IAAF TRACK AND FIELD FACILITIES MANUAL 2008 Chapter 1 - General Aspects of Planning
Approximate Maximum
Number of Participants Recom-
Compe- at Any One Time mended
Number Authorising
tition Event1 Construc-
Category Compe- Auxiliary of Days tion
Body1
Athletes tition Person- Category
Officials nel
World Championships IAAF,
1
and Olympic Games 75 100 75 9 I IOC
2 World Cups 30 60 50 3 III2 IAAF Rule 1.1(a)
Continental,
3 Regional and
Area Championships 75 75 60 4-8 II Continental, Regional
or Area Association
Continental, IAAF Rule 1.1(c),(f),(g)
4 Regional and
Area Cups 50 60 50 2 III
Group Games 50 50 30 4-5 II Group Association
5
IAAF Rule 1.1(b),(g)
Matches 50 60 30 1-2 III IAAF, Area or
National Federation
6
IAAF Rule 1.1(d),(h)
and Rule 2.7
International
Invitation Meetings IAAF
7
specifically authorised IAAF Rule 1.1(e)(i)
by IAAF 50 30 30 1 III
International
Invitation Meetings Area Association
8
specifically authorised IAAF Rule 1.1(j)
by an Area Association 50 30 30 1 III
Other Meetings
Area Association or
specifically authorised
National Federation
9 by an Area or a Member
IAAF Rule 1.1(i)
and National
and Rule 2.7
Championships 75 60 30 2-4 IV
10 Combined Events 50 50 30 2 IV As appropriate
Other National National Federation
11
Competitions V IAAF Rule 2.7
1 In accordance with IAAF Rule 1.1 and Rule 2.7
2 Warm-up track must conform to Competition Category I
Table 1.3.2 - Competition Categories; number of athletes, officials and auxiliary personnel
and auxiliary personnel on the arena at any one time is given. The total number of
these type people at a competition can be many times greater. Column 6 gives the
approximate duration of an athletics meeting. The items I to V listed in column 7
“Construction Category” refer to Section 1.5. Finally, column 8 states the authority
responsible for allocation and technical control at the international, continental, regional
or national level, with the exception of the Olympic Games for which the IOC is
responsible for allocation and various Group Games for which Group Associations
have responsibility.
18
Chapter 1 - General Aspects of Planning IAAF TRACK AND FIELD FACILITIES MANUAL 2008
1.5.2 CATEGORIES
In the light of the organisational requirements of the Competition Categories
listed in Table 1.3.2, the following five construction categories for Track and Field
facilities are recommended:
- Construction Category I for the Competition Category 1
- Construction Category II for the Competition Categories 3 and 5
- Construction Category III for the Competition Categories 2, 4, 6, 7 and 8
- Construction Category IV for Competition Categories 9 and 10
- Construction Category V for Competition Category 11
19
IAAF TRACK AND FIELD FACILITIES MANUAL 2008 Chapter 1 - General Aspects of Planning
Construction Category
I II III IV V
400m Standard Track as described under Chapter 2
1 1 1 1 - -
with min. 8 oval and 8 straight lanes for 100m and 110m Hurdles
2 400m Standard Track as line 1, but with 6 oval and 6 straight lanes - - - 1 -
3 400m Standard Track as line 1, but with 4 oval and 6 straight lanes - - - - 1
4 Water jump for the Steeplechase 1 1 1 - -
5 Facility for Long and Triple Jump with landing area at each end 2a) 2a) 1 2 -
6 Facility for Long and Triple Jump with landing area at one end - - - - 1
7 Facility for High Jump 2 2 1 2 1
8 Facility for Pole Vault with provision for landing area at each end 2a) 2a) 1 2 -
9 Facility for Pole Vault with provision for landing area at one end - - - - 1
Combined facility for Discus and Hammer throw
10 1b) 1b) 1b) 1c) 1
(separate or concentric circles)
11 Facility for Javelin Throw 2d) 2d) 2d) 1 1
12 Facility for Shot Put 2 2 2 2 1
13 Ancillary rooms as described under Chapter 4 * * * * *
14 Full facilities for spectators * * * * *
Warm-up area, comprising a 400m Standard Track with min. 4 oval
and min. 6 straight lanes (similar surface to the competition track);
15 * - - - -
separate throwing field for Discus, Hammer, Javelin;
2 facilities for Shot Put
Warm-up area, comprising preferably min. a 200m track with min.
4 oval and min. 4 straight lanes (synthetic surface);
16 - * - - -
separate throwing field for Discus, Hammer, Javelin;
facility for Shot Put
Warm-up area, comprising min. a 200m track but preferably
a 400m Standard Track with min. 4 oval and min. 4 straight lanes;
17 - - * - -
throwing field for Discus, Hammer, Javelin;
facility for Shot Put
18 Warm-up area: adjacent park or playing field - - - * -
Ancillary rooms e.g. for conditioning and physiotherapy,
19 adequate space for athletes resting between events, 250 200 150 200 -
with area of min. m2
* Required
a) The two facilities must be in the same direction and adjacent to allow simultaneous competition by two groups of competitors with
similar conditions
b) An additional facility for Discus only may also be provided
c) For large events, a second facility outside the stadium but in the same throwing direction is desirable
d) One at each end of the area
because they are damaged by the implements and/or a satisfactory mark is not made
on the synthetic surface so that the judges can determine the first mark made by the
fall of the implement.
The highest Construction Category possible for an arena that does not have all the
requisite throwing facilities on the main arena is Construction Category III if complying
throwing facilities are provided adjacent to the arena.
20
Chapter 1 - General Aspects of Planning IAAF TRACK AND FIELD FACILITIES MANUAL 2008
1.5.4 EXCEPTIONS
In agreement with the appropriate athletics authority, the organisers of a
competition may (with the exception of Construction Category I) make exceptions to
the respective Construction Category.
21