The Zhelezny open pit mine at Kovdor operates Atlas Copco and Russian drill rigs, Russian electric shovels and Belaz, Caterpillar and Komatsu haul trucks. The
in-pit crushing station is on the upper right of the picture.
few reserves of Baddeleyite (containing per year (Mt/y) until 2032. Output will
Super-deep mining zirconia), and a substantial supplier of then decline until closure around 2049.
Kovdorsky GOK, one of two mining Magnetite.
companies in the Kola Peninsula The mining method developed for Evolution
supplying two of Russia’s major the Zhelezny open pit is a bit special
phosphate fertilizer manufactu- too. Described as a breakthrough tech- The mining and processing operations
rers, has decided to utilize super- nique in Russia, super-deep mining re- at Kovdor started in 1959-62, initially
deep mining at the Zhelezny open
pit until reserves are exhausted in quires extraordinary control of drilling recovering only the magnetite from
2049. The technique relies heavily and blasting on near vertical benches. 6 Mt/y of ore, explained Igor Melik-
on precision drilling with equip- Kovdorsky GOK, which is part of the Gaikazov and Mikhail B Togunov, re-
ment supplied by Atlas Copco. Eurochem fertilizer group, wants to mi- spectively Technical Director and Chief
nimize ore dilution while maintaining Mining Expert at Kovdorsky GOK.
Treasure Trove production rates – although bench areas Super-deep mining is not the opera-
will decrease as the mine deepens. The tion’s first technical breakthrough, they
Discovered in 1933, the ore deposit at rim of the pit is approximately 200 pointed out. During the 1970s the staff
Kovdor in Russia’s Murmansk Oblast meters (m) above sea level and is 2.3 developed a process for separating the
(67° 33’ N, 30° 30’E) is unusual, pro- kilometers (km) in length, 1.7 km wide apatite and baddeleyite as well as the
bably unique. The discrete, deep and and presently 170 m deep. Whereas magnetite, with optimal processing
more or less downwardly conical car- mining was scheduled to cease in achieved early in the 1980s. The iron
bonatite deposit hosts 45 recorded mi- 2015 Kovdorsky GOK now intends to ore is extracted by magnetic separation,
nerals and is the type locality for five of mine down to 660 m below sea level, then the pulp undergoes flotation to
these. It is also one of the Kola Penin- thereby accessing an additional 330- recover the apatite and, finally, gravity
sula’s two major sources of Apatite for 400 million tonnes of ore and enabling techniques separate the baddeleyite.
fertilizer production, one of the world’s Zhelezny to produce 23 million tonnes In the same period the mineable area
15 m
238 m
B B
C C C
A = Pre-splitting holes 15 m
B = Buffer holes
Sea level C = Production holes
A
The Zhelezny open pit is 2.3 km long, 1.7 km wide and its current depth is approximately 170 m. The industry. In view of general trends and
diagram shows the vertical orebody and the planned angle of the slopes at the projected depth of 900 m advances in rock mechanics Kovdorsky
(dotted line). Kordovsky GOK aims to accomplish this with no significant expansion of the pit rim. GOK decided to continue development
of the Zhelezny pit to lower levels
was extended by draining part of Lake that 1997-2001 had been a period of rather than switch to underground
Kovdoro and diverting the High Kov- stabilization for the operation and for mining. To avoid widening the surface
dora River to access all of the primary Kovdor city. pit rim and creating large volumes of
orebody. The pit has since been pro- During 2003 the Kovdorsky team waste rock the project team focused
gressively deepened, with necessary introduced (and later modified) a on super-deep mining of benches with
changes to the material transportation Strategic Development Programme vertical or near vertical highwalls.
systems and equipment fleet. Particu- suited to EuroChem’s phosphate feed- Initial geomechanical studies ena-
larly interesting are the Cyclical Line stock requirements that covered the bled expert organizations to produce
Technology (CPT) in-pit crushing and period until 2015. Commenting on pro- parameters for the engineering geolo-
conveyor systems used to haul ore and gress in the period 2003 – 2006, senior gists and a 3D geological-structural
waste. personnel1 pointed out that the mine map of the Kovdor deposit for use in
Privatization in the early 1990s – succeeded in restoring ore production forecasting potential slope failures.
as Kovdorsky Gorno-obogatitelnyi to the desired long-term 16 Mt/y target. Five engineering-geological sectors of
Kombinat (Kovdorsky Mining and Pro- The planned apatite concentrate recov- the pit were defined and for each one
cessing Combine, Kovdorsky GOK) – ery from open pit ore in 2010 would the bench slope angles, bench heights
was followed by a difficult period. But be about twice the amount achieved in and widths of safety berms were cal-
in 1998 management started exploiting 2001. culated.
baddeleyite-apatite-containing waste This information was used to deve-
from magnetite-only processing stored Super-deep mine planning lop specifications for super-deep ex-
in sedimentation ponds*. This enabled cavation using methods such as pre-
Kovdorsky GOK to compensate reduc- The mining licence for Kovdor allows split drilling and blasting. These speci-
tions in mine apatite and baddeleyite mineral extraction from the primary fications are used in conjunction with
output made in response to low iron ore orebody to a depth of two kilometer techniques for the relief of water pres-
demand until 2005. and a major mine redesign to exploit the sure in the benches; stabilization of
In 2001 EuroChem Mining and lower levels started early this century. weak rock masses by, for instance, rock
Chemical Company JSC (EuroChem), The start of super-deep mining was bolting and cement mortar injection;
reputedly Russia’s largest integrated preceded by several years of advanced and thorough slope stability monitor-
fertilizer producer, acquired the Kov- and extensive studies using some of the ing for which Kovdorsky is using three
dor facilities. A report for Kovdor’s most sophisticated methods of testing, methods: visual observation, surveying
40th anniversary in 2002 commented calculation and data processing in the with electronic and optical instruments