Reticulation details for Electrical and allied regarding First Floor Slab

List not exhaustive – verified with concerned drawings

A. Lighting Layout (DW 5, 2)

Circuit notation Description Robb Shail


ie
Sreserve1 (Timer4 From DB LCP ( innermost to avoid DB FIRST FLOOR) through this floor vertically
reserve) up till CB on roof (see drwg 2) – do port for good execution of civil work
S5 (Timer2) From DB LCP ( innermost to avoid DB FIRST FLOOR) through this floor vertically
up till non balcony/ upper porch and roof (see drwg 2) – do port for good
execution of civil work
L2 DB GRD FLOOR to fittings common toilet
L1 DB GRD FLOOR to fittings Livings
S4 (Timer1, Switch) DB GRD FLOOR to fittings Livings
Mains DB First Yellow Sleeve Up
Floor

B. Socket Layout (DW 11 & 12)


Amongs the individual conduits except the mains enlisted on below table- refer to drawing

Conduit Description Circuit Robb Shail


notation # ie
Surveillance keypad Living (1600mm) – Living (300mm) C6
P37 (MAINS G Kitchen (1300mm) – DB First Floor (1500mm) C6
C6)
P38 (MAINS COOKER UNIT G KITCHEN (300MM) Blank Plate for floating wires then
COOKER 3) 1300 for D.P– DB FIRST FLOOR
P42 (MAINS COOKER UNIT G KITCHEN (300MM) Blank Plate for floating wires then
COOKER 4) 1300 for D.P– DB FIRST FLOOR
P30 through Sleeves yellow for Mains DB FIRST FLOOR from CEB or DB LCP+ Mimic
P32 METERING
P41 For Washing Machine + Ironing C7
(MAINS C7)
P39 For Data Cabinet and Refrigerator and DVR C5
(MAINS C5)
P54 Ensuite Master Bedrooms LHS and RHS C8
(MAINS C8)
(MAINS AC1) BOX @ AC LHS (2700MM) - DB Ground Floor (1500mm) AC1
(MAINS AC4) BOX @ AC RHS (2700MM) - DB Ground Floor (1500mm) AC2
BOX @ AC LHS (2700MM) – RISER To condenser AC AC1
BOX @ AC RHS (2700MM) – RISER To condenser AC AC2
Pump First Pass Through Yellow Sleeve (Put yellow sleeve outermost to 2 lighting
Floor conduits (see higher)
ALLOW I POWER DIRECTLY TO DVR/ NVR FF FROM DB GROUND FLOOR TILL
FF IS IMPLEMENTED (Probably via yellow sleeve for FTH