COVER
10mm Ø 150 C/C
B SLAB (M20)
B MAIN STEEL
8mm Ø 200 C/C
1400 1200 DISTRIBUTION STEEL
100mm Ø PIPE
100
100mm Ø PIPE @ 5m C/C
4880 550 550 4880 550 550 4880 E
SLOP
100 mm Ø PIPE @ 5m C/C 100 mm Ø PIPE @ 5m C/C 100 mm Ø PIPE @ 5m C/C
500
1000 1000
NOTES:
1. ALL DIMENSION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. DIMENSIONS SHALL NOT BE SCALE ONLY WRITTEN DIMENSION
100mm Ø PIPE
1300 SHOULD BE FOLLOWED.
TOTAL DRAIN WIDTH 3. CLEAR COVER TO ALL REINFORCEMENT BARS INCLUDING STIRRUP
REINFORCEMENT REINFORCEMENT
STEEL STEEL SHALL BE AS FOLLOWS:
RCC SLAB RCC SLAB
SIDE WALL -30MM
1000 1000 BOTTOM SLAB -30MM, SLAB COVER -30MM
100 FINISHED
4. REINFORCING STEEL SHALL BE OF HYSD (TMT) BARS OF FE-500,
12.3 12.3
100 CONFIRMING TO IS 1786.
500
500
2190 500 2190 CUTOUT FOR WATER COLLECTION OF MAIN ROAD IN ALTERNATE BIG COVER 2190 500 2190 5. GRADE OF CONCRETE AS SHOWN IN SECTIONS.
5000 6. IF ANY AMBIGUITY FOUND IN DRAWINGS ARE AT SITE BRING TO
TYPICAL RCC SLAB PLAN 100mm Ø PIPE @ 5m C/C 100mm Ø PIPE @ 5m C/C 7.
DESIGNERS NOTICE BEFORE EXECUTION.
LAPPING OF REINFORCEMENT SHOULD BE AS PER PROVISION OF
TYPICAL ELEVATION 8.
IRC-12:2011.
THE INTERNAL FRICTION OF SOIL ANGLE IS MORE THAN 30° AND
DENSITY IS MORE THEN 18KN/CUM AS PER MORTH
DESIGNED DRAWN CHECKED APPROVED DATE LEGEND: SCALE: CLIENT: CONSULTANT: CONTRACTOR: PROJECT:
Proposed CL DEVELOPMENT OF ROAD
BY BY BY BY 0 25 50 75 100m AATVIK
16-01-2024 Carriageway
Proposed
Horizontal 1:2000 MADHYA PRADESH CONSULTANCY
DIAMOND INFRA
CONSTRUCTIONS
FROM AMAR FACTORY TO
URBAN & PRIVATE LIMITED JAIL ROAD AT KHURAI (M.P.)
REVISION DATE DESCRIPTION REVISED BY Median DEVELOPMENT INFRASTRUCTURE
0 2.5 5.0 7.5 10m
CHENNAI
NO. R0 04-01-2024 TEMPLATES AS PER IRC -09 & ALIGNMENT PM Shoulder