SEWAGE TREATMENT PLANT 03

TREATED SEWAGE
FOR DISPOSAL
AERATION TANK
BYPASS BYPASS MEDIUM BYPASS BYPASS
SCREEN

BUFFLE WALL
RAW
SEWAGE WET DRY SECONDARY
WELL WELL
PARSHALL
SETTLING TANK
FLUME

RECIRCULATED
COURSE
SLUDGE

SLUDGE
SCREEN
DRYING BED

RAS
SUMP WELL GRIT CHAMBER
PRIMARY P
SETTLING TANK
P SST SLUDGE

WAS
PST SLUDGE
P
MIXED
SLUDGE SUMP

FLOW LINE DIAGRAM SLUDGE


FIRST
SECOND
STAGE DIGESTOR
THICKNER
(N.T.S.) STAGE DIGESTOR

ROAD (6 M WIDE)
DESIGN SUMMERY
MAINTENANCE ROOM 1. DRY WELL& WET WELL
-DIA. OF SUMP=20.0M
AERATION TANK (2 NOS.) (43.4m x 21.7m) P -DEPTH OF SUMP=4.0M
RAW SEWAGE

COURSE
SCREEN
2. BAR SCREEN
PARKING BYPASS MEDIUM
SCREEN
BYPASS PRIMARY
SETTLING TANK
BYPASS
-COARSE SCREEN=0.7(W) x 1.3(D)
30.0 m DIA
-MEDIUM SCREEN = 0.8(W) x 1.3(D)

WET WELL DRY WELL 3. GRIT CHAMBER


PARSHALL FLUME -SIZE OF GRIT CHAMBER=6.7x6.7x1.6M (2 NO.)
ADMINISTRATIVE Ø Ø30
BUILDING
20 4. PRIMARY SETTLING TANK
GRIT
CHAMBER -DIA. OF TANK=30M

ROAD (6 M WIDE)
-DEPTH OF TANK=3.5M +0.15MF.B.
ROAD (6 M WIDE)

ROAD (6 M WIDE)
SLUDGE COLLECTOR
5.AERATION TANK
LAB.
DISTRIBUTION -LENGTH=43.4M
BOX
RAS -WIDTH=21.7M
P -DEPTH=5.0M
WA -NOS= 1
S
SUPERNATANT
MIXED
SLUDGE
P SECOND STAGE
Ø17.4 6.SECONDARY SETTLING TANK
SUMP DIGESTOR -DIA OF TANK = 31M
SUPERNATANT

-DEPTH = (4 + 0.5)M
-NOS=2 NOS
STAFF QUARTER
P 7. SLUDGE THICKNER
-DIA OF TANK=15.6M
SECONDARY Ø3 SECONDARY Ø3
-DEPTH = 3M
SETTLING TANK- I 1 SETTLING TANK- I 1
31.0 m DIA 31.0 m DIA 8.SLUDGE DIGESTER 9.SLUDGE DRYING BED
FIRST STAGE Ø2 1)FIRST STAGE DIGESTOR -LENGTH=25M
.6 0
Ø1
5 DIGESTOR -DIA OF TANK=20M -WIDTH=10M
SLUDGE -DEPTH = 7M -NOS = 20
THICKNER
2)SECOND STAGE DIGESTOR
TREATED SEWAGE
FOR DISPOSAL
SLUDGE DRYING BED 20 NOS. (25 M X10 M)
-DIA OF TANK=17.4M
-DEPTH = 8M
ROAD (6 M WIDE)
ENTRY

NAME : SIGN
SECURITY CABIN

ROLL NO. :

CLASS : F.S. OF BE.IV (PTD)


LAYOUT PLAN
(SCALE 1:350) YEAR : 2024-25