You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTES:
915-CC-5505A/B
A CLAY TOWERS 1. PROVIDE ENOUGH SPACE FOR CLAY REPLACEMENT.
A
Inside Diam. x Len.(T/T) : 2400 mm x 11250 mm 2. LOCATE AS CLOSE TO SG ON DRAIN LINES AS POSSIBLE.
3. CLOSED HYDROCARBON DRAIN TO 915-VV-5514 AROMATIC SUMP ON DWG. NO. 222334-915-11541.
Design Press. : 29.000 / 0.5V Kg/cm²g SHALL BE ROUTED TO OWS ONLY DURING STEAM OUT / LINE FLUSHING.
Design Temperature : 250 °C 4. CLAY TOWER UNLOADING NOZZLE.
4 5. REFER SC-7 ON P&ID FOR GENERAL NOTES AND TYPICAL DETAILS B018-02-42-00-1192 (SHEET 2)
FOR SAMPLING ARRANGEMENT DETAILS.
6. ALL DRAINS 2" AND ABOVE ROUTED TO 'ACD' HEADER ORIGINATING FROM EQUIPMENTS AND
4"-P-915-53004-B87A-IH 2"-SM-915-53101-B2A-IH ASSOCIATED SYSTEMS INDICATED ON THIS P&ID ARE REPRESENTED ON PID B018-02-42-910-11735.
12247

12257
AROM. EXTRACT MP STEAM
915-11530 B018-02-42-910-11717 4
FROM 915-EE-5515, CLAY B87A B2A FROM DISTRIBUTION
B TOWER CHARGE HEATER B

2"-IG-915-53101-A1A-

12258
LP NITROGEN
+
915-11540
A11A B87A 29.00
B87A A1A +
FROM LOW PRESSURE
4 IS IH PSV
+
29.00 B87A A11A DISTRIBUTION GENERAL NOTES:
6"-WFL-915-53101-A11A-IS
12249

WET FLARE 53101A PSV IH IS 4 1. DELETED.


+
915-11540 2. DELETED.

6"-WFL-915-53102-A11A-IS
LO 6"-WFL-915-53103-A11A-IS

12256
53102A WET FLARE
TO 915-VV-5511, SOLVENT VENT 3. DELETED.
3/4" 915-11540

2"-P-915-53116-A11A-IS
C DRUM 4 LO 4. DELETED. C

6"-WFL-915-53104-A11A-IS
TO 915-VV-5511, SOLVENT VENT 5. DELETED.

2"-P-915-53020-A11A-IS
3/4" 2"-SM-915-53102-B2A-IH 3/4"
A11A B87A DRUM 6. DELETED.
IS IH PSV 3/4" B87A A11A 7. DELETED.
+ + 8. ALL TAG NUMBERS FOR INSTRUMENTS WILL BE PRECEDED BY UNIT NUMBER 915 UNLESS
53101B 29.00 PSV IH IS OTHERWISE SPECIFIED.

LO
+ +

LO 4 29.00 53102B 9. ON/OFF VALVE POSITION TO BE INDICATED ON DCS FOR ZV.

LO
3/4" 10. PUMP RUNNING STATUS-LIGHT INDICATION TO BE SHOWN ON DCS.
4 4

2"-P-915-53114-B87A-IH
LO

NC

NC
11. DELETED.
4"-P-915-53102-B87A-IH 4 12. DRAIN SYSTEM TO BE LOCATED AT LOWEST POINT.
3/4" 3/4"

2"-P-915-53118-B87A-IH
4
4 13. FOR LEGENDS, SYMBOLS, GENERAL NOTES AND ENGINEERING DESIGN NOTES
3/4"
4 NO NO NC NO SEE LEGEND & SYMBOL DIAGRAM. (222334-000-11011 / 11012 / 11013)
14. PSV INPUT AND OUTPUT LINES SHOULD BE FREE DRAINING.

NO
NC
D D

LC
2"-P-915-53115-B87A-IH
15. DELETED.

4"-P-915-53104-B87A-IH
4"-P-915-53103-B87A-IH
4

LC
4 16. FIELD INSTRUMENTS MOUNTED ON TRACED LINES/EQUIPMENT AND INSTRUMENT
IMPULSE LINES SHALL BE TRACED.
2"-P-915-53119-B87A-IH
4
IS IH
4 4
A11A B87A 3/4" 2"-P-915-53113-B87A-IH
2"-P-915-53117-B87A-IH IH IS
4 3/4" B87A A11A
PI PT PT PI 4
53101A 53101A 53101B 53101B L
L
E 4 4
E
2" MH MH 2"
24" 24"

6"x4" 6"x4"

4"-P-915-53106-B87A-IH

4"-P-915-53107-B87A-IH
915-CC-5505A 915-CC-5505B F
FI FE/FT
NOTE 1 NOTE 1
F 53101A 53101A F
H PDI
H
4 02/01/2019 HAZOP RECOMMENDATION & 60% MODEL SB AKS SKS
PDI REVIEW COMMENTS INCORPORATED
53102B
FG
53102A 3 07/20/2018 ISSUED FOR HAZOP SB AKS SKS
53101
2 06/25/2018 ISSUED FOR ENGINEERING SB AKS SKS
VISIBLE ISSUE
REV DATE DESCRIPTION BY CHK APP
32" 32"
NC

NOTE 4 CONTRACTOR:
NOTE 4
H
PDT PDI NOTE 5
G 53105 53105 EL. 3500
SA02
EL. 3500 G
53101
(A Govt. of India Undertaking)

B018-02-42-915-11531
6"x4" 6"x4"
PI PT TI TI PT PI GURU GOBIND SINGH POLYMER ADDITION PROJECT
53103A 53103A 53101A 53101B 53103B 53103B
STEAM CRACKER & ASSOCIATED UNITS
H
LO LC LO LO
4"-P-915-53105-B87A-IH BATHINDA, PUNJAB H
NC

NC
CLIENT:

HPCL MITTAL ENERGY LIMITED

NC
NC

4"-P-915-53108-B87A-IT
(HMEL)
BYPASS/FILLING LINE

OWS
SG
PT PIC GTC PROJECT No. : 300390

12254
OWS
J J
4"-P-915-53109-B87A-IH 53104 53104 915-11532
12250

AROM. EXTRACT
L GTC TECHNOLOGY
915-11530 TO FY-53201, ON BENZENE
TO 915-EE-5514, CLAY TOWER COLUMN FEED LINE THIS DRAWING IS ISSUED TO THE CLIENT BASED ON THE AGREEMENT THAT IT
3"-P-915-53110-B87A-IT

SG SHALL NOT BE REPRODUCED, COPIED OR DISPOSED OF DIRECTLY OR INDIRECTLY, NOR


FEED/EFFLUENT EXCHANGER USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SPECIFICALLY FURNISHED.
FI
53103
12253

VENT 2"-WFL-915-53105-A11A-IS
915-11542
TO 915-VV-5513, LP VENT DRUM A11A FE/FT
B87A
NC

NOTE 2 53103
K K
4"x3" DRAIN LINE 3"-P-915-53111-B87A-IT
12251

DRAIN LINE 4"-P-915-53101-B87A-IT


915-11522
TO 915-EE-5509, SRC 1 02/02/2018 REVISED AS NOTED KK MC SD GJV HRA
2"

CONDENSER
2"-ACD-915-53118-B87A-IT 3/4"-P-915-53112-B87A-IT MC
0 12/22/2017 FOR BEP CL SD GJV HRA
ISSUE
REV DATE DESCRIPTION DWG PE LPE PDM PM

4"-P-915-52909-B87A-IT
12252

AROM. EXTRACT
915-11529 (START-UP LINE)
L L
FROM 915-PA-5509A/B, CLAY
TOWER CHARGE PUMP
OWS CB&I TECHNOLOGY
B87A
A87A PIPING AND INSTRUMENT FLOW DIAGRAM

UNIT-915 BENZENE EXTRACTION UNIT


15071

ACD
B018-02-42-910-11735
TO 'ACD' HEADER
CLAY TOWERS
M NOTE 6 M
SCALE: DWG NO: 222334-915-11531 REV: 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like