03 Substation 4D Substation - 02-07-2014 - 2
03 Substation 4D Substation - 02-07-2014 - 2
at
Substation 4D – Substation
02/07/2014
By
Summary of Inspection
Location Subst Equip. Tag No. Equip.Type Equip. Fault Level Page
ation No. Part Severity
Minas 4D Substation 4D-3D LA Connection N/A Normal 4
Minas 4D Substation 4D-3D T-Line Tap Connection N/A Normal 5
Minas 4D Substation 4D-3D LS Connection Area Low 6
2
Minas 4D Substation 4D-3D TO 4D-FDR 4 CCPD Connection N/A Normal 7
Minas 4D Substation 4D-3D TO 4D-FDR 5 IS Connection N/A Normal 8
Minas 4D Substation 4D-3D TO 4D-FDR 6 CB Connection N/A Normal 9
Minas 4D Substation 4D-3D TO 4D-FDR 7 IS Connection N/A Normal 10
Minas 4D Substation 4D-3D TO 4D-FDR 8 CB Connection N/A Normal 11
Minas 4D Substation 4D-3D TO 4D-FDR 9 T-Line Tap Connection N/A Normal 12
Minas 4D Substation 4D-3D TO 4D-FDR 10 LA Connection N/A Normal 13
Minas 4D Substation 4D-3D TO 4D-FDR 11 T-Line Tap Connection N/A Normal 14
Minas 4D Substation 4D-3D TO 4D-FDR 12 LA Connection N/A Normal 15
Minas 4D Substation 4D-3D TO 4D-FDR 13 LS Connection N/A Normal 16
Minas 4D Substation 4D-3D TO 4D-FDR 14 LS Connection N/A Normal 17
Minas 4D Substation 4D-3D TO 4D-FDR 15 LS Connection N/A Normal 18
Minas 4D Substation 4D-3D TO 4D-FDR 16 LA, TX Connection N/A Normal 19
Minas 4D Substation 4D-3D TO 4D-FDR 17 IS, CB Connection Area Medium 20
2, 3
Minas 4D Substation 4D FDR 1 CB, IS Connection N/A Normal 21
Minas 4D Substation 4D FDR 1 T-SLEEVE, Connection N/A Normal 22
LS
Minas 4D Substation 4D FDR 1 T-SLEEVE, Connection N/A Normal 23
LS
Minas 4D Substation 4D FDR 1 NTS, IS Connection N/A Normal 24
Minas 4D Substation 4D FDR 1 IS Connection N/A Normal 25
Minas 4D Substation 4D FDR 1 CB Connection N/A Normal 26
Minas 4D Substation 4D FDR 2 T-SLEEVE, Connection N/A Normal 27
HLC
Minas 4D Substation 4D FDR 2 IS Connection N/A Normal 28
Minas 4D Substation 4D FDR 2 IS Connection N/A Normal 29
Minas 4D Substation 4D FDR 2 IS Connection N/A Normal 30
Minas 4D Substation 4D FDR 2 CB Connection N/A Normal 31
Minas 4D Substation 4D FDR 3 IS, LA Connection N/A Normal 32
Minas 4D Substation 4D FDR 3 IS Connection N/A Normal 33
Minas 4D Substation 4D FDR 3 NTS, IS Connection N/A Normal 34
Minas 4D Substation 4D FDR 3 IS Connection N/A Normal 35
Minas 4D Substation 4D FDR 3 CB Connection N/A Normal 36
Minas 4D Substation 4D FDR 3 TO 4D FDR LS Connection N/A Normal 37
4
Minas 4D Substation 4D FDR 4 IS Connection N/A Normal 38
Minas 4D Substation 4D FDR 4 NTS, IS Connection N/A Normal 39
Minas 4D Substation 4D FDR 4 IS Connection N/A Normal 40
Summary of Inspection
Location Subst Equip. Tag No. Equip.Type Equip. Fault Level Page
ation No. Part Severity
Minas 4D Substation 4D FDR 4 CB Connection N/A Normal 41
Minas 4D Substation 4D FDR 5 IS Connection N/A Normal 42
Minas 4D Substation 4D FDR 5 IS Connection N/A Normal 43
Minas 4D Substation 4D FDR 5 NTS Connection N/A Normal 44
Minas 4D Substation 4D FDR 5 IS Connection N/A Normal 45
Minas 4D Substation 4D FDR 5 CB Connection N/A Normal 46
Minas 4D Substation 4D FDR 6 T-SLEEVE Connection N/A Normal 47
Minas 4D Substation 4D FDR 6 T-SLEEVE, Connection N/A Normal 48
LS
Minas 4D Substation 4D FDR 6 IS Connection N/A Normal 49
Minas 4D Substation 4D FDR 6 NTS, IS Connection N/A Normal 50
Minas 4D Substation 4D FDR 6 IS Connection N/A Normal 51
Minas 4D Substation 4D FDR 6 CB Connection N/A Normal 52
Minas 4D Substation 4D FDR 6 TO 4D-KBJ IS, CB Connection Area High 53
3
Minas 4D Substation 4D FDR 6 TO 4D-KBJ LA, TX Connection N/A Normal 54
Minas 4D Substation 4D FDR 6 TO 4D-KBJ LS Connection N/A Normal 55
Minas 4D Substation 4D FDR 6 TO 4D-KBJ LS Connection N/A Normal 56
Minas 4D Substation 4D FDR 6 TO 4D-KBJ LS Connection N/A Normal 57
Minas 4D Substation 4D FDR 6 TO 4D-KBJ LS Connection N/A Normal 58
Minas 4D Substation 4D FDR 6 TO 4D-KBJ HLC, LA Connection N/A Normal 59
Minas 4D Substation 4D FDR 6 TO 4D-KBJ T-Line Tap Connection N/A Normal 60
Minas 4D Substation 4D FDR 6 TO 4D-KBJ IS Connection N/A Normal 61
Minas 4D Substation 4D FDR 6 TO 4D-KBJ CB Connection N/A Normal 62
Minas 4D Substation 4D FDR 6 TO 4D-KBJ IS Connection N/A Normal 63
Minas 4D Substation 4D FDR 6 TO 4D-KBJ CB Connection N/A Normal 64
Minas 4D Substation 4D FDR 6 TO 4D-KBJ CCPD Connection N/A Normal 65
Minas 4D Substation 4D-KBJ LS Connection N/A Normal 66
Minas 4D Substation 4D-KBJ T-Line Tap Connection N/A Normal 67
Minas 4D Substation 4D-KBJ LA Connection N/A Normal 68
Minas 4D Substation 4D-KBJ TO 4D-6DN LS Connection N/A Normal 69
Minas 4D Substation 4D-KBJ TO 4D-6DN CB Connection N/A Normal 70
Minas 4D Substation 4D-KBJ TO 4D-6DN CB Connection N/A Normal 71
Minas 4D Substation 4D-KBJ TO 4D-6DN CCPD Connection N/A Normal 72
Minas 4D Substation 4D-3D TO 4D-6DN LS Connection N/A Normal 73
Minas 4D Substation 4D-3D TO 4D-6DN CB Connection N/A Normal 74
Minas 4D Substation 4D-3D TO 4D-6DN CB Connection N/A Normal 75
Minas 4D Substation 4D-3D TO 4D-6DN LS Connection N/A Normal 76
Minas 4D Substation 4D-6DN LS Connection N/A Normal 77
Minas 4D Substation 4D-6DN T-Line Tap Connection N/A Normal 78
Minas 4D Substation 4D-6DN LA Connection N/A Normal 79
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D
<Equipment_Type> LA
<Equipment_Part> Connection
1 38.0°C
2 37.1°C
3 35.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 34.2°C
2 36.3°C
3 36.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D
<Equipment_Type> LS
<Equipment_Part> Connection
40.00 2 45.8°C
35.00
3 39.4°C
30.00
25.00
20.00
1
15.00 Max.
39.71
10.00
5.00
0.00
-5.00
-20.00 -7.63
Thermoteknix Miricle 9:25:15 AM 7/2/2014 e : 0.83 Bg : 23.00°C
Analysis
1. The contact point of Line Switch shown in Area 2 was 45.8°C (6.4°C hotter than
reference Area 3 (39.4°C), but did not exceed above 75°C for temperature limit baseline
refer to Table 1(b): Reference Conditional Explanation of Symmetrical Load – Electrical
(Bare Overhead Conductors).
2. Possible causes of local temperature increase are one or combination of these; oxides,
dirty materials, improper contact, physically defect or internal problems.
Recommended Action:
Note: Dismantle, clean up and check suspected LS,
Requires monitoring & check-up at the
finger & its termination. Repair/replace if necessary.
earliest convenient time
Retighten/re-align all connections when reinstalling.
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 4
<Equipment_Type> CCPD
<Equipment_Part> Connection
1 37.4°C
2 37.5°C
3 37.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 5
<Equipment_Type> IS
<Equipment_Part> Connection
1 37.6°C
2 39.6°C
3 37.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 6
<Equipment_Type> CB
<Equipment_Part> Connection
1 37.5°C
2 34.8°C
3 36.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 7
<Equipment_Type> IS
<Equipment_Part> Connection
1 37.4°C
2 37.0°C
3 37.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 8
<Equipment_Type> CB
<Equipment_Part> Connection
1 33.9°C
2 34.0°C
3 34.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 9
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 33.8°C
2 35.8°C
3 35.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 10
<Equipment_Type> LA
<Equipment_Part> Connection
1 34.5°C
2 34.1°C
3 34.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 11
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 34.1°C
2 33.4°C
3 30.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 12
<Equipment_Type> LA
<Equipment_Part> Connection
1 36.7°C
2 37.6°C
3 36.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 13
<Equipment_Type> LS
<Equipment_Part> Connection
1 39.3°C
2 42.0°C
3 38.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 14
<Equipment_Type> LS
<Equipment_Part> Connection
1 44.1°C
2 49.7°C
3 49.8°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 15
<Equipment_Type> LS
<Equipment_Part> Connection
1 36.2°C
2 35.7°C
3 35.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 16
<Equipment_Type> LA, TX
<Equipment_Part> Connection
1 41.7°C
2 42.2°C
3 42.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-FDR 17
<Equipment_Type> IS, CB
<Equipment_Part> Connection
-20.00 5.36
Thermoteknix Miricle 9:43:00 AM 7/2/2014 e : 0.83 Bg : 23.00°C
Analysis
1. The connection of Isolation Switch shown in Area 2 was 58.8°C (16.3°C hotter than
reference Area 1 (42.5°C), but did not exceed above 75°C for temperature limit baseline
refer to Table 1(b): Reference Conditional Explanation of Symmetrical Load – Electrical
(Bare Overhead Conductors).
2. The connection of Isolation Switch shown in Area 3 was 48.5°C (6.0°C hotter than
reference Area 1 (42.5°C), but did not exceed above 75°C for temperature limit.
3. Possible causes of local temperature increase are one or combination of these; oxides,
dirty materials, improper contact, physically defect or internal problems.
Recommended Action: Note: Dismantle, clean up and check all suspected IS,
fingers & their terminations. Repair/replace if
Requires attention
necessary. Retighten/re-torque all connections when
reinstalling.
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> CB, IS
<Equipment_Part> Connection
1 40.2°C
2 39.6°C
3 39.2°C
4 48.5°C
5 40.7°C
6 43.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> T-SLEEVE, LS
<Equipment_Part> Connection
1 38.6°C
2 39.5°C
3 39.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> T-SLEEVE, LS
<Equipment_Part> Connection
1 41.3°C
2 37.9°C
3 38.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> NTS, IS
<Equipment_Part> Connection
1 32.2°C
2 33.4°C
3 33.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> IS
<Equipment_Part> Connection
1 37.1°C
2 38.0°C
3 38.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 1
<Equipment_Type> CB
<Equipment_Part> Connection
1 34.5°C
2 35.6°C
3 34.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 2
<Equipment_Type> T-SLEEVE, HLC
<Equipment_Part> Connection
1 39.7°C
2 40.6°C
3 41.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 2
<Equipment_Type> IS
<Equipment_Part> Connection
1 41.1°C
2 41.4°C
3 40.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 2
<Equipment_Type> NTS
<Equipment_Part> Connection
-20.00 -5.93
Thermoteknix Miricle 10:07:57 AM 7/2/2014 e : 0.83 Bg : 23.00°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 2
<Equipment_Type> IS
<Equipment_Part> Connection
1 42.1°C
2 45.2°C
3 45.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 2
<Equipment_Type> CB
<Equipment_Part> Connection
1 36.3°C
2 38.0°C
3 37.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 3
<Equipment_Type> IS, LA
<Equipment_Part> Connection
1 44.1°C
2 40.6°C
3 35.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 3
<Equipment_Type> IS
<Equipment_Part> Connection
1 38.9°C
2 38.2°C
3 36.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 4
<Equipment_Type> NTS, IS
<Equipment_Part> Connection
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 3
<Equipment_Type> IS
<Equipment_Part> Connection
1 36.0°C
2 36.3°C
3 37.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 3
<Equipment_Type> CB
<Equipment_Part> Connection
1 34.7°C
2 33.4°C
3 35.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 3 TO 4D FDR
4
<Equipment_Type> LS
<Equipment_Part> Connection
1 41.6°C
2 40.8°C
3 39.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 4
<Equipment_Type> IS
<Equipment_Part> Connection
1 42.3°C
2 41.9°C
3 41.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 4
<Equipment_Type> NTS, IS
<Equipment_Part> Connection
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 4
<Equipment_Type> IS
<Equipment_Part> Connection
1 39.5°C
2 38.6°C
3 39.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 4
<Equipment_Type> CB
<Equipment_Part> Connection
1 38.1°C
2 38.8°C
3 36.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 5
<Equipment_Type> IS
<Equipment_Part> Connection
1 40.0°C
2 39.8°C
3 40.6°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 5
<Equipment_Type> IS
<Equipment_Part> Connection
1 41.9°C
2 41.9°C
3 41.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 5
<Equipment_Type> NTS
<Equipment_Part> Connection
1 36.0°C
2 36.3°C
3 36.8°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 5
<Equipment_Type> IS
<Equipment_Part> Connection
1 42.5°C
2 42.8°C
3 40.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 5
<Equipment_Type> CB
<Equipment_Part> Connection
1 39.9°C
2 38.8°C
3 38.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> T-SLEEVE
<Equipment_Part> Connection
1 40.2°C
2 40.0°C
3 39.6°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> T-SLEEVE, LS
<Equipment_Part> Connection
1 41.1°C
2 41.3°C
3 40.8°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> IS
<Equipment_Part> Connection
1 39.2°C
2 39.8°C
3 39.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> NTS, IS
<Equipment_Part> Connection
1 36.9°C
2 37.9°C
3 37.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> IS
<Equipment_Part> Connection
1 43.3°C
2 43.5°C
3 41.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6
<Equipment_Type> CB
<Equipment_Part> Connection
1 37.8°C
2 37.1°C
3 38.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> IS, CB
<Equipment_Part> Connection
-20.00 5.58
Thermoteknix Miricle 10:29:38 AM 7/2/2014 e : 0.83 Bg : 23.00°C
Analysis
1. The connection of Isolation Switch shown in Area 3 was 71.6°C (21.8°C hotter than
reference Area 2 (49.8°C), but did not exceed above 75°C for temperature limit baseline
refer to Table 1(b): Reference Conditional Explanation of Symmetrical Load – Electrical
(Bare Overhead Conductors).
2. Possible causes of local temperature increase are one or combination of these; oxides,
dirty materials, improper contact, physically defect or internal problems.
Recommended Action:
Note: Dismantle, clean up and check suspected IS,
Requires attention as soon as possible finger & its terminations. Repair/replace if necessary.
Retighten/re-torque all connections when reinstalling.
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> LA, TX
<Equipment_Part> Connection
1 42.6°C
2 43.8°C
3 44.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> LS
<Equipment_Part> Connection
1 39.3°C
2 39.9°C
3 38.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> LS
<Equipment_Part> Connection
1 39.5°C
2 39.9°C
3 40.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> LS
<Equipment_Part> Connection
1 38.8°C
2 38.0°C
3 37.7°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.6°C
2 40.6°C
3 40.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> HLC, LA
<Equipment_Part> Connection
1 39.3°C
2 39.3°C
3 40.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 37.3°C
2 38.9°C
3 38.8°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> IS
<Equipment_Part> Connection
1 40.8°C
2 40.9°C
3 40.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> CB
<Equipment_Part> Connection
1 39.0°C
2 37.7°C
3 36.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> IS
<Equipment_Part> Connection
1 38.5°C
2 39.2°C
3 39.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> CB
<Equipment_Part> Connection
1 37.2°C
2 37.7°C
3 39.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D FDR 6 TO 4D-KBJ
<Equipment_Type> CCPD
<Equipment_Part> Connection
1 38.6°C
2 39.0°C
3 39.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.5°C
2 40.1°C
3 39.5°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 34.7°C
2 33.9°C
3 33.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ
<Equipment_Type> LA
<Equipment_Part> Connection
1 41.6°C
2 38.4°C
3 38.2°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ TO 4D-6DN
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.7°C
2 47.1°C
3 40.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ TO 4D-6DN
<Equipment_Type> CB
<Equipment_Part> Connection
1 42.6°C
2 41.2°C
3 41.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ TO 4D-6DN
<Equipment_Type> CB
<Equipment_Part> Connection
1 41.4°C
2 41.1°C
3 42.3°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-KBJ TO 4D-6DN
<Equipment_Type> CCPD
<Equipment_Part> Connection
1 42.5°C
2 43.0°C
3 43.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-6DN
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.4°C
2 40.6°C
3 40.8°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-6DN
<Equipment_Type> CB
<Equipment_Part> Connection
1 40.3°C
2 41.7°C
3 41.9°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-6DN
<Equipment_Type> CB
<Equipment_Part> Connection
1 41.3°C
2 41.3°C
3 42.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-3D TO 4D-6DN
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.3°C
2 41.5°C
3 41.1°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-6DN
<Equipment_Type> LS
<Equipment_Part> Connection
1 40.9°C
2 37.7°C
3 39.4°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-6DN
<Equipment_Type> T-Line Tap
<Equipment_Part> Connection
1 35.3°C
2 35.4°C
3 36.6°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager
Identification Details
<Location> Minas
<Substation> 4D
<Equipment_No> Substation
<Tag_No> 4D-6DN
<Equipment_Type> LA
<Equipment_Part> Connection
1 43.0°C
2 41.3°C
3 41.0°C
Analysis
No fault finding Recommended Action
Monitor at next thermography inspection
schedule
Contractor
Thermographer Analyst Project Manager