Electrical operation
manual
Shandong Kaitai Shot Blasting Machinery Co., Ltd.
(Stock code: 832846)
Q378E Steel Structure Parts Shot Blasting Machine Instruction Manual Page II II
warn
Be sure to read this manual and understand its contents before proceeding with
operation, maintenance and inspection!
The operators and management supervisors of this equipment must not allow
personnel who do not understand the instructions to operate, maintain and repair the
equipment!
The management supervisor of this equipment should instruct the operator or
maintenance personnel to regularly confirm the contents of the instructions and
operate according to the contents specified in the instructions!
Preface
warn
If this equipment is used carelessly, it may result in death or
serious injury or other serious accidents!
☆This manual is a guide for safe and correct use of this equipment.
☆Be sure to read this manual before using this equipment, and fully understand the
☆Do not operate, maintain or repair this equipment before fully understanding this
manual.
☆Failure to operate according to the contents recorded in this manual may cause
serious accidents.
and [Caution] as shown above. These are special precautions to ensure safety, so
☆The contents of this manual may be changed without prior notice. Please follow the
change instructions.
☆This manual should be placed close to the equipment and in an easily visible place.
☆If there is anything unclear or doubtful about this manual, please contact our
company.
Table of contents
Preface ...........................................................................................................................2
1. Before using the machine ...................................................................................2
2. Precautions during operation ..............................................................................2
3. Maintenance and inspection precautions ............................................................2
4. Precautions after maintenance and overhaul ......................................................2
5. Equipment introduction ......................................................................................2
Chapter 1 Operation Instructions ..................................................................................3
1. Equipment working principle: ............................................................................3
2. Equipment operation process .............................................................................3
Chapter 2 Safety Precautions ........................................................................................4
1. Warning symbols indicate ..................................................................................4
2. Safety device ......................................................................................................4
3. Safety cover and explosion-proof cover, etc. .....................................................4
4. Safety sensor .......................................................................................................4
5. Other safety devices, etc. ....................................................................................4
6. What you should know about safe operations ....................................................4
Chapter 3 Inspection and Maintenance .........................................................................7
1. Enter the machine to perform maintenance and inspection operations ..............7
2. Check the operation of in-machine equipment ...................................................7
3. After maintenance and inspection work is completed ........................................7
4. Management of shot blasting materials ..............................................................7
6. Equipment regular inspection list .......................................................................7
Chapter 4 Failure Analysis ............................................................................................8
1. Basic matters ......................................................................................................8
2. Fault diagnosis countermeasures ........................................................................8
4. How to order parts ............................................................................................10
Preface
* When operating, maintaining and inspecting this equipment, be sure to read this
manual in advance and fully understand its contents.
* Use parts manufactured or approved by our company.
* This equipment may not be modified or moved without the written approval of our
company.
* During operation, maintenance and inspection, the precautions recorded in the
manual and the instructions on the warning and caution signs affixed to the equipment
must be followed.
* Please do not operate this equipment before fully understanding this manual. Only
people who fully understand the contents of this manual can operate it.
* Please do not exceed the scope of usage and specification conditions other than
those for which you originally selected the equipment.
*Be sure to confirm whether there is anyone in the dangerous area of the equipment
before operation.
* Do not touch the movable parts of the device.
* Maintenance and inspection personnel must fully understand this manual and
receive operational training.
* No one person is allowed to perform maintenance and repair work. There must be
more than 2 people and a team leader must be appointed, and the two people must
negotiate with each other.
* When maintenance and inspection work is carried out, management supervisors,
operators and surrounding workers must be notified, and a sign saying "Maintenance
and inspection work in progress" must be hung.
* Cut off all electrical, pneumatic and other operating energy sources.
* The key must be removed, and the person in charge of the operation or the
designated person in charge must keep the key until the equipment operation is
completed.
* Lock the movable part, close the air pressure main valve, and discharge the residual
pressure.
* Be sure to confirm whether all switches and valves are closed.
* Confirm whether each part is inactive by starting the button and operating the valve.
* All operating energy sources are fixed with locks and warning signs are hung.
* Protective devices such as doors and protective covers removed during maintenance
must be restored to their original positions.
* After the inspection is completed, it is necessary to confirm whether there are any
forgotten tools and parts in the mechanism.
* After the maintenance work is completed, the person responsible for the
maintenance should gather all the people together and confirm that there is no one in
the danger area before starting the operation.
5. Equipment introduction
The hook-type shot blasting machine uses two hooks to load workpieces alternately
into the shot blasting cleaning room. Use a shot blaster to throw 0.2~0.8 projectiles
onto the surface of the workpiece, so that the surface of the workpiece reaches a
certain roughness, making the workpiece beautiful, or changing the compressive
stress of the workpiece to increase its life. This Huashengtai machine is widely used
in surface cleaning or strengthening treatment of medium and small castings and
forgings in foundry, construction, chemical industry, electrical machinery, machine
tools and other industries. And this model is suitable for cleaning slender and thin-
walled parts that are not suitable for collision.
This machine is a double hook system. When one of the hooks is loading the
workpiece for throwing, the other hook is used by workers to load and unload the
workpiece, which is more efficient. When working, when the preparation work (dust
removal system, sand circulation system operation) is completed, the machine starts to
work normally. First, the hook descends to lift the workpiece, rises to a certain
position, and hits the track on which the hook runs. Then it enters the shot blasting
cleaning room along the track, reaches the predetermined position, and the rotation
motor starts. At this time, close the door of the shot blasting cleaning room, turn on
the shot blasting motors No. 1 and 2, and after a certain period of time, the shot
supply gate will be automatically opened to start shot blasting the workpiece. At this
time the time relay starts timing. After cleaning for a certain period of time, stop the
pill supply valve, manually open the cleaning room door, and move the hook out of
the cleaning room. (During this period, another hook can load and unload workpieces.
The two workpieces work at the same time, saving time and improving efficiency.)
When the hook moves out of the cleaning room and reaches the limit, another hook
loaded with workpieces enters the shot blasting room, closes the door, and starts
throwing. beat. And so on. until the work is over.
Repeat this process until the work is completed and stop the machine in sequence.
After the dust removal motor stops, the vibration motor runs to remove dust in the
settling box.
Only after the wiring is connected correctly can the computer be turned on.
1) Manual control: first turn on the key switch, the power indicator lights up, start the
buttons in sequence, dust removal - → lifting - → spiral - → open the door - → No. 1
hook lifts the workpiece, reaches the limit, and hits the hook running track Position
——→The hook enters and reaches the limit. Close the cleaning room door—→Press
the rotation button (the motor rotates forward and reverse alternately)—→Start the 1
and 2 shot blasting motor buttons in sequence, and delay the shot blasting valve for a
certain period of time to open—→The set time is reached, and after cleaning, the shot
blasting The valve closes automatically and the shot blasting motor stops running. —
→ Press the rotation stop button — → Open the shot blasting chamber door — →
The hook exits and reaches the limit. At the same time, No. 2 hook can enter the shot
blasting cleaning room for cleaning — → After cleaning, press the button stop switch
(1). The contents of the warnings are dangerous causes that may lead to accidents and
must be followed to ensure safe operations.
(2). Ignoring warning signs and performing incorrect operations may cause personal
injury or death.
(3). Follow the instructions of the warning symbols and carry out operations. This
equipment is equipped with preventive measures.
(4). Such warning signs should be inspected and cleaned regularly to keep their
surfaces clear and eye-catching.
(5). The installation location must not be changed at will.
2. Safety device
(1). To ensure safe and effective operation, the equipment is equipped with
mechanical or other safety devices, protection devices, and electrical interlocking
4. Safety sensor
(1). There is a key switch in the operating circuit. Once the key switch is pulled out,
all driving parts cannot be started. When servicing each device, be sure to pull out the
key switch and carry it with you.
(2). An overload relay is installed in the motor circuit. Once the motor is overloaded,
the power supply will be automatically cut off to prevent the motor from burning out.
(3). During operation, if there is any abnormality, press the emergency stop button and
all driving parts will stop.
(1). In order to ensure safety, operators using the equipment must comply with the
prescribed safety procedures, and management and supervisory personnel should
supervise the implementation.
(2).. Operators and supervisors should be familiar with and understand the following
matters that should be paid attention to in general safe operations and abide by them
to ensure safe operations.
(3). You should know how to work safely and study it regularly.
Notice
Failure to follow the prescribed safety precautions may cause a serious accident.
operation.
13. The equipment must not be operated
Before operation, confirm whether there
without safety devices. Before operation,
is a safety device at the specified position
confirm the specified position before
before operating the equipment.
operating the equipment.
14. Do not change the position and When making changes, please discuss
structure of the safety device at will. with the supervisor in advance and
17. When the equipment is in operation, After stopping, touch the movable part
do not touch the movable parts. again.
operations
(1) When entering the machine for inspection operations, cut off all power and air
sources to avoid sudden movements that may involve people.
(2) The sliding part may need to be fixed, close the air pressure main control valve,
and release the residual pressure.
(3) The person in charge of the operation or the designated person in charge must
remove the switch key of the equipment and keep it until the completion of the
operation is confirmed.
(4) Make sure that all switches and valves are closed.
(5) Confirm that every part of the equipment cannot move by operating the start
button and valve.
(6) All movable parts must be fixed with locks to ensure that they cannot be operated,
and notice boards must be hung.
(1) Confirm whether there is anyone inside the aircraft. Sudden movement of the
equipment may cause people to be involved.
(2) Follow the instructions of the person in charge and make sure it is safe before
proceeding.
(3) Before starting the equipment, communicate it verbally to the workers or use a
buzzer to notify all personnel to confirm the safety of all personnel.
(4) Do not enter the aircraft at will.
(5) When the equipment is in operation, the equipment must not be touched, and
repairs or adjustments must not be made.
(1) Removed doors, safety covers and other protective devices must be restored to
their original state.
(2) The person in charge of the operation should convene after the operation to
confirm whether all personnel have left the dangerous area.
(3) Confirm whether there are tools, parts, etc. left in the machine. After using tinder,
inspect it.
(1) Steel shots of specified specifications should be used. Because steel shot is a
consumable material, it must be replenished at any time according to the startup time.
(2) If there is oil or grease on the shot blasting material, it may cause poor fluidity and
may cause fire in the dust collector. Therefore, pay full attention when refueling.
(3) If there is moisture on the projectile material, it will cause rust and become lumpy.
Therefore, special attention should be paid to moisture. If it is not used for a long
time, it should be removed and kept properly.
In order to prevent malfunctions and accidents before they occur and to maintain
equipment performance, it is very important to conduct daily and regular inspections.
Routine maintenance operations must be performed on the following items. The daily
operation time is based on 8 hours. If the operation exceeds 1 day, the maintenance
cycle should be shortened accordingly.
1. Basic matters
Problems with shot blasting equipment are generally manifested in “increased steel
shot consumption” or “low cleaning effect”. If this happens, repairs should be carried
out immediately to ensure that it continues to operate under normal conditions.
Insufficient circulation of
supplement pills
steel shot
The inlet pipe, elevator
discharge part, and drum Inspection and foreign
screen part are blocked by matter removal
foreign matter.
The introduction pipe and
other projectile circulation
Repair
system components are
worn through
4 Current value is too
Elevator belt slipping Tension lifting strap
low
The hopper of the elevator
is worn and falls off and Replacement,
cannot reach the lifting installation
capacity.
Poor setting of projectile
Readjust
control valve plate
Ammeter broken replace
Shot blaster drive belt Adjust the motor tension
slipping and replace the belt