You are on page 1of 4

HEADLINE

_______________________________ = _____

_______________________________ = _____

(TOTAL) = _____
SLUG
PRINTER’S DIRECTION

during the wste and Wter sumit held Friday on, environment under

secretary Carlos David reported that only 74 millionfilipinos have access

to piped and clean

water.

depart ment of enviraonment and NATtural Resourcesss (dENr)

Sec.retary Ma. Antonia Yulo-Loyzaga said on Saturday that’s

cooperation and science-informed decision-making are neeeded

to adddress the lakck of accc ess to pota ble water in d ‘country’.

He also NOTED that 3.8 million Filipinos still practice open defecation, or

defecating inopenspaces, including of bodies water.

“We need COOPERATION now and science-informed decision-

making, and we are the cost ASSESSING. The P250 bill lion mentioned

yest erday is just an esti mate,” Yulo-Loyzaga said over a DZRH interview.

MR. MELVIN C. FEDERIS


Resource Speaker, Copyreading & Headline Writing
“Now, the Lgus and the national gover nment must have a meeeting, and

we need to ass ess the costs.

Different situations will

different require investments. Cooperation is needed.),” she added.

Moreover, Yulo-Loyzaga stre ssed that LGUs and bar gays must

under stand that “surface water tapping,” for now, is better than digging

the ground to water collect.

“There are places in Phili ppines the were the ground-based water is

really running out.),” she said.

MR. MELVIN C. FEDERIS


Resource Speaker, Copyreading & Headline Writing
HEADLINE

_______________________________ = _____

_______________________________ = _____

(TOTAL) = _____
SLUG
PRINTER’S DIRECTION

Sini mulan na kasi ngay ong araw, January 26, ang nito ope rasyon

na magtatagal ng 180 na araw

o anim na buwan

NAGLABAS ng abiso ang department of Transportation (DOTr)

kaugnay sa NORTH Edsa carousel busway stride PROJECT

Apektado riyan ang FOOTBRIDGE na nagdudugtong sa Cyber West

at SM North EDSA sa Quezon City.

Ibig sabihin, ito ay naka takdang gibain kaya hindi na ito pwedeng m

adaan ng mga tao

“We wish to inform the public of the termination of access to the

footbridge crossing West Avenue/Paramount, as the demolition of the

MR. MELVIN C. FEDERIS


Resource Speaker, Copyreading & Headline Writing
existing footbridge is set to begin on 26 January 2024 (Friday),” anunsyo

ng DOTr sa isang Facebook post. Dahil diyan ay pinayuhan nila

ang publiko na dumaan na muna sa footbridge ng Metropolitan Manila

Development Authority (MMDA) bilang alternatibo.

Para sa kaalaman ng marami, ang nabanggit na proyekto ay isang

karagdagang Busway Station kung saan magkakaroon na ng iba’t-ibang

access katulad ng elevators at escalators.

As an alternative, kenemerut you may use the existing MMDA

pedestrian footbridge connected to the Skygarden (near Starbucks), sey

ng ahenysa.

Ayon sa kanila, asahan ang pagbabago sa ruta ng traffiko dahil

magkakaroon din ng pagsasara ng lane.

“Expect traffic rerouting on some days should be there lane closures.

The completion on this project will provide better service and convenience

to all,” wika sa caption.

MR. MELVIN C. FEDERIS


Resource Speaker, Copyreading & Headline Writing

You might also like