00
62117 15 2/16/2021 PATATAG
210.00
62117 2 2/16/2021 PATATAG
250.00
39.00
62127 30 2/16/2021 SEVILLENO
JASPER GLASS
5.00
62178 1 2/19/2021 PATATAG
JASPER GLASS&BUILDERSCORPS
JASPER GLASS
JASPER GLASS
JASPER GLASS&BUILDERSCORPS
JASPER GLASS
62127 80 2/16/2021 SEVILLENO
92.00
KAMP 112941 A. PINIDO
812.00
62117 105 2/16/2021 PATATAG
55.00
62117 2 2/16/2021 PATATAG
3.00
KAMP. 112861 H. PINEDO
1.00
1.00
-
KAMP. 112861 H. PINEDO
3.00
6.00
KAMP. 112861 H. PINEDO
6.00
3.00
3.00
1.00
KAMP. 112861 H. PINEDO
NITO GIRONA
NITO GIRONA
6.00
KAMP. 112861 H. PINEDO
6.00
30.00
62117 1 2/16/2021 PATATAG
55.00
62118 1 2/16/2021 DESAMPARADO
1.00
112239 1 2/28/2021 PATATAG
9.00
BANTAYAN HARDWARE
BANTAYAN HARDWARE
5.00
62117 1 2/16/2021 PATATAG
MYNIEL'S
7.00
62115 1 2/16/2021 ROSOS
BANTAYAN HARDWARE
175.00
62152 4 2/18/2021 PATATAG
1.00
10.00
112156 1 2/22/2021 GULFO
23.00
15.00
4.00
62172 1 2/19/2021 PATATAG
41.00
2.00
17.00
KAMP 112946 A. PINIDO
155.00
KAMP 112553 C. DESUCATAN
14.00
KAMP 112941 A. PINODO
20.00
62116 5 2/16/2021 REVIRA
90.00
62197 3 2/21/2021 PATATAG
4.00
KAMP 112933 S. FORROSUELO
2.00
23823
64512
REMARKS BALANCE
1295.00
BLK 3195.00
BLK 19 3165.00
BLK 3150.00
BLK 15 2825.00
CH B LAYING 2780.00
BLK 4 2710.00
BLK 15 2670.00
BLK 15 2660.00
PLASTERING 2650.00
BLK 19 2630.00
BLK 33 2610.00
BLK 24 2580.00
BLK 20 2570.00
BLK 7 2550.00
BLK 21 2390.00
BLK 7 2320.00
BLK 21 2310.00
BLK 22 2295.00
ROAD 1 2085.00
BLK 19 1890.00
BLK 27 1825.00
3.00
200.00
152.00
75.00
361.00
33.00
52.00
140.00
140.00
333.00
368.00
131.00
422.00
41.00
6420.00
BLK 3 9220.00
BLK 30 8220.00
BLK 7 6920.00
BLK 7 5860.00
BLK 31 5160.00
BLK 32 4540.00
6.00
2176.00
166.00
2100.00
1.00
5.00
27.00
24.00
3403.00
922.00
988.00
1998.00
900.00
985.00
500.00
500.00
3.00
525.00
BLK 32 505.00
BLK 20 503.00
ROAD 3 478.00
36.00
BLK 14 35.00
BLK 32 34.00
0.00
60.00
645.00
363.00
BLK 32 359.00
BLK 20 355.00
852.00
198.00
1936.00
BLK 7 1934.00
939.00
217.00
BLK 21 207.00
ELECTRICAL 195.00
BLK 14 S.O.G 187.00
BLK 20 159.00
BLK 21 126.00
140.00
BLK 21 130.00
BLK 20 123.00
BLK 21 113.00
0.00
105.00
BLK 31 145.00
144.00
3.00
43.00
9.00
0.00
0.00
4.00
5.00
BLK 20 4.00
BLK 6 3.00
4.00
0.00
97.00
BLK 21 95.00
BLK 31 83.00
2.00
0.00
11.00
22.00
1.00
0.00
69.00
70.00
62.00
638.00
BLK 14 637.00
BLK 3 636.00
BLK 6 635.00
BLK 7 631.00
BLK 9 630.00
3.00
BLK 31 LOT 8
BLK 15-16
0.00
1155.00
BLK 5 1151.00
BLK 13 1139.00
BLK 30 1133.00
BLK 7 1125.00
BLK 31 1086.00
953.00
BLK 5 948.00
BLK 13 933.00
BLK 30 928.00
BLK 7 920.00
BLK 31 885.00
210.00
BLK 4 206.00
BLK 6 200.00
BLK 5 195.00
BLK 7 189.00
250.00
BLK 5 1450.00
400.00
BLK 6 386.00
BLK 5 376.00
1270.00
BLK 8 1120.00
BLK 19 1080.00
1248.00
5.00
BLK 31 3.00
142.00
BLK 30 5980
BLK 31 5740
8870
568.00
BLK 30 560.00
1720.00
1720.00
1720.00
690.00
ACTUAL INVENTORY 03-16-21 2690.00
BLK 13 2040.00
BLK 19 1820.00
92.00
BLK 6 1726.00
BLK 30 1684.00
BLK 7 1580.00
BLK 7 2956.00
BLK 13 2464.00
BLK 10 2240.00
812.00
BLK 6 327.00
BLK 30 99.00
BLK 7 0.00
BLK 19 1606.00
BLK 13 1454.00
BLK 10 1150.00
55.00
BLK 30 55.00
BLK 7 54.00
BLK 31 LOT 8 53.00
0.00
BLK 30 0.00
1.00
1.00
0.00
3.00
6.00
6.00
3.00
3.00
0.00
BLK 30 0.00
BLK 4 99.00
BLK 6 89.00
BLK 4 79.00
BLK 13 77.00
BLK 30 55.00
BLK 6 45.00
BLK 31 37.00
BLK 9 17.00
6.00
3.00
0.00
39.00
BLK 13 35.00
BLK 21 34.00
BLK 7 32.00
30.00
BLK 29.00
BLK 13 27.00
BLK 13 25.00
BLK 13 24.00
BLK 13 23.00
BLK 14 21.00
BLK 14 19.00
BLK 15 18.00
46.00
74.00
BLK 19 73.00
55.00
BLK 32 53.00
BLK 51.00
BLK 19 50.00
BLK 21 47.00
BLK 15 43.00
10.00
BLK 8.00
1.00
9.00
BLK 30 24.00
BLK 7 23.00
BLK 7 17.00
BLK 31 11.00
BLK 5 23.00
BLK 7 21.00
BLK 7 20.00
BLK 22 PLASTERING 19.00
BLK 13 18.00
BLK 28.00
BLK 5 15.00
BLK 30 13.00
VM-3 SILLON 10
5.00
BLK 7 3.00
VM-3 SILLON 1
1.00
BLK 30 3.00
BLK 7 0.00
BLK 20 2.00
7.00
BLK 32 2.00
BLK 20.00
PLASTERING WINGS 18.00
BLK 21 17.00
BLK 19 16.00
BLK 14.00
175.00
BLK 13 171.00
BLK 7 167.00
BLK 14 163.00
BLK 15 159.00
7.00
BLK 20 6.00
BLK 18 3.00
BLK 9 1.00
1.00
10.00
23.00
15.00
4.00
BLK 30 3.00
2.00
27.00
BLK 31 25.00
41.00
2.00
17.00
150.00
155.00
14.00
20.00
LOADING TO DT 39 50.00
BLK 13 20.00
90.00
BLK 13 87.00
14.00
11.00
5.00
4.00
BLK 30 9.00
BLK 30 7.00
VM-3 SILLON 6
2.00
BLK 40.00
7.00
551.00
463.00
8.00
VM-3 SILLON
5.00
259.00
SUBJECT MATERIALS MONITORING
STRUCTURAL
250 3/10/2021
17.6 3/5/2021
13.48 3/6/2021
13.48 3/6/2021
17.69 3/7/2021
13.48 3/8/2021
14.48 3/10/2021
13.48 3/12/2021
3 3/12/2021
13.48 3/12/2021
398 3/15/2021
C H B 6' 114479 PCS
163 3/1/2021
110 3/2/2021
186 3/2/2021
162 3/3/2021
207 3/3/2021
42 3/4/2021
136 3/4/2021
165 3/4/2021
151 3/5/2021
201 3/5/2021
42 3/5/2021
152 3/6/2021
160 3/6/2021
80 3/7/2021
84 3/8/2021
119 3/8/2021
121 3/9/2021
135 3/9/2021
126 3/11/2021
80 3/11/2021
114 3/12/2021
139 3/13/2021
109 3/14/2021
112 3/15/2021
C H B 4' 71,298 PCS
300 3/1/2021
395 3/2/2021
350 3/3/2021
100 3/3/2021
151 3/4/2021
310 3/4/2021
153 3/5/2021
230 3/5/2021
290 3/6/2021
146 3/6/2021
260 3/7/2021
272 3/8/2021
510 3/9/2021
280 3/11/2021
340 3/12/2021
317 3/13/2021
ROOFING
3,000.00
ANGLE BAR 3MMX50MMX50MMX6.0M 2468 PCS
C-PURLINS1.2X2X6X4.0M 3,316 PCS
PCS 40 3/1/2021
PCS 23 3/2/2021
PCS 27 3/2/2021
12 3/11/2021
57 3/12/2021
19 3/1/2021
24 3/3/2021
24 3/5/2021
27 3/6/2021
30 3/7/2021
15 3/9/2021
30 3/11/2021
30 3/13/2021
6 3/15/2021
97 03/01/2021
16 3/3/2021
51 3/4/2021
28 3/5/2021
24 3/6/2021
15 3/7/2021
51 3/8/2021
36 3/9/2021
54 3/10/2021
18 3/11/2021
57 3/12/2021
30 3/13/2021
20 3/15/2021
J
UPVC ELBOW 1/2 X 90 1491.00 PCS
30 3/8/2021
PCS 30 3/13/2021
100 3/15/2021
50 3/15/2021
10
1720 3/10/2021
PVC TEE 100MM X 100MM 1800
BOX 10 3/13/2021
BOX 10 3/13/2021
BOX 36 3/13/2021
190 3/10/2021
SWITCH OMNI 5
PE TUBING 1/2' 7
TEFLON TAPE 155 PCS
CEILING
210 3/9/2021
WINDOW ACCESSORIES
PCS 30 3/4/2021
1300 3/4/2021
935 3/10/2021
1411 3/11/2021
325 3/11/2021
29 3/5/2021
300 3/10/2021
400 3/5/2021
400 3/5/2021
WATER CLOSET 451 PCS
14 3/5/2021
18 3/15/2021
FLUSH DOOR 700 X 2100 31 PCS
15 3/15/2021
150 3/5/2021
PAINTING MATERIALS
WELDING GLOVES 3
FINISHING NAIL 1 X 1/ 2 10
5 3/6/2021
50 3/13/2021
4 3/4/2021
10 3/6/2021
50 3/13/2021
PCS 10 3/13/2021
2 3/12/2021
10 3/13/2021
PCS 2 3/4/2021
20 3/13/2021
2 3/6/2021
1 3/6/2021
SCREW BIT 29
PCS 50 3/2/2021
70 3/8/2021
20 3/8/2021
200 3/9/2021
13 3/9/2021
5 3/10/2021
5 3/6/2021
30 3/13/2021
PCS 7 2/1/2021
CHARGE MTRL'S
FROM KODIA
UNIT
PO # ISSUANCES REMARKS
COST
FROM ST. FE
FAB. ON SITE
FAB. ON SITE
RAMIREZ
FAB. ON SITE
RAMIREZ
ALMOHALLAS
FAB. ON SITE
RAMIREZ
FAB. ON SITE
RAMIREZ
ALMOHALLAS
FAB. ON SITE
R. RAMIREZ
ALMOHALLAS
ALMOHALLAS
RAMIREZ
RAMIREZ
ALMOHALLAS
ALMOHALLAS
RAMIREZ
RAMIREZ
RAMIREZ
RAMIREZ
RAMIREZ
DESABILLE
ALLMOHALLAS
DESPI
DESPI
ALMOHALLAS
DESPI
ALMOHALLAS
ALMOHALLAS
DESPI
ALMOHALLAS
ALMOHALLAS
ALMOHALLAS
ALMOHALLAS
ALMOHALLAS
ALMOHALLAS
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
FAB. ON SITE
KODIA
KODIA
SIR. ARIEL
KAMP
REBQUIO
D.J. REBOQUIO
D.J. REBOQUIO
H.O MANILA
H.O MANILA
ACTUAL INVENTORY
BH VM-3 SILLON
BH
BH VM-3 SILLON
BH
BH
BH
BH
BH VM-3 SILLON
BH VM-3 SILLON
BH
BH
SIR. AREIL
BH VM-3 SILLON
112651 4 3/6/2021 P. OFQUIRIA BLK 20
BH
KAMP.
APPROVED BY:
1720.00
392.00
836.00
1298.00
197.00
0.00
1491.00
0.00
250.00
0.00
0.00
362.00
291.00
285.00
279.00
276.00
270.00
267.00
261.00
18.00
16.00
10.00
1.00
0.00
16.96
12.96
6.96
3.96
0.00
17.60
14.60
11.60
5.60
0.60
14.08
27.56
24.56
21.56
15.56
13.56
7.56
4.56
0.00
17.70
14.70
11.70
25.18
22.18
19.18
10.18
7.18
1.18
0.00
14.50
8.50
2.50
0.00
13.50
16.50
29.98
26.98
16.98
14.98
32.67
26.67
22.67
19.67
16.67
13.67
12.67
9.67
6.67
3.67
0.00
398.00
395.00
389.00
386.00
383.00
381.00
375.00
84.00
247.00
197.00
47.00
0.00
110.00
296.00
246.00
408.00
615.00
415.00
215.00
257.00
393.00
558.00
498.00
248.00
399.00
600.00
642.00
442.00
292.00
444.00
604.00
504.00
324.00
124.00
0.00
80.00
164.00
283.00
404.00
539.00
200.00
0.00
126.00
206.00
320.00
220.00
359.00
279.00
388.00
500.00
200.00
140.00
-
300.00
100.00
495.00
395.00
245.00
595.00
695.00
595.00
746.00
1,056.00
856.00
656.00
809.00
1,039.00
789.00
639.00
929.00
1,075.00
895.00
745.00
1,005.00
805.00
705.00
555.00
455.00
302.00
574.00
1,084.00
884.00
584.00
484.00
284.00
84.00
364.00
164.00
504.00
304.00
621.00
561.00
361.00
61.00
65.00
35.00
15.00
5.00
0.00
48.00
88.00
111.00
138.00
78.00
0.00
368.00
358.00
353.00
65.00
45.00
0.00
285.00
268.00
210.00
175.00
13.00
0.00
4540.00
4440.00
3940.00
2990.00
2740.00
4.00
3.00
3.00
1626.00
1586.00
1486.00
1436.00
1386.00
1336.00
1236.00
916.00
756.00
696.00
396.00
296.00
136.00
36.00
116.00
140.00
90.00
2090.00
1890.00
1840.00
1340.00
1300.00
500.00
300.00
0.00
1.00
59.00
0.00
12.00
0.00
57.00
0.00
21.00
0.00
0.00
0.00
0.00
19.00
7.00
31.00
26.00
10.00
34.00
61.00
0.00
30.00
13.00
28.00
1.00
31.00
7.00
37.00
43.00
0.00
0.00
0.00
97.00
52.00
68.00
12.00
63.00
91.00
115.00
0.00
15.00
66.00
16.00
16.00
70.00
0.00
18.00
0.00
57.00
87.00
0.00
20.00
0.00
3303.00
3298.00
3293.00
3291.00
3276.00
3258.00
3248.00
3233.00
3224.00
3216.00
3211.00
3184.00
3172.00
3167.00
3152.00
3142.00
3127.00
3125.00
3115.00
3105.00
3081.00
3066.00
3042.00
3012.00
3007.00
2995.00
2986.00
2976.00
2964.00
2955.00
2954.00
2951.00
2936.00
2924.00
2909.00
2891.00
876.00
870.00
865.00
860.00
858.00
832.00
806.00
780.00
754.00
751.00
741.00
733.00
729.00
724.00
704.00
700.00
688.00
680.00
675.00
667.00
637.00
625.00
621.00
618.00
600.00
597.00
596.00
576.00
571.00
551.00
539.00
513.00
970.00
960.00
951.00
931.00
920.00
908.00
903.00
902.00
896.00
1979.00
1973.00
1965.00
1954.00
1949.00
1936.00
1931.00
1901.00
1897.00
1888.00
1877.00
1833.00
1821.00
1811.00
1793.00
1773.00
1743.00
1732.00
1721.00
1716.00
1711.00
1688.00
1664.00
1646.00
1623.00
1600.00
1595.00
1592.00
1587.00
1569.00
1558.00
1557.00
1538.00
1524.00
1518.00
788.00
773.00
770.00
769.00
733.00
688.00
658.00
636.00
633.00
618.00
610.00
606.00
601.00
595.00
565.00
562.00
558.00
550.00
545.00
537.00
525.00
485.00
473.00
469.00
466.00
446.00
422.00
419.00
418.00
417.00
414.00
384.00
379.00
349.00
331.00
292.00
289.00
928.00
910.00
888.00
864.00
840.00
830.00
828.00
816.00
500.00
499.00
428.00
420.00
415.00
395.00
390.00
380.00
375.00
12.00
10.00
8.00
6.00
0.00
30.00
28.00
13.00
11.00
0.00
30.00
25.00
20.00
0.00
100.00
80.00
75.00
0.00
10.00
0.00
49.00
48.00
38.00
5.00
5.00
0.00
100.00
90.00
78.00
73.00
68.00
64.00
60.00
50.00
40.00
34.00
623.00
621.00
601.00
600.00
580.00
541.00
515.00
495.00
485.00
465.00
453.00
445.00
444.00
432.00
422.00
312.00
307.00
304.00
274.00
273.00
242.00
203.00
164.00
134.00
112.00
109.00
98.00
90.00
79.00
74.00
44.00
21.00
16.00
4.00
0.00
300.00
292.00
253.00
249.00
226.00
223.00
205.00
185.00
173.00
170.00
166.00
165.00
154.00
135.00
115.00
114.00
96.00
66.00
52.00
841.00
840.00
830.00
829.00
818.00
805.00
792.00
782.00
777.00
770.00
760.00
754.00
749.00
743.00
733.00
732.00
722.00
712.00
706.00
198.00
196.00
193.00
163.00
130.00
91.00
51.00
21.00
18.00
8.00
0.00
1720.00
1716.00
1698.00
1690.00
1660.00
1652.00
1612.00
1602.00
1598.00
1592.00
1580.00
1577.00
1573.00
1572.00
1542.00
1540.00
1522.00
1482.00
1462.00
1924.00
1923.00
1903.00
1883.00
1855.00
1829.00
1819.00
1799.00
1798.00
1788.00
1781.00
1771.00
1759.00
1739.00
1719.00
1707.00
1687.00
1682.00
1674.00
1654.00
1634.00
1632.00
927.00
926.00
916.00
885.00
868.00
866.00
853.00
843.00
838.00
831.00
821.00
815.00
805.00
800.00
794.00
784.00
774.00
764.00
758.00
100.00
102.00
92.00
86.00
70.00
60.00
52.00
46.00
0.00
10.00
10.00
116.00
0.00
36.00
4.00
16.00
8.00
0.00
8.00
4.00
8.00
4.00
4.00
0.00
0.00
4.00
0.00
0.00
18.00
190.00
189.00
188.00
187.00
186.00
4.00
5.00
83.00
82.00
80.00
0.00
1.00
69.00
0.00
36.00
0.00
39.00
24.00
17.00
4.00
2.00
1.00
0.00
112.00
108.00
93.00
83.00
73.00
67.00
50.00
630.00
629.00
627.00
624.00
623.00
620.00
618.00
617.00
616.00
615.00
613.00
611.00
610.00
609.00
607.00
606.00
605.00
604.00
603.00
602.00
601.00
600.00
599.00
598.00
596.00
595.00
593.00
592.00
590.00
587.00
3.00
9.00
5.00
4.00
1.00
1.00
4.00
1.00
170.00
165.00
160.00
140.00
130.00
100.00
94.00
89.00
84.00
61.00
56.00
51.00
33.00
28.00
18.00
8.00
6.00
39.00
24.00
19.00
4.00
0.00
102.00
98.00
84.00
69.00
59.00
49.00
43.00
23.00
19.00
15.00
1086.00
1074.00
1069.00
1064.00
1059.00
1053.00
1043.00
1038.00
885.00
875.00
870.00
865.00
860.00
852.00
847.00
185.00
180.00
175.00
172.00
169.00
166.00
160.00
155.00
1150.00
850.00
550.00
450.00
150.00
1150.00
850.00
450.00
250.00
366.00
356.00
346.00
340.00
333.00
543.00
537.00
527.00
1248.00
1228.00
1208.00
1188.00
1168.00
1148.00
1128.00
1068.00
1018.00
998.00
928.00
908.00
898.00
878.00
838.00
808.00
8870.00
8740.00
8610.00
8480.00
8350.00
8380.00
7990.00
7910.00
7520.00
4187.00
3784.00
3654.00
3264.00
3069.00
2939.00
2874.00
2744.00
2289.00
2154.00
2089.00
1894.00
1829.00
1634.00
1439.00
789.00
142.00
140.00
1720.00
1712.00
3.00
2.00
1.00
1820.00
1780.00
1720.00
1680.00
1640.00
1560.00
1460.00
1400.00
1100.00
980.00
920.00
820.00
660.00
515.00
455.00
2240.00
2212.00
2128.00
1988.00
1904.00
1764.00
1644.00
1504.00
1438.00
1174.00
1136.00
2436.00
2198.00
1943.00
1855.00
1583.00
1499.00
1431.00
1210.00
1124.00
1005.00
920.00
832.00
662.00
618.00
1553.00
1349.00
1261.00
2672.00
2584.00
2482.00
2380.00
2292.00
2136.00
2051.00
1963.00
1859.00
1781.00
1713.00
1625.00
1156.00
1118.00
1030.00
916.00
726.00
638.00
524.00
334.00
182.00
0.00
935.00
1260.00
1107.00
971.00
731.00
629.00
553.00
496.00
428.00
53.00
52.00
51.00
50.00
49.00
48.00
47.00
46.00
40.00
39.00
38.00
0.00
447.00
442.00
437.00
397.00
367.00
356.00
344.00
321.00
309.00
286.00
263.00
245.00
234.00
215.00
201.00
450.00
445.00
474.00
469.00
429.00
399.00
388.00
376.00
353.00
341.00
318.00
295.00
277.00
266.00
247.00
233.00
448.00
443.00
403.00
373.00
362.00
350.00
327.00
315.00
292.00
269.00
251.00
240.00
221.00
207.00
300.00
291.00
251.00
221.00
210.00
198.00
175.00
163.00
140.00
117.00
99.00
88.00
69.00
55.00
200.00
195.00
190.00
440.00
435.00
395.00
365.00
354.00
342.00
319.00
307.00
284.00
261.00
243.00
232.00
213.00
199.00
1.00
301.00
298.00
290.00
284.00
280.00
277.00
274.00
1.00
450.00
445.00
440.00
429.00
417.00
405.00
400.00
399.00
393.00
1.00
401.00
392.00
381.00
369.00
357.00
352.00
351.00
3.00
453.00
448.00
443.00
430.00
423.00
410.00
405.00
397.00
389.00
385.00
405.00
396.00
389.00
385.00
383.00
403.00
393.00
379.00
383.00
378.00
402.00
390.00
377.00
381.00
377.00
375.00
369.00
366.00
364.00
363.00
359.00
356.00
353.00
351.00
900.00
895.00
894.00
889.00
878.00
866.00
854.00
849.00
848.00
847.00
846.00
6.00
406.00
405.00
0.00
446.00
441.00
434.00
426.00
418.00
410.00
408.00
380.00
378.00
368.00
366.00
365.00
342.00
340.00
338.00
315.00
307.00
279.00
277.00
274.00
259.00
257.00
245.00
231.00
229.00
14.00
7.00
20.00
14.00
10.00
8.00
6.00
4.00
2.00
0.00
18.00
17.00
12.00
10.00
8.00
6.00
4.00
2.00
17.00
16.00
67.00
61.00
57.00
42.00
30.00
30.00
180.00
168.00
154.00
147.00
142.00
138.00
130.00
128.00
120.00
116.00
115.00
113.00
111.00
200.00
190.00
180.00
170.00
160.00
150.00
145.00
32.00
30.00
29.00
27.00
25.00
13.00
11.00
9.00
7.00
5.00
4.00
2.00
0.00
50.00
49.00
48.00
187.00
73.00
68.00
67.00
66.50
42.00
40.00
39.00
38.50
0.00
10.00
9.50
9.00
6.00
3.00
2.00
1.00
0.00
5.00
3.00
1.00
0.00
50.00
49.00
18.00
17.00
16.00
14.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
3.00
2.50
1.00
0.00
10.00
9.00
8.00
3.00
2.00
1.00
5.00
4.00
3.00
2.00
12.00
9.00
7.00
5.00
2.00
0.00
50.00
48.00
45.00
44.00
42.00
39.00
29.00
2.00
12.00
11.00
3.00
2.00
1.00
3.00
2.00
12.00
11.00
2.00
1.00
0.00
20.00
1.00
0.00
2.00
1.00
0.00
4.00
2.00
1.00
14.00
13.00
155.00
124.00
120.00
0.00
1.00
0.00
1.00
9.00
5.00
23.00
2.00
1.00
0.00
0.00
25.00
24.00
23.00
22.00
21.00
41.00
2.00
37.00
150.00
40.00
90.00
119.00
189.00
4.00
3.00
3.00
20.00
15.00
10.00
5.00
0.00
20.00
15.00
215.00
210.00
208.00
206.00
204.00
200.00
195.00
190.00
187.00
87.00
1.00
14.00
13.00
0.00
5.00
4.00
6.00
5.00
4.00
7.00
12.00
8.00
5.00
3.00
0.00
30.00
25.00
20.00
551.00
190.00
0.00
463.00
228.00
0.00
8.00
110.00
45.00
52.00
5.00
259.00
CHARGES TO KAMP. AND KODIA
SUBJECT MATERIALS MONITORING R.C.P. SILLION
PROJECT :VILLA MERCEDEZ 3 SILLON 32 CHARGE MTRL'S
MARCH 16-31, 2021 3200 FROM VM-1
106.25 26.5625 FROM KODIA
UNIT
ITEMS DESCRIPTION TOTAL TOTAL DELIVERIES COST
PO # ISSUANCES
REQUIRMENTS
1B DONE QTY UM QTY DATE SUPPLIER MIS # QTY
STRUCTURAL
650118 150
650128 2
650130 25
650136 10
650145 20
650125 12
650153 40
650154 10
650158 25
650159 15
650169 15
650173 3
650179 25
650187 30
650189 15
650194 10
650197 30
650203 40
650214 20
650221 6
650222 25
650227 15
650229 10
650230 15
650231 20
650241 10
650242 60
650243 5
650246 50
650250 30
650252 10
650253 10
650255 5
650258 15
650263 15
650265 6
650279 30
650281 200
650288 10
650290 25
650291 26
650292 20
650293 10
650294 20
650295 20
650296 15
650298 15
650302 20
650303 40
650304 10
650305 15
650306 10
650307 30
650308 20
650309 10
650310 15
650311 20
650313 30
650314 20
650316 20
650317 18
650318 10
650320 10
650322 10
650325 15
650327 20
650328 20
650332 10
650336 10
650337 6
650338 20
650339 15
650341 30
650342 10
650343 3
650344 15
650345 10
650348 15
650349 10
650352 90
650354 20
650356 20
650359 20
650364 20
650366 300
650367 100
650373 10
650384 30
650118 130
650120 20
650121 10
650122 10
650123 30
650126 30
650131 20
650133 20
650137 30
650142 10
650143 15
650144 10
650145 30
650148 20
650150 25
650152 20
650156 15
650164 15
650165 10
650168 20
650171 20
650172 16
650180 25
650182 20
650190 20
650191 20
650192 10
650198 25
650204 20
650206 10
650210 20
650211 20
650213 15
650218 15
650225 15
650230 18
650232 30
650234 20
650237 15
650240 20
650243 25
650248 20
650251 20
650254 25
650255 30
650256 20
650259 20
650260 25
650266 20
650270 30
650271 20
650273 30
650274 30
650275 50
650282 10
650283 15
650285 20
650286 10
650288 10
650291 4
650346 10
650350 10
650353 20
650357 15
650358 15
650360 30
650361 10
650369 30
650370 10
650371 20
650374 15
650376 10
650126 20
650131 20
650133 11
650134 30
650150 20
650153 15
650172 40
650192 15
650193 6
650207 8
650213 15
650214 40
650240 20
650242 108
650243 30
650245 10
650247 12
650253 10
650256 40
650259 40
650260 50
650262 30
650267 20
650268 35
650270 30
650271 15
650272 30
650274 30
650288 15
650292 29
650310 30
650311 40
650317 30
650326 20
650327 20
650337 20
650338 20
650343 20
650353 10
650360 20
650361 10
650374 15
650375 10
650377 20
650183 64
650191 10
25 3/19/2021 LYNS
650212 15
650213 1
650214 4
650220 4
650221 1
650223 1
650230 4
650240 6
650241 1
650242 10
650243 1
650245 1
650246 3
650255 6
650256 3
650259 4
650260 4
650261 1
650272 4
650274 4
650283 4
650288 2
650297 2
650313 3
650314 1
650317 1
650326 1
650327 5
650358 2
650374 1
650377 3
650382 2
50 3/31/2021 BH
650145 10
650158 12
650174 10
650179 13
650192 5
650201 12
650222 15
650223 12
650231 10
650242 9
650250 9
650277 6
650290 13
650302 6
650307 13
650316 3
650352 35
650356 16
650119 9
650121 3
650124 3
650127 6
650130 6
650132 6
650133 12
650136 6
650137 3
650140 6
650144 3
650145 6
650148 20
650125 12
650154 3
650158 2
650159 15
650165 2
650166 6
650174 3
650179 3
650187 20
650190 3
650191 3
650193 6
650201 5
650203 3
650204 6
650205 6
650214 6
650216 4
650219 6
650220 6
650222 9
650223 2
650227 12
650229 5
650230 3
650231 6
650232 3
650240 3
650242 12
650243 6
650248 3
650250 9
650255 6
650258 3
650260 9
650262 3
650266 2
650277 18
650278 9
650286 3
650286 3
650290 3
650292 6
650294 12
650298 3
650302 3
650304 3
650310 5
650313 2
650156 100
650182 200
650191 200
650219 200
650226 100
650219 200
650226 100
650241 200
650243 400
650248 100
650260 400
650261 150
650262 100
650259 100
650270 300
650271 200
650284 100
650292 478
650298 200
650353 500
650364 207
650369 198
650156 100
43 3/18/2021 MATA
50 3/19/2021 MATA
650191 200
650193 200
650210 200
40 3/20/2021 MATA J.
650226 200
650228 50
650240 50
650241 200
650243 100
650247 300
650260 250
650261 150
650262 100
99 3/24/2021 MATA
650270 200
650275 100
650284 100
650288 100
650292 209
650298 150
650311 160
92 3/26/2021 MATA
650317 100
650321 100
650327 200
650330 200
650335 100
650343 100
650358 200
650360 500
650374 200
99 3/31/2021 RAMIREZ
30 3/20/2021 KAMP
650265 12
650313 18
650365 21
650381 6
650383 4
500 3/28/2021
650341 84
650345 54
650351 112
650362 52
650363 117
650364 24
650368 57
650368 10
1 3/16/2021 KAMP
95 3/24/2021 KODIA
650298 6
650347 8
650373 18
79 3/16/2021 KAMP
650298 18
650347 24
650373 58
650151 20
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 6
CAPPING 1510MM 54 6
CAPPING 1690MM 16 2
CAPPING 3660MM 16 2
650373 640
650209 2
650378 83
650378 54
STORM/SEWER LINE
650119 10
650124 10
650132 7
650160 5
650162 14
650170 5
650175 5
650177 13
650200 5
650215 5
650238 5
650264 2
650315 5
650323 6
650342 13
650362 8
650119 1
650135 15
650138 5
650160 10
650175 12
650177 12
650186 4
650200 15
650215 3
650224 3
650238 10
650254 26
650264 8
650301 15
650308 12
650315 5
650362 9
650119 2
650132 2
650160 12
650280 2
650322 18
650342 31
PVC ELBOW 100MMX45 540
650123 15
650146 10
650160 6
650170 3
650238 10
650264 8
650123 15
650146 15
650160 4
650280 2
650362 3
650123 26
650146 30
650170 10
650175 24
650177 24
650199 6
650200 30
650215 36
650238 30
650264 12
650362 13
650123 26
650146 20
650160 12
650162 24
650170 24
650175 16
650177 16
650199 4
650200 20
650215 24
650238 20
650264 8
650362 6
650146 10
650161 6
650170 12
650175 8
650177 8
650199 2
650200 15
650215 12
650239 10
650264 4
650362 4
650119 6
650124 20
650132 6
650147 15
650160 10
650170 20
650175 12
650177 21
650195 3
650199 6
650200 25
650216 15
650238 15
650245 12
650245 5
650265 6
650301 5
650362 13
650119 2
650124 39
650132 2
650147 20
650160 12
650171 36
650176 24
650178 16
650199 4
650201 30
650216 24
650238 20
650265 4
650362 10
650119 2
650124 39
650132 2
650146 30
650160 18
650170 24
650176 16
650178 24
650195 6
650199 6
650201 45
650215 36
650238 30
650245 11
650265 12
650297 2
650306 2
650320 2
650357 2
650362 15
650120 20
650122 3
650165 3
650172 15
650194 5
650195 6
650245 7
650252 4
650266 3
650282 3
650297 2
650301 16
650320 2
650340 5
650357 3
650372 2
650373 5
650195 12
650245 7
650301 8
650149 15
650195 12
650245 14
650301 16
650119 1
650120 1
650124 3
650161 1
650171 3
650172 2
650176 2
650178 3
650199 1
650201 4
650216 4
650239 3
650265 1
650297 1
650323 2
650357 1
650362 1
650120 6
650149 15
650172 10
650194 5
650301 5
650322 1
PVC CONDUIT PIPE 1/2X3.0M 2,512 PCS
650163 12
650231 6
650293 10
650116 1
650139 1
650116 1
650139 1
650139 1
PVC SOCKET LAMP HOLDER 1,200 PCS 1200 3/22/2021 KAMP 93714
SWITCH OMNI 5
650116 3
650116 3
650139 1
650151 1
650380 2
PANEL BOARD 6BRANCHES W/ BREAKE 240 PCS 240 3/22/2021 KAMP 93714
650233 10
26 3/30/2021 KAMP
650233 10
39 3/30/2021 KAMP
52 3/16/2021 KAMP
650138 5
650184 4
650202 2
O-RING 50MM 162 PCS
60 3/16/2021 KAMP
650138 5
650184 4
650202 2
650315 5
CEILING
650151 10
650151 10
650173 1
650355 1
650125 5
650125 250
AIR VENTILATION 30X 40MM 610 PCS
650125 10
650331 150
WINDOW ACCESSORIES
650151 10
650167 30
650173 12
650181 20
650195 50
650198 20
650217 110
650218 20
650235 10
650244 50
650254 20
650257 120
650269 20
650289 30
650308 20
650312 30
650319 20
650322 60
650334 160
650336 20
650355 40
650373 60
650125 130
650167 195
650173 464
650289 196
650308 130
650312 195
650319 129
650181 2
JALOUSY BLADE 4'X 18' 2820 PCS
650125 120
650125 200
650167 100
650173 528
650181 36
650196 132
650198 40
650217 150
650218 40
650235 22
650244 87
650269 40
650285 40
650289 203
650308 40
650312 177
650319 40
650322 120
650334 300
650167 100
650181 36
650196 132
650198 40
650209 100
650218 40
650235 22
650244 110
650249 40
650254 40
650257 264
650269 40
650273 100
650285 40
650289 173
650308 40
650312 192
260 3/27/2021 BANTAYAN H.
650319 40
650322 120
650334 121
650173 1
650122 85
650123 88
650127 96
650129 238
650141 51
650143 170
650144 181
650146 88
650152 363
650165 265
650252 255
650258 68
650265 88
650266 255
650273 425
650282 204
650299 40
650306 170
650312 448
650313 88
650320 204
650322 119
650324 88
650332 198
650334 44
650340 202
650341 88
650342 320
650355 280
650357 204
650372 68
650373 160
650379 68
650122 85
650125 17
650129 238
650141 88
650122 3
650123 2
650127 4
650129 8
650143 2
650146 2
650152 8
650165 3
650252 3
650265 2
650266 3
650273 20
650282 4
650299 1
650306 3
650312 7
650313 2
650320 4
650323 6
650332 3
650340 4
650342 7
650357 3
650122 2
650124 1
650125 1
650129 1
650141 4
650196 2
650289 2
650312 2
650322 2
650334 1
650372 1
650373 2
650120 20
650149 15
650172 15
650194 5
650244 12
P-TRAP 2CM W/ PLUG 479 SET
650120 20
650149 15
650172 15
650194 5
650244 12
650120 20
650149 15
650172 15
650194 5
650244 12
650120 20
650149 15
650172 15
650194 5
650120 20
650149 15
650172 15
650194 5
650244 12
650120 20
650123 12
650149 19
650172 15
650194 19
650299 6
650122 2
650124 2
650129 8
650139 3
650143 5
650147 5
650152 3
650165 3
650171 20
650196 6
650252 2
650266 3
650282 4
650306 3
650320 3
650322 1
650340 4
650355 6
650357 3
650372 1
650373 4
650195 6
650244 7
650301 8
650332 3
650195 6
650244 7
650301 8
650196 6
650301 8
650196 6
650244 7
650301 8
650125 6
4 3/17/2021 REBOQUIO
650151 4
12 3/19/2021 REBOQUIO
650249 2
10 3/23/2021 REBOQUIO
650257 3
650273 6
20 3/24/2021 REBOQUIO
650289 7
650312 3
23 3/26/2021 REBOQUIO
22 3/31/2021 REBOQUIO
650125 6
22 3/17/2021 REBOQUIO
650151 4
10 3/19/2021 REBOQUIO
650249 2
16 3/22/2021 REBOQUIO
650257 3
12 3/23/2021 REBOQUIO
650273 6
650289 3
650312 2
38 3/29/2021 REBOQUIO 26
29 3/29/2021 GERONA N.
2 3/31/2021 REBOQUIO
650123 2
650125 8
650173 1
650239 20
650249 4
650257 6
650260 12
650273 12
650289 11
650312 5
650125 40
650151 20
650249 23
650257 15
650273 30
1,565 650289 27
650312 13
650355 2
PRIMA FLAT LATEX WHITE 100 PAIL
650188 5
650355 2
650373 1
650355 3
650125 1
650181 1
650196 1
650173 1
650245 2
650125 1
650173 3
650181 1
650167 120
650181 50
650195 150
650198 100
650217 190
650218 80
650235 30
650244 150
650254 100
650257 430
1400 3/24/2021
650285 20
650285 50
650289 60
650308 40
650319 40
650322 120
650334 320
650336 20
650373 200
3500 3/31/2021 BH
650292 3
650255 1
650316 1
650344 1
650120 0.5
650125 2
650127 0.5
650133 0.5
650149 0.5
650172 1
650208 2
650309 1
650327 1
650378 2
CONCRETE NAIL 1" 50 KLS
650236 0.5
FINISHING NAIL 1 X 1/ 2 10
50 3/23/2021 KODIA
650266 1
650273 2
650276 1
650289 1
650301 1
650332 1
650361 1
650313 1
650173 2
650216 2
2 3/23/2021 KODIA
SCREW BIT 29
650329 2
650337 2
650379 1
650260 1
650313 1
GLASS CUTTER
650185 30
650141 51
650157 3
650169 2
650193 2
650219 2
650241 2
650253 2
650267 2
650272 4
650287 2
650288 1
650309 1
650324 3
650341 5
650345 5
650361 3
650362 5
650365 2
650368 5
650375 1
650376 1
650381 2
650130 1
650155 1
650165 1
650204 1
650173 3
DATE ISSUED
1285.00
2197.00
2110.00
1298.00
800.00
605.00
0.00
794.00
300.00
250.00
0.00
25.00
225.00
170.00
261.00
0.00
375.00
140.00
252.00
725.00
837.00
883.00
1126.00
846.00
1113.00
942.00
1169.00
1089.00
1212.00
1399.00
272.00
569.00
696.00
1004.00
425.00
778.00
175.00
301.00
425.00
656.00
776.00
905.00
0.00
110.00
270.00
213.00
341.00
617.00
667.00
336.00
376.00
479.00
501.00
657.00
273.00
434.00
724.00
386.00
485.00
723.00
3/24/2021 RIVERA BLK 35 623.00
461.00
617.00
719.00
92.00
261.00
509.00
787.00
968.00
1,190.00
707.00
999.00
938.00
1,242.00
597.00
707.00
959.00
1,058.00
0.00
30.00
32.00
0.00
500.00
353.00
0.00
175.00
0.00
2740.00
3.00
116.00
LOADING TO ST-06
0.00
0.00
0.00
0.00
18.00
78.00
168.00
375.00
1243.00
580.00
50.00
0.00
67.00
40.00
34.00
52.00
706.00
1462.00
1322.00
1632.00
758.00
2891.00
513.00
116.00
289.00
1518.00
896.00
3/17/2021 DEMORAL BLK 20-21 LAVATORY INST'L 881.00
816.00
499.00
587.00
6.00
30.00
1434.00
1434.00
1434.00
1434.00
100.00
MINIDUMP 582.00
46.00
10.00
8.00
8.00
8.00
10.00
36.00
186.00
4.00
3.00
3.00
0.00
2600.00
4.00
4.00
0.00
0.00
0.00
4.00
5.00
77.00
0.00
0.00
36.00
0.00
0.00
R. PENDO 26.00
0.00
R. PENDO 39.00
0.00
52.00
41.00
41.00
41.00
15.00
75.00
4.00
1038.00
1028.00
1028.00
1028.00
1028.00
1028.00
1028.00
847.00
835.00
835.00
835.00
835.00
155.00
150.00
150.00
150.00
250.00
367.00
367.00
367.00
367.00
367.00
808.00
2376.00
1586.00
789.00
650.00
140.00
2792.00
455.00
1135.00
500.00
460.00
36.00
640.00
1082.00
1.00
1625.00
5100.00
12959.00
428.00
2550.00
351.00
47.00
201.00
207.00
55.00
199.00
229.00
274.00
#REF!
393.00
351.00
846.00
405.00
17.00
15.00
23.00
31.00
42.00
77.00
16.00
32.00
38.00
52.00
61.00
88.00
117.00
119.00
111.00
3/25/2021 PATATAG DOOR KNOB FOR PANEL AND FLUSH DOOR 35.00
168.00
0.00
0.00
0.00
25.00
23.00
23.00
48.00
40.00
40.00
40.00
187.00
14.00
13.00
120.00
117.00
117.00
87.00
11.00
8.00
8.00
11.00
4.00
0.00
20
15
0.00
1400.00
1690.00
4490.00
4490.00
4490.00
38.00
35.00
35.00
66.00
25.00
22.00
22.00
22.00
49.00
50
50
1.00
23.00
5.00
5.00
21.00
2.00
0.00
29.00
1.00
13.00
1.00
37.00
150.00
90.00
189.00
3.00
187.00
4.00
20.00
59.00
APPROVED BY:
UNIT
ITEMS DESCRIPTION TOTAL DELIVERIES COST
PO # ISSUANCES
TOTAL
REQUIRMENTS
1B DONE QTY UM QTY DATE SUPPLIER MIS #
STRUCTURAL
PORTLAND PREMIUM CEM 45,750.00 81,628 BAGS
13
18
22
27
30
31
33
41
43
45
46
47
49
52
62
66
67
71
75
88
90
94
95
97
100
104
108
111
113
115
116
119
120
121
124
125
126
128
130
132
138
139
140
141
142
144
145
146
147
148
150
155
157
158
159
161
162
163
165
19
21
23
26
28
31
35
37
38
40
48
52
53
54
55
56
57
58
59
63
68
69
70
76
78
79
81
82
84
86
87
93
96
102
109
18
19
26
27
30
38
49
52
61
73
81
90
91
92
93
139
156
157
159
167
15
18
19
21
27
29
30
49
59
61
71
77
81
91
96
97
115
116
138
139
140
147
155
157
13
16
29
41
62
64
108
147
155
11
13
16
19
21
26
28
29
30
31
38
40
41
43
81
92
93
104
108
109
111
113
124
155
157
166
98 4/6/2021 ALMOHALLAS
20
28
31
145 4/7/2021
47
87 4/8/2021
78
224 4/9/2021
132
86 4/10/2021
159
18
19
26
28
30
31
59
62
73
79
81
92
140
98 4/14/2021 RAMIREZ
ROOFING
ANGLE BAR 3MMX50MMX5 3,000.00 2,576.00 PCS
15 4/9/2021 KAMP
158
28
40
70
75
82
87
114
120
145
51
127
134
51
127
134
134
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 6
CAPPING 1510MM 54 6
CAPPING 1690MM 16 2
CAPPING 3660MM 16 2
16
24
27
51
72
127
134
155
25
STORM/SEWER LINE
PVC PIPE 100MMX3.0M W/ 3675 3847 PCS
34
39
51
71
74
83
91
103
117
118
122
136
144
161
39
54
101
102
113
126
131
136
139
146
163
39
136
136
39
136
39
136
34
39
51
71
74
83
91
103
117
118
122
131
136
143
161
39
136
12
39
66
131
136
12
40
131
136
12
35
39
57
60
118
131
136
23
34
35
50
62
76
86
88
111
121
124
142
143
160
162
66
12
40
54
62
71
83
85
117
118
131
136
142
144
161
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 2,512 PCS
15
74
15
10 4/6/2021 KAMP
15
50 4/6/2021 KAMP
10
74
77
74
15
135
2 GANG PLATE(OUTLET) 4
SWITCH OMNI 5
74
15
60 4/6/2021 KAMP
70 4/7/2021 KAMP
135
MALE FLUG 7
17
106
133
17
106
11 4/5/2021 KAMP
42
65
110
129
164
42
4 4/7/2021 KAMP
89
137
89
106
C.I ELBOW 50X90 2 PCS 2 4/5/2021 KAMP
17
42
65
110
129
164
11 4/12/2021 KODIA
73 4/7/2021 KODIA
99
DRAINAGE SYSTEM
RCP 900MM 303 PCS
RCP 600MM 54
CEILING
METAL FURRING 19MMX50MMX40MMX4.0M 1166
WALL ANGLE 1X1X3.0M 969
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLAD 5,000.00 3519 SET
24
33
50
149
154
24
33
50
72
85
98
118
121
143
149
154
160
24
33
50
72
85
98
118
121
143
149
154
160
22
23
24
33
35
40
50
57
60
62
72
75
76
85
86
87
111
113
118
121
124
125
126
127
142
143
146
153
160
162
163
22
23
24
34
35
40
50
54
57
72
75
76
85
86
87
111
113
126
142
144
146
160
163
24
33
50 4/7/2021 KAMP
50
62
85
121
160
16 4/9/2021 KAMP
125
23
33
35
50
57
60
62
76
86
87
88
111
118
121
124
142
144
146
160
162
163
1 4/12/2021 KODIA
125
141
156
157
165
15 4/12/2021 KAMP
125
130
10 4/13/2021 KAMP
. 138
24 4/7/2021 REBOQUIO
10 4/8/2021 GERONA
72
85
98
118
121
143
160
3 4/7/2021 REBOQUIO
72
85
98
118
121
143
160
23 4/14/2021 GERONA
72
85
72
85
98
118
121
143
160
74
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER 50
122
33
50
85
143
161
33
51
72
143
24
34
50
149
51
85
88
118
149
24
33
50
149
154
COMMON NAIL 3' 130
22
37
27
FINISHING NAIL 1 X 1/ 2 10
147
62
118
144
1 4/12/2021 KAMP
1 4/15/2021 BH
79
118
SCREW BIT 29
88
121
69
10 4/15/2021 BH
37
53
57
80 4/8/2021 KAMP
21 4/8/2021 KAMP
10
11
14
21
22
27
36
37
53
61
70
75
77
79
82
87
90
102
112
114
120
128
139
145
151
158
159
10 4/15/2021 BH
138
FROM KODIA
1590.00
248.00
605.00
215.00
176.00
170.00
52.00
0.00
0.00
WAREHOUSE 30.57
0.00
147.00
283.00
625.00
393.00
213.00
253.00
447.00
333.00
475.00
1,058.00
1,188.00
1,522.00
1,700.00
1,946.00
2,101.00
1,331.00
1,484.00
784.00
944.00
597.00
827.00
207.00
445.00
275.00
425.00
582.00
480.00
627.00
0.00
0.00
343.00
64.00
2.00
154.00
11.00
12.00
0.00
0.00
5200.00
1.00
0.00
0.00
0.00
351.00
300.00
100.00
50.00
85.00
0.00
0.00
446.00
339.00
1204.00
495.00
304.00
32.00
24.00
24.00
18.00
22.00
9.00
0.00
236.00
87.00
87.00
87.00
87.00
87.00
87.00
616.00
1267.00
1232.00
1232.00
1412.00
667.00
654.00
654.00
2676.00
116.00
1,180.00
1414.00
860.00
700.00
971.00
553.00
1434.00
1072.00
46.00
8.00
6.00
10.00
36.00
184.00
#REF!
2600.00
4.00
4.00
0.00
0.00
0.00
1200.00
1.00
5.00
70.00
240.00
2.00
0.00
0.00
36.00
26.00
39.00
31.00
41.00
59.00
4.00
8.00
1.00
0.00
1028.00
835.00
150.00
0.00
367.00
1586.00
0.00
138.00
2792.00
0.00
WAREHOUSE 800.00
WAREHOUSE 5800.00
0.00
800.00
WAREHOUSE 11680.00
0.00
10916.00
2550.00
247.00
26.00
134.00
166.00
140.00
0.00
132.00
138.00
173.00
173.00
173.00
173.00
183.00
369.00
330.00
832.00
384.00
270.00
77.00
WAREHOUSE 101.00
111.00
119.00
122.00
30.00
0.00
0.00
WAREHOUSE 500.00
0.00
WAREHOUSE 2.00
23.00
22.00
22.00
40.00
187.00
13.00
13.00
117.00
87.00
8.00
8.00
4.00
0.00
15
4490.00
WAREHOUSE 5290.00
4590.00
35.00
66.00
22.00
20.00
20.00
38.00
29.50
29.50
24.50
9.00
46
87
87
87
87
0.00
2.00
21.00
5.00
2.00
21.00
17.00
17.00
0.00
4.00
10.00
0.00
12.00
8.00
1.00
81.00
0.00
17.00
10.00
20.00
APPROVED BY:
UNIT
ITEMS DESCRIPTION TOTAL TOTAL DELIVERIES COST
PO # ISSUANCES REMARKS BALANCE
REQUIRME
1B DONE NTS QTY UM QTY DATE SUPPLIER MIS # QTY DATE ISSUED
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 82,778 BAGS 248.00
266 10 2/26/2021 OFQUIRIA CHB LAYING PARAPET WALL BLK 21-31 951.00
708.00
83.00
83.00
48.00
48.00
2.00
266 300 2/26/2021 OFQUIRIA CHB LAYING PARAPET WALL BLK 21-31 163.00
163.00
163.00
163.00
252.00
ROOFING
ANGLE BAR 3MMX50MMX50MMX6.0M 3,000.00 2,576.00 PCS 9.00
STORM/SEWER LINE
260.00
62.00
601.00
1,081.00
2,501.00
83.00
83.00
1,096.00
1,096.00
1,054.00
969.00
969.00
522.00
522.00
1,347.00
1,347.00
1,347.00
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 2,512 PCS 1,072.00
1,069.00
PVC CONDUIT PIPE 3/4X3.0M 566 46.00
2 GANG PLATE(OUTLET) 4 -
3.00
28.00
C,I SADDLE CLAMP 75X1/2 102 PCS 102 4/22/2021 KAMP 93945 R. PENDO LOADING TO MINIDUMP 102.00
87.00
431.00
434.00
G.I TEE 1/2X1/2 23 PCS 23 4/22/2021 KAMP 93945 R. PENDO LOADING TO MINIDUMP 23.00
-
P.E TUBING 1/2 1 ROLL 1 4/24/2021 KODIA R. PENDO 1.00
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 5,000.00 3519 SET 1,486.00
1,076.00
1,076.00
2,390.00
2,390.00
2,390.00
8,180.00
8,180.00
1,007.00
1,007.00
FLOOR DRAIN 4X4 453 PCS 166.00
106.00
106.00
57.00
130.00
130.00
130.00
162.00
162.00
180.00
180.00
224.00
753.00
753.00
383.00
383.00
383.00
62 4/29/2021 -
116.00
116.00
HINGES 2X4 3 SET
85.00
85.00
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER 50 GAL 22.00
32.00
179.00
179.00
179.00
1 4/23/2021 BH 1.00
1 4/23/2021 BH 1.00
1 4/23/2021 BH 1.00
CHOCO. BROWN 3
12.00
12.00
93.00
80.00
4.00
4.00
8.50
85.00
PHENOLIC BOARD 1/2X4X8 271 SHEETS 249 12 4/23/2021 BATAIN BLK 12 1.00
7.50
SAND PAPER 3.00 3 ROLL 3 4/22/2021 KAMP 93945 R.PENDO LOADING TO MINIDUMP 3.00
106.25 26.5625
STRUCTURAL
PORTLAND PRE 45,750.00 81,628 BAGS
ROOFING
ANGLE BAR 4.5
ANGLE BAR 6M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440M 54 6
CAPPING 1510M 54 6
CAPPING 1690M 16 2
CAPPING 3660M 16 2
STEEL COIL
WHITE
LENGTH=1201
WETGTH=3670 1.5 ROLL
(SMALL)
FASCIA .195
353 PCS
CM
CAPPING
41 PCS
250CM
CAPPING
232 PCS
390CM
CAPPING
#REF! PCS
1510CM
CAPPPIG
#REF! PCS
2440CM
CAPPING
100 PCS
1690CM
CAPPING
50 PCS
3660CM
FLASHING
737 PCS
250CM
STORM/SEWER LINE
PVC PIPE 100MM 3675 3847 PCS
PE COUPLING 1/2
TEPLON TAPE
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 2,512 PCS
2 GANG PLATE(OUTLET) 4
SWITCH OMNI 5
MALE FLUG 7
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
RCP 600MM 54
CEILING
METAL FURRING 19MMX50MMX4 1166
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRA 50
WELDING GLOVES 3
FINISHING NAIL 1 X 1/ 2 10
SCREW BIT 29
GLASS CUTTER
TANSI #100
DIGGING BAR
CORROGATED SHEET 26 X 8 33
SHOVEL 75
FROM KODIA
1590.00
605.00
215.00
176.00
170.00
52.00
0.00
0.00
0.00
1,058.00
0.00
0.00
343.00
64.00
154.00
11.00
12.00
0.00
5200.00
1.00
116.00
0.00
0.00
0.00
351.00
300.00
100.00
50.00
85.00
446.00
#REF!
1204.00
495.00
32.00
18.00
22.00
#REF!
0.00
236.00
#REF!
616.00
1267.00
1412.00
667.00
#REF!
#REF!
2676.00
116.00
1,180.00
1414.00
860.00
700.00
971.00
553.00
1434.00
500.00
500.00
3.00
1072.00
46.00
8.00
10.00
36.00
184.00
1000.00
3.00
43.00
9.00
3.00
2600.00
4.00
4.00
0.00
0.00
0.00
1200.00
1.00
5.00
70.00
240.00
2.00
0.00
11.00
22.00
1.00
0.00
0.00
36.00
265.00
150.00
200.00
0.00
26.00
39.00
41.00
59.00
3.00
4.00
7.00
3.00
6.00
3.00
14.00
2.00
0.00
6.00
2.00
3.00
11.00
254.00
16.00
214.00
214.00
250.00
11.00
1.00
1.00
4.00
1.00
0.00
1028.00
835.00
150.00
0.00
367.00
1586.00
0.00
138.00
2792.00
0.00
0.00
1020 0.00
10916.00
2550.00
247.00
#REF!
26.00
#REF!
134.00
166.00
140.00
0.00
132.00
138.00
183.00
369.00
330.00
832.00
8.00
384.00
#REF!
#REF!
2.00
77.00
119.00
#REF!
#REF!
#REF!
30.00
0.00
0.00
0.00
23.00
40.00
187.00
13.00
12.00
13.00
117.00
87.00
8.00
8.00
4.00
0.00
15
4490.00
35.00
66.00
38.00
24.50
9.00
46
0.00
1.00
21.00
5.00
21.00
2.00
0.00
9.00
4.00
0.00
12.00
1.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.00
81.00
0.00
11.00
5.00
17.00
20.00
259.00
APPROVED BY:
UNIT
ITEMS DESCRIPTION TOTAL TOTAL DELIVERIES COST
PO # ISSUANCES
REQUIRME
1B DONE NTS QTY UM QTY DATE SUPPLIER MIS #
STRUCTURAL
PORTLAND PREMIUM CEMENT 45,750.00 82,778.00 BAGS
313
314
315
316
317
319
321
322
323
325
327
329
332
333
334
335
337
341
342
345
351
353
354
358
359
362
365
369
370
372
373
375
377
378
379
382
322
365
369
314
315
325
327
332
359
DEF.BAR 16MMX6.0M 7,676 PCS
314
323
332
341
369
373
322
325
327
332
353
362
322
322
329
351
ROOFING
ANGLE BAR 4.5MMX75MMX75MMX6.0M
3,000.00
DN HI RIB 5200MM
DN HI RIB 3800MM
CAPPING 2000MM
CAPPING 2000MM
CAPPING 2440MM 54 6
CAPPING 1510MM 54 6
CAPPING 1690MM 16 2
CAPPING 3660MM 16 2
346
STORM/SEWER LINE
317
319
330
346
357
376
354
375
380
PVC WYE REDUCER 100MMX50MM 1455
319
336
351
357
375
190
218
247
346
354
377
346
356
366
PVC TEE REDUCER 100MMX50MM 2266 PCS
317
330
336
351
364
378
313
328
331
348
356
360
368
368
313
321
328
331
347
348
354
360
366
368
313
328
331
348
354
360
366
UPVC MALE ADAPTOR1/2MM 1,000 PCS
313
328
331
347
348
354
360
366
368
321
347
354
328
330
331
346
348
356
360
364
368
375
377
380
313
328
331
348
356
360
368
377
PE COUPLING 1/2
TEPLON TAPE
ELECTRICAL
PVC CONDUIT PIPE 1/2X3.0M 2,712 PCS
2 GANG PLATE(OUTLET) 4
SWITCH OMNI 5
MALE FLUG 7
363
320
326
340
344
355
355
363
326
340
344
355
363
1 5/4/2021 KAMP
340
3 5/8//21 KODIA
374
PE TUBING 1/2' 7
DRAINAGE SYSTEM
RCP 900MM 303 PCS
RCP 600MM 54
WINDOW ACCESSORIES
JALOUSY FRAME 13 BLADE 5,000.00 3519 SET
330
336
346
351
346
364
376
173
194
198
330
336
351
346
364
376
336
351
346
364
376
318
324
339
350
349
361
367
371
381
382
356
366
377
380
366
377
354
361
371
382
SHOWER HEAD 453 SET
313
328
331
348
356
360
366
368
313
328
331
354
360
366
368
313
328
331
346
348
360
369
343
366
380
338
343
PAINTING MATERIALS
ISLAND 400 CONCRETE NEUTRALIZER 50 GAL
PRIMA FLAT LATEX WHITE 100 PAIL
317
330
336
351
346
364
376
AQUAMARINE 1 GAL
30 5/4/2021 LAYSAN
330
336
20 5/5/2021 CANTILLAS
20 5/6/2021 CANTILLAS
347
352
20 5/7/2021 CANTILLAS
364
30 5/10/2021 CANTILLAS
376
THALO GREEN 32 CAN
10 5/4/2021 LAYSAN
330
336
10 5/5/2021 CANTILLAS
10 5/6/2021 CANTILLAS
347
352
10 5/7/2021 CANTILLAS
364
376
10 5/5/2021 CANTILLAS
10 5/6/2021 CANTILLAS
347
352
10 5/7/2021 CANTILLAS
364
376
CHOCO. BROWN 8 GAL.
1 5/4/2021 LAYSAN
1 5/5/2021 CANTILLAS
1 5/6/2021 CANTILLAS
347
1 5/8/2021 CANTILLAS
364
1 5/10/2021 CANTILLAS
376
351
317
336
364
PAINT BRUSH 2'' 100 PCS
351
376
BLIND RIVET 1/8 X 1/2 9660 PCS
330
336
351
346
364
376
353
366
315
323
327
342
WELDING GLOVES 3
348
353
362
370
377
313
337
353
373
FINISHING NAIL 1 X 1/ 2 10
337
373
DIAMOND CUTTING WHEEL 4' 115 PC
328
330
347
348
360
361
368
375
376
SCREW BIT 29
216
1 5/6/2021 CANTILLAS
1 5/7/2021 CANTILLAS
364
376
GLASS CUTTER
TANSI #100
DIGGING BAR
171
177
188
197
207
208
237
241
250
264
315
337
359
365
CORROGATED SHEET 26 X 8 33
SHOVEL 75
64512
FROM KODIA
708.00
466.00
50.00
29.00
150.00
106.00
106.00
106.00
83.00
57.00
57.00
57.00
57.00
57.00
57.00
57.00
57.00
48.00
40.00
40.00
40.00
2.00
-
163.00
133.00
133.00
252.00
112.00
258.00
9.00
-
1,210.00
116.00
-
-
501.00
450.00
100.00
50.00
339.00
1,049.00
1,027.00
1,027.00
1,027.00
1,027.00
1,027.00
1,027.00
260.00
242.00
242.00
24.00
18.00
9.00
120.00
62.00
24.00
24.00
601.00
596.00
596.00
1,232.00
1,081.00
1,003.00
654.00
2,501.00
2,391.00
83.00
1,096.00
1,054.00
756.00
756.00
734.00
558.00
558.00
558.00
558.00
288.00
(65.00)
(65.00)
(65.00)
969.00
964.00
522.00
516.00
515.00
1,347.00
1,251.00
1,251.00
1,251.00
1,251.00
500.00
500.00
3.00
1,069.00
46.00
6.00
18.00
85.00
179.00
2,000.00
3.00
43.00
9.00
2,376.00
4.00
4.00
1,200.00
1.00
3.00
67.00
-
342.00
2.00
11.00
22.00
1.00
5,000.00
36.00
17.00
28.00
73.00
59.00
3.00
17.00
5.00
3.00
2.00
4.00
8.00
4.00
2.00
1.00
5.00
22.00
87.00
82.00
82.00
1.00
4.00
2.00
252.00
142.00
6.00
284.00
20 5/3/2021 PACINIO FOR WATERLINE 264.00
145.00
145.00
145.00
225.00
431.00
434.00
356.00
2.00
2.00
1.00
4.00
1.00
1,028.00
835.00
150.00
-
267.00
1,076.00
326.00
138.00
2,792.00
2,390.00
1,730.00
1,650.00
8,180.00
120 5/4/2021 PATATAG BLK 34 8,060.00
6,960.00
6,960.00
1,007.00
106.00
57.00
130.00
105.00
105.00
162.00
136.00
128.00
180.00
158.00
158.00
158.00
158.00
158.00
158.00
36.00
266.00
90.00
90.00
90.00
224.00
82.00
753.00
579.00
8.00
383.00
222.00
207.00
-
6.00
116.00
51.00
85.00
20.00
32.00
179.00
164.00
164.00
20.00
30.00
22.00
42.00
30.00
30.00
10.00
13.00
23.00
19.00
10.00
10.00
10.00
10.00
20.00
17.00
17.00
17.00
1.00
1.00
2.00
3.00
3.00
3.00
2.00
2.00
13.00
12.00
12.00
11.00
11.00
11.00
93.00
86.00
86.00
86.00
86.00
69.00
4.00
4.00
3.00
2,484.00
2,484.00
35.00
32.75
32.75
64.00
62.75
62.75
10.00
4.25
4.25
8.50
6.50
24.00
22.75
22.75
6.75
76.00
76.00
76.00
76.00
21.00
2.00
17.00
2.00
9.00
-
3.00
8.00
1.00
1.00
1.00
2.00
1 5/10/2021 PATATAG BK 21 -
-
-
1.00
7.50
(0.50)
(1.50)
-
10.00
10.00
3.00
259.00
APPROVED BY: