EXISTING WAREHOUSE
Y DOWN AREA
BASKETBALL COURT/LA
GROUTED RIPRAP
CONCRETE CONCRETE
PARKING PAVEMENT
OWST
GROUTED ROCKWALL
(5.0 Meter Wide)
ROADWAY
(6.0 Meter Wide)
AUXILIARY
NEW CONCRETE
SV
CONTROL BUILDING BUILDING
FFEC
SV
1.5 1.2
MRF
GENSET
CT-DS4S
2 GUARD HOUSE HOUSE
CT-DS4S
SEE NOTE 9 13.8kV METERING EQUIPMENT
TO
WE
L1
CT-RSC
CT-RSC
CT-RSC
CT-RSC
R1
GA
2.0
38
AN
BO
NO. 2 NO. 1
GATE NO. 1
ZAM
1.0
CT-SS3S CT-DS4S
NEW
L2
BASIC BODY
GA
AN
EXISTING OUTFALL
BO
ZAM
B C D
A SEE NOTE 15
MH
2
SEE NOTE 10 SEE NOTE 15 2
SP NO. 1
CT-RSC2
CT-RSC2
CT-RSC2
LCP
FUTURE
ZAMBOANGA L2
CT-DS4S
MB PTR No. 2 1 02/08/2021 AS PER NGCP COMMENT
BAY 71
H-FRAME MB MB MB MB
NO. DATE REVISION DRAWN CHECKED APPROVED
CT-SS3S
CABLE SUPPORT
CT-SS2S
CT-RSC2 CVT CVT CVT DS CT PCB CT MB DS DS/ES MB CT PCB CT MB DS/ES DS MB CT PCB CT DS CVT CVT CVT LT CVT SA
PTR SA CVT
BS BS APPROVED NOTED/INFO/REFERENCE
LCP
AURORA L1
SA VT DS/ES MB CT PCB DS BS DS MB CT PCB DS VT NEW
BAY 72
PTR No. 1
H3
X3
CT-DS4S
SALUG
X2 H2
MB MB MB MB
MB
X1
Y3 Y2 Y1 H1
H-FRAME
AURORA L2
BAY 73
SECTION CHECKED DATE REVIEWED DATE
MB MB MB MB
ELECTRICAL
CT-RSC2
CT-RSC2
CT-RSC2
BUS VT'S
FUTURE
DS/ES
PROTECTION
OIC-CIVIL DESIGN SUPERVISOR, S/S SECTION
SEE NOTE 11
COMMUNICATION
PCB
CT-DS4S
TELECOM SHELTER
CIVIL APPROVED: WILMER M. SUZARA
LA CVT
HEAD, CIVIL ENGINEERING DESIGN DIVISION
FUTURE
PANTRY/GENSET/AUXILIARY
COMMUNICATION ARCHITECTURAL
TOWER
PTR
MECHANICAL
MFH
E Approval of the Contractor's drawings shall not be held to relieve the Contractor or
any part of the Contractor's obligations to meet the requirements of the
PT
Specifications nor of the responsibility for the correctness of the Contractor's
ELEVATED WATER TANK drawings.
CB(3rd)
OLD CONTROL BUILDING
FOR APPROVAL
OWNER:
STEEL MAST
NATIONAL GRID CORPORATION
CB(5th)
GATE NO. 2
STEEL MAST
OF THE PHILIPPINES
NEW
CONTRACTOR:
CB
THYRISTOR & CONTROL BUILDING NEW NORTHEAST ELECTRIC GROUP HIGH
VOLTAGE SWITCHGEAR CO., LTD.
DS/ES CT LA SR CB
CT PROJECT NAME:
DS/ES
MINDANAO SUBSTATION REHABILITATION PROJECT,
CT
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA
SUBSTATIONS)
& MINDANAO SUBSTATION UPGRADING PROJECT,
STEEL MAST STEEL MAST
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
SV CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV)
CONCRETE PAVEMENT
C D
E F
LINEMEN'S QUARTER
A B
TO
WE E F
R1
38
STEEL TOWER
TYPE DD
BASIC BODY
A B 1
G H
1
SA VT DS/ES CT PCB DS BS DS CT PCB DS VT PTR SA CVT CVT DS PCB CT DS DS/ES CT PCB CT DS/ES DS CT PCB DS CVT LT CVT SA
BS BS
BAY 71
H-FRAME
BAY 72
H3
H2
X2
X1
Y3 Y2 Y1 H1
H-FRAME BOX
METER
BOX
OPERATING
DS
EXISITING CABLE TRENCH APPROVED NOTED/INFO/REFERENCE
BAY 73
BUS VT'S
EXISITING CABLE TRENCH RFC FOR CONSTRUCTION
SECTION CHECKED DATE REVIEWED DATE
C ELECTRICAL
PROTECTION RECOMMENDED: CHRISTOPHER REY A. VARILLA
OIC-CIVIL DESIGN SUPERVISOR, S/S SECTION
PANTRY/GENSET/AUXILIARY
COMMUNICATION COMMUNICATION
TOWER
FOR APPROVAL
OWNER:
NATIONAL GRID CORPORATION
FLAGPOLE
OF THE PHILIPPINES
NGCP Building, Power Center Complex
Quezon Avenue cor BIR Road, Diliman, Quezon City
CONTRACTOR: