You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

CONTRACTOR'S VERIFICATION STAMP

WE ENERVO GROUP, VERIFY THAT THIS CONTRACTOR'S


DOCUMENT
A A
· HAS BEEN PRODUCED AND CHECK IN ACCORDANCE WITH
CONTRACTOR'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER TO
ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENT OF THE CONTRACT

FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED FOR


WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:

[PROVIDE ALL REFERENCES TO LETTERS AND CTIS WHICH


DEMONSTRATE THE DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER]
B B
OTHER RELATED LETTERS/RFI WHICH DOCUMENT
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE LISTED
BELOW:

[PROVIDE ALL OTHER LETTER/CTI REFERENCES-USE AN


ATTACHMENT IF IT IS A LONG LIST]

CONTRACTOR'S PROJECT MANAGER:

BARAA
C C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

REVISE & RESUBMIT. WORK MAY PROCEED SUBJECT


CODE 2 TO INCORPORATION OF COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT .WORK MAY PROCEED

D 1 B D
00004 00005 CODE 4 REVIEW NOT REQUIRED. WORK MAY PROCEED
A B C D E
2092 THE STATEMENT " WORK MAY PROCEED" APPLIES TO THE
FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE MATTERS
CONTAINED WITHIN THE CONTRACTOR'S DOCUMENT:
697.5 697.5 483.5 214
DESIGN/PROCUREMENT/CONSTRUCTION/ALL * ACTIVITIES
(*DELETE/AMEND/ADD AS APPLICABLE)
UP CORRUGATED UP
THRESHOLD SHEET THRESHOLD ANY REVIEW ,COMMENT OR ACCEPTANCE BY EMPLOYER UNDER THIS
DO NOT SCALE FROM THIS DRAWING

CONTRACT WITH RESPECT TO ANY OF CONTRACTOR'S DOCUMENTS


1 SHALL NOT IN ANY WAY BE,OR DEEMED TO BE ,AN APPROVAL OF
FIRE FIRE
ANY WORK OR AN ACCEPTANCE THAT THE CONTRACTOR'S
E EXIT EXIT DOCUMENTS MEET THE REQUIREMENTS OF THE CONTRACT, AS E
1770 320 CONTRACTOR HAS THE SOLE RESPONSIBILITY FOR PERFORMING THE
100 60 100 60 100 60 165 60 100 60 100 60 100 60 157.5 60 100 60 100 60 100 60 207.5 WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE
CONTRACT.
555

CORRUGATED
SHEET NOTE:
FINISH FLOOR LEVEL SHOULD BE VERIFY AS
PER SITE CONDITION.
ABU DHABI PORTS APPROVAL CODE DATE

F F
2
open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves
LEGEND

2 002 07.09.2021 Issued for Approval NM KA WS


NEW BUILDING
00004 001 21.08.2021 Issued for Approval NM KA WS
584

ARCHIVE Rev. Date Description Drawn Chkd Appr


1772

380 sq.m
Drawn by / Date Checked by / Date Approved by / Date
2C-01-01-001
A A
G 00005 00005 G
Client

3 UP
CORRUGATED
SHEET

Contract No. & Project Title


633.5

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves

open shelves
H
CONSTRUCTION WORKS FOR SAIPEM H
630 150
FACILITY AT ZAYED PORT
SUB.ELECTRICAL ROOM-1
CONTRACT NO. 2107-351

300
IDF ROOM
2D-01-01-001 2D-01-01-002
100 60 100 60 100 60 165 60 100 60 100 60 100 60 157.5 60 100 60 100 60 367.5
Independent Checking Engineer
September 7, 2021 - 1:08 PM

Signature
Contractor

J GROUND FLOOR PLAN J

B
00005

Consultant

K K
TECHNOLOGY HOUSE L.L.C.

Tel. : 02 - 6417627 Email : sth_cons@emirates.net.ae


Fax : 02 - 6449572 P.O.Box : 108707 - Abu Dhabi

Drawing Title

ZAYED PORT
GROUND FLOOR PLAN - ARCHIVE BLD.
(MAIN WORKSHOP BUILDING)
L L

Sheet Scale Paper size


CAD file name: 2107-351-VA-8900-00002

2 OF 33 1/100 A1
Drawing Status

Schematic Design Drawing


M QR CODE Drawing No. Revision M

2107-351-VA-8900-00002 002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like