CONTRACTOR'S VERIFICATION STAMP

A WE, [ALI & SONS], VERIFY THAT THIS CONTRACTOR'S A


DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT

FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED


FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
B [NIL] B
OTHER RELATED LETTERS / RFI WHICH DOCUMENT
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:
1. IFC-PODIUM GROUND FLOOR FRAMING PLAN
2500-108-VS-5210-21000 & 21001_C00
2. IFC-OFFICE -BEAM SCHEDULE -2500-108-VS-5999-21700_C00
3. GROUND FLOOR SLAB REINFORCEMENT DETAILS (SD)
2201-246-VS-5300-01001 TO 01006_C00
4.GROUND FLOOR BEAMS REINFORCEMENT DETAILS (SD)
2201-246-VS-5700-01001 & 01002_C00
CONTRACTOR'S PROJECT MANAGER:
FIRAS
C __________ __________ ________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

CODE 1 WORK MAY PROCEED

ELEVATION CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


SCALE: 1:150 SUBJECT TO INCORPORATION OF

3 1 COMMENTS INDICATED

D TOP ROOF PLAN 01217 01216 01215 01214


CODE 3

CODE 4
REVISE & RESUBMIT. WORK MAY NOT
PROCEED

REVIEW NOT REQUIRED. WORK MAY


D

PROCEED

THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
DECORATIVE TENSION RODE
(AS PER APPROVED MATERIAL)
DECORATIVE TENSION RODE
(AS PER APPROVED MATERIAL)
MATTERS CONTAINED WITHIN THE CONTRACTOR'S
T.O.P.+44.88 T.O.P.+44.88 HIGH LEVEL BUILDING ID 2 T.O.P.+44.88
1200 (SIGN TYPE-7.1b) 1200
DOCUMENT:
HIGH LEVEL BUILDING ID 2
(SIGN TYPE-7.1b)
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
T.O.P.+44.18 LOWER ROOF LEVEL
1200 (*DELETE/AMEND/ADD AS APPLICABLE)
CW-26 T.O.P.+44.18
1200
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E 2517
DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
CW-26 CW-26 CW-26 CW-26
ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
OPEN TO ABOVE THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS
CW-22

THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN

CW-30
51250
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
OPEN TO SKY
2500 1250 ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.
LOWER ROOF LEVEL
ACP-ALUMINIUM COMPOSITE PANEL
(DETAILED DRAWING SHALL BE
SUBMITTED SEPARATELY )

2250
----------------------------- --------------- ------------------
AD PORTS GROUP APPROVAL CODE DATE

200
250 x 200 x 10mm BASE PLATE P.SHAFT CW-02c
250 x 200 x 10mm BASE PLATE
GI BRACKET-250 x 200 x 10mm thk
UR-04
F F

UR-03
F.F.L.+VARIES
RW S.S.L+47.70

CW-02b
S.E.

S.M.
F.F.L.+VARIES
ELEVATION GEAD
S.S.L+47.70 MEP

4 200mm CONCRETE UP EMERGENCY


HIGH LEVEL BUILDING ID 3
C00 03/08/2022 Issued For Approval/SD KAM PBU KSM

STAND FROM S.S.L UP STAND AS PER THE


UP STAND AS PER THE CONTROL ROOM-02
F.F.L.+47.80 DETAIL FOR THE DUCT
DETAIL FOR THE DUCT
PENETRATION THRU SLAB UR-03
(SIGN TYPE-7.1c)
ELEVATION Rev Date Description Drawn Chkd Appr
PENETRATION THRU SLAB EMERGENCY
UP STAND AS PER THE CONTROL ROOM-01 UP STAND AS PER THE
Drawn by / Date Checked by / Date Approved by / Date
2
HIGH LEVEL OPEN TO ABOVE
DETAIL FOR THE DUCT DETAIL FOR THE DUCT
BUILDING ID 1
F.H.C PENETRATION THRU SLAB ELEVATOR SHOP.DWG.
UR-02 PENETRATION THRU SLAB
(SIGN TYPE-7.1a) UR-05 WILL BE SUBMITTED
F.F.L.+VARIES
OPEN TO ABOVE S.S.L+47.70 KAM/03/08/2022 PBU/03/08/2022 KSM/03/08/2022
SEPARATELY

G S.M.
UP STAND AS PER THE Client
G

S.M.
TFAD

UR-02
ST-02 DETAIL FOR THE DUCT
200mm CONCRETE UP
S.M. PENETRATION THRU SLAB OPEN TO ABOVE OPEN TO ABOVE OPEN TO ABOVE
UR-05 STAND FROM S.S.L
DN S.M.

F.H.C

ELEVATOR SHOP.DWG. MEP R.W.


WILL BE SUBMITTED
SEPARATELY UP STAND AS PER THE

UR-01
OF-SE01 DETAIL FOR THE DUCT

P.SHAFT
(FIRE RW F.F.L.+46.00
PENETRATION THRU SLAB
FIGHTING LANDING DN
LIFT)
UP STAND AS PER THE ST-01
DETAIL FOR THE DUCT
MEP T.O.P + 49.15 PENETRATION THRU SLAB UR-01
F.F.L.+46.00
Contract No. & Project Title

P.SHAFT
WITH PAINT FINISH WITH PAINT FINISH WITH PAINT FINISH WITH PAINT FINISH

F.CWP
P.
P.SHAFT SHAFT LANDING 73 x 140 x 4mm VERTICAL COLUMN 73 x 140 x 4mm VERTICAL COLUMN T.O.P + 49.15 73 x 140 x 4mm VERTICAL COLUMN 73 x 140 x 4mm VERTICAL COLUMN
WITH PAINT FINISH
MEP 73 x 140 x 4mm HORIZONTAL BEAM
2201-246
H H
STAIRCASE SHOP.DWG. CW-02a CONSTRUCTION OF KIZAD HQ OFFICES
WILL BE SUBMITTED
SEPARATELY Abu Dhabi, KIZAD AREA B, Plot:C1
10900
A1920
OPEN TO SKY
Sub Contractor
CW-27

F.F.L.+VARIES 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500

CW-29
S.S.L+43.93
42500

CW-28 CW-28 CW-28 CW-28

J J
T.O.P.+44.18 LOWER ROOF LEVEL
T.O.P.+44.20 Contractor

T.O.P.+44.88 DECORATIVE TENSION RODE (AL-C2) ACP-ALUMINIUM COMPOSITE PANEL T.O.P.+44.88 DECORATIVE TENSION RODE T.O.P.+44.88
(AS PER APPROVED MATERIAL) (DETAILED DRAWING SHALL BE (AS PER APPROVED MATERIAL)
SUBMITTED SEPARATELY )

STEEL STRUCTURE DETAILS

Consultant
K 3 K
ELEVATION

P.O.BOX 2967, ABU DHABI, UNITED


ARAB EMIRATES
TEL + 971 2 681 5777
FAX + 971 2 681 5776
EMAIL abudhabi@dewan-architects.com
www.dewan-architects.com

Drawing Title

L L
SCAFFOLDING DESIGN
Sheet Scale Paper Size

05 OF 08 As Shown A1
Drawing Status
DESIGN DRAWING
QR CODE
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2201-246-VA-6800-01204 C01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16