STATION 11 AS BUILT SURVEY FOR HIGH TENSION WIRE

(West Bound)
Vertical Distance from
Heigth Of
Item Elevation of High Heigth of Tension from the Tip of Drilling Horizontal Distance Form Tip of Machine
Station 11 /BP No. dia Road Level Drilling Note
No. Tension Wire Ground level Machine to High Tension to High Tension Wire
Machine
Wire

1 BP1-1 2.5 119.991 98.963 21.028 12.754 8.274 0.66

2 BP1-2 2.5 117.549 99.201 18.348 12.754 5.594 0.77

3 BP1-3 2.5 116.421 99.572 16.849 12.754 4.095 0.89

4 BP1-4 2.5 116.498 99.568 16.930 12.754 4.176 1.19

5 BP1-5 2.5 116.908 99.788 17.120 12.754 4.366 1.45

6 BP1-6 2.5 117.468 99.922 17.546 12.754 4.792 1.68

7 BP1-7 2.5 118.309 100.058 18.251 12.754 5.497 1.88

8 BP1-8 2.5 118.959 100.353 18.606 12.754 5.852 1.95

9 BP1-9 2.5 118.979 100.493 18.486 12.754 5.732 1.83

10 BP1-10 2.5 119.425 100.718 18.707 12.754 5.953 1.59

11 BP1-11 2.5 120.038 100.942 19.096 12.754 6.342 1.42

12 BP1-12 2.5 121.035 101.161 19.874 12.754 7.120 1.45

13 BP1-13 2.5 121.979 101.314 20.665 12.754 7.911 1.58

Note : As built Survey with Vertical Clearance of High Tension wire and Tip of Drilling Machine
Considering BOOM length are 9.0 meters