You are on page 1of 1

See Drawing VA-4101

KEY PLAN

PLATFORM HVAC

CHWR - Ø100 COOLING


TOWER

SANDWICH PANEL
1.000
SCALE

EXISTING EXISTING EXISTING


TRAVO TRAVO TRAVO
TRAVO

CHELLER WATER

ROLLING DOOR
PUMP 100X80,30KW
OPER WEIGHT 140KG
PHE

VACUM LIFTER

AC.10PK

BOP ± 7200 LOCATION

C/W INSULATION 50mm

CHWS - Ø100
BOP ± 7200
NOTE & LEGEND
C/W INSULATION 50mm
DISCLAIMER:
DRAWING SHOWS IS NOT A SHOPDRAWING:
INFORMATION DEPICTED IS SUBJECT TO CLIENT AND A/E APPROVAL IN
SUBMITTALS ISSUED BY THE CONTRACTOR IN THE PRE-CONSTRUCTION
PROCESS.
APPROVED SUBMITTALS SHALL BE SUBJECT TO FIELD-VERIFICATION BY THE
ENGINEER PRIOR TO INSTALLATION ON-SITE.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
ALL LEVEL ARE IN METERS UNLESS NOTED OTHERWISE.
LEGEND :
: SUPPLY AIR DUCT
: RETURN AIR DUCT
: CHILLED WATER SUPPLY
SAD 1000 x 600 SAD 1000 x 800 : CHILLED WATER RETURN
: SUPPLY AIR TECTILE DUCT
BOD ± 8100 BOD ± 8100 SATD
LRD
: SUPPLY AIR TECTILE DUCT
: LOW RETURN DUCT
14089 RAD : RETURN AIR DUCT
AHU : AIR HANDLING UNIT
OU : OUTDOOR UNIT
ACC : AIR COOLED CONDENSER
VD : VOLUME DAMPER
VD AHU-01
SPOT COOLING AREA

DONE FABRICATION

1862
SAD 600 x 600
VD
VD 1
BOD ± 8100 VA-1401

DRAIN PIPE
Ø40

1384
SCALE1 : 125
RAD 1000 x 800 VD SLOPE 0.5%
7453

BOD ± 7000 = REVISION CLOUD - = REVISION MARK

18463 9336
0 ISSUED FOR CONSTRUCTION

SAD 800 x 500 SAD 800 x 500


BOD ± 8113 BOD ± 4000
5867

0 08-02-2023 CPY AZ RN TM CCEP IFC


CHECKED BY: APPROVED BY :
REV. DATE CLIENT ISSUANCE
16686 Drafter Sr. Eng. Eng. Mgr Proj. Mgr
CLIENT :
Coca-Cola
EUROPACIFIC PARTNERS
Jl. Teuku Umar Km. 46, Sukadanau,
Cikarang Barat, Sukadanau,
Kec. Cikarang Bar., Bekasi,
Jawa Barat 17530

CONSULTANT : PT TeamworX Indonesia


Beltway Office Park
Building C, Ground Floor

TeamworX Jl. TB. Simatupang No. 41, Cilandak


Jakarta Selatan 12550 - INDONESIA
Phone
Fax
: +62 21 780 0940
: +62 21 789 2151
Website : www.teamworx.co.id

PROJECT MANAGEMENT, DESIGN & CONSTRUCTION :

6000 6000 6000 6000 6000 6000 6000


77750 PROJECT TITLE :

COCA-COLA EUROPACIFIC PARTNERS


8 9 10 11 12 13 BKS1 WATER LINE CONVERSION
Cibitung-West Java
DRAWING TITLE :
SCALE
BD.1 NEW PRODUCTION LINE 7 PLOT
PLAN - GROUND FLOOR & MEZZANINE 1NTS
:1

HVAC INSTALLATION

PLAN - MEZZANINE FLOOR, HVAC INSTALLATION 13 Desember 2023 FOR CONSTRUCTION DRAWING NUMBER :
4365-CSD-VA-1101-R0