Table of Contents
1 INTRODUCTION .............................................................................................................................. 3
1.1 Document History ............................................................................................................................. 3
1.2 Required Tools ................................................................................................................................. 3
2 WORKFLOW .................................................................................................................................... 4
2.1 Before Installing ................................................................................................................................ 4
2.2 Parts that are Reused ....................................................................................................................... 4
2.3 Workflow Overview ........................................................................................................................... 6
11 CABINETS ..................................................................................................................................... 53
2 WORKFLOW
2.1 Before Installing
WARNING
Make sure that all hospital power supplies are off.
WARNING
Do not manually lift heavy objects. Labor protection rules give the maximum weight for one
person (guideline is 23 kg).
For heavy objects, use tools or lift with more persons.
EPNav PC
LUC
Rack mount
Geo PCU & Rotor control
Ext. Injector
EPmed Chameleon
Ethernet switch
M inter
com
M
R 2R
C-arm FDXD
5M
Grid monitor Xper
View
pad Module
Xper
Module
Table Equipment Rack Geo Imaging
accessories Pan Module Module
handle TTCB
Imaging Geo
Module Module
Trolley
collimator
IPC
Stand Tube (Witt)
injector Table
Hand
switch TBCB
floorplate
Foot pedals
AD7 remains, AD5 is
Foot pedals replaced
M R/E R
Disassembly is done.
Equipment
Install CRCB to existing wall bracket or Install new system cables from WCBs.
Install MCS. New AD7? rack
frame. (use cabling diagram) Yes Yes
present ?
See Note
56" or Install new AD7, refer
reused Prepare re use cables (MDVR, RTL Do an upgrade of
Install rear cover extender for M-cabinet to DMR162948 (AD7)
monitors? fiber) Install WCBs. Equipment rack,
and/or B-Cabinet. or to DMR166936
Refer to DMR165213.
(AD7 swivel).
Installation part 1 Yes
These installation
activities can be done Install monitor(s).
independently from each Install system cables
other. No from AD7
(use cabling diagram).
No No
Rework MCC/MCS:
· Cable hose
· X-ray-on light
· Intercom speaker Install system cables from CRCB: Install re used cables
· Install cables to the technical room (rack mount injector,
first, Then you can work in parallel hemo, local options)
with the cabinet installation.
Install system cables from MCS · Install other CRCB cables.
(use cabling diagram). (use cabling diagram).
Connect EGAD.
Note
Install M-cabinet, refer to Install R-cabinet, refer to
Do the MCS rework after or at the same DMR107785. DMR138821. FlexVision or EP
time with the cabinets. cockpit ?
Install cabinets It is important to have the cable hose on- Yes
time available in the technical room
Re-install the tube coolers. Install B-cabinet,
Install the detector chiller(s). refer to
Re-install scan converters DMR133796.
(option).
Installation part 2
Connect all system cabling to Install and connect control
Install and connect exam room
the cabinets (use cabling room equipment (UIs, Update generator firmware.
Cabinet cabling is most equipment (UIs, pedestal,
diagram), include EMC monitors, equipment to
time consuming and equipment to WCBs).
measures. WCBs, DVD receivers, ..)
difficult to work parallel
because of limited access.
Combine with parallel
activities in blocks next to
it.
Disconnect
EGAD.
Installation finished,
continue with setting to
work.
· Top bracket
· Top ventilation cover
· Two ground cables and mounting
material
NOTE
WARNING
Use the new bolts. The bolts
that are removed from the
old MCS are not reliable to
use again.
NOTE
NOTE
NOTE
NOTE
CAUTION
Guiding bush
Securing screw
Support pin
Bearing plate
Decoration plate
Actuator
Actuator assembly
NOTE
NOTE
NOTE
CAUTION
Up/down lever
10 mm
10 mm
Studs Studs
Alignment stud
Stud
Lug
tud
CAUTION
Strap 400 cm
15 mm
WARNING
25 mm 25 mm
Before you remove the
hoist tools, make sure that
the monitor is locked in the
monitor frame. The monitor
can fall when not correctly
locked.
30 mm
WARNING
When the monitor is not
correctly locked, a monitor
collision with other objects
can cause the monitor to
fall.
WARNING
Do not remove only one
hoist tool from the strap on
top of the MCC. The other
hoist tool falls and can
cause serious injuries,
damage to the monitor, or
monitor frame.
WME1–
X(DVI1)
WME1–
X(DVI4)
WME1– WME1–
X(DVI3) X(DVI2)
Move switch
to the right.
CAUTION
NOTE
NOTE
NOTE
NOTE
NOTE
NOTE
Power
Ground
Signal
NOTE
End result
(with 56” monitor)
NOTE
The MCS cables are routed. When applicable, install any additional cables in the MCS
cable hose now.
NOTE
NOTE
NOTE
NOTE
NOTE
NOTE
TF-X1
4. Connect the power cable from the
MCS to cable TF-X1/TF-X3.
Safety bracket
TB-X1
Tie wrap
TF-X3
TF-X3
NOTE
If there is no geometry
module connected to this
control room connection
box, the connector labeled
with “stop” is necessary.
NOTE
To optimize the workflow, first install the cable sets from the control room to the cabinets.
System cables to
Control room
To connect cables, refer to the cable cabinets and
equipment
drawings. examination room
Control room
connection box
CAUTION
CAUTION
NP – X100 no change Keep the ground wire to the Auxiliary ATY – X100
connection box, remove other external
ground wires.
NP – X301 no change Power on or off generator frontal EZ – X550
NP – X302 no change Power on or off generator lateral 2EZ – X550
WARNING
Make sure that there is no voltage on NP – X106. NP – X106 connects to the room light
switch.
CAUTION
11 CABINETS
1. The 2R cabinet is reused. For an FD20/10 system, install the new flat detector temperature control
unit (chiller). Refer to the system installation instruction Installation, System Installation Part 1
(DMR138821).
2. Unpack the cabinets. Refer to the system installation instruction Unpack, Transport, Mount
Cabinets (DMR101237).
NOTE
To return the old cabinets, use the new cabinet packing materials.
3. Install the M-cabinet. Refer to the system installation instruction Installation, M-cabinet-FD
(DMR107785).
4. Install the R-Cabinet. Refer to the system installation instruction System Installation Part 1
(DMR138821).
5. If there is a FlexVision or EP cockpit subsystem, Install the B-cabinet, Refer to the system
installation instruction Installation, B-cabinet (DMR133796).