DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

IV. Development Issues, Goals, Objectives and Targets

The Provincial Development and Physical Framework Plan of the Province of


Rizal present the future state of the province within the next nine years. This is
contained in the vision statement, where its forthcoming directions for the physical
and socio-economic development are laid out.

The rapid population growth in the province, brought about by natural increase
and migration has serious implications on the absorptive capacity of the province
especially in the areas of housing, provision of basic services and facilities,
provision of jobs/livelihood sources and access to natural resources of the
province. The proximity of the province to Metro Manila made it a receptacle of its
spills. Rapid urbanization has led to rapid conversion of agricultural lands into
subdivision settlement areas. Encroachment in upland areas and in protection
areas has raised danger of soil erosion, landslides and flooding.

In this time of climate change, characterized by highly unusual meteorological


patterns that raise the likelihood of disastrous events , the PDPFP has become
even more important to reduce overall vulnerability to disaster and it also
mainstreamed environmental protection and conservation, disaster risk reduction
and management, sustainable development, inclusive growth that promote a more
proactive and responsive local development.

The analysis of the planning environment leads to a chain of planning activities.


Part IV focused on the identification of development issues, goals and
objectives/targets. Development issues are basically problems directly related to
symptoms or feedback from stakeholders. Goals, objectives/targets are
responses to identified development issues/problems.

The trends and scenarios in the province as discussed in the planning


environment were hinged on population, economic activity and physical
resources. The interaction of these “drivers” defined the quality of life which was
manifested through income, expenditures and services being enjoyed by the
community and its members, physically expressed in the way land and other
physical resources are utilized. The formulation of development issues, goals and
objectives/targets and the succeeding preparation of strategies, programs,
projects, and activities are focused on access to services, income/employment
and land use.

Strategies, Programs, Projects and Activities

After the development issues, goals and objectives/targets have been identified,
the next step is the formulation of strategies, programs, projects and activities.
Strategies are courses of actions that will help achieve objectives/targets.
Programs are set of projects that translate strategies to specific action plans.
Projects are subset of programs or special undertaking within a program designed
to carry out a set of objectives. An activity is a work process within a program
designed to accomplish specific objective.

Provincial Development and Physical Framework Plan 2021-2030 | 392


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

V. Strategies, Programs, Projects and Activities

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
Health
Insufficient Provide Ensure the Prioritize Health Facility Construction of hospitals
number of adequate quality of investments Enhancement and health centers
hospital and health health on health Program
health center infrastructure infrastructure facilities
needed by the to meet the and facilities
increasing needs of the
population population

Incomplete Improve the Improve the Expand Upgrade the Upgrading of Health
equipment in existing capacity of physical capacities of the Facilities
the existing health existing health facilities and hospitals to meet the
hospitals of the facilities with facilities upgrade existing and future
province complete equipment hospital bed
equipment and services requirements
of existing
hospitals
No available Provide a Upgrade the Upgrade & Hospital Upgrading of public
public tertiary tertiary provincial modernize the Enhancement hospital to the ideal level
hospital in Rizal hospital for Hospital into a provincial Program category
the province tertiary hospital hospital into a
tertiary Training program for
hospital personnel to complement
the needs of a tertiary
hospital
Link with
private banks
to avail of
loans
upgrading
hospital into a
tertiary
hospital

Limited medical To develop a To recruit Enhance the Medical Personnel Capability and capacity
specialists and pool of well qualified capability & Recruitment building for Health
health trained and personnel and capacity of Program Providers
personnel inhighly skilled medical hospitals
most of the health and specialists and through the
hospitals and medical adequately provision of
other healthpersonnel meet the additional
facilities and manpower health service
practitioners needs in the providers
for health health sector
services
delivery
Increasing To reduce Decrease Implementatio Maternal Child Orientation on Health and
infant mortality maternal and incidence of n of the First Health and Nutrition Nutrition
rate and erratic infant maternal and 1000 Days Program
trend of mortality rate infant death Law

Provincial Development and Physical Framework Plan 2021-2030 | 393


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
maternal Women’s Health and Prenatal Care
mortality rate Safe Motherhood
Program Promotion of
breastfeeding
Family Planning
Health Program Nutrition Counseling

IEC Program Psycho-social support for


mothers

Social Welfare Support


Immunization Provision of medicines,
Program vaccines, supplies and
equipment including
information technology
items and IEC materials
Deaths of Decrease Decrease Improve Nutrition Program Information dissemination
children under deaths of deaths of knowledge of campaign in the
five years old children children under parents on importance of proper
under five five years old proper nutrition, water and
years old by 1 percent nutrition, sanitation
per year water and
proper Nutrition Counseling
sanitation
Immunization Full immunization of target
Program for Children children
Distribution of Vaccines distributed to
vaccines and CHU/RHUs and
monitoring of Immunization given to
immunization target population
Cases of Decrease Prevention of Improve Programs for: Information dissemination
mortality and morbidity mortality and health *Cancer Control campaign on the
morbidity cases morbidity services and Program importance of healthy
health care, *Diabetes Prevention lifestyle, safe drinking
good and Control Program water and healthy diet.
environmental *Cardiovascular
sanitation, disease prevention
adequate and control program
access to safe *Chronic obstructive
water, and and pulmonary
elimination of disease prevention
air pollution, and control program
healthy *Renal disease
lifestyle, control and
proper prevention program
exercise and *Smoking Cessation
healthy diet. Program
*Diarrheal Disease
Control Program
Prevalence of Improve Reduce Reduction of Nutrition Program Milk code/Breastfeeding
malnutrition nutritional underweight malnutrition education
status of and severely rate

Provincial Development and Physical Framework Plan 2021-2030 | 394


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
children underweight Nutrition counseling
among pre-
school children Deworming on children
by 2
percent/year Vitamin supplementation

School feeding through


breakfast & milk feeding
for underweight school
children grades 1 and 2

Children Weighing
Program and Nutrition
Supplement by barangay
Incidence of To lessen To reduce Intensive Health Services Maternal and child care
teenage incidence of number of Information and population
pregnancy teenage teenage education management
pregnancy pregnancy campaign
Adolescent Health and
Development Program

Family planning services

Access to clinics and


other health services

Health Promotion

Mental Health Program

Provisions of drugs and


medicines
Increasing To prevent To reduce/ Intensive Program on the IEC Program
number of and control control the risk Information prevention and
infectious infectious of infection education control of the ff:
diseases and diseases campaign *STD/HIV/AIDS
Covid-19 cases Prevention and
Practice Control Program
Protective *Rabies Control and
measures Prevention Program
*Tuberculosis
Prevention and
Control Program
Leprosy Prevention
and Control Program

Minimize To conduct Conduct seminar in Capacity Development


Covid-19 training/ response to the Program
cases/infection workshop on current situation
Retooling and involving Covid 19
upskilling

To achieve Vaccination Program

Provincial Development and Physical Framework Plan 2021-2030 | 395


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
herd immunity
through
vaccination
Water and To reduce To control the Reduction of Mosquito and Malaria Control Program
vector-borne the morbidity spread of water water and dengue control Dengue Control Program
diseases due to rate of these and vector- vector borne waterborne diseases Water and Environmental
flood prone diseases borne diseases diseases and Sanitation Program
settlements and
presence of To control
stagnant bodies bacterial Prevention of Control of Campaign on the
of water (creeks disease leptospirosis Leptospirosis prevention of
and rivers) caused by leptospirosis
contaminated
flood waters
Exposure and To enhance To mitigate the Prevention of Update data on Health Information
Risk of Health risk/disaster effect of flood exposure and hazards System
facilities to flood mitigation for and RIL hazard risk to hazard vulnerabilities and
and RIL hazard vulnerable to health of health prepare risk Disaster preparedness
health facilities facilities assessment report and Response Health
facilities System
through
appropriate
climate
change
adaptation
approaches
and
responses
Education
Student- To attain the To provide To build School Building Additional School building
Classroom ratio ideal ratio of better school additional Program for elementary, Junior and
is far from the student- environment classroom Senior High School
ideal ratio of classroom for children/
1:40 for ratio students To rehabilitate Repair/Rehabilitation of
elementary and and improve school buildings
1:45 for existing
Secondary school
facilities

Improve Purchase of
student- additional desks and
seating ratio armchairs

Equip schools Prioritize Construction of


with additional provision of comfort rooms and
comfort rooms more comfort learning facilities
and learning rooms and
facililties such learning
as computer facilities
and science
laboratories, Encourage Adopt-A-School
sports facilities, private sector Program
libraries ,etc participation in

Provincial Development and Physical Framework Plan 2021-2030 | 396


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
improving
school
facilities
Shortage in the Improve Meet the Create Personnel Hiring of additional school
number of student- standard teacher Recruitment program teachers and personnel
teachers and teacher ratio teacher-pupil positions
guidance ratio of 1:40 for specially in
personnel elementary and schools with
1:45 for high
secondary pupil/student
level teacher ratio
Filling up of
existing
vacant
positions
Need for faculty Enhance/ Reskilling and Capacitate Capacity
development develop upskilling of teachers with Development
competency teachers the modern Program for
of teachers tools/t Teachers
echnology in
teaching
Low cohort- To ensure To attain Provide Scholarship grants Scholarship grants and
survival rate that all efficiency in scholarship and Financial Financial Assistance
and net school-age education grants and Assistance Program Program
enrollment ratio population system and financial
in both have access increase assistance to
elementary and to complete participation poor but
secondary level elementary rate by 100% deserving
and students
secondary
education Provide Livelihood skills Technical Assistance on
employment training food processing,
and livelihood handicrafts making,
opportunities housekeeping products
to poor and recycled products
families
Improve Health and Nutrition Supplementary Feeding
health and Status Profile of
nutrition pupils/students in
development Rizal province
of students
Revitalization of
Health and Nutrition
Programs
Health Mobile
Project (Health-on-
Wheels)
Nutrition Center
Project (Nutrition
Care Center)
Poor ICT Create stable Increase Provide free Improve the cell site Expansion/Improvement
Network connectivity coverage areas access to facilities by the of ICT facilities

Provincial Development and Physical Framework Plan 2021-2030 | 397


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
in the entire internet service providers
province connection

Improve the Improve Construct Facilitate Construction of


ICT network access to Communication construction of communication tower
reliable internet Infrastructure to communication
connection expand infrastructure ICT Infrastructure,
coverage and
Network, Computer
access to
Ensure virtual ICT development System
affordable, connectivity
reliable and Promote free wi-fi Creation of data centers
secure portal connections in public
and places and Layout of fiber-optic
telecommunica educational networks to interconnect
tion services institutions government offices

Provide ICT equipment


such as computer, tablets
to students
Mismatch of To provide To improve Integration of Provide scholarship Scholarship Grants and
college and access to significantly the networked grants and financial financial assistance
technical/vocati and equity in quality of technologies assistance
onal graduates college/unive courses and SUCs/Private
and skills rsity and skill programs Retooling and Capacity Enhancement Curriculum
demand of the vocational/te offered by upskilling Development Program
economy chnical tertiary and
education technical/vocati Teaching, Research and
onal schools service through
online/virtual courses,
Exposure and To ensure To mitigate the Prevention of Upgrade schools that School building upgrading
Risk of the structural effect of flood exposure and are prone to hazards
education safety of all and RIL hazard risk to hazard
facilities to flood school to school of school Construct climate Construction of climate
and RIL hazard facilities facilities facilities proofed school proofed school buildings
facilities

Capacity building for Integration project of


school board, official climate change adaptation
and personnel in and disaster risk reduction
dealing with risk and plans and interventions on
damages of natural School Division
disaster Plans/Programs/ Activities

Housing
Increasing Provide Reduce Provision of Housing Program Project Evaluation for land
housing affordable , housing Land for acquisition
backlog low cost and backlog by future housing
climate- 20% yearly requirement Emergency Response to
resilient due to ISFs
housing increase
projects household Enhancement
formation and Program/Leadership

Provincial Development and Physical Framework Plan 2021-2030 | 398


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
in migration. Training/Livelihood
Training
Development
of medium Social preparatory
rise building activities on ISFs/CAs

Direct Buying Scheme


Projects

Census mapping/tagging
of those in danger zone
and those in the ordinary
locations

Community Mortgage
Program Projects

Infrastructure for Housing


and Community
Development

Provide New housing road Improvement of existing


access to new access programs blighted areas whenever
housing sites possible

Strict implementation of
housing standards

Low cost housing for


marginal families

Setting aside areas in the


municipality for future
housing expansion
Include Land titling projects Repair and maintenance
private in different project of existing facilities (roads,
sectors in the sites (2-3 months drainage, etc.)
development depending on the
of affordable completeness of
housing documents
submitted)
Provision of basic Installation of
needs and services electrification project and
water system at the site
Construction of other
facilities at the housing
site such as schools,
covered courts, etc.
Construction of needed
housing units at the site
Creation of more
recreational facilities such

Provincial Development and Physical Framework Plan 2021-2030 | 399


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
as parks and playgrounds
Livelihood training
Program
Implement Comprehensive
appropriate Land Use Plan
land use plan (CLUP) and Zoning
and zoning Program
Provision of Urban Medium Rise
medium rise Program
housing in
urban areas

Categorization To establish Monitoring of Establishment


of land use permitted permitted land of Zoning
policies land uses uses Monitoring
applicable to System
land within a
municipality
Security
Insufficient Provide Improve police Increase Police and Fire Police and Fire Personnel
Number of additional and firefighters police and fire Personnel Recruitment Program
personnel manpower to population fighters Recruitment
police force and for police ratio 1:1000 personnel Program
fire protection officers and and
personnel fire fighters 1:2000,respecti
in Rizal vely
province
Insufficient Improve Provide and Provide and Protective Capability building for
protective protective upgrade upgrade Equipment and police personnel, DRRM
equipment and equipment protective protective Facilities Provision officers, firefighters and
facilities and facilities equipment and equipment and Upgrading jail personnel
facilities and facilities Program
Construction/Improvement
of Jail facilities

Provision of investigative
equipment for police
personnel, PPEs for
firefighters and disaster
response and rescue
equipment

Provision of Water,
Sanitation & Hygiene
(WASH) facilities

Increasing Strengthen Effectively Strict Disaster Procurement and


intensity of partnership Reduce Loss Monitoring of Preparedness provision of disaster
natural with LGUs of Lives and Disaster Program response equipment
disasters and other Properties in Preparedness
government times of Program Construction and/or
agencies disasters/ improvement of Disaster

Provincial Development and Physical Framework Plan 2021-2030 | 400


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
calamities Intensify Mitigating infrastructure
trainings on
DRRM

Strengthen
coordination
and
partnership
with
MDRRMCs
and other
government
agencies

Develop more
innovative
warning and
warning
systems

Water and Sanitation


Inadequate Provision of Provide all Provide Water Supply and
water and access to households, access to safe Sanitation Program
sanitation safe water industries and water and
facilities and other sanitation Water Management
sanitation consumers facilities Plan
facilities regular access Encourage
to safe water private
(Level III) and sector’s
sanitary participation in
facilities supplying safe
water and
sanitation
facilities to
places in
shortage of
said needs
Building of Construction of
communal communal water
water system system for upland
for upland areas and artesian
areas and wells
artesian wells
for socially
disadvantage
communities
Power
Still presence of Provide Provide electric Promote Rural Electrification
unenergized electric services to the partnership Program
barangays/sitio services to unenergized and close
s in the the entire areas of the coordination
province province province with

Provincial Development and Physical Framework Plan 2021-2030 | 401


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
MERALCO
Organization
of
beneficiaries/
target
communities

To provide To assist Provide back- Renewable Energy Wind Farm Project,


renewable private owners up Technology Hydropower Project
and in acquiring (emergency
sustainable necessary Power supply
sources of permits of key
energy facilities
Right-of-way Resolve Assist Create proper ROW Acquisition
problems(ROW Right of Way MERALCO in representation Program
) acquirement Problems the acquisition s to all
for the of ROW stakeholders
installation of
electrical lines
Transportation, Access and Circulation
Inaccessibility Improved Build an Road Network Convert gravel and earth
of Roads to quality of environment Improvement roads into either concrete
facilitate roads conducive to Program or asphalt
commerce, the
exchange of establishment Construction/Repair/
goods and of labor Improvement which
services and intensive includes concreting,
push industries/ asphalting, gravel
development in attract surfacing of existing road
neglected areas investors network

Road Improvement Construction of more farm


Program to market road/barangay
roads and improvement of
the existing ones
Tourism Construction/
Development Improvement of roads
program leading to various tourism
destinations

Eco-Tourism
Development
Full support to SME Development Construction/
industries with Program Improvement of roads
potential for leading to various
promoting industries and economic
local zones
employment &
economic ICT Development
growth Program
Construction of steel
bridge flyover for traffic

Provincial Development and Physical Framework Plan 2021-2030 | 402


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
congestion in urban areas
Construction/
Improvement of local,
diversion and bypass
roads
Laguna Lake Construction of Ports
Transport Program
Road Traffic Construction of MRT Line
Improvement 7 project
Program
Extension Southeast
MetroManila Expressway
(C6) Project

LRT-2 Cogeo Extension


Project

Installation of traffic lights,


pedestrian overpass,
signages, etc.
Improvement/widening of
all national roads
Transport Network Asphalting/concrete
Maintenance blocking road
Program maintenance projects
Insufficient safe Provide To reduced car To provide Provision of bicycle
pedestrian easily traffic; lower bicycle lanes, lanes, wider
infrastructure accessible pollution; wider sidewalks,
transit improved sidewalks, pedestrian crossings
services, mobility; pedestrian
complete promote crossings
streets and healthy
safe paths lifestyles; Provision of Provision of
for biking or
decreased attainable attainable housing
walking suburban housing at
sprawl; varying
reduced income levels
household
spending on
transportation
Irrigation/Drainage/Flood Control
Occurrence of Prevent the Prevent the Protect and Watershed Reforestation and
flooding in the occurrence occurrence of rehabilitate Rehabilitation Riverbank Stabilization
province even of flooding flooding in the water shed Program Project
in areas not entire province
considered as
flood prone”
Reforestation Forest Land Use
and Riverbank Plan Preparation
Stabilization
Project
Prevent Updating of CLUPs

Provincial Development and Physical Framework Plan 2021-2030 | 403


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
establishment
of structure on
floodplains or
lake bed
Penalize Solid waste Legislation on penalties
persons who Management
will be caught
disposing
garbage in
water ways
Moratorium on Legislation on penalties
construction
of new
housing
subdivisions
to avoid
cutting of
trees (esp in
the upper
elevations of
Antipolo, San
Mateo and
Rodriguez.
Replan and Program on
decongest Resettlement
identified
areas away
from flood
prone and low
lying areas
Gradual Shore Protection Implementation of regular
dredging and Program dredging and desilting
desilting of project
Laguna Lake
Frequent To reduce To construct Create tree Flood Control Riprapping/Canal/
flooding brought potential flood control parks in the Program Drainage System
damages to damage to and drainage municipalities,
crops and crops, asset structures in city not only Building of retention
properties due and flood prone for aesthetics ponds and dikes
to inadequate properties areas but to help
flood control absorb Building/improvement of
and drainage floodwaters drainage facilities
facilities
Build
protective
infrastructure
that will make
easy flow and
fast subsiding
of flood
waters

Provincial Development and Physical Framework Plan 2021-2030 | 404


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
Flooded To formulate Prevent Waterways Dredging of various
agricultural and and construction Restoration creeks and rivers
settlement implement of structure (provincewide)
areas caused flood hazard near the
by river and damage waterways Dredging of clogged
overflows due mitigation waterways and demolition
to heavy rainfall plan and of illegal structure along it.
and poor integrate
drainage climate Identify and maximize
capacity of change and width of the natural
rivers and disaster risk waterways
drainage canal reduction
system. parameters
in the design
Low lying and
sections of the construction
national roads of flood
and provincial control and
roads are drainage
flooded during facilities and
strong typhoon structures
and heavy rain
Solid Waste Management
Improper/not Dispose To reduce solid Full YES to Green Solid waste Management
environment safely all waste implementatio program Services
friendly waste solid waste accumulation n of RA 9003
disposal with and and other Enhancement of Enhancement of MRF in
minimum contamination environmental Material Recovery all towns of Rizal and
environment by laws and Facilities (MRF) clustered barangay MRFs
al impact implementing policies through YES Program
throughout proper disposal
the province systems IEC drive on proper waste
management/zero waste
management
To adopt and Provide MRFs Prioritize
implement to all SWM Provision and
systematic barangays programs and implementation of
and eco- projects ordinances on every
friendly solid barangay on waste
waste segregation
management
plan and Management of Establishment of facilities
programs for Medical Waste that deal with proper
the disposal and treatment of
preservation toxic and hazardous
of a healthy wastes
and clean
environment

To provide Green Construction of Sewerage


decent work business Treatment Plant for
on waste development Hospitals
prevention, on waste

Provincial Development and Physical Framework Plan 2021-2030 | 405


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
reuse, collection, Management of IEC on proper disposal of
recycling and sorting and single use facemask single use facemask
recovery recycling
Promotion on the use of
reusable facemask that
can be worn and washed

Outdated Solid Need to To update the Updating of


Waste update the Solid Waste Solid Waste
Management Solid Waste Management Management
Plan of the Management Plan of the Plan
province Plan province by
2025
Insufficient safe Safe To provide safe Expansion of Extension/Expansion
disposal facility disposal of disposal of Sanitary of Sanitary Landfill
for untreated untreated untreated solid Landfill
solid waste or solid waste waste
resource or resource
recovery recovery
residual residual
Other Services and Facilities
Absence of Provide Provide Prioritize Implementation of Creation for a drop-in
services and services and services and provision of the Gender and center or a rehabilitation
facilities facilities facilities services and Development Code center for the abused and
required by required by needed by facilities neglected or children and
community community community needed by battered women
groups groups groups that community
merits special groups
attention over
the planned
period
Rehabilitation Establishment of Halfway
Centers for CICL, House in Taytay and
drug abuse, victims Women’s Desk in every
of disasters and provincial hospitals and
calamities, child barangays
abuse, etc sectors,
A House or Home for
the Aged Establishment of the
facility or a house that will
serve as home for the
aged and older persons
(who have no family or
neglected by their family
and that have no home to
turn to in the twilight of
their lives).
Inadequate Empower Develop and Improve the Women and Children Construction of Senior
service delivery marginalized upgrade social delivery and Elderly Citizen building
system and sector in the service delivery system for the Development
facilities for the province system and marginalized Program
Welfare sector: facilities for the sector of the

Provincial Development and Physical Framework Plan 2021-2030 | 406


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
marginalized province Establishment of Establishment of halfway
*Inadequate sector in the shelter for women Home
services city/municipaliti Provide social and children
provided for the es of the protection and
elderly province promote the
*Inadequate rights and Person with disability Capability
information and welfare of the Development Training/seminar for
education poor and Program PWDs
campaign for disadvantage
the welfare of d members of Gender and Scholarship program for
women and the Development PWDs
children in community Program
conflict Health Development
circumstances Program for
*Inefficient children/elderly/PWDs,
program for IPs
children and
youth in conflict
with the law
*Inadequate
access to
welfare services
of the
marginalized
and
disadvantaged
groups
*Inadequate
nutritional and
medical needs
for the IPs
Volunteer Participate in To promote Volunteerism
engagements volunteer community,
service for family and
development society’s
welfare
Poverty
Incidence of Reduce By 2030, Creation of Livelihood Skills
Poverty incidence of reduce jobs and Training
Poverty incidence of provision of
among poverty livelihood and
families especially in income
the genera-
municipalities ting
of Jalajala, opportunities
Baras, Tanay,
Pililla and
Cardona
INCOME/ EMPLOYMENT
High rate of Reduce Reduce Build up the Skills development Training for productivity
unemployment unemployme unemployment skills required program project
(Calabarzon- nt rate & rate to at least by growing

Provincial Development and Physical Framework Plan 2021-2030 | 407


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
11%) provide 5% & provide industries/ TechVoc Scholarship
income income businesses
generating generating Capacity building and
opportunities opportunities to Technical Training on ICT
unemployed
and low
income families
Provide Rizal College
tertiary Scholarship Program
education Students Assistance
scholarships Program
to deserving Special Program for
students Employment of
Students (SPES)
Provide Livelihood Skills Technical Assistance on
opportunities Development animal production & meat
for livelihood Program processing, fish
& to increase production & processing,
income fruit & vegetable
processing, soap making ,
chocolate & candy
making, candle making,
flower
arrangement,etc.

Capacity Building and


Technical training on ICT
Padyak Provision of pedicab as
Kabuhayan Program mobile market (negosyo
cart)
Emergency Provision of emergency
Employment employment to displaced
Program workers, out of school
youth, victims of
calamities, etc.
Conduct of Jobs Fair Entrepreneurial Training
Public Finance
Revenue Increasing To provide Conceptualiza
generation revenue additional tion and
capacity of the generation sources of preparation of
province to fund funds for feasibility
all projects, projects, studies
programs and programs and
activities activities Enhancement/
Review of the
Revenue
Code

LGU and
private
Partnership
and

Provincial Development and Physical Framework Plan 2021-2030 | 408


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
collaboration

Tax
compliance
studies

Computerizati
on
Enhancement
Agriculture
Input/Supply
High cost on Provision of Reduce cost Provision of Provision of quality Program on Rice
input and subsidy on on input and Agricultural seeds and planting Production, Corn and
supply for crops input/supply supply input materials Vegetable production
and other
commodities

Insufficient Produce high To produce To establish Establishment of Reforestation/


good quality or good quality high good nurseries nurseries Treeplanting in watershed
high yielding stocks/seeds quality area/sloppy
stocks/seeds/se / seedlings stocks/seeds/ Agricultural Land
edlings seedlings Technology

Insufficient Provide To establish Establishment Establishment of


water supply water supply small water of small water impounding facility
to production impounding impounding and/or irrigation
areas facility and/or facility and/or system
irrigation irrigation
system system
Availability of To provide To provide high Modernization Provision of farm
good quality high quality/ quality/modern of farm tools tools and equipment
farm tools and modern tools farm tools and and
equipment and equipment equipment
equipment

High cost on To establish To produce Establishment Agricultural


pullet stocking a one-stop quality eggs of a one-stop Production Services
and chicken layer chicken layer
establishment facility facility
of poultry farm, including
production
houses,
trading
center and
primary and
value added
processing
plant.

Production
Insufficient food To achieve Innovative, Provision of IEC Program
supply in food-self- competitive proper

Provincial Development and Physical Framework Plan 2021-2030 | 409


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
reference to the sufficiency and resilient schedule/ Program on Rice/
growing by enhancing agriculture calendar of Corn /Crops
population agricultural industry planting production
productivity activities
in all
crops/comm Provision of Distribution of quality
odities quality seeds rice, corn seeds, fruit
and planting trees and other
materials vegetables planting
materials
Provision of
Agricultural
input subsidy

Capability Techno Demo and


building thru Training Program
training of
farmers

Training on Conduct Farmers


updated Field School
technology in
organic
Farming

Presence of Capacitate Minimize the Provision of Organic Agriculture


pests and farmers on use of updated Program
diseases use of the hazardous technology in
proper pests chemicals organic Vermiculture
and diseases farming thru
management training/semin Composting
ars

Conduct Capacity Building on


capacity Organic fertilizers
building on and pesticides
the production
of organic
fertilizers and
pesticides thru
hands-on
training

High labor cost Agricultural Promotion of Improve farm Student orientation Vegetable Production:
and skills AFF productivity on Agriculture Eco Garden and Gulayan
inadequate development sa Paaralan/Gulayan sa
skilled farm Provision of Integration of Lalawigan/
workers technical vegetable garden in
assistance school Urban Container
gardening and Organic
Urban Gardening Farming Projects

Provincial Development and Physical Framework Plan 2021-2030 | 410


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
Capacity building Established Gulayang
training for non- Pangkabuhayan in every
agricultural workers LGUs
High prices of To decrease To establish a Establishment Establishment of
Superior prices of shared feed of Animal Animal Breeding
Genetic Stocks superior mill, and Breeding Center and Artificial
of Swine genetic breeding Center and Insemination Center
stocks station of good Artificial
quality stocks Insemination
per Center
municipality
Replacement Animal Breeding
and upgrading Services
of old genetic
stocks Swine Artificial
through Insemination
artificial
insemination

Inappropriate To manage To strictly Enabling Compliance to Clean Animal Waste Products


Waste waste from follow proper policies and Air Act Management and Animal
Management swine and disposal of regulation on By-Products Utilization
for poultry waste from Waste Proper waste
swine/poultry production swine and Management management and
production poultry compliance to disposal
Clean Air Act
Low standard To provide Increase Capability Capability building
poultry and good quality production building of Program
housing poultry and capability for stakeholders,
facilities for housing poultry and egg
poultry/egg facilities for production
production poultry/egg
production
Outbreak of To prevent To provide Provision on Inspection of Establishment of
poultry disease entry of policies on Enabling poultry/poultry additional Checkpoint
like Avian poultry poultry policies and products
Influenza products with products regulation on
diseases Poultry and
Poultry
Product.

Continuing Provision of To increase To provide Provision of


support to programs fishery necessary fingerlings, fishing
fishery sector and services production and production gears, fishing boat
to fishery augment support to engine and
sector income of fishery paraphernalia
fisherfolks
Technical assistance Establishment of Techno-
and support to demo Farm
fisherfolk
organizations Aquaculture Training
Harvest/Post Harvest/Post Production

Provincial Development and Physical Framework Plan 2021-2030 | 411


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
High losses due Capacitate Minimize Conduct Capacity building on
to mishandling, the farmers losses through capacity handling farm
lack of on harvest trainings/ building on products
knowledge on and post seminars handling farm
quality harvest produced
standards activities and
quality
standard of
farm
produced

Availability of To prolong Provision of Establishment Post Harvest


post harvest the shelf life post harvest of post Facilities, Farm
equipment and of facility harvest facility Mechanization and
facility commodities Development
Program
Processing
Incapacity of Capacitate Enable the To capacitate Technical
farmers/stakeho the farmers/ farmers/ the farmers/ assistance/Capacity
lders on value stakeholders stakeholders to stakeholders Development
added products on value produce high on value Program
added quality farm added
products products products

Availability of Provision of Produce high Provision of Establishment of


processing establishmen quality value processing Processing facility
facility t of shared added farm facility for
processing products farm products
facility

Inadequate To produce Produced high Establishment Establishment of


knowledge on high quality quality egg of shared processing facility on
value added egg products products processing egg-based products
processing of facilities and
chicken egg, no capacitate the
processing stakeholders
facilities on egg-based
products

Marketing
Poor farm-to- For easy To improve Improvement Upgrading/improvem
market (FMR) hauling and farm to market of farm to ent of farm-to-market
roads marketing of road for easy market road road
farm hauling and
products marketing of
farm products
Poor state of To improve To upgrade Upgrading of Upgrading of abattoir
slaughter slaughter abattoir LRMEs to
houses in some houses in Double A
municipalities some abattoirs
municipalitie complete with
s water system

Provincial Development and Physical Framework Plan 2021-2030 | 412


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
and access
road

Inadequate To provide Assurance of Capacity Capacity


National Meat good quality good quality Development Development
Inspection meat meat of Meat Program
Service (NMIS) Inspectors
certification

Big market To meet the Increase Provision of


supply gap due market production to expansion for
to high demand supply gap meet the poultry and
for livestock on livestockdemand for livestock
poultry/poultry and poultry livestock and
products poultry/poultry
products
Enabling Environment/Support Services
Rampant land Enabling Minimize land Strict Strict implementation
conversion of policies and conversion of implementatio of RA 7160, Rule
agricultural and regulation on agricultural and n of non- VII. Reclassification
farm lands land farm lands conversion of of Agricultural Land
conversion prime
agricultural
lands
Poor soil Encourage to Revive soil Organic Organic Agriculture Soil Conservation-farming
condition enforce fertility Farming Program Technology
organic Technology
agriculture
and
composting

Production To reduce Reduction of Accessibility Insurance Program


losses due to risks and risks and to agricultural
climate change disasters disasters insurance of Rehabilitation
and other associated associated with subsistence Program
environmental with climate climate change farmers and
causes change fisherfolks to
cover crops,
livestock,
fisheries and
non-
agricultural
asset
Poor financial Facilitate to Access to Agricultural Financial Assistance
access for small financial financial credit Credit and to small hog raisers
hog raisers to services to service Financing
purchase new small hog facilities Program
stocks raisers and
provide Promote the Promotion of “Paiwi“
incentive to “PAIWI” or Paalaga System
the scheme for cluster farmers
organized organization

Provincial Development and Physical Framework Plan 2021-2030 | 413


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
hog/swine
raisers

Inadequate To ensure To provide Inspection of Establishment of


Checkpoints good quality good quality hogs and additional check
Entry/exit of meat in the meat meat/meat point in every entry /
hogs from/to market products exit points
other places
Poor access to To provide To increase To provide Facilitation to
financial access to farmers’ access to financial institutions
services financial financial financial
services capacity. institutions
Tourism and Culture and Arts Sector
Accessibility of To develop a To contribute in Improvement Improvement of Tourism-related road
the province to sustainable the growth and of access to Roads improvement
tourism and expansion of tourism
destination sites competitive provincial destinations
to foreign and tourism economy in
domestic industry tourism
tourists
To promote
and preserve
the tourism
potentials of
the provinces
Low awareness Increase To widen Content Culture Awareness
on cultural awareness awareness on development Program
heritage on Cultural cultural using ICT
Heritage heritage
Increase To improve To promote the Tourism Tourism Promotion
tourism tourism tourism sites Development and Marketing
marketing and marketing and Program
promotion and destinations Culture, arts and
promotion heritage protection
conservation and
development
Tourism Skills
Development
Tourism Trade Fair
Market and Products Development of Rizal
Development One-Stop-Shop Business
Program Office
Formulation of Development of eco-
Rizal Tourism tourism zones and
Development strengthening of the
Plan province’s tourism
marketing
promotions

Explore partnership
with TIEZA on
establishing Rizal as

Provincial Development and Physical Framework Plan 2021-2030 | 414


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
potential meetings,
incentives,
conferences and
exhibitions (MICE)
destination.
Culture To support Mainstream Capacitate Cultural Programs
development cultural culture local planners and Projects
and values programs components in for the
formation and projects the CDP and integration of
CLUP culture in the
plans and
programs

Integrate
Ancestral
Domain
Sustainable
and
Development
Plan (ADSDP)
in the local
development
plan
particularly to
those with IPs
communities

Increase the Conduct of


number of cultural
schools of mapping
living traditions
and culture
bearers
LAND USE AND PHYSICAL FRAMEWORK
Urban Minimize Stop Strict
encroachment indiscriminat unnecessary implementatio
in agricultural e land land n of non-
lands conversion, conversion in conversion of
protect agricultural prime
agricultural areas agricultural
lands lands
Encourage Urban Expansion
urban Road Program
expansion to
environmental
ly compatible
areas
Infilling within Vacant land survey
the built- up
areas
Evaluate and Land Use plan Updated Land Use Plan
update land review and updating and Zoning

Provincial Development and Physical Framework Plan 2021-2030 | 415


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
use plan and
zoning
Increase Agricultural
agricultural Productivity Program
income to
discourage
conversion
Prioritize
preservation of
existing agricultural
lands and protected
agricultural zones
Invasion in Mitigate Mitigate Strict Forest Land Use Establishment of Shield
protective areas invasion in invasion in implementatio Plan Updating on Demarcation Areas
protective protective n of land use Boundaries
areas areas in the plans and Conservation/Enhan
next years zoning cement of Protected
Areas

Provide Livelihood Promotion


alternative and Skills
sources of Enhancement
income to
upland
dwellers
Invasion in Avoid Prevent Review and Review and update
floodplains, displacement invasion of update CLUPs
lakebed, and damage informal CLUPs
waterways, etc. of lives settlers in
causing during floodplains, Regular Regular inspection
flooding calamities lakebed, inspection and and monitoring of the
waterways, etc. monitoring of status of floodplains,
the status of lakebed and
floodplains, waterway
lakebed and
waterway.

Clear Demolition of illegal


floodplains, structures
lakebed and
waterways of
informal
settler.

Relocate Relocation of
informal informal settlers.
settlers
High population Balanced Use urbanized Assess and Assess and update
growth rate distribution of areas for update CLUPs
resulting to the commercial, CLUPs
increase population residential and
demand for industrial Encourage

Provincial Development and Physical Framework Plan 2021-2030 | 416


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
land purposes development
of urbanized
areas

Develop
access to
social
services

Create See PPAs for


livelihood and income/employment
employment
opportunities
Regulate Promotion of Program on Family
increase in Family Planning
population Planning

Build medium Medium rise Housing


rise housing in construction
urban areas
Environmental Preserve/ Significantly Lake/Waterwa Lake and Rivers Review of CLUP of
Degradation Protect decrease ys: Strengthen Rehabilitation city/municipalities
Environment environmental Efforts in Program
and Natural degradation Cleaning the Monitoring compliances of
Resources Lake and YES to Green different 14 LGUs to YES
Waterways Program projects

Strict Reactivation of BESWMC


implementatio in every barangays
n of Laws
Protecting the Watershed IEC dissemination
Lakes and Rehabilitation activities
Rivers

Avoid Safe closure of prohibited


construction dumpsites and
of Structures Rehabilitation
along natural
waterways

Provision of Forests: Livelihood Program Rehabilitation of


green job Intensify Hinulugang Taktak
opportunities Forest
through Rehabilitation Upland Communities
forest Efforts Rehabilitation
rehabilitation
and eco
tourism Mining and Strict Implementation of
Quarrying: SP-Ordinance No. 10-08,
Strict An Ordinance Imposing
Implementatio Environmental Monitoring
n of Mining and Stabilization Fee
and Quarrying

Provincial Development and Physical Framework Plan 2021-2030 | 417


DEVELOPMENT ISSUES, GOALS, OBJECTIVES, STRATEGIES, PROGRAMS, PROJECTS & ACTIVITIES

Issues/ Objectives/
Goals Strategies Programs/Projects Projects
Problems Targets
Laws Strict implementation of
Urban SP Ordinance 08-008 and
Ecosystem: SP Resolution 223,
s.2013

Create tree Creation of tree


parks /urban parks /urban forests,
forests, tree tree strips
strips

Improve
monitoring of
water and air
quality in the
urban areas

Environmental Tree Planting Tree Planting


ly critical Program
areas:
Conduct
Immense Tree
Planting
severe
erosion areas

Regulation of
structures
near/along the
active fault
line

Strict
Implementatio
n of Laws:
Abuse/Degrad
ation of
Pollution
threatened
Areas like
lakes, prime
agricultural
areas, etc.

Strict Information Education


Implementatio Campaign on areas
n of Zoning covered by active fault
Laws line

Provincial Development and Physical Framework Plan 2021-2030 | 418