You are on page 1of 16

notes

(1) Installation is to be done according to the


design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

ELECTRICAL DESIGNS (3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no

DESIGNED BY: ENGR. E. A. NYIEKAA ( responsibility for works not supervised by him
or his authorised agent.

Location

)
job title PROJECT

DRAWN BY: ENGR. E. A NYIEKAA ( )


client

Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Project Title: Proposed Residential Development at plot No......... Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

Beside BIPC Estate Nyiman Layout, Makurdi, Drawing title

Benue State. COVER PAGE

Client: ----------------------------
scale
sheet no. NTS

dimension

May, 2019. 00 date


MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the

LEGEND design and conformity to the rules in the latest


edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made

ITEM DESCRIPTION RATING cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.

Location

job title PROJECT

client

Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

Drawing title
LEGEND

scale
sheet no. NTS

dimension
01 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.
BL1 BL1 BL1 BL1 BL1
(3) The entire installation is to be earthed
consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
BL1 BL2 .level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.
BL2
BL1 Location

job title PROJECT

BL1 BL2

client

BL1
Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
BL2
Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

Drawing title
BL1 LIGHTING CIRCUIT ON THE GATE HOUSE

GEN. HOUSE

TOI/BATH BL2
BL3 BL3
BL3

BL2 BL2 BL2 BL2 BL2 BL2

BL3 BL3
GATE HOUSE

scale
sheet no. NTS

BL3 BL3 BL3 BL3 BL3 BL3 BL3 dimension


02 date
MAY, 2019
LIGHTING CIRCUITS AT THE GATE HOUSE AND FENCE
08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.

Location

job title PROJECT

client

Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

Drawing title

POWER AND FAN CIRCUITS AT THE GATE


HOUSE

BS1
GEN. HOUSE
BS1
DB-B

TOI/BATH
BWh

GATE HOUSE
scale
BS1 BL3 sheet no. NTS

BS1 dimension
03 date
MAY, 2019

POWER AND FAN CIRCUITS AT THE GATE HOUSE 08082259483, 08164521557


notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
AL1 AL1 appropriate accessories.

AL1 (3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


AL3 between 0.25m and 0.75m from finished floor
.level
AL1 AL3 (5) All switchs should be installed between
AL5 COURTYARD TOI/BATH AL1 0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level
AL3 (7) Any change to this design must be approved
AL3 by a registered Electrical Engineer .
BEDROOM 2
KITCHEN AL3
(8) The design Engineer assumes no
AL3 responsibility for works not supervised by him
or his authorised agent.
AL4 DINING AREA
BEDROOM 1 Location
AL3
AL3

STORE AL3 LOBBY


job title PROJECT

AL1 AL3
AL4
AL4 AL3 AL1
AL3
TOI/BATH
AL4 client
ANTEROOM
AL2
AL4
TOI/BATH
LIVING ROOM
Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

AL2 AL2 Bedroom 3


AL2 AL4 Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
AL4
Checked by:

AL4 AL4 Drawing title


AL4
LIGHTING CIRCUITS ON THE GROUND FLOOR

AL4
AL4
AL2
AL1 TOI.
AL1
AL4

TERRACE

AL1 AL1 AL1 AL1


scale
LIGHTING CIRCUITS ON THE GROUND FLOOR sheet no.

dimension
NTS

04 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
ACCU AWh1 AS4 must be less than 1ohm .
AS2 AP3 AS3 AP4 (4) 13A socket outlets should be installed
COURTYARD between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


AL3 AS3 0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.
AS3 AS4 (6) Wall brackets should be installed at 1.5m
AL3 (5ft) from the finished floor level

KITCHEN AS2 (7) Any change to this design must be approved


by a registered Electrical Engineer .
AS4
AP2 BEDROOM 2 TOI/BATH BEDROOM 1 (8) The design Engineer assumes no
responsibility for works not supervised by him
AS2 or his authorised agent.

Location
AS3
DINING AREA
AS2
STORE
DB-A LOBBY AS4
AS2 job title PROJECT

AP5 AWh2
TOI/BATH
AS1
AS1
client
ANTEROOM AS5
TOI/BATH

AS5 Bedroom 3
Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
LIVING ROOM AP6 Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

AP1 Checked by:


AS1
AWh3 AL4
Drawing title
POWER AND FAN CIRCUITS ON THE GROUND
AS5 AS5
FLOOR

AS1 TOI.

AS1
TERRACE

scale
sheet no. NTS
POWER AND FAN CIRCUITS ON THE GROUND FLOOR dimension
05 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
CWh CL1 must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level
BATH
BATH (5) All switchs should be installed between
0.75m and 1.15m and 1.0m to 1.15m. for counter
CS3 CL1 kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.
CS3 CS3 CL1
DB-C Location

CLOSET CL2
CLOSET

job title PROJECT

CS1
CP1
CP2 CL2
LOUNGE CL2 CL2 client

CS1
MASTER BEDEOOM
CL1 CL1 LOUNGE
CS2 Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

MASTER Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

BEDROOM CL2 Checked by:

CS1 CS2 Drawing title


LIGHTING AND POWER CIRCUITS ON THE
PENT HOUSE

CS2 CL2

POWER AND FAN CIRCUITS ON THE PENT HOUSE LIGHTING CIRCUITS ON THE PENT HOUSE
scale
sheet no. NTS

dimension
06 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
LOAD DISTRIBUTION FOR 8 - WAY DISTRIBUTION BOARD DB-A must be less than 1ohm .

PEAK DIVERSITY R (W) Y(W) (4) 13A socket outlets should be installed
WAY PHASE LABEL DESCRIPTION & LOCATION POINTS B(W) FUSE RATING/CABLE
LOAD (W) FACTOR between 0.25m and 0.75m from finished floor
SIZE
.level
R AL1 Security lighting circuits 13 1300 0.8 1040 5A, 1.5mm sq pvc/cu cable
(5) All switchs should be installed between
0.75m and 1.15m and 1.0m to 1.15m. for counter
1. Y AL2 Lighting circuits in the living room 12 1200 0.8 960 5A, 1.5mm sq pvc/cu cable kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


Lighting and fan circuits in the dining, kitchen, (5ft) from the finished floor level
B AL3 17 1700 0.8 1360 5A, 1.5mm sq pvc/cu cable
bedroom1 & 2.
(7) Any change to this design must be approved
R AL4 Lighting and fan circuits anteroom, lobby. 13 1300 0.8 1040 5A, 1.5mm sq pvc/cu cable
by a registered Electrical Engineer .
bedroom 3 and baths/tois

2. Y 13A Ring mains power SSO in the living room 1500 30A, 2.5mm sq pvc/cu cable (8) The design Engineer assumes no
AS1 5 1.0 1500
and terrace responsibility for works not supervised by him
or his authorised agent.
B AS2 13A Ring mains power SSO in the store, dining 5 1500 1.0 1,500 30A, 2.5mm sq pvc/cu cable
area and kitchen
13A Ring mains power SSO in the bedroom2 and Location
R AS3 attached bath/toi 4 1200 1.0 1200 25A, 2.5mm sq pvc/cu cable

13A Ring mains power SSO in the bedroom 1 and 4 1200


3. Y AS4 0.6 720 25A, 2.5mm sq pvc/cu cable
attached bath/toi

B AS5
13A Ring mains power SSO in bedroom 3 and the 4 1200 0.6 720 25A, 2.5mm sq pvc/cu cable
attached bath/toi

R
Radial power circuit, 2.0hp standing AC unit in
AP1 1 1500 1.0 1500 30A, 4.0mm sq pvc/cu cable
the livig room
Radial power circuit, 1.5hp split AC unit in the 1 job title PROJECT
4. Y AP2 1200 1.0 1200 25A, 4.0mm sq pvc/cu cable
dining area

B
Radial power circuit, 1.5hp split AC unit in 1
AP3 1200 1.0 1200 25A, 4.0mm sq pvc/cu cable
bedroom 2

AP4 Radial power circuit, 1.5hp split AC unit in


R 1 1200 0.5 600 25A, 4.0mm sq pvc/cu cable
bedroom 1
AL1 AL2 AL3 AL4 AS1 AS2 AS3 AS4 AS5 AP1 AP2 AP3 AP4 AP5 AP6 AWh1 AWh2 AWh3 S ACCU S S S S
Radial power circuit, 1.5hp split AC unit in the
5. Y AP5 1 1,200 0.5 600 25A, 4.0 mm sq pvc/cu cable
staire case
Spares client
Radial power circuit, 1.5hp split AC unit in
B AP6 1 1200 0.5 600 25A, 4.0 mm sq pvc/cu cable
bedroom 3

R AWh1 50ltrs water heater in the shw/wc of bedroom 2 1 1500 1.0 1500 30A, 4.0 mm sq pvc/cu cable 3x6.0mm2
cu/pvc cable
6. Y AWh2 50ltrs water heater in the shw/wc of bedroom 1 1 1500 1.0 1500 30A, 4.0 mm sq pvc/cu cable
3x4.0mm2 Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
B AWh3 50ltrs water heater in the shw/wc of bedroom 3 1 1200 1.0 1500 30A, 4.0mm sq pvc/cu cable cu/pvc cable
Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
R S Spare Circuitry S
3x2.5mm2
cu/pvc cable Checked by:
7. ACCU Radial cooker control unit 1 2500 1.0 2500 45A, 6.0mm sq pvc/cu cable
Y
2x1.5mm2
B S Spare Circuitry cu/pvc cable Drawing title
LOAD DISTRIBUTION FOR THE GROUND
FLOOR
R S Spare Circuitry
5A 5A 5A 5A 30A 30A 25A 25A 25A 30A 25A 25A 25A 25A 25A 30A 30A 30A S 45A S S S S

8. Y S Spare Circuitry R Y B R Y B R Y B R Y B R Y B R Y B R Y B R Y B

S 1 2 3 4 5 6 7 8
B Spare Circuitry

Estimated load per phase (W) 6,880 8,980 6,880

Total Allowed Load (W) 22,740

Total Current per phase (A) 39.55 POWER DISTRIBUTION FOR DB-A

scale
sheet no. NTS

dimension
07 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level
LOAD DISTRIBUTION FOR 4 - WAY DISTRIBUTION BOARD DB-B (7) Any change to this design must be approved
by a registered Electrical Engineer .
PEAK DIVERSITY R(W) Y(W) B(W) FUSE RATING/CABLE
WAY PHASE LABEL DESCRIPTION & LOCATION POINTS (8) The design Engineer assumes no
LOAD (W) FACTOR SIZE
responsibility for works not supervised by him
or his authorised agent.
R BL1 Fence lighting circuits on the left side of the gate 10 1000 0.8 800 5A, 1.5mm sq pvc/cu cable
BL1 BL2 BL3 BS1 BWh S S S S S S S
Location
1. Y BL2 Fence lighting circuits on the right side of the gate 10 1000 0.8 800 5A, 1.5mm sq pvc/cu cable

Outside fence lighting, fan, and interior lighting Spares


B BL3 13 1300 0.8 1040 5A, 1.5mm sq pvc/cu cable
circuits of the gate house, bath/toi and Gen. house.
13A Ring mains SSO in the gate house, gen.
R BS1 4 1200 1.0 1200 25A, 2.5mm sq pvc/cu cable
house and corridor
3x4.0mm2
cu/pvc cable
2. Y BWh Radial power mains for 30ltr. water heater in the 1 1200 1.0 1200 30A, 4.0mm sq pvc/cu cable job title PROJECT
gate house

B S Spare circuitry 3x2.5mm2


cu/pvc cable
R S Spare circuitry

2x1.5mm2
3. Y S Spare circuitry cu/pvc cable client

B S Spare circuitry

5A 5A 5A 25A 30A S S S S S S S
R S Spare circuitry
R Y B R Y B R Y B R Y B Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

4. Y S Spare circuitry
1 2 3 4 Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

B S Spare circuitry Checked by:

Estimated load per phase (W) 2,000 2,000 1,040 Drawing title
LOAD DISTRIBUTION FOR THE GATE HOUSE
Total Allowed Load (W) 5,040 POWER DISTRIBUTION FOR DB-B
Total Current per phase (A) 8.76

scale
sheet no. NTS

dimension
08 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
LOAD DISTRIBUTION FOR 4 - WAY DISTRIBUTION BOARD DB-C kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


PEAK DIVERSITY R(W) Y(W) B(W) FUSE RATING/CABLE (5ft) from the finished floor level
WAY PHASE LABEL DESCRIPTION & LOCATION POINTS
LOAD (W) FACTOR SIZE
(7) Any change to this design must be approved
Lighting circuits in the master bedroom, closet 5A, 1.5mm sq pvc/cu cable by a registered Electrical Engineer .
R CL1 5 500 0.8 400
and bath/toi CL1 CL2 CS1 CS2 CS3 CP1 CP2 CWh S S S S
(8) The design Engineer assumes no
Lighting circuits in the master bedroom, closet responsibility for works not supervised by him
1. Y CL2 5 700 0.8 400 5A, 1.5mm sq pvc/cu cable
and bath/toi or his authorised agent.

B CS1 13A Ring mains SSO in the master bedroom 3 900 1.0 900 25A, 2.5mm sq pvc/cu cable Spares Location

R CS2 13A Ring mains SSO in the lounge 3 900 1.0 900 25A, 2.5mm sq pvc/cu cable
3x4.0mm2
cu/pvc cable
2. Y CS3 13A Ring mains SSO in the lounge, closet and toi 3 900 1.0 900 25A, 4.0mm sq pvc/cu cable

B 15A Radial circuit, 1.5hp split AC unit in the 1200 25A, 4.0mm sq pvc/cu cable
CP1 1 1.0 1200 3x2.5mm2
master bedroom
cu/pvc cable job title PROJECT
15A Radial circuit, 2.0hp split AC unit in the 1.0
R CP2 lounge 1 1500 1500 30A, 4.0mm sq pvc/cu cable

50ltrs water heater in the bath/toi attaached 2x1.5mm2


3. Y CWh to the master bedroom 1 1500 1.0 1500 30A, 4.0mm sq pvc/cu cable cu/pvc cable

B S Spare circuitry

5A 5A 25A 25A 25A 25A 30A 30A S S S S client


R S Spare circuitry
R Y B R Y B R Y B R Y B
4. Y S Spare circuitry
1 2 3 4

B S Spare circuitry Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)


Estimated load per phase (W) 2,800 2,800 2,100
Checked by:
Total Allowed Load (W) 7,700 POWER DISTRIBUTION FOR DB-C
Total Current per phase (A) 19.39 Drawing title
LOAD DISTRIBUTION FOR THE PENT HOUSE

scale
sheet no. NTS

dimension
09 date
MAY, 2019

08082259483, 08164521557
notes

DB-C (1) Installation is to be done according to the


design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


60A Voltage operated ELCB cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


60A Change Over switch between 0.25m and 0.75m from finished floor
.level
Earth connection
block at each floor 60A TP/N Isolator (5) All switchs should be installed between
0.75m and 1.15m and 1.0m to 1.15m. for counter
1/F cable kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

DB-A DB-B (8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.

60A Voltage operated ELCB 30A Voltage operated ELCB Location

insulated cable insulated cable


job title
Earth connection PROJECT

block at each floor 100A TP/N Isolator


G/F
insulated cable

client

Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Building main earth Checked by:

terminal
armoured cu cable Drawing title
45KVA, 3-phase POWER SCHEMATIC DIAGRAM

50hz Generator 150A TP/N isolator


G 150A 3-Phase change over switch

armoured cu cable insulated armoured cu


cable
Control Room

M 3-Phase meter
From PHCN scale
sheet no. NTS

dimension

SCHEMATIC REPRESENTATION OF POWER SUPPLY 10 date


MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
LIGHTNING ARRESTER appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .

(8) The design Engineer assumes no


responsibility for works not supervised by him
or his authorised agent.

Location
35mm cu tape

35mm sqr cu pvc cable


job title PROJECT

client

Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

Drawing title
LIGHTING ARRESTER SYSTEM

KEY

0.9m
Earth material(0.6mx0.6m)
1.2m

Main force earth rod-1.2 with clamps


level

Main force cu nail clipping hole


ground

B
1.5m

o1.2m A 35mm sqr bare cu cable


Main force cu tape
Natural

2m
A&B tape filled with charcoal sheet no.
scale
NTS
and industrial salt
dimension
LIGHTNING ARRESTER SYSTEM. 11 date
LIGHTNING ARRESTER SYSTEM SHALL BE INSTALLED TO ENGINEER SPECIFICATION MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


CAM 3
between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

COURTYARD (7) Any change to this design must be approved


BEDROOM 2 by a registered Electrical Engineer .
TOI/BATH
CAM 8 BATH
(8) The design Engineer assumes no
responsibility for works not supervised by him
or his authorised agent.
KITCHEN

BEDROOM 1 Location

CLOSET

STORE LOBBY
CAM 7
job title PROJECT

TOI/BATH
CAM 2 MASTER LOUNGE
BEDROOM
CAM 4
ANTEROOM
CAM 5 DISPLAY
TOI/BATH

Bedroom 3 client
LIVING ROOM

CAM 6
Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

TOI.
Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:

TERRACE
POSITION OF CCTV MONITOR IN THE MASTER BEDROOM
CAM 1
Drawing title
CCTV CIRCUITS

CCTV CIRCUITS ON THE GROUND FLOOR AND STAIR CASE

scale
sheet no. NTS

dimension
12 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.
CAM 1 (3) The entire installation is to be earthed
consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


CAM 2 between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
CAM 3 kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level
CAM 4 (7) Any change to this design must be approved
by a registered Electrical Engineer .

(8) The design Engineer assumes no


CAM 5 responsibility for works not supervised by him
or his authorised agent.

Location
CAM 6 CCTV MONITOR

CAM 7

job title PROJECT

CAM 8
LOAD DISTRIBUTION FOR -8- CHANNEL DIGITAL VIDEO RECORDER - (DVR)

KEY CHANNEL NO DISCRIPTION AND LOCATION


client

= CCTV CAMERA
CAM 1 Dome camera installed at front view

DISPLAY = CCTV MONITOR


CAM 2 Dome camera installed at left view
Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

CAM 3 Dome camera installed at rare view


DVR = 8 - CHANNEL DIGITAL VIDEO RECORDER Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Checked by:
CAM 4 Dome camera installed at right view

CAM 5 Dome camera installed at anteroom Drawing title


CCTV SCHEMATICS

CAM 6 Dome camera installed at living room

CAM 7 Dome camera installed at the stair case

CAM 8 Dome camera installed in the kitchen

8 - CHANNEL DVR

scale
sheet no. NTS

dimension
SCHEMATIC DIAGRAM OF 8 - CHANNEL DVR WITH CCTV 13 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
.level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


(5ft) from the finished floor level

(7) Any change to this design must be approved


COURTYARD by a registered Electrical Engineer .
TOI/BATH
(8) The design Engineer assumes no

SD F BATH responsibility for works not supervised by him


or his authorised agent.
KITCHEN SD F
Location
BEDROOM 2 BEDROOM 1

SD F
SD F ZONE 3
F LOUNGE
CLOSET
STORE ZONE 1
LOBBY job title PROJECT
ZONE 2
SD F
TOI/BATH

ANTEROOM
SD F
SD F
TOI/BATH SD F client

SD F MASTER
BEDROOM

SD F
LIVING ROOM Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
Bedroom 3
Drawn by: ENGR. E. A NYIEKAA (mnse, mnieee, mnim)
TOI.
Checked by:

TERRACE Drawing title


FIRE ALARM CIRCUITS

FIRE ALARM CIRCUITS ON THE GROUND FLOOR FIRE ALARM CIRCUITS ON THE PENT HOUSE

scale
sheet no. NTS

dimension
14 date
MAY, 2019

08082259483, 08164521557
notes
(1) Installation is to be done according to the
design and conformity to the rules in the latest
edition of the IEE wiring regulations.

(2) All cable used must be quality Nigerian made


cables fully concealed in 20mm UPVC pipes with
appropriate accessories.

(3) The entire installation is to be earthed


consistent with good practice.The resistance
must be less than 1ohm .

(4) 13A socket outlets should be installed


between 0.25m and 0.75m from finished floor
SD F SD F SD F .level

(5) All switchs should be installed between


0.75m and 1.15m and 1.0m to 1.15m. for counter
ZONE 1 kitchen cabinet from the finished floor level.

(6) Wall brackets should be installed at 1.5m


SD F SD F SD F SD F SD F (5ft) from the finished floor level

(7) Any change to this design must be approved


by a registered Electrical Engineer .
ZONE 2 END OF LINE RESISTOR (8) The design Engineer assumes no
SD F SD F SD F responsibility for works not supervised by him
or his authorised agent.

ZONE 3 Location

SPARE
ZONE 4
2.5MM SQR.SINGLE CORE PVC COPPER
INSULATED CABLE.
job title PROJECT

1 2 3 4 4-ZONE FIRE ALARM PANEL

client

SD F SMOKE DETECTOR SENSOR.


Design : ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

Drawn by:
CHARGER FIRE ALARM SWITCH BREAK GLASS TYPE (GENY OR CARTRE). ENGR. E. A NYIEKAA (mnse, mnieee, mnim)

RECTIFIER 24VOLTS DC Checked by:


BATTERY

FIRE ALARM BELL Drawing title


FIRE ALARM LOAD DISTRIBUTION CIRCUITS

F
FIRE ALARM INDICATOR CONTROL PANEL 4-ZONE
13ASS0
A/C SUPPLY

scale
sheet no. NTS

dimension
15 date
MAY, 2019

08082259483, 08164521557