Professional Documents
Culture Documents
First Article Inspection Demo
First Article Inspection Demo
Add to Cart
e .
id
w
ld
or
FIRST ARTICLE INSPECTION
w
ed
rv
se
Origination Date: XXXX
re
s
ht
Document
Identifier:
rig
First Article Inspection
ll
.A
Document
lti
Abstract:
This document describes the process for first article inspection.
©
ht
ig
yr
op
C
REVISION LOG
e .
Issue Date Comment Author
id
w
0-0
ld
or
w
ed
rv
se
DOCUMENT CHANGE RECORD
re
s
Issue Item Reason for Change
ht
rig
ll
.A
LC
,L
es
lti
ia
ec
Sp
F
Jn
©
ht
ig
yr
op
C
TABLE OF CONTENTS
e .
1.0 Scope........................................................................................................................................................... 4
id
w
2.0 Requirements .............................................................................................................................................. 4
ld
2.1 Manufactured Items .....................................................................................................................................................................4
or
2.2 Evaluations ..................................................................................................................................................................................4
w
2.3 Partial or Complete First Article Inspection ................................................................................................................................5
ed
2.4 Nonconformities ..........................................................................................................................................................................5
2.5 Records ........................................................................................................................................................................................5
rv
Guidelines to Complete the First Article Inspection Forms ................................................................................... 6
se
Instructions to Complete Form 1 ...............................................................................................................................................................6
re
Instructions to Complete Form 2 ...............................................................................................................................................................6
s
Instructions to Complete Form 3 ...............................................................................................................................................................6
ht
First Article Inspection Forms ................................................................................................................................ 6
rig
ll
.A
LC
,L
es
lti
ia
ec
Sp
F
Jn
©
ht
ig
yr
op
C
1.0 Scope
Establish requirements for performing and documenting First Article Inspection.
e .
id
2.0 Requirements
w
ld
2.1 Manufactured Items
or
The Company shall perform First Article Inspection (FAI) on items that represent the
w
production process; that is, products that have been manufactured by R&D processes using lab-
ed
scale production equipment do not represent a production process. Items that represent the
rv
production process have been through several design reviews that help to catch
se
manufacturability problems at the paper design stage. An item ready for production normally
re
has:
s
1.
ht
2.
3.
rig
ll
.A
4.
LC
2.2 Evaluations
lti
The Company should prepare the following Configuration Definition Data Package to ensure
ia
requirements:
Sp
F
Jn
©
ht
ig
yr
op
C
.
authorized configuration updates, i.e,
e
id
w
ld
or
w
A complete or partial first article inspection shall be performed as directed by the Customer or
ed
when a change or finding affects one or more of the following items, or production has been
rv
suspended for two years:
se
re
s
ht
rig
ll
.A
LC
,L
es
lti
ia
ec
Sp
F
Jn
2.4 Nonconformities
©
All nonconformities and corrective actions must be closed prior to performance of a first article
ht
2.5 Records
C
Each design requirement shall be identified, verified and recorded on report forms.
Continuation sheets may be used if the form is completed electronically. Design requirements
that are identified as "Reference" are
This document expires 30 days after printing unless marked "Released".
PROPRIETARY INFORMATION Form Rev: Orig
Date Printed:
First Article Inspection
Your Company Name
CAGE: xxxxx Rev: Orig
.
assembly or production process verifications should be recorded on the assembly report form.
e
id
Units of measure that are specified on each design requirement shall
w
If a design
ld
requirement is a visual or mechanical "go or no-go" requirement or acceptance is verified using
or
approved tooling
w
ed
Guidelines to Complete the First Article Inspection Forms
rv
se
Instructions to Complete Form 1
re
Complete this form following its format to record results for individual items, subassemblies
s
and assemblies – all fields must
ht
Instructions to Complete Form 2 rig
ll
Complete this form following its format to record results for design requirements relating to
.A
Complete this form following its format to record results for specification and engineering
blueprint notes with reference to their location in the requirement document and designation
lti
ia
If you desire to register your QMS, you will need to purchase the SAE sponsored AS9102
©
document to prove to your Registrar that you understand the requirements. Please visit the SAE
website to purchase the FAI standard: http://standards.sae.org/as9102/
ht
ig
yr
op
Add to Cart
C