CONTRACTOR'S VERIFICATION STAMP


LEGEND: Note:
HEAVY DUTY TRAFFIC BARRIER WE, [SDVCE], VERIFY THAT THIS CONTRACTOR'S DOCUMENT
A (850MM HEIGHT) - Safety barrier fixing & layout is subject to site condition. A
HEAVY DUTY COLUMN GUARD - Clear width for corridors should not be less than 5m after fixing the barrier. · HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE
(1200MM HEIGHT) WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
HEAVY DUTY DOOR FRAME / HEIGHT
- Contractor to consider that the cold store (WH01,WH02 & WH03) temperature is
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
RESTRICTOR (SIZE AS PER BOQ) (-34 to +40)c, dry store (WH04) temperature is (+10 to +40)c. TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
- The barriers related to racking system protection inside WH02, WH03 & · COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
WH04 are to be finalized after finalizing the racking layout.
- All steel parts should have anti corrosion / rust powder coated finish system as FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
per specs ( Anti corrosion primer coat, intermediate coat & top coat). The colour FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
B should be RAL1003 (Safety yellow). [PROVIDE ALL REFERENCES TO LETTERS AND RFI WHICH B
DEMONSTRATE THE DISPENSATION HAS BEEN ACCEPTED BY
THE EMPLOYER]

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

[ PROVIDE ALL OTHER LETTER / RFI REFERENCES - use an


attachment if it is a long list]

CONTRACTOR'S PROJECT MANAGER:

C GOPAL JOSHI
__________ __________ ________ C
PRINT NAME SIGNATURE DATE
09 09 09
DOCUMENT STATUS STAMP
O
SPD
SPD 06 SD SD
SD SD SD SD
15 02 02 02 02
02 02
ELECTRICAL
UP UP UP UP UP UP
ROOM
CODE 1 WORK MAY PROCEED

CONNECTION
AREA
CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF
COMMENTS INDICATED
ELECTRICAL
UP UP UP UP UP UP
ROOM

A SPD
15 SPD
06
SPD
10
SPD
10
SPD
10
SPD
10
SPD
10
SPD
10 CODE 3 REVISE & RESUBMIT. WORK MAY NOT
D SPD
10
PROCEED D
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CODE 4 REVIEW NOT REQUIRED. WORK MAY
+16 to +24 C O
PROCEED
RUD
01
CO - PACKING
AREA THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE
SPD
17 FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
B MATTERS CONTAINED WITHIN THE CONTRACTOR'S
RUD
03
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
(*DELETE/AMEND/ADD AS APPLICABLE)
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
DO NOT SCALE FROM THIS DRAWING

RUD
03

UNDER THIS CONTRACT WITH RESPECT TO ANY OF


CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E C DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
RUD
03 ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS
THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN
RUD
03
ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.

D
RUD
03

----------------------------- --------------- ------------------

UP
ABU DHABI PORTS APPROVAL CODE DATE
DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE

UP
RUD
8 9 10 11 12 13 14

STAIR-1
03

6
8

1
F F

OFFICE
09

10

12

13

14

15

16
11
E
RUD

OFFICE
03

STATION
WORK
11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11

OFFICE
C00 20-12-21 Issued for Approval / IFC SK MA

CORRIDOR
RUD
03
12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D 12 12 P&D P&D P&D P&D P&D P&D P&D P&D

Rev Date Description Drawn Chkd Appr

OFFICE
LADIES
TOILET
F +16 to +24 C O
+16 to +24 CO
13 Drawn by / Date Checked by / Date Approved by / Date
+16 to +24 CO
+16 to +24 C
O
+16 to +24 C O
+16 to +24 C O
+16 to +24 C O

FIRST AID
SK MA

ROOM
SPD SPD SPD SPD SPD SPD
08 SPD 08 08 08
08 08 08
TD

20-12-2021 20-12-2021
05
FEMALE

G
TD
05 WC
Slope (8.3%)

Slope (8.3%)

TD

G TD
05 SPD
05
SPD
05
SPD
05
SPD SPD
05
SPD SPD
05
G

UP
05 TD TD 05 05 SPD
04 MALE TD
Client

Minimum
06 14
WC 05

ENTRANCE
SD

MAIN
Slope (8.3%)

03 TD

STORE
TD RECEPTION

UP
JAN.
06 TD

5m
05

H BGD
03
CORRIDOR +16 to +24 C
O
CORRIDOR +16 to +24 C
O
02
sivakumar

ELEC.

LIFT - 1
MARSHALLING
LOUNGE OFFICE
ROOM
SHIPPING
AREA

SLOPE 1:12
SPD SPD SPD SPD SPD SPD
05 SPD
05 05 05 05 05 05

I +16 to +24 S.C.H.F S.C.H.F

WAITING
SPD

UP
SD TD

AREA
03 03 11

SPD SPD SPD SPD


+16 to +24 C O SPD +16 to +24 C
O
SPD SPD +16 to +24 O
C 08
08 +16 to +24 C O
08 08 08 +16 to +24 C O
08 +16 to +24 C O 08

+16 to +24 C
O

13

TOILET
GENTS
J © Copyright Abu Dhabi Ports (ADPorts), 2019. All Rights Reserved.
RUD
02

MEETING
P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D
Contract No. & Project Title

PANTRY
12 12 12 12 12 12 12 12 12 12 12 12 12

CORRIDOR
Dec 20, 2021 - 11:20am

RUD

CANTEEN

ELECTRICAL
02

ROOM
H 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
CONTRACT NO. 4201-105 H
CRITICAL WAREHOUSING CAPACITY ENHANCEMENT
K

SERVER
ROOM
RUD
02

STAIR-2
09

10

11

12

13

14

15

16

CONTOL
8

1
6

ROOM
UP
RUD
Independent Checking Engineer
02

UP
L Signature
RUD
02

Contractor
DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE DRY STORE
J RUD
02
1 2 3 4 5 6 7 J

M
RUD
02

RUD
Consultant
1 2 3 4 5 6 7 8 9 10 11
02
UP
STAIR 03-WH04

22 21 20 19 18 17 16 15 14 13 12

N SPD SPD
10 12
SPD
16

K UP 22
K
4201-105-VA-8900-01022_C00 Steel Barrier.dwg

01 21
02 20
03 19
04 18
05 17
BATTERY CHARGING
UP
06
07
16
15
ROOM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
08 14
09 13
10 12
11

STAIR 02-WH04
SPD

O
SPD SPD SPD SPD SPD
10 10 SPD
10 10 10 10 10

UP UP UP UP UP UP UP

Drawing Title

KLP-21 KHIB-10 (COLD STORES)


WAREHOUSE-4
BARRIER PROTECTION LAYOUT
L L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Sheet Scale Paper Size

01 BARRIER PROTECTION LAYOUT


1 OF 1 1:300 A1
- SCALE: 1:300
Drawing Status
CAD file name :

ISSUED FOR CONSTRUCTION DRAWING

QR CODE
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 4201-105-VA-8900-04023 C00