SRTN (Shortest Remaning Time Next)

Arrive Time Proccess Duration Order after T=5


1 A 5 E-C-B-D
4 B 7
3 C 3
2 D 10
5 E 2

T 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
A
B
C
D
E

Running Ready

Arrive Start Finish


Process Duration Response Time Wait Time
Time Time Time
A 1 5 1 6 6-1=5 5–5=0

B 4 7 11 18 18 – 4 = 14 14 – 7 = 7

C 3 3 8 11 11 – 3 = 8 8–3=5

D 2 10 18 28 28 – 2 = 26 26 – 10 = 16

E 5 2 6 8 8–5=3 3–2=1
5 + 14 + 8 + 26 + 3 0 + 7 + 5 + 16 + 1
= 11.2 = 5.8
5 5