CONTRACTOR'S VERIFICATION STAMP

A WE, [ALI & SONS], VERIFY THAT THIS CONTRACTOR'S A


DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT

FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED


FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
B [NIL] B
OTHER RELATED LETTERS / RFI WHICH DOCUMENT
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:
1. IFC-PODIUM GROUND FLOOR FRAMING PLAN
2500-108-VS-5210-21000 & 21001_C00
2. IFC-OFFICE -BEAM SCHEDULE -2500-108-VS-5999-21700_C00
3. GROUND FLOOR SLAB REINFORCEMENT DETAILS (SD)
2201-246-VS-5300-01001 TO 01006_C00
4.GROUND FLOOR BEAMS REINFORCEMENT DETAILS (SD)
2201-246-VS-5700-01001 & 01002_C00
CONTRACTOR'S PROJECT MANAGER:
FIRAS
C __________ __________ ________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP


B CODE 1 WORK MAY PROCEED
H G F E D C A
MONORAIL MONORAIL
CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED
F.F.L. WINCH WINCH
SUBJECT TO INCORPORATION OF
56.65 m +56.65 m
1850 1850 COMMENTS INDICATED
LTF

500
300
1275 1275 CODE 3 REVISE & RESUBMIT. WORK MAY NOT
AL-C1
D PROCEED D
CODE 4 REVIEW NOT REQUIRED. WORK MAY
350 350 PROCEED

+51.40 m +51.40 m THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
MATTERS CONTAINED WITHIN THE CONTRACTOR'S
DOCUMENT:
AL-C3
F.F.L. DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
47.80 m (*DELETE/AMEND/ADD AS APPLICABLE)
GSP1
LUR ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
REFER TO THE REFER TO THE
CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E SIGNAGE DESIGN SIGNAGE DESIGN
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
F.F.L. +44.88 m +44.88 m ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
44.20 m
THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS
LRF
AL-C3
THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN
ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.

F.F.L.
40.60 m GV1
L09
----------------------------- --------------- ------------------
AD PORTS GROUP APPROVAL CODE DATE
F.F.L. GRC1
AL-P2
F 37.00 m
L08
F
AL-C3

GV1
F.F.L. C00 03/08/2022 Issued For Approval/SD KAM PBU KSM
33.40 m GSP1
L07
AL-P2
Rev Date Description Drawn Chkd Appr
F.F.L. Drawn by / Date Checked by / Date Approved by / Date
29.80 m
L06 KAM/03/08/2022 PBU/03/08/2022 KSM/03/08/2022
AL-C3
G Client
G
F.F.L.
26.20 m
L05
GSP1

AL-C2
F.F.L.
22.60 m
L04
AL-C3 Contract No. & Project Title

AL-C2 +20.10 m AL-C3 AL-C3 AL-C3 +20.10 m GV1 GV2 GRA GRA GSP2 AL-P1 2201-246
H F.F.L.
H
19.00 m
L03
+19.00 m CONSTRUCTION OF KIZAD HQ OFFICES
+18.40 m +18.40 m
Abu Dhabi, KIZAD AREA B, Plot:C1
AL-C1 +16.80 m A1920
F.F.L. +16.10 m
15.40 m +14.98 m Sub Contractor
L02

+14.05 m
GSP2 AL-P1 GV2 GSP2 GV2 GRA
GV1

+12.30 m +12.23 m
F.F.L.
11.10 m
+11.13 m
J L01 J

Contractor
F.F.L.
7.70 m
LATTIC

F.F.L.
4.20 m
+4.17 m +4.17 m
LM

Consultant
K
F.F.L.
K
0.10 m PAVEMENT
+0.10 m LEVEL
L00

REFER TO
3 THE SIGNAGE 3 P.O.BOX 2967, ABU DHABI, UNITED
DESIGN ARAB EMIRATES
80123 TEL + 971 2 681 5777
FAX + 971 2 681 5776
EMAIL abudhabi@dewan-architects.com

ELEVATION-2 AL-P1 GV2 GSP2 AL-P4 GV1 GSP1 AL-C3 GD3 GV2 AL-P1
www.dewan-architects.com

2 SCALE: 1:150 Drawing Title

L SCAFFOLDING, MONORAIL L
& WINCH DESIGN
Sheet Scale Paper Size

02 OF 08 As Shown A1
Drawing Status
DESIGN DRAWING
QR CODE
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2201-246-VA-6800-01201 C01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16