SEMERA CORE SITE BUILDING FLOOD LIGHT-SDB Power Wire

Power Cable
DESCRIPTION I (A) A (mmsq.) Ptot(KW)
1
LIGHTING [FLOOD LIGHT] 3x25 5X4 1.00
FROM MDB 2
RESERVE
3
5X4mm² 4
RESERVE
RESERVE
3X25A
Total Power=1.00KW
Total Pmax=1.00KW
D.F=1.0

SEMERA CORE SITE CORE SITE BUILDING-MDB [EXISTING] Power wire


Power cable
DESCRIPTION I (A) A (mmsq.) R S T Ptot(KW)
1
STAIR LIGHTING 10 2 X 2.5 0.10
2
GROUND FLOOR-SDB 3X32 5X6 13.30
3
FIRST FLOOR-SDB 3X32 5X6 12.00
4
FROM MDB 5
RESERVE
RESERVE
6
5X16mm² 7
RESERVE
Date Revision No. 0

3X63A 8
RESERVE
Ownwer
RESERVE Location
9 NEER (SEMERA)
RESERVE Project Name CORE SITE RENOVATION
10 REMAINING WORK

RESERVE Drawing Title SEMERA CORE SITE


(Exchange Building)
EL LOAD ANALYSIS

Designed By Drawing Paper


TIBEBU ABERA A4
Modified By
Dr. No.
Total Power=25.40KW Checked By
YONAS DENEKE EL
Total Pmax=25.40KW Drawn By
TIBEBU ABERA
Verified By
10/10
Scale
1:100
D.F=1.0 Approved By
MELAKU YALEW
Date
Oct. 2023