This report, in the form of a template, has been specifically designed for B.E (C.S.E) students
attending Industrial Training during 8th semester at respective Organizations/Industry/R&D
Institutes.
Note:
1. Use UK English
2. There should be NO grammatical or spelling mistakes
3. Submission after due date will not be accepted
4. For more information, contact TPC (CSE).
- Read the above carefully and attach this page at the end of your report before submission -
1. Project identification
1.2 Name of
Organization/
Industry/R&D
Institute
1.3 Project title
1.4 Name of
Technical 1.4.1 Supervisor:
Supervisor(s)/ Name:
Manager(s) Designation:
(As officially assigned
at industry) 1.4.2 Supervisor (if any):
Name:
Designation:
1.5 CERTIFICATE
“This is to certify that the Industrial Training work until mid-year evaluation
held on ___________________, titled as stated in Sec. 1.3, executed (as till
date) by the student group mentioned in Sec. 1.1, has been found satisfactory (Signature of
and every section of this report is reflecting the same.” Supervisor &
date)
2. Project insights
Sub-areas (optional):
Mobile Programming Web Programming HCI
Data Mining Networking Image Processing
Other (please specify):
2.2 Keywords
(Max. 3 to 6. Don’t use
jargon or abbreviation)
3.1 Undergrad.
courses Course code and title
3.
4.
5.
6.
2.
3.
4.
5.
6.
3.3 Standards
Name, purpose, source and other details
and
databases 1.
(Must be easily accessible.
Add more rows if required.)
2.
3.
4.
4.
4. Objective / Scope
Write the objective/scope that has been understood from project title and meetings with technical advisor(s) so far. Title and
scope of project must be elaborated in detail. Maximum 500 words.
5. Expected outputs
List expected outputs of the project in discrete terms. Maximum 250 words.
6. Utilization
Describe target beneficiaries, target market, potential customers, etc. Maximum 250 words.
8. Methodology
Concisely list down the principle milestones and associated deliverables that must be achieved to accomplish the Training/project objectives. Add more rows if required.
Expected
S. Percent
List of Training/Project milestones Deliverable(s) number of days
No. Completed
to complete
1.
2.
3.
4.
5.
9. Executed work
Describe in detail the works along with the obtained results and deliverables that have been completed until now and how.
Note that very general information about topics is NOT required so try to be specific. The sequence, as already described in
Methodology (Sec. 8), should be followed as possible. Maximum 3 pages including equations, figures and tables etc.
Describe in detail the plans to execute remaining works. The sequence, as already described in Methodology (Sec. 8), should
be followed as possible. Maximum 500 words.
11.References
Style “IEEE - Reference Order” should be followed for giving references of books, research papers, reviews, online
resources, databases, software manuals, figures and anything else cited in this report.
2. Project insights
3. Relevant study
material
4. Objective/Scope
5. Expected outputs
6. Utilization
7. Literature study/Data
collection
8. Methodology
9. Executed work
11. References
Overall performance