EARTHQUAKE ENGINEERING

Technical Report #4

Submitted to:
Engr. Jose E. Elfa Jr.

Submitted by:
Jaruda, Czarmie G.
Ordinario, Jesery B.
Peremne, Beatrix Rose A.
BUILDING

PERSPECTIVE
1 SCALE: 1:50 m.

PREPARED BY: INSTRUCTOR: REMARKS: SHEET


RUFFA MAE C. SINDOL ENGR. JUNLEX B. TUBILID
PROJECT TITLE: SUBJECT: SCORE: 1
PROPOSED TWO-STOREY RESIDENTIAL BUILDING CE A81 - BUILDING DESIGN I
LOCATION: LOT 19, BLOCK 12, LADISLAWA VILLAGE,
N DAVAO CITY
16.00 m W89°N
GATE PROPERTY LINE

~ 2.01 m
11.00 m
SERVICE ENTRY

PROPERTY LINE
THE SITE

.
ST
EL

WALK
UR
O

6 PROPOSED
CUDA

LA

TWO-STOREY

14.00 m
P.
J.

5 27 RESIDENTIAL

ENTRY
TO DA
TO

28

21.57 m N
26 BUILDING

PROPERTY LINE
25 29
24

24.00 m N1°E
11
23
22 13 30
21
11 14 15 16 17 31
18 19 20 WA
ISLA
NG

12 BUILDING
10 LAD AGE 32
NA

VILL
13
8 33
GARAGE
LA

9
3 34
TO

7 6
35
TO BUHANGIN

5 4
9 36
3 2 37
10 1 14 38
57 39 ~ 2.10 m 7.00 m 4.00 m ~ 3.05 m
56 55
53
54 51
52 40
49 48 LAWN
50

DRIVEWAY
NE
RTY LI
PROPE D
ROA

VICINITY MAP SITE DEVELOPMENT PLAN


2 NOT DRAWN TO SCALE 3 SCALE: 1:150 m.

PREPARED BY: INSTRUCTOR: REMARKS: SHEET


RUFFA MAE C. SINDOL ENGR. JUNLEX B. TUBILID
PROJECT TITLE: SUBJECT: SCORE: 2
PROPOSED TWO-STOREY RESIDENTIAL BUILDING CE A81 - BUILDING DESIGN I
FRONT ELEVATION LEFT ELEVATION
4 SCALE: 1:70 m.
6 SCALE: 1:70 m.

BUILDING

REAR ELEVATION RIGHT ELEVATION


5 7 SCALE: 1:70 m.
SCALE: 1:70 m.

PREPARED BY: INSTRUCTOR: REMARKS: SHEET


RUFFA MAE C. SINDOL ENGR. JUNLEX B. TUBILID
PROJECT TITLE: SUBJECT: SCORE: 3
PROPOSED TWO-STOREY RESIDENTIAL BUILDING CE A81 - BUILDING DESIGN I
2.5 m 2.5 m 5.0 m 4.0 m

SHELVES COMBINED KITCHEN SERVICE STORAGE


BEDROOM

2.0 m
& DINING AREA ENTRY
ROOM
DRIVER'S NOOK T&B

3.5 m
ROOM LANAI BEDROOM

STUDY
SEC. FLOOR 1.0 m

2.0 m
ARC

ROOM open T&B LAUNDRY RAILINGS


ARC
ARC
2.0 m

T&B OPEN OPEN


LINE

RAILINGS
MAID'S
BELOW ROOM BELOW open T&B

3.5 m
FAMILY

3.0 m

ARC

ARC
HALL
T&B T&B open

cabinet
up BUILDING down
open

TOOL'S STORAGE DRESSER


ARC
LIVING
ROOM
MASTER
RECREATIONAL

4.0 m
4.0 m
BEDROOM
ROOM BEDROOM
2.0 m

PORCH
BALCONY
GARAGE

5.0 m 4.0 m 5.0 m 5.0 m 4.0 m 5.0 m

9 FIRST FLOOR PLAN 10 SECOND FLOOR PLAN


SCALE: 1:90 m. SCALE: 1:90 m.

PREPARED BY: INSTRUCTOR: REMARKS: SHEET


RUFFA MAE C. SINDOL ENGR. JUNLEX B. TUBILID
PROJECT TITLE: SUBJECT: SCORE: 4
PROPOSED TWO-STOREY RESIDENTIAL BUILDING CE A81 - BUILDING DESIGN I
A B C D

3.5 m
2 3.5 m

BUILDING

3
4.0 m

5.0 m 4.0 m 5.0 m

11 FOUNDATION PLAN
SCALE: 1:70 m.

PREPARED BY: INSTRUCTOR: REMARKS: SHEET


RUFFA MAE C. SINDOL ENGR. JUNLEX B. TUBILID
PROJECT TITLE: SUBJECT: SCORE: 5
PROPOSED TWO-STOREY RESIDENTIAL BUILDING CE A81 - BUILDING DESIGN I
A B c D
A B c D

1
1 1

2 2
2 2

3 3
3 3

4 4
4 4

A B C D
A B C D

14
2ND FLOOR FRAMING BEAM FRAMING PLAN 15
R O O F B E A M F R A M I N G P L A N
SCALE 1:100M SCALE 1:100M

7
GRIDLINE 1 BEAM CD

ROOF   3.5  
2

3 −   
BEAM AB WDL =  2.65(3.5)    5  
 
 3   2 
  
 3.5  
2

 3 −     
WDL =  2.65(3.5)    5   WDL = 3.88 kN/m
 
 3  2 
 2.65(1) 
   
  WDL =  2 
WDL = 3.88 kN/m WDL = 1.33 kN/m
 2.65(1)  WDL = 5.21 kN/m
 
WDL =  2    3.5  
2

 3 −   
WDL = 1.33 kN/m WLL =  2.9(3.5)    5  
 
WDL = 5.21 kN/m  3  2 
 
  3.5  
2
 
3 −   
WLL =  2.9(3.5)    5   WLL = 4.25 kN/m
 
 3  2   2.9(1) 
  WLL =  
   3 
WLL = 4.25 kN/m
 2.9(1) 
WLL = 1.45 kN/m
WLL =   WLL = 5.70 kN/m
 3  Wu = 1.2 ( 5.21 + 2.36 ) + 1.6 (5.70)
Wu = 18.20 kN/m
WLL = 1.45 kN/m
WLL = 5.70 kN/m 2ND FLOOR
Wu = 1.2 ( 5.21 + 2.36 ) + 1.6 (5.70)
Wu = 18.20 kN/m
BEAM AB
BEAM BC


WDL =   3.5  
2
 3.5  
2
3 −   
WDL = 3 − 
 2.65(3.5)  
 
 4    4.57(3.5)    5  
   
 3   2   3  2 
   
   
WDL = 6.69 kN/m
WDL = 3.45 kN/m
 2.65(1)    3.5  
2

  3 −   
WDL =  2 
WLL =  6.7(3.5)    5  
 
WDL = 1.33 kN/m  3   2 
 
WDL = 4.78 kN/m  
  3.5  
2 WLL = 9.81 kN/m
3 −   
 2.9(3.5)  
Wu = 1.2 ( 6.69+2.36+9.9+4.51) + 1.6 (9.81)
 4  
WLL =   Wu = 55.26 kN/m
 3  2 
 
 
WLL = 3.78 kN/m
 2.9(1) 
WLL =  
 3 
WLL = 1.45 kN/m
WLL = 5.70 kN/m
Wu = 1.2 ( 4.78 + 2.36 ) + 1.6 (5.70)
Wu = 17.69 kN/m
GRIDLINE 2 2ND FLOOR
BEAM AB
ROOF
BEAM AB   3.5  
2

3 −   
WDL =  4.57(3.5)    5  
2 
  3 .5     
2
3 2
3−    
WDL =  2 . 65 (3 . 5 )    5  
2   
 3  2 
  WDL = 13.38 kN/m
 
  3.5  
2

3 −   
WDL = 7.76 kN/m  2.9(3.5)    5  
2 
 WLL =   
 3.5   3 2
2

 3 −     
 2.9(3.5)    5    
2 
WLL =  3  2  WLL = 19.61 kN/m
 
  Wu = 1.2 ( 13.38 + 2.36 ) + 1.6 (19.61)
WLL = 8.49 kN/m Wu = 61.66 kN/m
Wu = 1.2 ( 7.76 + 2.36 ) + 1.6 (8.49)
Wu = 25.73 kN/m BEAM BC

BEAM BC   3.5  
2

3 −   
 4.57(3.5)    4  
 2 
 3.5  
2
WDL =  3   2 
3 −   
 2.65(3.5)    4    
WDL = 2   
 3  2 
  WDL = 11.91 kN/m
 
WDL = 6.91 kN/m   3.5  
2

3 −   
 6.7(3.5)    4  
 2 
 3.5  
2
WLL =  3  2 
3 −   
 2.9(3.5)    4   



2 
WLL =  3   2 
  WLL = 17.47kN/m
  Wu = 1.2 ( 11.91 + 2.36) + 1.6 (17.47)
WLL = 7.56 kN/m Wu = 56.48 kN/m
Wu = 1.2 ( 6.91 + 2.3) + 1.6 (7.56)
Wu = 24.71 kN/m BEAM CD

BEAM CD   3.5  
2

 3 −   
WDL =  4.57(3.5)    5  
2 
  3.5 
2
  3  2 
3 −     
WDL =  2.65(3.5)    5    
2 
 3  2 
  WDL = 13.38 kN/m
 
  3.5  
2

 3 −   
WDL = 7.76 kN/m  2.9(3.5)    5  
2 
  3.5  
2
WLL =  3  2 
3 −     
 2.9(3.5)    5    
2 
WLL =  3   2 
  WLL = 19.61 kN/m
  Wu = 1.2 ( 13.38 + 2.36 ) + 1.6 (19.61)
Wu = 61.66 kN/m
WLL = 8.49 kN/m
Wu = 1.2 ( 7.76 + 2.36 ) + 1.6 (8.49)
Wu = 25.73 kN/m
BEAM BC

  3.5  
2

3 −   
WDL =  4.57(3.5)    4  
 
 3  2 
 
 
WDL = 5.96 kN/m
  3.5  
2

3 −   
WLL =  6.7(3.5)    4  
 
 3  2 
 
 
WLL = 8.31 kN/m
Wu = 1.2 (5.96+2.36 +9.9+4.51) + 1.6 (9.81)
Wu = 40.57 kN/m

BEAM CD

  3.5  
2

3 −   
WDL =  4.57(3.5)    5  
 
 3   2 
 
 
WDL = 6.69 kN/m
  3.5  
2

3 −   
WLL =  6.7(3.5)    5  
 
 3   2 
 
 
WLL = 9.81 kN/m
Wu = 1.2 ( 6.69+2.36+9.9) + 1.6 (9.81)
Wu = 38.44 kN/m
GRIDLINE 3 BEAM BC

ROOF   3.5  
2

3 −   
BEAM AB WDL =  2.65(3.5)    4  
 
 3  2 
  
 3.5  
2

3 −     
WDL =  2.65(3.5)    5  
 
 3  2  WDL = 3.45 kN/m
 
    3.5  
2

3 −   
WDL = 3.88 kN/m WDL =  2.65(4 )    5  
 2
  
  
 4.5  3 2
3 −     
WDL =  2.65(4 )    5    
 3   2  WDL = 3.94 kN/m
  WDL = 7.39 kN/m
 
WDL = 4.17 kN/m   3.5  
2

3 −   
WDL = 8.05 kN/m WLL =  2.9(3.5)    4  
 
    
 3.5  
2 3 2
3 −     
WLL =  2.9(3.5)    5    
 
 3   2  WLL = 4.25 kN/m
   2.9(4 ) 
   5 
WLL =
WLL = 4.25 kN/m
 4 
2

3 −    WLL = 3.87 kN/m


 2.9(4 )  
WLL =
5  WLL = 8.12 kN/m
 5   2  Wu = 1.2 ( 7.39 + 2.36 ) + 1.6 (8.12)
  Wu = 24.69 kN/m
 
WLL = 4.56 kN/m BEAM CD
WLL = 8.81 kN/m
Wu = 1.2 ( 8.05 + 2.36 ) + 1.6 (8.81)   3.5  
2
Wu = 26.59 kN/m 3 −   
WDL =  2.65(3.5)    5  
 
 3  2 
 
 
WDL = 3.88 kN/m
  4.5  
2

3 −   
WDL =  2.65(4 )    5  
 3   2 
 
 
WDL = 4.17 kN/m
WDL = 8.05 kN/m
  3.5  
2

3 −   
WLL =  2.9(3.5)    5  
 
 3   2 
 
 
WLL = 4.25 kN/m
 4 
2

3 −   
 2.9(4 )  
WLL =
5 
 5   2 
 
 
WLL = 4.56 kN/m
WLL = 8.81 kN/m
Wu = 1.2 ( 8.05 + 2.36 ) + 1.6 (8.81)
Wu = 26.59 kN/m
2ND FLOOR BEAM BC
BEAM AB
  3.5  
2

3 −   
   4.57(3.5)  
2
 3.5  WDL =  4  
3 −     
WDL =  4.57(3.5)    5    3  2 
   
 3  2   
 
  WDL = 5.96 kN/m
WDL = 6.9 kN/m   3.5  
2

3 −   
 4 
WDL =  4.57(4 )  
2

−  5  
 3      
WDL =  2.65(4 )   5  3 2 
 3   2   
 
 
  WDL = 6.09 kN/m
WDL = 7.19kN/m WDL = 12.05 kN/m
WDL = 13.88 kN/m   3.5  
2

3 −   
  3.5  
2 WLL =  6.7(3.5)    4  
3 −     
WLL =  6.7(3.5)    5    3  2 
   
 3   2   
  WLL = 8.73 kN/m
 
WLL = 9.81 kN/m   4 2 
 3  
 4 
2 WLL =  6.7(4 )    4  
3 −     5   2 
 6.7(4 )  
WLL =
5   
 5   2   
  WLL = 12.8 kN/m
  WLL = 21.52 kN/m
WLL = 10.54 kN/m Wu = 1.2 ( 12.05 + 2.36+9.51 ) + 1.6 (21.52)
WLL = 20.35 kN/m Wu = 63.14 kN/m
Wu = 1.2 ( 13.88 + 2.36+9.9 ) + 1.6 (20.35)
Wu = 63.93 kN/m
BEAM CD

  3.5  
2

3 −   
WDL =  4.57(3.5)    5  
 
 3  2 
 
 
WDL = 6.69 kN/m
 4 
2

3 −   
WDL =  4.57(4 )   5 
 3   2 
 
 
WDL = 7.19 kN/m
WDL = 13.88 kN/m
  3.5  
2

3 −   
WLL =  6.7(3.5)    5  
 
 3   2 
 
 
WLL = 9.81 kN/m
 4 
2

3 −   
 6.7(4 )  
WLL =
5 
 5   2 
 
 
WLL = 10.54 kN/m
WLL = 20.35 kN/m
Wu = 1.2 ( 13.88+2.36+9.51) + 1.6 (20.35)
Wu = 63.46 kN/m
GRIDLINE 4 BEAM CD

ROOF  4 
2

3 −   
BEAM AB WDL =  2.65(4 )   5 
 
 3  2 
  
4 
2

 3 −     
WDL =  2.65(4 )   5 
  WDL = 4.17 kN/m
 3   2 
   2.65(1) 
  WDL =  
WDL = 4.17 kN/m  2 
WDL = 1.33 kN/m
 2.65(1) 
WDL =   WDL = 5.5 kN/m
 2   4 
2

3 −   
WDL = 1.33 kN/m WLL =  2.9(4 )   5 
WDL = 5.5 kN/m  
 3   2 
  
4 
2

 3 −     
WLL =  2.9(4 )   5  WLL = 4.56 kN/m
 
 3 

2 
  2.9(1) 
  WLL =  
 3 
WLL = 4.56 kN/m
 2.9(1)  WLL = 1.45 kN/m
WLL =   WLL = 6.01 kN/m
 3  Wu = 1.2 ( 5.5 + 2.36 ) + 1.6(6.01)
Wu = 19.05 kN/m
WLL = 1.45 kN/m
WLL = 6.01 kN/m
Wu = 1.2 ( 5.5 + 2.36 ) + 1.6(6.01)
Wu = 19.05 kN/m

BEAM BC

 2.65(4 ) 
WDL =  
 3 
WDL = 3.53 kN/m
 2.65(1) 
WDL =  
 2 
WDL = 1.33 kN/m
WDL = 4.86 kN/m

 2.9(4 ) 
WLL =  
 3 
WLL = 3.87 kN/m
 2.9(1) 
WLL =  
 3 
WLL = 1.45 kN/m
WLL = 5.32 kN/m
Wu = 1.2 ( 4.86 + 2.36 ) + 1.6(5.32)
Wu = 17.18 kN/m
2ND FLOOR
BEAM AB

 4 
2

 3 −   
WDL =  4.52(4 )   5 
 
 3  2 
 
 
WDL = 7.19 kN/m
 4 
2

 3 −   
WLL =  6.7(4 )   5 
 
 3  2 
 
 
WLL = 10.54 kN/m
Wu = 1.2 (7.19 + 2.36 + 0.18) + 1.6 (10.54)
Wu = 28.54 kN/m

BEAM BC

 4.52(4 ) 
WDL =  
 3 
WDL = 6.09 kN/m

 6.7(4 ) 
WLL =  
 3 
WLL = 8.93 kN/m
Wu = 1.2 (6.09+ 2.36 + 9.9 + 1.6 (8.93)
Wu = 36.31 kN/m

BEAM AB

 4 
2

 3 −   
WDL =  4.52(4 )   5 
 
 3  2 
 
 
WDL = 7.19 kN/m
 4 
2

 3 −   
WLL =  6.7(4 )   5 
 
 3  2 
 
 
WLL = 10.54 kN/m
Wu = 1.2 (7.19 + 2.36 + 9.9) + 1.6 (10.54)
Wu = 40.20 kN/m
GRIDLINE A 2ND FLOOR
BEAM 1-2
ROOF
BEAM 1-2 4.57(3.5)
WDL =
2.65(3.5) 3
WDL = WDL = 5.33 kN/m
3 6.7(3.5)
WDL = 3.09 kN/m WLL =
3
2.9(3.5)
WLL = WLL = 7.82 kN/m
3 Wu = 1.2 (5.33+2.36+9.9+1.51) + 1.6 (7.82)
Wu = 35.43 kN/m
WLL = 3.83 kN/m
Wu = 1.2 (3.09+2.36+2.36) + 1.6 (3.83)
Wu = 15.5 kN/m BEAM 2-3

BEAM 2-3 4.57(3.5)


WDL =
2.65(3.5) 3
WDL = WDL = 5.33 kN/m
3 6.7(3.5)
WDL = 3.09 kN/m WLL =
3
2.9(3.5)
WLL = WLL = 7.82 kN/m
3 Wu = 1.2 (5.33+2.36+9.9) + 1.6 (7.82)
Wu = 33.62 kN/m
WLL = 3.83 kN/m
Wu = 1.2 (3.09+2.36+2.36) + 1.6 (3.83)
Wu = 15.5 kN/m BEAM 3-4

BEAM 3-4 4.57( 4)


WDL =
3
2.65( 4)
WDL = WDL = 6.09 kN/m
3 6.7( 4)
WDL = 3.53 kN/m WLL =
3
2.9( 4)
WLL = WLL = 8.93 kN/m
3 Wu = 1.2 (6.09+2.36+9.9+0.18) + 1.6 (8.93)
Wu = 36.52 kN/m
WLL = 3.87 kN/m
Wu = 1.2 (3.53+2.36+2.36) + 1.6 (3.87)
Wu = 16.09 kN/m
GRIDLINE B 2ND FLOOR
BEAM 1-2
ROOF
BEAM 1-2
WDL =
4.57(3.5)
(2)
3
WDL =
2.65(3.5)
(2) WDL = 10.66 kN/m
3
WDL = 6.18 kN/m WLL =
6.7(3.5)
(2 )
3
WLL =
2.9(3.5)
(2 ) WLL = 15.64 kN/m
3 Wu = 1.2 (10.66+2.36+9.9) + 1.6 (15.64)
Wu = 59.71 kN/m
WLL = 6.77 kN/m
Wu = 1.2 (6.18+2.36) + 1.6 (6.77)
Wu = 10.25 kN/m BEAM 2-3

BEAM 2-3
WDL =
4.57(3.5)
(2)
3
WDL =
2.65(3.5)
(2) WDL = 10.66 kN/m
3
WDL = 6.18 kN/m WLL =
6.7(3.5)
(2 )
3
WLL =
2.9(3.5)
(2 ) WLL = 15.71 kN/m
3 Wu = 1.2 (10.66+2.36+9.9) + 1.6 (15.64)
Wu = 59.71 kN/m
WLL = 6.77 kN/m
Wu = 1.2 (6.18+2.36) + 1.6 (6.77)
Wu = 21.08 kN/m BEAM 3-4

BEAM 3-4
WDL =
4.57( 4)
(2)
3
WDL =
2.65( 4)
(2) WDL = 12.19 kN/m
3
WDL = 7.07 kN/m WLL =
6.7( 4)
(2 )
3
WLL =
2.9( 4)
(2 ) WLL = 17.87 kN/m
3 Wu = 1.2 (12.19+2.36+9.9) + 1.6 (17.87)
Wu = 57.93 kN/m
WLL = 7.73 kN/m
Wu = 1.2 (7.07+2.36) + 1.6 (7.73)
Wu = 23.68 kN/m
GRIDLINE C 2ND FLOOR
BEAM 1-2
ROOF
BEAM 1-2
WDL =
4.57(3.5)
(2)
3
WDL =
2.65(3.5)
(2) WDL = 10.66 kN/m
3
WDL = 6.18 kN/m WLL =
6.7(3.5)
(2 )
3
WLL =
2.9(3.5)
(2 ) WLL = 15.64 kN/m
3 Wu = 1.2 (10.66+2.36+9.51) + 1.6 (15.64)
Wu = 52.43 kN/m
WLL = 6.77 kN/m
Wu = 1.2 (6.18+2.36) + 1.6 (6.77)
Wu = 10.25 kN/m BEAM 2-3

BEAM 2-3
WDL =
4.57(3.5)
(2)
3
WDL =
2.65(3.5)
(2) WDL = 10.66 kN/m
3
WDL = 6.18 kN/m WLL =
6.7(3.5)
(2 )
3
WLL =
2.9(3.5)
(2 ) WLL = 15.71 kN/m
3 Wu = 1.2 (10.66+2.36+9.51) + 1.6 (15.64)
Wu = 52.43 kN/m
WLL = 6.77 kN/m
Wu = 1.2 (6.18+2.36) + 1.6 (6.77)
Wu = 21.08 kN/m BEAM 3-4

BEAM 3-4
WDL =
4.57( 4)
(2)
3
WDL =
2.65( 4)
(2) WDL = 12.19 kN/m
3
WDL = 7.07 kN/m WLL =
6.7( 4)
(2 )
3
WLL =
2.9( 4)
(2 ) WLL = 17.87 kN/m
3 Wu = 1.2 (12.19+2.36+9.9) + 1.6 (17.87)
Wu = 57.93 kN/m
WLL = 7.73 kN/m
Wu = 1.2 (7.07+2.36) + 1.6 (7.73)
Wu = 23.68 kN/m
GRIDLINE D 2ND FLOOR
BEAM 1-2
ROOF
BEAM 1-2 4.57(3.5)
WDL =
2.65(3.5) 3
WDL = WDL = 5.33 kN/m
3 6.7(3.5)
WDL = 3.09 kN/m WLL =
3
2.9(3.5)
WLL = WLL = 7.82 kN/m
3 Wu = 1.2 (5.33+2.36+9.9+1.51) + 1.6 (7.82)
Wu = 35.43 kN/m
WLL = 3.83 kN/m
1(3.5) BEAM 2-3
WRL =
3
WRL = 1.17 kN/m
Wu = 1.2(3.09+2.36+2.36)+1.6(3.83)+0.5(1.17)
4.57(3.5)
WDL =
Wu = 15.37 kN/m 3
WDL = 5.33 kN/m
BEAM 2-3
6.7(3.5)
WLL =
2.65(3.5) 3
WDL = WLL = 7.82 kN/m
3 Wu = 1.2 (5.33+2.36+9.9+1.51)+1.6 (7.82)
WDL = 3.09 kN/m Wu = 35.43 kN/m
2.9(3.5)
WLL = BEAM 3-4
3
WLL = 3.83 kN/m
4.57( 4)
1(3.5) WDL =
WRL = 3
3 WDL = 6.09 kN/m
WRL = 1.17 kN/m
Wu = 1.2(3.09+2.36+2.36)+1.6(3.83)+0.5(1.17) 6.7( 4)
Wu = 15.37 kN/m WLL =
3
BEAM 3-4 WLL = 8.93 kN/m
Wu = 1.2 (6.09+2.36+9.9+1.51 + 1.6 (8.93)
Wu = 38.12 kN/m
2.65( 4)
WDL =
3
WDL = 3.53 kN/m
2.9( 4)
WLL =
3
WLL = 3.87 kN/m
1( 4)
WRL =
3
WRL = 1.33 kN/m
Wu = 1.2(3.53+2.36+2.36)+1.6(3.87)+0.5(1.33)
Wu = 16.76 kN/m
SEISMIC LOAD PARAMETERS:

Seismic Zone Factor, z: 04


Seismic Source Type: B (Central Davao Fault System)
Soil Site Class: SD
Distance to nearest known active fault: 6.4 Km
Seismic importance Factor, I: I=1.0 (Standard Occupancy Structure)
Acceleration-dependent near-source factor, (Na): Na=1.0
Velocity-dependent near-source factor, (Nv): Nv=1.44
Acceleration-dependent seismic coefficient, (Ca): Ca=0.44Na
Ca=0.44(1.0)
Ca=0.44
Velocity-dependent seismic coefficient, (Cv): Cv=0.64Nv
Cv=0.64(1.44)
Cv=0.9216
Structure Period (T); T=Ct (hn)3/4
Ct=0.0731(Reinforced concrete moment
resisting frames)
T=0.0731(7)3/4
T=0.3142
T<0.7; Therefore Ft=0
Response Modification Factor, R: R=8.5 (C. Moment-resisting frame system
special reinforced concrete shear walls)
GRIDLINE 1 GRIDLINE 3 GRIDLINE A

Design Base Shear Design Base Shear Design Base Shear


CvI CvI CvI
V= w V= w V= w
RT RT RT
V=
(0.9216)(1.0)
(883.54) V=
(0.9216)(1.0)
(1261.37) V=
(0.9216)(1.0)
(548.62)
8.5(0.3142) 8.5(0.3142) 8.5(0.3142)
V = 304.89kN V = 435.27kN V = 189.32kN

Maximum Base Shear Maximum Base Shear Maximum Base Shear


2.5CaI 2.5CaI 2.5CaI
Vmax = w Vmax = w Vmax = w
R R R
Vmax =
2.5(0.44)(1.0)
(883.54) Vmax =
2.5(0.44)(1.0)
(1261.37) Vmax =
2.5(0.44)(1.0)
(548.62)
8.5 8.5 8.5
Vmax = 114.34kN Vmax = 163.24kN Vmax = 71kN

Minimum Base Shear Minimum Base Shear Minimum Base Shear


Vmin = 0.11CaIw Vmin = 0.11CaIw Vmin = 0.11CaIw
Vmin = 0.11(0.44)(1.0)(883.54) Vmin = 0.11(0.44)(1.0)(1261.37) Vmin = 0.11(0.44)(1.0)(548.62)
Vmin = 42.76kN Vmin = 61.05kN Vmin = 26.55kN

Therefore use V=114.34 Therefore use V=163.24 Therefore use V=71kN


No Tf since T<0.7 No Tf since T<0.7 No Tf since T<0.7

GRIDLINE 2 GRIDLINE 4 GRIDLINE B

Design Base Shear Design Base Shear Design Base Shear


CvI CvI CvI
V= w V= w V= w
RT RT RT
V=
(0.9216)(1.0)
(1198.66) V=
(0.9216)(1.0)
(748.16) V=
(0.9216)(1.0)
(854.07)
8.5(0.3142) 8.5(0.3142) 8.5(0.3142)
V = 413.63kN V = 238.17kN V = 294.74kN

Maximum Base Shear Maximum Base Shear Maximum Base Shear


2.5CaI 2.5CaI 2.5CaI
Vmax = w Vmax = w Vmax = w
R R R
Vmax =
2.5(0.44)(1.0)
(1198.66) Vmax =
2.5(0.44)(1.0)
(748.16) Vmax =
2.5(0.44)(1.0)
(854.07)
8.5 8.5 8.5
Vmax = 155.12kN Vmax = 96.82kN Vmax = 110.53kN

Minimum Base Shear Minimum Base Shear Minimum Base Shear


Vmin = 0.11CaIw Vmin = 0.11CaIw Vmin = 0.11CaIw
Vmin = 0.11(0.44)(1.0)(1198.66) Vmin = 0.11(0.44)(1.0)(748.16) Vmin = 0.11(0.44)(1.0)(854.07 )
Vmin = 58.02kN Vmin = 36.21kN Vmin = 41.34kN

Therefore use V=155.12 Therefore use V=96.82 Therefore use V=110.53


No Tf since T<0.7 No Tf since T<0.7 No Tf since T<0.7
GRIDLINE C

Design Base Shear


CvI
V= w
RT
V=
(0.9216)(1.0)
(667.92)
8.5(0.3142)
V = 230.48kN

Maximum Base Shear


2.5CaI
Vmax = w
R
Vmax =
2.5(0.44)(1.0)
(667.92)
8.5
Vmax = 86.44kN

Minimum Base Shear


Vmin = 0.11CaIw
Vmin = 0.11(0.44)(1.0)(667.92)
Vmin = 32.33kN

Therefore use V=86.44kN


No Tf since T<0.7

GRIDLINE D

Design Base Shear


CvI
V= w
RT
V=
(0.9216)(1.0)
(557.12)
8.5(0.3142)
V = 192.25kN

Maximum Base Shear


2.5CaI
Vmax = w
R
Vmax =
2.5(0.44)(1.0)
(557.12)
8.5
Vmax = 72.10kN

Minimum Base Shear


Vmin = 0.11CaIw
Vmin = 0.11(0.44)(1.0)(557.12)
Vmin = 26.96kN

Therefore use V=72.10


No Tf since T<0.7
GRIDLINE 1

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 252.76 1769.32 0.4449 114.34 50.87
2NDFLOOR 3.5 3.5 630.78 2207.73 0.5551 114.34 63.47
 7 3977.05 114.34

GRIDLINE 2

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 356.14 2492.98 0.4581 155.12 71.06
2NDFLOOR 3.5 3.5 842.52 2948.82 0.5419 155.12 84.06
 7 5441.8 155.12

GRIDLINE 3

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT Wihi   Wihi 
 
ROOF 3.5 7 371.86 2603.02 0.4554 163.24 74.34
2NDFLOOR 3.5 3.5 889.51 3183.29 0.5446 163.24 88.90
 7 5716.32 163.24

GRIDLINE 4

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 259.22 1814.54 0.5146 96.82 49.82
2NDFLOOR 3.5 3.5 488.94 1711.29 0.4854 96.82 47
 7 35250.83 96.82

GRIDLINE A

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 172.86 1210.02 0.4792 71 34.02
2NDFLOOR 3.5 3.5 375.76 1315.16 0.5208 71 36.98
 7 2525.18 71
GRIDLINE B

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 204.38 1430.66 0.3866 110.53 42.73
2NDFLOOR 3.5 3.5 648.69 2270.42 0.6134 110.53 67.80
 7 3701.08 110.53

GRIDLINE C

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT
Wihi   Wihi 
 
ROOF 3.5 7 242.28 1695.96 0.5324 86.44 46.02
2NDFLOOR 3.5 3.5 425.64 1489.74 0.4676 86.44 40.42
 7 3185.7 86.44

GRIDLINE D

FLOOR h hx STOREY Wxhx Wxhx V (kN)  Wxhx 


V  = F (kN )
LEVEL (m) (m) WEIGHT Wihi   Wihi 
 
ROOF 3.5 7 174.63 1222.41. 0.4658 72.10 33.58
2NDFLOOR 3.5 3.5 400.49 1401.72 0.5342 72.10 38.52
 7 2624.13 72.1
Column Shear: JOINT F: JOINT J:
ROOF: M= 16.96kN×1.75m M= 16.96kN×1.75m
50.87=6V M= 25.44kN-m M= 25.94 kN-m
V=8.48 kN M= 38.22kN×1.75m M=8.48kN×1.75m
2V=16.96 kN M= 66.84 kN-m
M= 14.84kN-m
2ND FLOOR: M=14.84kN-m +33.44kN-m
114.34=6V M=25.44kN-m -14.84kN-m
V=19.11kN M= 48.28 kN-m M= 10.6kN-m
2V=38.22 kN M=(25.44kN-m+66.89kN-m)-48.28kN-m
M= 44.05 kN-m JOINT K:
JOINT A: M= 16.96kN×1.75m
M= 19.11kN×1.75m JOINT G: M= 25.94 kN-m
M= 33.44 kN-m M= 16.96kN×1.75m M=25.44kN-m-14.84kN-m
M= 25.44kN-m
M= 10.6kN-m
JOINT B: M= 38.22kN×1.75m
M= 66.84 kN-m M=25.44kN-m -25.44kN-m
M= 38.22kN×1.75m
M= 14.84kN-m
M= 66.89 kN-m M==(25.44kN-m+66.89kN-m)-48.28kN-m
M= 44.05 kN-m JOINT L:
JOINT C: M=(25.44kN-m+66.89kN-m)-44.05kN-m M= 8.48kN×1.75m
M= 38.22kN×1.75m
M= 48.28 kN-m M= 14.84kN-m
M= 66.89kN-m
M= 8.48kN×1.75m
JOINT H: M= 14.84kN-m
JOINT D:
M= 8.48kN×1.75m
M= 19.11kN×1.75m
M= 14.84kN-m BEAM SHEAR:
M= 33.44kN×1.75m
M=19.11kN×1.75m ROOF:
M= 66.89 kN-m V= (14.84×2) ÷4
JOINT E:
M= 8.48kN×1.75m M=14.84kN-m +66.89kN-m V=5.94kN
M= 14.84kN-m M= 48.28 kN-m V= (10.6×2) ÷4
M=19.11kN×1.75m V=5.3kN
M= 33.44 kN-m JOINT I: V= (14.84×2) ÷5
M=14.84kN-m +33.44kN-m M= 8.48kN×1.75m V=5.94kN
M= 14.84kN-m 2ND FLOOR:
M= 48.28 kN-m
M= 8.48kN×1.75m V= (48.28×2) ÷5
M= 14.84kN-m V=19.31kN
V= (44.05×2) ÷4
V=22.03kN
V= (48.28×2) ÷5
V=19.31kN
GRIDLINE 1

50.87 kN I J K L

1.7500

1.7500

63.47kN E F H 7.0000

1.7500

1.7500

A B C D
5.0000 4.0000 5.0000

SHEAR DIAGRAM (GIRDER)

5.94 kN 5.3 kN 5.94 kN

19.31kN 19.31 kN
22.03 kN

MOMENT DIAGRAM (GIRDER)


14.84 kN-m
14.84 kN-m 10.6 kN-m

48.28 kN-m 44.05 kN-m 48.28 kN-m

SHEAR DIAGRAM (COLUMN)

8.48 kN 16.96 kN 16.96kN 8.48 kN

19.11 kN 19.11 kN
36.22 kN
36.22 kN

MOMENT DIAGRAM (COLUMN)


25.44 kN-m 25.44 kN-m 14.84 kN-m
14.84 kN-m

66.89 kN-m 66.89 kNm 33.44 kN-m


33.44 kN-m
GRIDLINE 2

Column Shear: JOINT F: JOINT J:


ROOF: M= 23.68kN×1.75m M= 23.68kN×1.75m
71.06=6V M= 41.44kN-m M= 41.44kN-m
V=11.84 kN M= 51.7kN×1.75m M= 8.29kN×1.75m
2V=23.68kN M= 90.48kN-m
M= 20.74kN-m
2ND FLOOR: M=20.72kN-m +45.24kN-m
155.12=6V M= 41.44kN-m -20.74kN-m
V=25.85kN M= 65.96 kN-m M= 20.72kN-m
2V=51.7 kN M=(25.44kN-m+66.89kN-m)-48.28kN-m
M= 44.05 kN-m JOINT K:
JOINT A: M= 23.68kN×1.75m
M= 25.85kN×1.75m JOINT G: M= 41.44 kN-m
M= 45.24 kN-m M= 16.96kN×1.75m M=41.44kn-m-20.72kn-m
M= 25.44kN-m
M= 20.72kN-m
JOINT B: M= 38.22kN×1.75m
M= 66.84 kN-m M=41.44kn-m-20.72kn-m
M= 51.7kN×1.75m
M= 20.72kN-m
M= 90.48 kN-m M=14.84kN-m +33.44kN-m
M= 48.22 kN-m JOINT L:
JOINT C:
M=(41.44kN-m+90.48kN-m)-65.96kN-m M= 8.48kN×1.75m
M= 51.7kN×1.75m
M= 65.96 kN-m M= 14.84kN-m
M= 90.48 kN-m
M= 8.48kN×1.75m
JOINT D: JOINT H: M= 14.84kN-m
M= 25.85kN×1.75m M= 11.84kN×1.75m
M= 45.24 kN-m M= 20.72kN-m BEAM SHEAR:
M=25.87kN×1.75m ROOF:
JOINT E: M= 45.24 kN-m V= (20.72×2) ÷5
M= 11.48kN×1.75m M=20.72kN-m +45.24kN-m V=8.29kN
M= 20.72kN-m M= 65.96 kN-m V= (20.72×2) ÷4
M= 25.85kN×1.75m V=10.36kN
M= 45.24kN-m JOINT I: V= (20.72×2) ÷5
M=20.72kN-m +45.24kN-m V=80.29kN
M= 8.48kN×1.75m 2ND FLOOR:
M= 48.28 kN-m M= 14.84kN-m V= (65.96×2) ÷5
M= 8.48kN×1.75m V=26.38kN
M= 14.84kN-m V= (65.96×2) ÷4
V=32.98kN
V= (65.96×2) ÷5
V=26.38kN
GRIDLINE 2

71.06 kN I J K L

1.7500

1.7500

84.06kN E F H 7.0000

1.7500

1.7500

A B C D
5.0000 4.0000 5.0000

SHEAR DIAGRAM (GIRDER)

8.29 kN 5.94 kN
10.36 kN

26.38kN 26.38 kN
32.08 kN

MOMENT DIAGRAM (GIRDER)


14.84 kN-m
20.72 kN-m 20.72 kN-m

45.24 kN-m 44.05 kN-m 48.28 kN-m

SHEAR DIAGRAM (COLUMN)

11.84 kN 23.66 kN 23.66 kN 11.84 kN

25.85 kN 25.85 kN
51.7 kN
51.7kN

MOMENT DIAGRAM (COLUMN)


25.44 kN-m 25.44 kN-m 14.84 kN-m
20.72 kN-m

66.89 kN-m 66.89 kNm 33.44 kN-m


33.44 kN-m
Column Shear: JOINT F: JOINT J:
ROOF: M= 24.78kN×1.75m M= 24.78kN×1.75m
74.34=6V M= 43.37kN-m M= 43.37kN-m
V=12.39 kN M= 54.42kN×1.75m M=12.39kN×1.75m
2V=24.78kN M= 95.24 kN-m
2ND FLOOR: M= 21.68kN-m
163.24=6V M=21.68kN-m +47.62kN-m M= 43.37kN-m -21.69kN-m
V=27.21kN M= 69.3 kN-m M= 21.69kN-m
2V=54.42 kN M=(45.37kN-m+95.24kN-m)-69.3kN-m
M= 69.3 kN-m JOINT K:
JOINT A: M= 24.78kN×1.75m
M= 27.21kN×1.75m JOINT G: M= 43.37kN-m
M= 47.62 kN-m M= 24.78kN×1.75m M=43.37kN-m -21.69kN-m
M= 43.37kN-m
JOINT B: M= 21.69kN-m
M= 54.42kN×1.75m
M= 54.42kN×1.75m M=12.39kN×1.75m
M= 95.42 kN-m
M= 95.24 kN-m M= 21.68kN-m
M=(45.37kN-m+95.24kN-m)-69.3kN-m
JOINT C: M= 69.31 kN-m JOINT L:
M=54.42kN×1.75m M=(45.37kN-m+95.24kN-m)-69.31kN-m M=12.39kN×1.75m
M= 95.42 kN-m M= 69.3 kN-m M= 21.68kN-m
M= 43.37kN-m -21.69kN-m
JOINT D: JOINT H: M= 21.69kN-m
M= 27.21kN×1.75m M= 12.39kN×1.75m
M= 47.62 kN-m M= 21.68kN-m BEAM SHEAR:
M=27.21kN×1.75m ROOF:
JOINT E:
M= 47.62 kN-m V= (21.68×2) ÷5
M= 12.39kN×1.75m V=8.67kN
M=(45.37kN-m+95.24kN-m)-69.31kN-m
M= 21.68kN-m V= (21.68×2) ÷4
M= 27.21kN×1.75m M= 69.3 kN-m
V=10.85kN
M= 47.62 kN-m V= (21.68×2) ÷5
JOINT I:
M=21.68kN-m +47.62kN-m V=8.67kN
M= 12.39kN×1.75m 2ND FLOOR:
M= 69.3 kN-m M= 21.68kN-m V= (69.3×2) ÷5
M= 12.39kN×1.75m V=22.72kN
M= 21.68kN-m V= (69.31×2) ÷4
V=34.66kN
V= (69.3×2) ÷5
V=22.72kN
GRIDLINE 3

71.34 kN I J K L

1.7500

1.7500

88.90 kN E F H 7.0000

1.7500

1.7500

A B C D
5.0000 4.0000 5.0000

SHEAR DIAGRAM (GIRDER)

8.67 kN 8.67 kN
10.85kN

22.72 kN 27.72 kN
34.66 kN

MOMENT DIAGRAM (GIRDER)


21.68 kN-m
21.68 kN-m 21.69 kN-m

69.3 kN-m 69.31 kN-m 69.3 kN-m

SHEAR DIAGRAM (COLUMN)

12.39 kN 24.78 kN 24.78 kN 12.39 kN

27.21 kN 27.21 kN
54.42 kN
54.42 kN

MOMENT DIAGRAM (COLUMN)


43.37 kN-m 43.37 kN-m 21.68 kN-m
21.68 kN-m

95.24 kN-m 95.24 kNm 47.62 kN-m


47.60 kN-m
GRIDLINE 4

Column Shear: JOINT F: JOINT J:


ROOF: M= 16.6kN×1.75m M=16.6kN×1.75m
49.82=6V M= 29.05kN-m M= 29.05kN-m
V=47 kN M= 32.28kN×1.75m M=8.30kN×1.75m
2V=16.68kN M= 56.49kN-m
2ND FLOOR: M= 14.53kN-m
96.82=6V M=14.53kN-m +28.25kN-m M= 29.05kN-m -14.53kN-m
V=16.14kN M= 42.78kN-m M= 14.52kN-m
2V=32.28 kN M=(29.05kN-m+56.49kN-m)-42.78kN-m
M= 42.76 kN-m JOINT K:
JOINT A:
M= 16.6kN×1.75m
M= 16.14kN×1.75m
JOINT G: M= 29.05kN-m
M= 28.25 kN-m
M= 16.6kN×1.75m M=29.05kN-m -14.5kN-m
JOINT B: M= 29.05kN-m
M= 14.52kN-m
M= 32.28kN×1.75m M= 32.28kN×1.75m
M=29.05kN-m-14.52kN-m
M= 56.49kN-m. M= 56.49 kN-m
M= 14.53kN-m
M=(29.05kN-m+56.49kN-m)-69.3kN-m
JOINT C: M= 69.31 kN-m JOINT L:
M=32.28kN×1.75m M=(45.37kN-m+95.24kN-m)-42.76kN-m M=12.39kN×1.75m
M= 56.49kN-m M= 21.68kN-m
M= 42.78kN-m
JOINT D: M= 29.05kN-m-14.52kN-m
JOINT H: M= 14.53kN-m
M= 16.14kN×1.75m
M= 8.3kN×1.75m
M= 28.25 kN-m
M= 14.53kN-m BEAM SHEAR:
JOINT E: M=16.14kN×1.75m ROOF:
M= 28.25kN-m V= (14.53×2) ÷5
M= 8.30kN×1.75m
M=(14.53kN-m+28.25kN-m)-42.78kN-m V=5.81kN
M= 14.53kN-m V= (14.52×2) ÷4
M= 16.14kN×1.75m M= 42.78 kN-m V=7.26kN
M= 28.25 kN-m V= (14.53×2) ÷5
M=14.53kN-m +28.25kN-m JOINT I: V=85.81kN
M= 8.30kN×1.75m 2ND FLOOR:
M= 42.78 kN-m
M= 14.53kN-m V= (42.78×2) ÷5
M= 8.30kN×1.75m V=17.11kN
M= 14.53kN-m V= (42.76×2) ÷4
V= 21.38kN
V= (42.78×2) ÷5
V=17.11kN
GRIDLINE 4

49.82 kN I J K L

1.7500

1.7500

47 kN E F H 7.0000

1.7500

1.7500

A B C D
5.0000 4.0000 5.0000

SHEAR DIAGRAM (GIRDER)

5.81 kN 5.94 kN
7.26 kN

17.11kN 19.31 kN
21.38 kN

MOMENT DIAGRAM (GIRDER)


14.52 kN-m
14.52 kN-m 14.53 kN-m

42.78 kN-m 42.76 kN-m 42.78 kN-m

SHEAR DIAGRAM (COLUMN)

8.3 kN 16.6 kN 16.6 kN 8.3 kN

16.14 kN 16.14 kN
32.28 kN
32.28 kN

MOMENT DIAGRAM (COLUMN)


29.05kN-m 29.05 kN-m 14.84 kN-m
14.53 kN-m

56.49kN-m 56.49 kNm 66.89 kN-m


28.25 kN-m
Column Shear: JOINT F: JOINT J:
ROOF: M= 11.34kN×1.75m
M= 11.34kN×1.75m
34.02=6V M= 19.85kN-m
M= 19.85kN-m
V=5.67kN
M= 23.66kN×1.75m M= 5.67kN×1.75m
2V=11.34kN
2ND FLOOR: M= 41.42kN-m M= 9.92kN-m
71.67=6V M=9.92kN-m +20.70kN-m M= 19.85kN-m -9.92kN-m
V=11.83kN M= 9.93kN-m
M= 30.62kN-m
2V=23.66kN
M=(19.85kN-m+41.42kN-m)-30.67kN-m
JOINT K:
JOINT A: M= 30.67kN-m
M= 11.34kN×1.75m
M= 5.67kN×1.75m
JOINT G: M= 19.85kN-m
M= 9.92kN-m
M= 11.24kN×1.75m M= 19.85kN-m -9.92kN-m
JOINT B: M= 19.85kN-m M= 9.93kN-m
M= 23.66kN×1.75m M= 23.66kN×1.75m M= 19.85kN-m -9.93kN-m
M= 41.42kN-m M= 41.42kN-m
M= 9.92kN-m
M=(19.85kN-m+41.42kN-m)-30.6kN-m
JOINT C: JOINT L:
M= 30.67kN-m
M=23.66kN×1.75m M=5.67kN×1.75m
M= 41.42kN-m M=(19.85kN-m+41.42kN-m)-30.67kN-m
M= 9.92kN-m
M= 30.6kN-m
JOINT D: M= 19.85kN-m -9.93kN-m
M= 11.83kN×1.75m JOINT H: M= 9.92kN-m
M= 20.70kN-m M= 5.67kN×1.75m
M= 9.92kN-m GIRDER SHEAR:
JOINT E: M= 11.83kN×1.75m ROOF:
V= (9.92×2) ÷3.5
M= 5.67kN×1.75m M= 20.70kN-m
V= 5.67kN
M= 9.92kN-m M=(9.92kN-m+20.7kN-m)-30.67kN-m V= (9.93×2) ÷3.5
M= 11.83kN×1.75m M= 30.6kN-m V= 5.68kN
M= 9.92kN-m V= (9.92×2) ÷4
M=9.92kN-m +20.72kN-m JOINT I: V= 4.36kN
M= 30.62kN-m M= 5.67kN×1.75m 2ND FLOOR:
M= 9.92kN-m V= (30.62×2) ÷3.5
M= 5.67kN×1.75m V= 17.50kN
V= (30.67×2) ÷3.5
M= 9.92kN-m V=17.53kN
V= (30.6×2) ÷40
V=15.3kN
GRIDLINE A

34.02 kN

1.7500

1.7500

36.98kN 7.0000

1.7500

1.7500

3.5000 3.5000 4.0000

SHEAR DIAGRAM (GIRDER)

5.94 kN
5.94 kN 5.3 kN

22.03 kN 19.31 kN
19.31kN

MOMENT DIAGRAM (GIRDER)

9.92 kN-m 9.93 kN-m 9.92 kN-m

30.62 kN-m 30.67 kN-m 30.6 kN-m

SHEAR DIAGRAM (COLUMN)

11.34 kN
5.67 kN 11.34 kN 5.66 kN

5.11.83 kN
23.66 5.11 kN
23.66 kN

MOMENT DIAGRAM (COLUMN)


9.92 kN-m 19.85 kN-m 19.85 kN-m 9.92 kN-m

20.70 kN-m 41.42 kN-m 41.42 kN-m 20.70 kN-m


Column Shear: JOINT F: JOINT J:
ROOF: M= 14.24kN×1.75m M= 7.12kN×1.75m
42.73=6V M= 24.92kN-m M= 12.46kN-m
V=7.12kN M= 36.84kN×1.75m M= 7.12kN×1.75m
2V=14.24kN M= 64.47kN-m
2ND FLOOR: M= 12.46kN-m
110.53=6V M= 24.92kN-m +32.24kN-m M= 24.92kN-m -12.46kN-m
V=18.42kN M= 44.76kN-m M= 12.46kN-m
2V=36.84kN M=(24.92kN-m+64.47kN-m)-44.7kN-m
M= 44.69kN-m JOINT K:
JOINT A: M= 14.24kN×1.75m
M= 18.42kN×1.75m JOINT G: M= 24.92kN-m
M= 32.24kN-m M= 14.24kN×1.75m M= 24.92kN-m -12.46kN-m
M= 24.92kN-m
JOINT B: M= 12.46kN-m
M= 36.84kN×1.75m
M= 36.84kN×1.75m M= 24.92kN-m -12.46kN-m
M= 64.47kN-m
M= 64.47kN-m M= 12.46kN-m
M=(24.92kN-m+64.47kN-m)-44.7kN-m
JOINT C: M= 44.69 JOINT L:
M=36.84kN×1.75m M=(24.92kN-m+64.47kN-m)-44.69kN-m M=7.12kN×1.75m
M= 64.47kN-m M= 44.7kN-m M= 12.46kN-m
M= 24.92kN-m -12.46kN-m
JOINT D: JOINT H: M= 12.46kN-m
M= 18.42kN×1.75m M= 7.12kN×1.75m
M= 32.24kN-m M= 12.46kN-m GIRDER SHEAR:
M= 18.42N×1.75m ROOF:
JOINT E:
M= 32.24kN-m V= (12.46×2) ÷3.5
M= 7.12kN×1.75m V= 7.12kN
M=(24.92kN-m+64.47kN-m)-44.69kN-m
M= 12.46kN-m V= (12.46×2) ÷3.5
M= 7.12kN×1.75m M= 44.7kN-m
V= 7.12kN
M= 32.24kN-m V= (12.46×2) ÷4
JOINT I:
M=12.46kN-m +32.24kN-m V= 6.23kN
M= 7.12kN×1.75m 2ND FLOOR:
M= 44.7kN-m M= 12.46kN-m V= (44.7×2) ÷3.5
M= 7.12kN×1.75m V= 25.54kN
M= 12.46kN-m V= (44.7×2) ÷3.5
V=25.54kN
V= (44.7×2) ÷4
V=23.35kN
GRIDLINE B

42.73 kN

1.7500

1.7500

67.80kN 7.0000

1.7500

1.7500

3.5000 3.5000 4.0000

SHEAR DIAGRAM (GIRDER)

6.23 kN
7.12 kN 7.12 kN

25.54 kN 22.35 kN
25.24kN

MOMENT DIAGRAM (GIRDER)

12.46 kN-m 12.46 kN-m 12.46 kN-m

44.7 kN-m 44.69 kN-m 44.7 kN-m

SHEAR DIAGRAM (COLUMN)

14.24 kN
7.12 kN 14.24 kN 7.12 kN

18.42 kN
36.84 18.42 kN
36.84 kN

MOMENT DIAGRAM (COLUMN)


12.46 kN-m 12.46 kN-m 12.46 kN-m 12.46 kN-m

36.84 kN-m 64.47 kN-m 64.47 kN-m 32.24 kN-m


Column Shear: JOINT F: JOINT J:
ROOF: M= 15.34kN×1.75m M= 7.67kN×1.75m
46.02=6V M= 26.85kN-m M= 13.42kN-m
V=7.67kN M= 28.82kN×1.75m M= 7.67kN×1.75m
2V=15.34kN M= 49.39kN-m
2ND FLOOR: M= 13.42kN-m
86.44=6V M= 13.42kN-m +25.22kN-m M= 26.85kN-m -13.42kN-m
V=14.41kN M= 38.64kN-m M= 13.43kN-m
2V=28.82kN M=(26.85kN-m+49.39kN-m)-38.64kN-m
M= 37.6kN-m JOINT K:
JOINT A: M= 15.34kN×1.75m
M= 14.41kN×1.75m JOINT G: M= 26.85kN-m
M= 25.22kN-m M= 15.34kN×1.75m M= 26.85kN-m -13.42kN-m
M= 26.85kN-m
JOINT B: M= 13.43kN-m
M= 28.82kN×1.75m
M= 28.82kN×1.75m M= 26.85kN-m -13.43kN-m
M= 49.39kN-m
M= 49.39kN-m M= 13.42kN-m
M=(26.85kN-m+49.39kN-m)-38.64kN-m
JOINT C: M= 37.6kN-m JOINT L:
M=28.82kN×1.75m M=(26.85kN-m+49.39kN-m)-37.6kN-m M=7.67kN×1.75m
M= 49.39kN-m M= 38.64kN-m M= 13.42kN-m
M= 26.85kN-m -13.43kN-m
JOINT D: JOINT H: M= 13.42kN-m
M= 14.41kN×1.75m M= 7.67kN×1.75m
M= 25.22kN-m M= 13.426kN-m GIRDER SHEAR:
M= 14.41N×1.75m ROOF:
JOINT E:
M= 25.22kN-m V= (13.42×2) ÷3.5
M= 7.67kN×1.75m V= 7.67kN
M=(26.85kN-m+49.39kN-m)-37.6kN-m
M= 13.426kN-m V= (13.43×2) ÷3.5
M= 14.441kN×1.75m M= 38.64kN-m
V= 7.67kN
M= 25.22kN-m V= (13.42×2) ÷4
JOINT I:
M=25.22kN-m +13.42kN-m V= 6.71kN
M= 7.67kN×1.75m 2ND FLOOR:
M= 38.64kN-m M= 13.42kN-m V= (38.64×2) ÷3.5
M= 7.67N×1.75m V= 22.08kN
M= 13.42kN-m V= (37.6×2) ÷3.5
V=21.49kN
V= (38.64×2) ÷4
V=19.32kN
GRIDLINE A

34.02 kN

1.7500

1.7500

36.98kN 7.0000

1.7500

1.7500

3.5000 3.5000 4.0000

SHEAR DIAGRAM (GIRDER)

5.94 kN
5.94 kN 5.3 kN

22.03 kN 19.31 kN
19.31kN

MOMENT DIAGRAM (GIRDER)

9.92 kN-m 9.93 kN-m 9.92 kN-m

30.62 kN-m 30.67 kN-m 30.6 kN-m

SHEAR DIAGRAM (COLUMN)

11.34 kN
5.67 kN 11.34 kN 5.66 kN

5.11.83 kN
23.66 5.11 kN
23.66 kN

MOMENT DIAGRAM (COLUMN)


9.92 kN-m 19.85 kN-m 19.85 kN-m 9.92 kN-m

20.70 kN-m 41.42 kN-m 41.42 kN-m 20.70 kN-m


Column Shear: JOINT F: JOINT J:
ROOF: M= 11.2kN×1.75m M= 5.6kN×1.75m
33.58=6V M= 19.6kN-m M= 9.8kN-m
V=5.6kN M= 24.7kN×1.75m M= 5.6kN×1.75m
2V=11.2kN M= 43.23kN-m
2ND FLOOR: M= 9.8kN-m
72=6V M= 9.8kN-m +21.61kN-m M= 19.6kN-m -9.8kN-m
V=12.35kN M= 31.41kN-m M= 9.8kN-m
2V=24.7kN M=(43.23kN-m+9.6kN-m)-31.41kN-m
M= 31.42N-m JOINT K:
JOINT A: M= 11.2kN×1.75m
M= 12.35kN×1.75m JOINT G: M= 19.6kN-m
M= 21.61kN-m M= 11.2kN×1.75m M= 19.6kN-m -9.8kN-m
M= 19.6kN-m
JOINT B: M= 9.8kN-m
M= 24.7kN×1.75m
M= 24.7kN×1.75m M= 19.6kN-m -9.8kN-m
M= 43.23kN-m
M= 43.23kN-m M= 9.8kN-m
M=(19.6kN-m+43.23kN-m)-31.41kN-m
JOINT C: M= 31.42kN-m JOINT L:
M=24.7kN×1.75m M=(19.6kN-m+43.23kN-m)-31.42kN-m M=5.6kN×1.75m
M= 43.23kN-m M= 31.41N-m M= 9.8kN-m
M= 19.6kN-m -9.8kN-m
JOINT D: JOINT H: M= 9.8kN-m
M= 12.35kN×1.75m M= 5.6kN×1.75m
M= 21.61kN-m M= 9.8kN-m GIRDER SHEAR:
M= 12.35N×1.75m ROOF:
JOINT E:
M= 21.61kN-m V= (9.8×2) ÷3.5
M= 5.6kN×1.75m V= 5.6kN
M=(19.6kN-m+43.23kN-m)-31.42kN-m
M= 9.8kN-m V= (9.8×2) ÷3.5
M= 12.35kN×1.75m M= 31.41kN-m
V= 5.6kN
M= 21.61kN-m V= (9.8×2) ÷4
JOINT I:
M=9.8kN-m +21.61kN-m V= 4.9kN
M= 5.6kN×1.75m 2ND FLOOR:
M= 31.4kN-m M= 9.8kN-m V= (31.4×2) ÷3.5
M= 5.6N×1.75m V= 17.94kN
M= 9.8kN-m V= (31.4×2) ÷3.5
V=17.94kN
V= (31.4×2) ÷4
V=15.71kN
GRIDLINE D

35.38 kN

1.7500

1.7500

38.52 kN 7.0000

1.7500

1.7500

3.5000 3.5000 4.0000

SHEAR DIAGRAM (GIRDER)

4.9 kN
5.6 kN 5.6 kN

17.95 kN 9.8kN
19.31kN

MOMENT DIAGRAM (GIRDER)

9.8 kN-m 9.8 kN-m 9.8 kN-m

31.4 kN-m 31.42 kN-m 31.41 kN-m

SHEAR DIAGRAM (COLUMN)

11.2kN
5.6 kN 11.2 kN 5.6 kN

12.35 kN
24.7kN 12.35 kN
24.7 kN

MOMENT DIAGRAM (COLUMN)


9.8 kN-m 19.6 kN-m 19.6kN-m 9.8 kN-m

21.6 kN-m 43.23 kN-m 43.23 kN-m 21.6 kN-m