Professional Documents
Culture Documents
A P P L I C AT I O N O F D M A I C A N D D M A D V O N
RESIDENTIAL PROJECT
Six sigma and Lean six sigma are some of the Quality
Management concepts that have been successfully used by
manufacturing firms. Explain DMAIC and DMADV and
how will you introduce the concept in construction of typical
large-scale residential construction? SUBMITTED BY
2 . A P P L I C AT I O N O F D M A I C I N F L O O R T I L I N G
ACTIVITY OF RESIDENTIAL BUILDING
3 . A P P L I C AT I O N O F D M D AV I N A F F O R D A B L E
HOUSING
4. CONCLUSION
Methodologies
There are various methodologies which are
used as a part of Six Sigma implementation in
various industries, based on the mode of
application like in Design and Manufacturing,
Designing New processes, Improving Existing
Cross-functional processes, Software
development and Improving cross-functional
processes. These are used for either Defect
reduction or Cycle time reduction.
DMADV-(Define-Measure-Analyze-Design-Validate) method
aims to redesign a problematic process or product. DMADV
methodology is implemented for inventing and innovating a
completely new product, service, or processes, or for inventing
and innovating major new features of existing products,
services, or processes.
1. It can individually be implemented in repetitive items of work, for example, prefabricated units/items for construction –
civil construction work (door windows), internal finishing (Tile work, plastering), fixture installation works, Services
installation, E.g.: HVAC ducting, piping installation, firefighting services, plumbing and electrical fixtures in large scale
projects, etc. Where each type of work is handled by its specific contractor/executor which they have expertise in.
2. It can be implemented if the construction process is streamlined and standardized. But the Construction industry is full of
design innovation and creativity, therefore have a standardized process of construction is difficult to achieve.
3. Management support can be one of the key factors for successful Six Sigma implementation in any organization.
One of the case examples is Bechtel Corporation (American engineering, procurement, construction, and project management
company) has deployed and implemented Six Sigma with 30million$ investment and made 200million$ savings until 2002
(Eckhouse, 2003). Six Sigma has been used as an identifier and preventer of defects in construction projects starting from
design to handover phases by Bechtel Project Teams (Kwak and Anbari, 2006).
For the purpose of identifying the defects in the floor tiling activity in the residential building a Checklist with 30 quality
parameters has been made using information from CPWD Specs- Vol 1, IS 13630,IS 13712, IS 15622
QUALITY MANAGEMENT SYSTEMS
MEASURE -- SAMPLE CHECK LIST FOR TILING WORK
(Source: CPWD Specs- Vol 1, IS 13630,IS 13712, IS 15622, Literature e review, Tile suppliers, Tile workers)
Skirting are at right angles with the corner and are Yes No Yes No No No
11
in level.
Yes No Yes No No No
23 No protuberence in the tile
After site inspection ,the collected data is filled in the checklist for all the rooms in the selected case studies. Those rooms which
satisfy the quality standards are marked “Yes” and which do not satisfy the requirements are marked “No”.
The number of “No” will tell us the defects and the total no of checks will give us the opportunities.
TOTAL 82 1620
Figure : Defects identified from the case Figure : Defects identified from the case
study in Bar chart form. study in pie chart form.
18.29% 2 20.00%
2 1 1
0 0.00%
Frequency Cummulative %
From this graph, we can see that the initial 7 defects have 80% of impact in the tile quality issue ,so the priority should
be to address these at first. This helps in the selection of problems and initiating the improvement.
QUALITY MANAGEMENT SYSTEMS
IMPROVE –CORRECTIVE ACTION
This step
The twois most
to know how used
widely can the
Sixproblem be solved using are
Sigma methodologies alternatives
DMAIC and derived in the Both
DMADV. analysis phase. The
methods defects that
are designed sowere addressed
a business
in the Pareto
process chart
will be morewere then put
efficient andupeffective.
for a brain storming
While both ofsession
these to identify the improvement
methodologies share some and controlcharacteristics,
important measures for 80%theyof
the defects. From the pareto chart, 7 defects mainly affect the quality. Therefore, corrective actions are provided to overcome the defect
are not interchangeable and were developed for use in differing business processes.
DMAIC
S.N (an acronym for Define, Measure,
DEFECTS CAUSES Analyze, Improve and Control) refers to a data-driven CORRECTIVE improvement
ACTION cycle used for
improving, optimizing andexpansion
Inadequate stabilizing business
or control processes
joints, Cutting & poorand designs. The DMAIC improvement cycle is the core tool used to
handling,
Cracks in
flooring/skirting driveExcessive
Damage by other trade after laying if unprotected, Six Sigma projects.
Proper sub surface preparation, controlling gaps and bubbles in underlying
1
DMADV (Define-Measure-Analyze-Design-Validate)
external vibration, Direct impact
method aims to redesign a problematic process or product. The approach
adhesive bed, Laying tiles even surface and rigid surfaces, Proper protection,
Direct impact, Damage by other trade after laying in unprotected, By filling the chipped portion by epoxy or adhesive and painting over to
initially
Chippedfollows
tiles the
Poor first three
cutting stepsknocks
& handling, of DMAIC and then
on the edges deviates
or corners of tiles inmatch
the last two-steps
the color by introducing
of tile,Proper Design/Redesign
protection, Using proper tools, by fillingand
the
2 Validate steps that to gain
are notthe
laidimprovements
flat, needed. This approach prevents chipped areaproblems from
with nail paint withhappening
same color of through
tiles quality and
robust
Dry joints or bad Joint not properly cleaned & filled, Tiled surface design concepts.
not properly Select suitable grouting materials, Joint should be properly filled, Tiled
3 pointing cleaned after tiling, Poor quality of grouts used. surface to be properly cleaned after setting time
Inadequate provision of expansion or control joints, Incompatible
Adhesion Failure tile & bedding material, Concrete or cement/sand screed not Allow sufficient curing, Proper surface preparation, Clean back of tiles
4 properly cured & drying shrinkage cracks occur after tiling before installation
Tiles have dimensional defects, Varied tile thickness, Incorrect Ensure tiles are even and level using sprit level, Ensure tiles are uniformly
Uneven
bedding thickness, Insufficient leveling of each individual tile or in tapped onto place, also by using proper tools and selecting tiles of correct
surface/Lippage
5 sufficient tapping of the tiles into position thickness
Repair buckled tiles using good quality adhesives, not using old or dusty
Buckled Tiles lack of expansion joint, uneven subfloor, moisture absorption by tiles, If it is buckled over a large area, then entire tiles need to be replaced
6 tiles, using poor quality adhesive or improper cleaning, with same design
Confirm soaking does not lead to crazing before installation, To prevent
crazing on tile, apply proper glaze effect on the tile surface, It is a
Crazing on tiles
Due to variation in firing temperature, also due to continuous manufacturing defect and should be cautious ,these tiles should be rejected or
7 movement of wall or substrate. do not use those tiles
Main root cause problems in tile installations identified through the research are as follows: Cracked Tile, Not Enough
Expansion and Contraction, Improper Adhesive, Lack of Cleaning and Workmanship, Applying the wrong grout,
Installing Tile Over Poorly Prepared Subfloor.
To cover these the corrective measures like the tiles should be soaked thoroughly, using expansion joints in tiles to avoid
tiles cracking, If there is a major size variation in tiles, then get replace the whole tiles box from the supplier, to avoid
changes in the color of the tile through covering leak in the shower, to damaged corner joints, leaking taps etc
4. Bottom line impact – Six Sigma is a process control technique. By ensuring that the process is under control, the
product can never be defective. Rejection or rework saved is straight away added to the bottom line in terms of profit to
the builder.
5. Sigma impact – The sigma level has been increased from 3.14 after the measures are adopted.The higher the sigma
level, the better the process is performing and the lower the probability that a defect will occur.
• Calculate
sigma level
for existing
unit based on
DPMO
ISSUES IDENTIFICATION :
• Small sizes of rooms
• Finishing is not completed
• Finishing work quality issues
• No water and power supply for nearly 1 year after completion
• Unfinished Landscaping
OBJECTIVE PARAMETERS
Adequacy : Carpet area and daylight & ventilation. & Durability : Quality related to walls, slab and door windows
QUALITY MANAGEMENT SYSTEMS
DEFINE
ADEQUACY DURABILITY
SETTheEVALUATION
two most widelyCRITERIA
used Six Sigma
(Based methodologies
on NBC) are DMAIC and DMADV. Both methods are designed so a business
process
1. Carpet willarea:
be more efficienttoand
compliance effective.
minimum While
space both of these
requirements in methodologies share some
the National Building Code important characteristics,
of India-2005, Part 3, they
clause 12.2. are not interchangeable and were developed for use in differing business processes.
2.DMAIC (an acronym
Daylighting and for Define, Measure,
ventilation: Analyze,
compliance Improve and
to minimum Control) refers
requirements to a data-driven
of fenestration improvement
area for daylightingcycle
andused for
improving, optimizing
ventilation and stabilizing
in the National Buildingbusiness
Code of processes
India 2005,and
Partdesigns.
3, clauseThe
15. DMAIC improvement cycle is the core tool used to
3. Walls: Existence of physical defects including seepage,drive Sixcracking
Sigma projects.
or spalling of plaster, efflorescence etc.
DMADV
4. Slabs: (Define-Measure-Analyze-Design-Validate) methodspalling
Existence of physical defects including seepage, aims toofredesign a problematicetc.
plaster, efflorescence process
. or product. The approach
5.initially
Doorsfollows the first three
and windows: stepsand
alignment of DMAIC
gaps. and then deviates in the last two-steps by introducing Design/Redesign and
Validate steps to gain the improvements needed. This approach prevents problems from happening through quality and
Location
robust design concepts.
Standards for area (NBS part 3) Daylighting & ventilation
Minimum Area(Sq.M,) Minimum Width (m) (NBS part 3)
Flat 1- Cracks in plaster, misaligned window in bedroom, misaligned door in bath, Seepage on walls & slab.
Flat 2- Foul smell in toilet, Misaligned door in WC, .
Flat 3- Plaster cracks, seepage/cracks on bath ceiling slab, misaligned door in bedroom
Flat 4- Seepage on WC ceiling slab, Cracks in plaster, misaligned door in bedroom and bath
Flat 5- Spalling of plaster on multiple walls, cracks in plaster near joints, multiple misaligned doors and windows.
DPMO =
(No of defects x 10 00 000) DPMO = 226666.67 DEFECT RATE = 22.67%
------------------------------------------ SIGMA LEVEL = 2.25 YIELD = 77.33%
(No of defect opportunities)
Carpet area of all spaces lower Window area lesser than NBC Cracks, seepage, Spalling Seepage Misaligned Door
than NBC specifications specifications causing low of plaster etc. windows
causing ergonomically poor daylight and natural
spaces ventilation
DPMO =
(No of defects x 10 00 000) DPMO = 60000 DEFECT RATE = 6.00%
------------------------------------------ SIGMA LEVEL = 3.05 YIELD = 94.00%
(No of defect opportunities)
3. Outside of a manufacturing operation, Six Sigma often fails to yield the kind of results needed to justify such a time-
consuming and expensive management change. To function effectively, Six Sigma requires buy-in from everyone involved.
It requires a sizable upfront cost to implement and train employees on the methodology of Six Sigma and its execution.
Although today there are limitations and barriers to the implementation of six sigma in the construction sector, six sigma as a
tool holds great potential in improving the overall quality. From the project management perspective, this system needs to be
adopted as fast as possible so that the benefits can be reaped as early as possible.
The construction industry needs to change its attitude toward quality work and measuring in order to improve its quality.
Full support by the top management is a key factor of success in the implementation of Six Sigma. The top management must
fully support the implementation and have a clear goal of what they want to get out of it.
The UCL or upper control limit and LCL or lower control limit are limits set by
your process based on the actual amount of variation of your process.
The USL or upper specification limit and LSL or lower specification limit are
limits set by your customers requirements. This is the variation that they will
accept from your process.