You are on page 1of 4

N

.1
.3
0P
P
N.

H
3
0O

N.
N
.3

O
B
30
0N

P
N

N.
3
0O
N
.3
0 M
M

N.

N. 3
30

N.
K K

30
0L

N
L
Sondir
N.30L

N.30M
1
N.30JJ
N.30K

N.30II
N.30J

N.30HH
N.30I

N.30GG
N.30H

N.30FF

N.30G

N.30EE N.30F

N.30DD N.30E

Sondir
N.30CC N.30D

ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
N.30C CAIULU UNIPESSOAL, LDA
N.30BB
0B

DESIGN CONSULTANT TO PREPARE


.3
N

PRELIMINARY SITE SURVEY,


A
30

FEASIBILITY STUDY, PRELIMINARY


W
N.

N.30AA DESIGN AND TENDER DOCUMENTS FOR


NE

THE CONSTRUCTION OF NEW


30

N.31
N.

150KV/20KV SUBSTATION AT TIBAR, DILI


N.30NEW

N.30

N.29

ROUTEMAP
N.30DD N.30E

N.30CC N.30D

Sondir
3

N.30C
N.30BB

Sondir
4
B0
.3
.2

A
N

30 ELECTRICIDADE DE TIMOR-LESTE,
H

W
N.
EMPRESA PUBLICA (EDTL,E.P.)
N.30AA

NE
B

PT. AMYTHAS IN JOINT VENTURE WITH

30
PT. HEXA INTEGRA ELECTRICA AND
N.31 CAIULU UNIPESSOAL, LDA

N.
N.30NEW

N.30

N.29
DESIGN CONSULTANT TO PREPARE
PRELIMINARY SITE SURVEY,

Sondir
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW

5
150KV/20KV SUBSTATION AT TIBAR, DILI

ROUTEMAP
N.30II
N.30J

N.30HH
N.30I

N.30GG
N.30H

N.30FF

N.30G

N.30EE N.30F ELECTRICIDADE DE TIMOR-LESTE,


EMPRESA PUBLICA (EDTL,E.P.)

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
DESIGN AND TENDER DOCUMENTS FOR
THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

ROUTEMAP

N.30DD N.30E
N
.3
0P
P
N.
30

N.
OO
N

.1
.3

30
0N

P
N

H
N.
30
B O
N
.3
0M
M

N.

N.3
30

N.
KK
Sondir

3
0

0N
LL
2 N.30L Sondir

N.30M
1
N.30JJ
N.30K

N.30II
N.30J
ELECTRICIDADE DE TIMOR-LESTE,
EMPRESA PUBLICA (EDTL,E.P.)

PT. AMYTHAS IN JOINT VENTURE WITH


PT. HEXA INTEGRA ELECTRICA AND
CAIULU UNIPESSOAL, LDA

DESIGN CONSULTANT TO PREPARE


PRELIMINARY SITE SURVEY,
FEASIBILITY STUDY, PRELIMINARY
N.30HH DESIGN AND TENDER DOCUMENTS FOR
N.30I THE CONSTRUCTION OF NEW
150KV/20KV SUBSTATION AT TIBAR, DILI

ROUTEMAP

You might also like