OOT Works 2022-23 Plan Head: 1600 — Traffic Facilities Cost of Work Item No Name of the Work (in 000°s of Rs.) : Provision of insulating sheet under ROB 1216A at KM 632.85 in view of running of DSDC at 9059 adgir, JUSTIFICATION Ref: [1] MTRS D.O. Lr. No, 2021/E 3M/170/1(DSDC) dt: 02.06.2022 [2] PCEE/SCR’s Lt. No. E.220/0DC/DSDC/Vol-l dt: 17.08.2022 [5] RB’s Lr. No. 2021/EEM/170/1 (SDC) — Part (1) dt 22.08.2022 [4] PCEE/SCR’s Lr. No. E.220/ODC/DSDC/Vol-I dt: 29.08.2022 G) SeDENNortVGTL's letter No.G/W.71/Br/Double Stacked Dwarf Container/DB Dt: 07.2022 Railway Board has advised to identify the infringements on all routes over SCR for operation of higher MMD (Maximum Moving Dimension) including DSDC ( Double Stack Dwarf Container) trains and to take necessary action for removal of all infringements for smooth movement of DSDC trains on mission mode vide ref [1]. The minimum Head Room required for passing of DSDC @ 15 kmph and all other trains at normal speed by providing insulation sheet at the bottom of ROB/FOB is 5450 mm with both contact and catenary wire vide ref (2). In view of this, the infringements were identified under ROB No. 1216A on UP & DN line between loc: 632/35-33 & 632/34-36 of YG-TGDE section of Guntakal division (Double line). The head room height from rail level is 5420 mm on UP line at loc 632/35-33 and 5440 mm on DN line at loc 632/34- 36. In order to maintain head room height of S450. mm, the track has to be lowered by 30 mm and 10 mm on UP & DN lines respectively. Vide ref[5], Engineering has conveyed the lowering of track at UP and DN lines. Thus for smooth movement of DSDC, the head room height should be $450 mm along with insulation sheet at bottom of ROB. Railway Board advised the works related to removal of infringements for running of higher MMD/DSDC trains may bé got sanctioned in PH-1600 vide ref [3]. PCEE advised to process the work on OOT basis under PH-1600 vide ref [4]. Hence, it is proposed to include the subject work in OOT (Out of Turn) works under “Plan Head — 1600 (Traffic Facilities)”. Abstract Cost S.No Name of the Work Total Rate Provision of insulating sheet under ROB 1216A at KM 632.85 in 1 | view of running of DSDC at yadgir. 8023181 Total 15107864 Contingencies @1% 80232 D & G charges @11.91% 955561 Grand Total 3058974 Sr.DEEMr/GTL Name of the Work: Gunt imate/PH16/007, takal Division - SOUTII CENTRAL RAILWAY °/ 2022-23, Department - Electrical TRD Funning of DSDC at Yair Provision of Insulating Sheet under ROB 1216A at KM 632.85 in view of 5 Unit Rate Total Rate S.No! Item No.| Description of Material Qty} unit aay | Total Cost, Material |Erection| Material | Erection SW-l[Schedule A SOR Items Slewii i 1 ‘ing of equi; 31h) \8 of equipment 12 | span i a a 5388 5388 Re-adjustment of OHE| 2 | 31(t)(xdiy [SPAMS including. erection] 27600 (xii) of droppers 12 | Span 0 2300 0 27600 3 _|32/31(h) [Slewing of equipment | Span 0 449 0 5388 5388 Re-adjustment of OHE| 32, 4 ee (9 spans including erection! 12 | Span 0 2300 0 27600 27600 ) Jot droppers Total 0O 65976, 65976 Escalation of 223% on Sch-A SOR Items oO 147126 147126 Total on Sch-A SOR 0 213102 213102 |SW-Schedule B: Insulating Sheet [Supply of RRBB Sheet - RRB - — 2050/775-5-B| /St-DGM/EI) Insulating Sheet - 2 Sheet| ae per Girder. Supply &| Rvntpu|Erection of GI Frame| nee 1 |Ne/scynj(Including —Lindapter| 4g 347114.63 | 86778.7 | 6248063 | 1562016 | 7810079 |SUR/RE/2|hardware) for| Location 018/03 Jinstallation of RRBB| dt25.09.20 /sheet with all connected| 21 Iworks & — accessories| complete Total on Sch-B Items 6248063 _| 1562016 | 7810079 [Consolidated Estimate SW-I_|Total on Sch-A SOR 0 213102 [23102 SW-II_|Total on Sch-B Items 6248063_[ 71562016 [7810079 Total 6248063_| 1775118 | 8023181 3671 [Contingencies @ 1% asi | 17751_[_ 80232 3684 [D&G Charges @ 11.91% aaa [211417 | 955561 Grand Total 7054688 [2004286 | 9058974 © eq Rereora froma fees Rail Vikas Nigam Limited, enn M RSIS CIN : L74999DL.2003G01118633 (A Government of india Enterprise) RVNLIPUNE/BGVN-SUR/RE/2018/03 Date: 25.09.2021 PM/PMC. Feedback Infra Pvt Ltd, Kurduwadi. ‘Sub: Sanction of Non-schedule item NS-18 i.e. “Providing Insulation sheet under ROB at KM 454/1 at Solapur Yard". ) Mis KEC L. No. KECIRVNL/BGVN-SURISP/688 dated 17-05-21 & dated 09-09-2021 2) PMIPMC recommendation letter No. FB/PMC/RVNUBGVN/SUR/RE/2021/683 dated 29-07-2021 3) Sanctioned vide E-office file No. RVNL/PUNE/ELEC/131/2021/ELEC-1/PUNE dated 24-09-2021 Re In connection with the above subject and reference to your office letter at reference (2) ‘competent authority has accorded sanction for Non schedule item NS-18 ie. Supply of 1) RRBB sheet - RRB-2050/775-5-B Insulating Sheet- 2 sheet per girder- 80 sheets 2) Supply & erection of Gl frame (Including Lindapter hardware) for installation of RRBB sheet - 40 Nos under RE work of BGVN-SUR section executed by M/s KEC International Limited” as detailed below. Rate For | Rate for Sr.No. | Description of material | aty | Unit | Supply in | Erectionin | "pcos!" I Rs. Rs. i Supply of 1) RRBB sheet - RRB- 2050/775-5-B Insulating Sheet- 2 sheet per girder- NS-18 | 80 sheets 40 2) Supply & erection of GI frame (Including Lindapter hardware) for installation of RRBB sheet - 40 Nos Each location 3,47,114.63/- | 86,778.66/- | 1,73,55,732/- 1) No price variation is applicable on the above NS items. 2) Payment condition & other terms and conditions will be same as per the agreement. This is for your information and necessary action please. calls = ae (Ru-Pillay) a Sr. DGM/Elect/RVNL/Pune C/- PM/ Mls. KEC International — For information and necessary action please 202-A, 2% floor, The Orion Building, Next to Atur Park Society, Koregaon Park, Pune ~ 411 001 Ph. No. 020 - 26128110

You might also like