Reticulation details for Electrical and allied regarding First Floor Slab
List not exhaustive – verified with concerned drawings
A. Lighting Layout (DW 5, 2)
Circuit notation Description Robb Shail
ie Sreserve1 (Timer4 From DB LCP ( innermost to avoid DB FIRST FLOOR) through this floor vertically reserve) up till CB on roof (see drwg 2) – do port for good execution of civil work S5 (Timer2) From DB LCP ( innermost to avoid DB FIRST FLOOR) through this floor vertically up till non balcony/ upper porch and roof (see drwg 2) – do port for good execution of civil work L2 DB GRD FLOOR to fittings common toilet L1 DB GRD FLOOR to fittings Livings S4 (Timer1, Switch) DB GRD FLOOR to fittings Livings Mains DB First Yellow Sleeve Up Floor
B. Socket Layout (DW 11 & 12)
Amongs the individual conduits except the mains enlisted on below table- refer to drawing
Conduit Description Circuit Robb Shail
notation # ie Surveillance keypad Living (1600mm) – Living (300mm) C6 P37 (MAINS G Kitchen (1300mm) – DB First Floor (1500mm) C6 C6) P38 (MAINS COOKER UNIT G KITCHEN (300MM) Blank Plate for floating wires then COOKER 3) 1300 for D.P– DB FIRST FLOOR P42 (MAINS COOKER UNIT G KITCHEN (300MM) Blank Plate for floating wires then COOKER 4) 1300 for D.P– DB FIRST FLOOR P30 through Sleeves yellow for Mains DB FIRST FLOOR from CEB or DB LCP+ Mimic P32 METERING P41 For Washing Machine + Ironing C7 (MAINS C7) P39 For Data Cabinet and Refrigerator and DVR C5 (MAINS C5) P54 Ensuite Master Bedrooms LHS and RHS C8 (MAINS C8) (MAINS AC1) BOX @ AC LHS (2700MM) - DB Ground Floor (1500mm) AC1 (MAINS AC4) BOX @ AC RHS (2700MM) - DB Ground Floor (1500mm) AC2 BOX @ AC LHS (2700MM) – RISER To condenser AC AC1 BOX @ AC RHS (2700MM) – RISER To condenser AC AC2 Pump First Pass Through Yellow Sleeve (Put yellow sleeve outermost to 2 lighting Floor conduits (see higher) ALLOW I POWER DIRECTLY TO DVR/ NVR FF FROM DB GROUND FLOOR TILL FF IS IMPLEMENTED (Probably via yellow sleeve for FTH