CONTRACTOR'S VERIFICATION STAMP


LEGEND: Note:
HEAVY DUTY TRAFFIC BARRIER WE, [SDVCE], VERIFY THAT THIS CONTRACTOR'S DOCUMENT
A (850MM HEIGHT) - Safety barrier fixing & layout is subject to site condition. A
HEAVY DUTY COLUMN GUARD - Clear width for corridors should not be less than 5m after fixing the barrier. · HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE
(1200MM HEIGHT) WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
HEAVY DUTY DOOR FRAME / HEIGHT
- Contractor to consider that the cold store (WH01,WH02 & WH03) temperature is
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
RESTRICTOR (SIZE AS PER BOQ) (-34 to +40)c, dry store (WH04) temperature is (+10 to +40)c. TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
- The barriers related to racking system protection inside WH02, WH03 & · COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT
WH04 are to be finalized after finalizing the racking layout.
- All steel parts should have anti corrosion / rust powder coated finish system as FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED
per specs ( Anti corrosion primer coat, intermediate coat & top coat). The colour FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
B should be RAL1003 (Safety yellow). [PROVIDE ALL REFERENCES TO LETTERS AND RFI WHICH B
DEMONSTRATE THE DISPENSATION HAS BEEN ACCEPTED BY
THE EMPLOYER]

OTHER RELATED LETTERS / RFI WHICH DOCUMENT


CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:

[ PROVIDE ALL OTHER LETTER / RFI REFERENCES - use an


attachment if it is a long list]

CONTRACTOR'S PROJECT MANAGER:

C GOPAL JOSHI
__________ __________ ________ C
PRINT NAME SIGNATURE DATE
O SD SPD
SD SD 06 SPD
02 15
02 02

UP UP UP
ELECTRICAL
ROOM DOCUMENT STATUS STAMP

CONNECTION CODE 1 WORK MAY PROCEED


AREA

CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED


UP UP UP UP UP UP
ELECTRICAL SUBJECT TO INCORPORATION OF
ROOM
SD SD
COMMENTS INDICATED
A
SD SD SD SD SPD
02 02 02 02 02 02 SPD 15
06

SPD SPD
SPD SPD SPD SPD SPD
09 09
09 09 09 09 10
CODE 3 REVISE & RESUBMIT. WORK MAY NOT
D 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 PROCEED D
O

+10C
RUD
01
CODE 4 REVIEW NOT REQUIRED. WORK MAY
CO - PACKING
AREA
PROCEED
SPD
02

B THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE


FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE
RUD
MATTERS CONTAINED WITHIN THE CONTRACTOR'S
03
DOCUMENT:
DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES
(*DELETE/AMEND/ADD AS APPLICABLE)
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER
DO NOT SCALE FROM THIS DRAWING

RUD
03

C UNDER THIS CONTRACT WITH RESPECT TO ANY OF


CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
E
RUD
03 ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS
THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN
RUD
03
ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.

D
UP

RUD
03

COLD COLD COLD COLD COLD COLD COLD


----------------------------- --------------- ------------------
ABU DHABI PORTS APPROVAL CODE DATE
UP
STAIR-1

STORE 14 STORE 13 STORE 12 STORE 11 STORE 10 STORE 9 STORE 8


1

7
2

8
OFFICE

16

15

14

13

12

11

10

09

-26 C -26 C -26 C -26 C -26 C


-26 C -26 C RUD
03

F E F
OFFICE

STATION
WORK

11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
RUD
03
OFFICE

CORRIDOR

12 12 12 12 12 12 12 12 12 12 12 12 12
P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D
RUD
03
C00 20-12-21 Issued for Approval / IFC SK MA
OFFICE

LADIES
TOILET

F 13 Rev Date Description Drawn Chkd Appr


FIRST AID
ROOM

SPD SPD SPD


SPD

SPD
SPD
07
SPD
SPD
07
SPD
07

SPD
SPD
07

SPD
07

SPD
07 07
TD
05 FEMALE
Drawn by / Date Checked by / Date Approved by / Date
SPD

G 04 TD
04 04 04 04 04 04 WC

MA
05

SK

Slope (8.3%)

Slope (8.3%)
TD
05
TD
UP

SPD BGD BGD BGD BGD BGD BGD BGD


02 TD TD 05
13 02
20-12-2021 20-12-2021
02 02 02 02 02 TD MALE
05 WC 04 06

Minimum
ENTRANCE

SD
MAIN

Slope (8.3%)
SD TD

G G
STORE

RECEPTION TD 03
UP

01 JAN.
06
TD 05

5m
11
10

02
2
1
9
8
7

5
4
3

SPD
6

BGD
Client
O O
UP

C C
ELEC. STAIR 04-WH02 CORRIDOR -10 CORRIDOR -10 02 02
LIFT - 1

ROOM UP TO CATWALK SYSTEM


BGD
MARSHALLING OFFICE
LOUNGE

BGD BGD BGD BGD BGD BGD SHIPPING


AREA
SLOPE 1:12

02 02 02 02 02
21

22

02
12
13
14
15
16

19
20
17
18

02
sivakumar

I SPD SPD SPD SPD


WAITING

SPD SPD SPD


UP

SPD TD SD
AREA

04 04 04 04 04 O
11
04 04 03
+10C 03

SPD SPD SPD


SPD SPD 07 SPD SPD
07 07 07 07
07 07

13
TOILET
GENTS

J
MEETING

P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D P&D © Copyright Abu Dhabi Ports (ADPorts), 2019. All Rights Reserved.
PANTRY

12 12 12 12 12 12 12 12 12 12 12 12 12
RUD
CORRIDOR

02

Contract No. & Project Title


ELECTRICAL

CANTEEN
ROOM

11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
Dec 20, 2021 - 11:18am

RUD
02

H K CONTRACT NO. 4201-105 H


SERVER
ROOM

CRITICAL WAREHOUSING CAPACITY ENHANCEMENT


STAIR-2

11
16

15

14

13

12

10

09
1

4
3

8
6
CONTOL

UP
ROOM

RUD
02
UP

RUD
Independent Checking Engineer
02

L PANTRY
MAINTENANCE
ROOM

-26 C -26 C -26 C -26 C -26 C -26 C -26 C


Signature
RUD
02
COLD COLD COLD COLD COLD COLD COLD Contractor
STORE 7 STORE 6 STORE 5 STORE 4 STORE 3 STORE 2 STORE 1

J TOOLS
ROOM
TOILET

RUD
02
J
M
RUD
02

STAIR 03-WH02
11 10 9 8 7 6 5 4 3 2 1

UP

RUD
Consultant
02
12 13 14 15 16 17 18 19 20 21 22

N SPD SPD
12 SPD 10
16

22 UP
21 01
20 02

K K
19 03
18 04
BATTERY CHARGING 17 05

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ROOM 16
15
06
07
UP
4201-105-VA-8900-01022_C00 Steel Barrier.dwg

14 08
13 09
12 10
11

SPD SPD SPD


09 SPD SPD SPD SPD
09 09 STAIR 02-WH02
09 09 09 09

O UP
SD
02

UP
SD
02

UP
SD
02

UP
SD
02
UP
SD
02

UP
SD
02

UP
SD
02

Drawing Title

KLP-21 KHIB-10 (COLD STORES)


WAREHOUSE-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 BARRIER PROTECTION LAYOUT
L L

Sheet Scale Paper Size


01 BARRIER PROTECTION LAYOUT
- SCALE: 1:300
1 OF 1 1:300 A1
Drawing Status
CAD file name :

ISSUED FOR CONSTRUCTION DRAWING

QR CODE
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 4201-105-VA-8900-02022 C00