CONSTRUCTION OF GABION WALL AND 12/14 CULVERT AT

Proposed Work Programme

Month 01 Month 02 Month 03

Week 01

Week 02

Week 03

Week 04

Week 05

Week 06

Week 07

Week 08

Week 09

Week 10

Week 11

Week 12
Description Days Start Finish

1.1
Mobilization and
Demobilization
1.0 Patching with mining
potholes using sand
emulsion mix 1:8 pro to
sand sealing
2.0
Bitumen surface
Asphalt
ID 03 5395 5.45
ID 05 2410 2.41
ID 21 2017 2.01
ID 22 102 0.17
ID 23 2641 2.64
ID 25 5000 4.44 43.18512
ID 28 1800 1.82
ID 29 1746 1.72
ID 30 8332 8.37
ID 31 11062 11.31 110.01
ID 32 2813 2.76 26.84481
ID 33 121 0.12
ID 33A 3340 3.00
ID 33B 587 0.56
47366 46.78
46.78
0.10281
3.12
35501.2
0.25 1 1.25 1.25 2 3 3 2.9 3.5
DescriptionMonth 01 Month 02 Month 03 Month 04 Month 05 Month 06 Month 07 Month 08 Month 09
4 4.2 4 4.4 6.2 5.75 46.7
Month 10 Month 11 Month 12 Month 13 Month 14 Month 15