You are on page 1of 1

UN SH

UN SH

UN SH
UN SH

UN SH

UN SH
Store
A=30.88m2 Ladies Changing
Room
A=11.9m2

UN SH
Back office

Fix power for LED 8 A=27.85m2

UN SH
9
UN SH
TV display@1.2m UN SH

UN TV Gents Changing
Room
A=16.8m2
Toilet
13 Toilet
Floor box Floor box
Floor box

UN SH
UN SH

Open Down

10
UN SH UN SH UN SH
554
Floor box

UN SH

UN SH
UN SH

UN SH
Store Toilet Toilet Store
9

UN SH
280
8 280
UN SH

140
Fleet team
5 Staff
A=31.07m2
UN SH

Floor box consisting of Two Open Down


data points RJ-45 and twin
power outlet
7
UN SH UN SH
UN SH
RJ-11/
voice

RJ-11/
voice

UN SH
RJ-11/
voice

RJ-11/
voice

UN SH
UN SH

19
Floor box

ADSL Corner Four RJ-11 New Corridor DC


2 Staff 11
10 points/RJ-11 voice floor
box A=13.82m2
20 18 UN SH UN SH UN SH UN SH UN SH
UN SH
UN SH

UN TV UN SH UN SH UN SH UN SH UN SH
Power for wireless Fix power for LED TV
acess point /wifi @ 2m display@1.2m
17

UN SH
280
UN SH

11 Power for backlit


Floor box Floor box 16
@1.5m
280
620

UN SH
Enter. Manager

UN SH
A=17.31m2
12

UN SH
730

280
Floor box Floor box DC Manager
Power for wireless A=17.31m2
acess point /wifi @ 2m
280

Date Oct, 18, 2023 Revision No. 1


268
UN SH
UN SH

UN SH UN SH UN SH 174 UN SH UN SH
15 Ownwer
socket @1.6m

Shop
UN SH

60

12 A=422.16m2
Fix power

Location
Floor box consisting of Two ADSL Corner Four RJ-11
RJ-11/ RJ-11/

UN SH Mekele (NR)
Floor box

data points RJ-45 and twin


power outlet
voice voice
points/RJ-11 voice floor
box
13 Reception Area Project Name
Shop Branding Work
RJ-11/ RJ-11/
voice voice

Floor box
Drawing Title
EL power design layout
UN SH

14
720

Designed By Drawing Paper


Tibebu Abera A4
Floor box

Modified By
UN SH

Dr. No.
UN SH

UN SH UN SH
Checked By
Yonas Deneke EL
UN SH Drawn By
Tibebu Abera 02/04
Verified By Scale
Melaku Yalew 1:50
Ground Floor Plan
Approved By Date
- Oct, 18, 2023

You might also like